| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | C.W. Matthews Contracting Co., Inc. | $85,289,706 | Low |
| 2 | Webber-Ferrovial JV | $87,898,800 | +3.0% |
| 3 | Reeves Construction Company | $96,249,735 | +13% |
| 4 | Apac-Atlantic Inc. | $102,219,044 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. C.W. Matthews Contracting Co., Inc. | 2. Webber-Ferrovial JV | 3. Reeves Construction Company | 4. Apac-Atlantic Inc. |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $4,264,000 | $4,210,000 | $4,812,400 | $7,009,000 |
| 0020 | Mobilization - subcontractor (1031100) | LS | 1 | $293,714 | $4,210,000 | $4,760,000 | $755,000 |
| 0030 | Bonds and insurance (1032010) | LS | 1 | $641,345 | $506,450 | $2,887,400 | $450,000 |
| 0040 | Construction stakes, lines & grades (1050800) | EACH | 1 | $747,883 | $515,000 | $295,000 | $744,000 |
| 0050 | Utility staking (1052001) | LS | 1 | $30,344 | $9,360.00 | $6,500.00 | $61,000 |
| 0060 | Large public water relocation no. ____ 01 (1052110) | EACH | 1 | $3,033,160 | $5,800,000 | $3,877,423 | $2,950,000 |
| 0070 | Law enforcement officer (DPS) (1071504) | HR | 400 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0080 | CPM progress schedule (1080300) | LS | 1 | $152,318 | $55,000 | $80,000 | $96,000 |
| 0090 | Clearing & grubbing within roadway (2012000) | LS | 1 | $238,000 | $8,450,000 | $2,686,891 | $1,127,232 |
| 0100 | Removal & disposal of existing curb (2024100) | LF | 63 | $10.14 | $42.00 | $29.50 | $131.10 |
| 0110 | Removal of exist. guardrail (2027801) | LF | 286 | $2.00 | $2.00 | $2.00 | $3.60 |
| 0120 | Removal & disposal of existing bridge (2028100) | LS | 1 | $485,853 | $385,000 | $929,999 | $660,300 |
| 0130 | Unclassified excavation (2031000) | CY | 41,146 | $15.69 | $12.70 | $7.25 | $17.44 |
| 0140 | Borrow excavation (2033000) | CY | 1,279,716 | $19.22 | $20.10 | $28.25 | $24.60 |
| 0150 | Borrow pit set-UP (2033100) | LS | 1 | $5,766,585 | $1.00 | $860,000 | $1,895,000 |
| 0160 | Muck excavation (2034000) | CY | 44,830 | $19.96 | $20.00 | $42.25 | $12.44 |
| 0170 | 18" diameter pipe additional foundation work (2034518) | LF | 462 | $17.93 | $65.50 | $92.00 | $45.00 |
| 0180 | 36" diameter pipe additional foundation work (2034536) | LF | 845 | $52.36 | $116.00 | $105.00 | $149.00 |
| 0190 | Geotextile, separation (2036020) | SY | 27,202 | $5.27 | $2.20 | $6.85 | $3.68 |
| 0200 | Channel relocation (2039920) | LF | 357 | $40.96 | $47.25 | $36.25 | $45.80 |
| 0210 | Structure excavation for culverts (2041000) | CY | 1,993 | $15.41 | $110.00 | $37.25 | $31.00 |
| 0220 | Stone bridge lift material (2052010) | TON | 31,279 | $62.92 | $71.50 | $73.00 | $146.40 |
| 0230 | Granular bridge lift material (2052020) | CY | 44,830 | $117.03 | $120.00 | $53.50 | $138.50 |
| 0240 | Fine grading (2081001) | SY | 64,953 | $5.24 | $2.00 | $1.60 | $16.25 |
| 0250 | Flowable fill (2103000) | CY | 10 | $474.93 | $295.00 | $435.00 | $934.00 |
| 0260 | Dewatering system no. 01 (2991000) | LS | 1 | $112,811 | $36,000 | $14,250 | $130,000 |
| 0270 | Dewatering system no. 02 (2991000) | LS | 1 | $112,811 | $36,000 | $14,250 | $130,000 |
| 0280 | Graded aggregate base course (10" uniform) (3050110) | SY | 61,535 | $38.24 | $41.00 | $34.50 | $62.85 |
| 0290 | Prime coat (4010005) | GAL | 16,615 | $10.48 | $14.75 | $8.00 | $5.75 |
| 0300 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,174 | $633.16 | $730.00 | $630.00 | $800.00 |
| 0310 | Asphalt base course - type A (4020310) | TON | 10,769 | $131.40 | $128.00 | $109.50 | $156.00 |
| 0320 | Asphalt intermediate course type B (4030320) | TON | 6,373 | $149.20 | $136.00 | $120.00 | $174.00 |
| 0330 | Asphalt surface course type B (4040320) | TON | 6,249 | $141.14 | $148.00 | $109.25 | $182.00 |
| 0340 | Traffic control (6011000) | LS | 1 | $6,396,606 | $155,394 | $1,042,300 | $1,225,000 |
| 0350 | Barricade - type III (6041200) | LF | 84 | $50.00 | $50.00 | $27.00 | $15.50 |
| 0360 | Permanent construction signs (ground mounted) (6051120) | SF | 312 | $20.00 | $8.65 | $7.50 | $10.40 |
| 0370 | Permanent construction signs (barricade mounted) (6051125) | SF | 70 | $20.00 | $11.30 | $8.00 | $14.00 |
| 0380 | Construction zone electric changeable message sign (trailer (6062000) | EACH | 2 | $30,000 | $2,100.00 | $20,500 | $27,500 |
| 0390 | Type B - flashing light (608100B) | EACH | 16 | $300.00 | $125.00 | $125.00 | $91.00 |
| 0400 | Pavement markings (temporary paint) 24"X36" white triangle yield bar (609138A) | LF | 27 | $11.00 | $5.00 | $5.00 | $13.60 |
| 0410 | 6" white broken lines -(gaps excluded)-fast dry paint (6240007) | LF | 6,999 | $0.21 | $0.25 | $0.25 | $0.26 |
| 0420 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 201 | $0.20 | $0.25 | $0.25 | $0.25 |
| 0430 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 28,006 | $0.20 | $0.25 | $0.25 | $0.25 |
| 0440 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 241 | $2.50 | $0.25 | $0.25 | $3.09 |
| 0450 | 12" white solid lines - fast dry paint (6240020) | LF | 4,922 | $0.85 | $0.25 | $0.25 | $1.05 |
| 0460 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 465 | $5.50 | $0.25 | $0.25 | $6.80 |
| 0470 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 84 | $75.00 | $15.00 | $15.00 | $92.78 |
| 0480 | White word message "only"- fast dry paint (6240035) | EACH | 45 | $95.00 | $15.00 | $15.00 | $117.53 |
| 0490 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 8 | $225.00 | $15.00 | $15.00 | $278.35 |
| 0500 | 6"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240111) | LF | 12,251 | $0.20 | $0.25 | $0.25 | $0.25 |
| 0510 | 6" white broken lines(gaps excl.)perm.PVMT.marking (6251007) | LF | 6,999 | $0.70 | $2.50 | $2.50 | $0.87 |
| 0520 | 4" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010) | LF | 201 | $2.00 | $1.30 | $1.30 | $2.47 |
| 0530 | 6" white solid lines (PVT. edge lines) perm.PVMT.marking (6251012) | LF | 28,006 | $0.65 | $1.30 | $1.30 | $0.80 |
| 0540 | 8" white solid lines perm.PVMT.markings (6251015) | LF | 241 | $3.75 | $2.50 | $2.50 | $4.64 |
| 0550 | 12" white solid lines - perm.PVMT.markings (6251020) | LF | 4,922 | $5.00 | $2.00 | $2.00 | $6.19 |
| 0560 | 24" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025) | LF | 465 | $12.50 | $15.00 | $15.00 | $15.46 |
| 0570 | White single arrows (LT, STRGHT, RT) perm.PVMT.marking (6251030) | EACH | 84 | $130.00 | $100.00 | $100.00 | $160.82 |
| 0580 | White word message "only" - perm.PVMT.marking (6251035) | EACH | 45 | $170.00 | $100.00 | $100.00 | $210.31 |
| 0590 | White lane drop arrow(LT.or RT.)perm.PVMT.marking (6251043) | EACH | 8 | $370.00 | $200.00 | $200.00 | $457.73 |
| 0600 | 6" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251076) | LF | 12,251 | $0.75 | $1.30 | $1.30 | $0.93 |
| 0610 | 24IN X 36IN white triang. yield bar (gaps exc)thermo-125MIL (6271024) | LF | 27 | $30.00 | $15.00 | $15.00 | $37.11 |
| 0620 | 6"yellow solid lines on curb/med.-high build paint-25 mil. (6280112) | LF | 231 | $1.60 | $2.00 | $2.00 | $1.98 |
| 0630 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 135 | $5.25 | $8.50 | $8.50 | $6.49 |
| 0640 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 87 | $5.25 | $8.50 | $8.50 | $6.49 |
| 0650 | Perm.red/clear pavement markers BI-dir. - 4"X 4" (6302001) | EACH | 399 | $5.25 | $8.50 | $8.50 | $6.49 |
| 0660 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 283.63 | $38.00 | $40.00 | $38.00 | $29.90 |
| 0670 | Flat sheet, type XI, size determined by MSG, overhead (6510108) | SF | 32.50 | $38.00 | $80.00 | $38.00 | $29.90 |
| 0680 | Extruded panel signs - ground mounted extruded (6520200) | SF | 172 | $50.00 | $45.00 | $50.00 | $61.22 |
| 0690 | Extruded panel signs- mounted overhead (6520250) | SF | 4,238.25 | $68.00 | $36.00 | $68.00 | $83.27 |
| 0700 | U-section post for sign supports - 3P (6531210) | LF | 644 | $18.00 | $20.00 | $18.00 | $23.26 |
| 0710 | Break-away sign supports (6541005) | LB | 1,174.28 | $20.00 | $100.00 | $20.00 | $24.49 |
| 0720 | Delineators, single, mono., incl. supports (6562105) | EACH | 134 | $100.00 | $175.00 | $100.00 | $210.00 |
| 0730 | Delineators, double, mono., incl. supports (6562110) | EACH | 50 | $130.00 | $225.00 | $130.00 | $276.00 |
| 0740 | Overhead sign structure no.(____) 01 (6573100) | EACH | 1 | $90,000 | $110,000 | $90,000 | $110,204 |
| 0750 | Overhead sign structure no.(____) 02 (6573100) | EACH | 1 | $78,000 | $60,000 | $78,000 | $95,510 |
| 0760 | Overhead sign structure no.(____) 03 (6573100) | EACH | 1 | $530,300 | $545,600 | $530,300 | $649,347 |
| 0770 | Overhead sign structure no.(____) 04 (6573100) | EACH | 1 | $91,000 | $75,500 | $91,000 | $111,429 |
| 0780 | Overhead sign structure no.(____) 05 (6573100) | EACH | 1 | $159,000 | $159,200 | $159,000 | $194,694 |
| 0790 | Overhead sign structure no.(____) 06 (6573100) | EACH | 1 | $78,000 | $70,000 | $78,000 | $95,510 |
| 0800 | Overhead sign structure no.(____) 07 (6573100) | EACH | 1 | $90,000 | $80,000 | $90,000 | $110,204 |
| 0810 | Overhead sign structure no.(____) 08 (6573100) | EACH | 1 | $110,000 | $85,000 | $110,000 | $134,694 |
| 0820 | Overhead sign structure no.(____) 09 (6573100) | EACH | 1 | $140,000 | $161,600 | $140,000 | $171,429 |
| 0830 | Overhead sign structure no.(____) 10 (6573100) | EACH | 1 | $151,200 | $155,555 | $151,200 | $185,143 |
| 0840 | Overhead sign structure no.(____) 11 (6573100) | EACH | 1 | $319,000 | $325,000 | $319,000 | $390,612 |
| 0850 | Overhead sign structure no.(____) 12 (6573100) | EACH | 1 | $250,500 | $305,600 | $250,500 | $306,735 |
| 0860 | Overhead sign structure no.(____) 13 (6573100) | EACH | 1 | $180,000 | $160,000 | $180,000 | $220,408 |
| 0870 | Overhead sign structure no.(____) 14 (6573100) | EACH | 1 | $162,000 | $162,480 | $162,000 | $198,367 |
| 0880 | Design & installation of rdwy. lighting electrical system 01 (6581000) | EACH | 1 | $501,500 | $916,875 | $501,500 | $614,082 |
| 0890 | High mast light standard- 100'HT.(galv.steel)T.L.low.dev. (6585015) | EACH | 4 | $69,500 | $90,000 | $69,500 | $85,102 |
| 0900 | Portable drive motor for high mast lowering device (6585050) | EACH | 2 | $5,000.00 | $5,000.00 | $5,000.00 | $6,122.45 |
| 0910 | SGL.LT.STD.35'HT.AL.pole 8'SGL.arm-ground MNT.W/foundation (6653074) | EACH | 68 | $11,750 | $10,500 | $11,750 | $14,388 |
| 0920 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 160 | $15.00 | $25.00 | $15.00 | $18.37 |
| 0930 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 3,522 | $29.41 | $27.50 | $18.00 | $22.04 |
| 0940 | Furnish & install 3.0" schedule 80 PVC conduit (675027C) | LF | 80 | $20.00 | $50.00 | $20.00 | $24.49 |
| 0950 | 2" schedule 80 HDPE conduit (6760020) | LF | 1,910 | $19.00 | $17.00 | $19.00 | $23.27 |
| 0960 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 670 | $40.00 | $45.00 | $40.00 | $48.98 |
| 0970 | 16 in. above ground utility marker (6770300) | EACH | 4 | $500.00 | $250.00 | $500.00 | $348.00 |
| 0980 | No. 4 bare copper wire ground (6770314) | LF | 70 | $8.50 | $13.00 | $8.50 | $10.41 |
| 0990 | Furnish & install no. 14 copper wire, 4 conductor - black (6770388) | LF | 575 | $6.00 | $3.00 | $6.00 | $7.35 |
| 1000 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 555 | $6.50 | $3.00 | $6.50 | $7.96 |
| 1010 | Furnish & install no. 14 copper wire, 8 conductor (black) (6770393) | LF | 5,300 | $7.00 | $4.00 | $7.00 | $8.57 |
| 1020 | Furnish & install fiber optic cable-single mode (6770470) | LF | 1,280 | $5.00 | $3.00 | $5.00 | $6.12 |
| 1030 | Furnish & install fiber optic interconnect center (6770476) | EACH | 2 | $3,300.00 | $5,100.00 | $3,300.00 | $4,040.82 |
| 1040 | Furnish & install fiber optic modem (6770482) | EACH | 2 | $1,200.00 | $500.00 | $1,200.00 | $1,469.39 |
| 1050 | Network switch (6770493) | EACH | 2 | $3,000.00 | $3,000.00 | $3,000.00 | $3,673.47 |
| 1060 | Furnish & install electrical service for traffic signal (6800499) | EACH | 2 | $4,000.00 | $16,000 | $4,000.00 | $4,897.96 |
| 1070 | F&I-17"X30"X24"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (680052C) | EACH | 19 | $1,700.00 | $1,600.00 | $1,700.00 | $2,081.63 |
| 1080 | Furnish & install 10' break- away alum pedestal pole and base (6825484) | EACH | 4 | $5,100.00 | $2,000.00 | $5,100.00 | $6,244.90 |
| 1090 | F&I - contr 332/336 cabinet assembly - base mounted 01 (6845511) | EACH | 2 | $25,000 | $14,000 | $25,000 | $30,612 |
| 1100 | Furnish and install battery back-UP including foundation (6845518) | EACH | 2 | $14,500 | $14,450 | $14,500 | $17,755 |
| 1110 | Closed circuit TV camera- highway use (6845691) | EACH | 2 | $7,200.00 | $6,000.00 | $7,200.00 | $8,816.33 |
| 1120 | Camera lowering device (6845693) | EACH | 2 | $17,200 | $16,125 | $17,200 | $21,061 |
| 1130 | Furnish & install - 12" 3 (6865723) | EACH | 19 | $1,500.00 | $1,500.00 | $1,500.00 | $1,836.73 |
| 1140 | Audible pedestrian system(APS) including pedestrian head & button assembly W/ sign (6865786) | EACH | 4 | $4,200.00 | $2,000.00 | $4,200.00 | $5,142.86 |
| 1150 | F&I vehicle traffic singal head mounting assembly for mast arm (6865831) | EACH | 19 | $900.00 | $100.00 | $900.00 | $1,102.04 |
| 1160 | Backplate W/ retrorefl.borders for traff. sig. (6865834) | EACH | 19 | $300.00 | $200.00 | $300.00 | $367.35 |
| 1170 | F&I-pedestrian traf. signal head mounting assem for post top (6865840) | EACH | 4 | $500.00 | $1,100.00 | $500.00 | $612.25 |
| 1180 | Furnish & install concrete cabinet foundation (6887951) | EACH | 2 | $2,500.00 | $1,200.00 | $2,500.00 | $3,061.23 |
| 1190 | Furnish & install radar for stop bar detection, inc 150' cable & mounting hardware (6887971) | EACH | 4 | $9,000.00 | $12,000 | $9,000.00 | $11,020 |
| 1200 | Furnish & install cabinet interface components for radar detection (6887972) | EACH | 4 | $9,150.00 | $9,000.00 | $9,150.00 | $11,204 |
| 1210 | Furnish & install radar for setback detection, inc 150' cable & mounting hardware (6887973) | EACH | 4 | $10,100 | $9,200.00 | $10,100 | $12,367 |
| 1220 | Furnish & install cabinet interface components for setback detection (6887974) | EACH | 4 | $5,000.00 | $8,200.00 | $5,000.00 | $6,122.45 |
| 1230 | Furnish & install radar detection cable to cross roadway (6887977) | LF | 1,815 | $5.00 | $3.00 | $5.00 | $6.12 |
| 1240 | Furnish & install factory terminated patch panel (6888082) | EACH | 2 | $1,800.00 | $800.00 | $1,800.00 | $2,204.08 |
| 1250 | Design, furnish & install steel pole with twin mast arms including foundation 01 (6888177) | EACH | 2 | $79,200 | $61,200 | $79,200 | $96,980 |
| 1260 | Design, furnish & install steel pole with mast arm including foundation (6888179) | EACH | 4 | $59,500 | $40,985 | $59,500 | $72,857 |
| 1270 | Conc. for structures - class 4000 (7011400) | CY | 2,503.70 | $1,127.22 | $877.00 | $1,495.55 | $1,908.00 |
| 1280 | Conc. for structures - class 4000(culvert) (7011402) | CY | 773.50 | $672.24 | $1,000.00 | $672.24 | $2,992.94 |
| 1290 | Straight headwall for 36" circular pipe-1 line (7016155) | EACH | 2 | $6,414.03 | $6,510.00 | $4,100.00 | $6,444.00 |
| 1300 | Straight headwall for 48" circular pipe-1 line (7016175) | EACH | 1 | $11,101 | $8,530.00 | $6,000.00 | $9,700.00 |
| 1310 | Grooved surface finish (7023200) | SY | 4,232 | $3.79 | $2.60 | $2.98 | $12.00 |
| 1320 | Reinf. steel for structures (roadway) (7031100) | LB | 100,949 | $6.87 | $2.50 | $9.45 | $1.94 |
| 1330 | Reinf. steel for structures (bridge) (7031200) | LB | 712,878 | $1.57 | $1.25 | $2.67 | $1.80 |
| 1340 | Hoop reinforcing steel for structures (bridge) (7031220) | LB | 34,458 | $2.26 | $2.00 | $3.87 | $4.20 |
| 1350 | Prestressed concrete florida I-beam(78") (7045478) | LF | 5,111.40 | $536.15 | $504.00 | $578.13 | $516.00 |
| 1360 | 42" MASH concrete barrier parapet/railing wall (7051050) | LF | 686 | $91.50 | $82.00 | $107.37 | $294.42 |
| 1370 | 46" MASH concrete barrier parapet/railing wall (7051055) | LF | 686 | $95.50 | $85.25 | $154.31 | $299.27 |
| 1380 | Dynamic pile analyzer test set-UP dynamic pile analyzer test setup (7110001) | EACH | 4 | $6,207.42 | $2,800.00 | $8,430.45 | $3,000.00 |
| 1390 | Pile driving set-UP (7110010) | EACH | 46 | $2,381.24 | $652.00 | $447.37 | $8,952.00 |
| 1400 | Steel H bearing piling (HP14 X 117) (7112250) | LF | 3,848 | $108.72 | $131.00 | $182.33 | $108.00 |
| 1410 | Steel H bearing index piling (HP14X 117) (7112252) | LF | 194 | $115.11 | $278.00 | $350.91 | $210.00 |
| 1420 | Drilled shaft set-UP (7120006) | EACH | 7 | $22,608 | $37,650 | $66,966 | $30,000 |
| 1430 | Crosshole sonic logging setup (7120010) | EACH | 7 | $1,061.26 | $750.00 | $2,848.13 | $6,000.00 |
| 1440 | Drilled shaft with wet & dry excavation - 48" diameter (7120161) | LF | 420 | $802.01 | $333.00 | $157.22 | $920.40 |
| 1450 | Drilled shaft with wet & dry excavation - 54" diameter (7120171) | LF | 228.10 | $1,012.84 | $433.00 | $199.37 | $1,165.20 |
| 1460 | Construction casing - 54" diameter (7120175) | LF | 228.10 | $594.30 | $533.00 | $528.61 | $679.20 |
| 1470 | 18" smooth wall pipe (7143618) | LF | 1,952 | $94.34 | $114.00 | $140.00 | $135.28 |
| 1480 | 36" smooth wall pipe (7143636) | LF | 856 | $208.10 | $264.00 | $262.00 | $308.13 |
| 1490 | 48" smooth wall pipe (7143648) | LF | 132 | $336.46 | $321.00 | $381.00 | $456.37 |
| 1500 | Catch basin - type 1 special (7191050) | EACH | 21 | $8,530.74 | $9,700.00 | $6,950.00 | $5,532.40 |
| 1510 | Drop inlet 113 convert from 3X4 box (7191130) | EACH | 6 | $10,265 | $13,190 | $8,336.50 | $11,822 |
| 1520 | Drop inlet type 125 single 4'X2' box (719125C) | EACH | 4 | $9,652.90 | $8,330.00 | $6,895.00 | $9,409.00 |
| 1530 | Manhole (7192105) | EACH | 4 | $6,169.69 | $17,970 | $2,685.00 | $4,874.00 |
| 1540 | Precast concrete riser - 48" diameter (7193005) | LF | 78 | $728.98 | $2,010.00 | $245.00 | $623.20 |
| 1550 | Precast concrete drainage base - 48" (7193105) | EACH | 4 | $6,177.96 | $5,250.00 | $2,695.00 | $5,212.00 |
| 1560 | Extra depth of box (7196000) | LF | 105 | $836.71 | $877.00 | $382.00 | $634.59 |
| 1570 | 4' slope flume (6" curb style with cutoffs) (7199200) | LF | 278 | $152.57 | $273.00 | $155.00 | $351.33 |
| 1580 | Concrete curb (9" X 15") (7201000) | LF | 2,453 | $34.96 | $31.50 | $41.00 | $79.55 |
| 1590 | Concrete curb and gutter(2'-0") vertical face (7203210) | LF | 75 | $58.06 | $48.75 | $91.25 | $134.36 |
| 1600 | Concrete sidewalk(4" uniform) (7204100) | SY | 2,493 | $59.64 | $78.50 | $67.15 | $122.16 |
| 1610 | Detectable warning material (7204900) | SF | 41 | $44.10 | $59.25 | $65.00 | $69.37 |
| 1620 | Concrete median (7206000) | SY | 5,332 | $75.91 | $96.00 | $67.60 | $142.59 |
| 1630 | Pedestrian ramp construction (7209000) | SY | 12 | $196.66 | $320.00 | $819.00 | $374.58 |
| 1640 | Surface applied detectable warning (7209100) | SF | 121 | $44.10 | $102.00 | $44.00 | $119.82 |
| 1650 | Deck joint strip seal (7232310) | LF | 143.20 | $708.53 | $603.00 | $806.50 | $480.00 |
| 1660 | Elastomeric bearing (7243100) | EACH | 68 | $3,364.14 | $2,160.00 | $2,470.50 | $1,920.00 |
| 1670 | Waterproofing (7282000) | SY | 81.20 | $82.35 | $13.50 | $20.00 | $180.00 |
| 1680 | Aggregate underdrain(agg#789)with 4"perf.pipe for struc (8011210) | TON | 1,030 | $107.73 | $113.00 | $121.70 | $192.21 |
| 1690 | Rip-rap (class A) (8041010) | TON | 14,675 | $116.90 | $125.00 | $114.25 | $182.02 |
| 1700 | Rip-rap (class B) (8041020) | TON | 1,113 | $127.53 | $140.00 | $126.50 | $284.23 |
| 1710 | Rip-rap (class C) (8041030) | TON | 558 | $137.06 | $140.00 | $127.00 | $234.01 |
| 1720 | Slope protection-4" concrete(fiber reinforced) (8047041) | SY | 2,235 | $73.50 | $118.00 | $71.47 | $323.45 |
| 1730 | Geotextile for erosion control under riprap(class 1)type D (8048115) | SY | 365 | $6.56 | $40.25 | $26.00 | $10.40 |
| 1740 | Geotextile for erosion control under riprap(class 2)type D (8048215) | SY | 3,058 | $7.76 | $5.90 | $5.10 | $11.25 |
| 1750 | MT3 leading end treatment TL3 (8051151) | EACH | 8 | $3,000.00 | $3,030.00 | $3,000.00 | $4,722.64 |
| 1760 | MB trailing end treatment (8051710) | EACH | 8 | $1,600.00 | $1,620.00 | $1,600.00 | $2,922.64 |
| 1770 | MGS3 GR standard shoulder (8052100) | LF | 4,637.50 | $23.00 | $23.20 | $23.00 | $27.00 |
| 1780 | MTBBC3 MASH thrie-beam barrier connector TL3 (8053253) | EACH | 2 | $2,650.00 | $2,680.00 | $2,650.00 | $4,902.64 |
| 1790 | MTBBC2 MASH thrie-beam barrier connector TL2 (8053255) | EACH | 2 | $1,600.00 | $1,620.00 | $1,600.00 | $4,902.64 |
| 1800 | Flume inlet at guardrail (handwork) (8053257) | EACH | 4 | $3,255.00 | $3,500.00 | $2,722.00 | $4,414.29 |
| 1810 | Non-mow strip under guardrail (8055250) | SY | 3,547 | $68.25 | $85.00 | $62.50 | $119.86 |
| 1820 | 56SS reinforced barrier wall (8058055) | LF | 84 | $595.00 | $499.00 | $821.50 | $814.72 |
| 1830 | Rigid VF buried moment slab shoulder application (8058402) | LF | 1,709 | $545.00 | $330.00 | $694.90 | $719.89 |
| 1840 | French drain and weep system (8058755) | LF | 827 | $56.87 | $40.00 | $60.44 | $66.76 |
| 1850 | Woven wire fence - type 1 without barbed wire (8061100) | LF | 11,322 | $10.50 | $10.60 | $10.50 | $14.40 |
| 1860 | 12' wide- farm fence gate (48"HT) (8065120) | EACH | 2 | $1,800.00 | $1,820.00 | $1,800.00 | $3,240.00 |
| 1870 | Temporary barrier fence (orange) (8068301) | LF | 10,120 | $2.37 | $2.40 | $3.00 | $2.88 |
| 1880 | Right of way marker(reinforced concrete) (8091000) | EACH | 33 | $338.89 | $395.00 | $175.00 | $300.00 |
| 1890 | Right of way plat (8091050) | LS | 1 | $49,702 | $100,000 | $16,500 | $30,000 |
| 1900 | Permanent cover (8100100) | ACRE | 55 | $1,398.96 | $1,400.00 | $1,425.00 | $1,680.00 |
| 1910 | Temporary cover (8100200) | ACRE | 28 | $883.14 | $1,000.00 | $1,200.00 | $1,200.00 |
| 1920 | Fertilizer (nitrogen) (8104005) | LB | 5,500 | $1.94 | $3.50 | $3.50 | $4.20 |
| 1930 | Fertilizer (phosphoric acid) (8104010) | LB | 5,500 | $1.94 | $3.50 | $3.50 | $4.20 |
| 1940 | Fertilizer (potash) (8104015) | LB | 5,500 | $1.94 | $3.50 | $3.50 | $4.20 |
| 1950 | Agricultural granular lime (8105005) | LB | 110,000 | $0.94 | $0.10 | $0.45 | $0.11 |
| 1960 | Selective watering (8109050) | GAL | 271,500 | $0.01 | $0.10 | $0.09 | $0.11 |
| 1970 | Mowing (8109901) | ACRE | 166 | $438.00 | $225.00 | $425.00 | $270.00 |
| 1980 | Temporary erosion control blanket (ecb) (8151110) | MSY | 145.49 | $2,245.95 | $1,500.00 | $1,699.96 | $1,799.96 |
| 1990 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 83 | $1,432.00 | $1,290.00 | $1,350.00 | $1,920.00 |
| 2000 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 83 | $3,395.00 | $3,050.00 | $2,900.00 | $3,660.00 |
| 2010 | Inlet structure filter - type F (weighted) (8152004) | LF | 500 | $10.00 | $12.00 | $4.25 | $14.40 |
| 2020 | Sediment tubes for ditch checks (8152007) | LF | 2,220 | $10.00 | $9.75 | $13.00 | $11.70 |
| 2030 | Silt fence (8153000) | LF | 23,177 | $3.85 | $2.70 | $3.60 | $3.24 |
| 2040 | Replace/repair silt fence (8153090) | LF | 2,318 | $3.64 | $2.70 | $4.50 | $3.24 |
| 2050 | Floating turbidity barrier- heavy duty (10'depth) (8153310) | LF | 1,576 | $24.70 | $42.00 | $65.25 | $50.40 |
| 2060 | Dewatering bags (8153801) | EACH | 4 | $3,000.00 | $500.00 | $590.00 | $9,139.04 |
| 2070 | Cleaning silt basins (8154010) | CY | 207 | $81.68 | $13.50 | $31.50 | $170.75 |
| 2080 | Removal of silt retained by silt fence (8154050) | LF | 5,795 | $2.54 | $2.80 | $2.65 | $4.80 |
| 2090 | Temporary diversion dike (8155100) | LF | 324 | $54.64 | $29.20 | $34.00 | $78.30 |
| 2100 | Inlet structure filter - type D1 (8156205) | EACH | 6 | $785.27 | $944.00 | $280.00 | $660.00 |
| 2110 | Filter material for inlet structure filter - type D1 (8156207) | EACH | 6 | $519.94 | $338.00 | $280.00 | $240.00 |
| 2120 | Sediment dam riprap (8156300) | TON | 1,106 | $119.36 | $157.00 | $117.00 | $184.02 |
| 2130 | Aggregate no.5 or 57 for erosion control (8156410) | TON | 34 | $85.56 | $91.75 | $136.00 | $243.96 |
| 2140 | Stabilized construction entrance (8156490) | SY | 550 | $61.64 | $38.50 | $15.00 | $56.91 |
| 2150 | Temporary flexible pipe slope drain - 10" (8157010) | LF | 400 | $61.45 | $78.75 | $35.00 | $77.81 |
| 2160 | Temporary flexible pipe slope drain - 24" (8157024) | LF | 668 | $81.45 | $114.00 | $53.00 | $113.07 |
| 2170 | Permanent sediment control structure (8160200) | EACH | 1 | $12,886 | $8,750.00 | $9,065.00 | $19,026 |
| 2180 | Aggregate diaphragm (8161100) | CY | 1 | $5,328.72 | $735.00 | $1,520.00 | $12,684 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.