| 0010 | Mobilization (1031000) | LS | 1 | $475,000 | $290,000 | $562,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $190,000 | $200,000 | $224,750 |
| 0030 | Removal & disposal of existing pavement (2023000) | SY | 909.50 | $36.00 | $37.45 | $40.00 |
| 0040 | Removal & disposal of existing curb (2024100) | LF | 750 | $16.00 | $7.75 | $14.00 |
| 0050 | Removal of exist. guardrail (2027801) | LF | 237.50 | $1.50 | $1.50 | $1.50 |
| 0060 | Unclassified excavation (2031000) | CY | 77 | $115.00 | $47.25 | $140.00 |
| 0070 | Borrow excavation (2033000) | CY | 3,336 | $45.00 | $50.40 | $112.00 |
| 0080 | Excavation for shoulder paving (2036000) | STA | 755.02 | $90.00 | $86.50 | $130.00 |
| 0090 | Hauling of excavated shoulder material (2072000) | STA | 755.02 | $70.00 | $150.00 | $80.00 |
| 0100 | Additional rock for full depth reclamation (3059001) | TON | 4,300 | $45.00 | $49.25 | $79.00 |
| 0110 | Maintenance stone (3059900) | TON | 153.25 | $115.00 | $98.00 | $140.00 |
| 0120 | Cement modified recycled base (10" unif)-curing method B (3063232) | SY | 43,410 | $6.25 | $8.10 | $9.50 |
| 0130 | Cement modified recycled base (12" unif)-curing method B (3063242) | SY | 45,056 | $6.75 | $6.05 | $7.25 |
| 0140 | Portland cement for cement modified recycled base course (3064000) | TON | 2,477 | $250.00 | $235.00 | $210.00 |
| 0150 | HMA shoulder widening course (3104000) | TON | 2,845.33 | $80.00 | $77.05 | $100.00 |
| 0160 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,314.68 | $600.00 | $640.00 | $656.00 |
| 0170 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 10,245 | $60.00 | $61.25 | $75.00 |
| 0180 | Full depth asph. pav. patching 8" unif (4012080) | SY | 5,080 | $80.00 | $68.10 | $89.00 |
| 0190 | Milling existing asphalt pavement 1.5" (4013115) | SY | 10,010 | $2.75 | $2.30 | $3.50 |
| 0200 | Milling existing asphalt pavement 2.0" (4013120) | SY | 91,215 | $2.75 | $2.20 | $2.30 |
| 0210 | Milling existing asphalt pavement (variable) (4013990) | SY | 10,425 | $11.00 | $7.50 | $3.90 |
| 0211 | Asphalt intermediate course type B (4030320) | TON | 2,720.96 | $80.00 | $79.30 | $82.00 |
| 0220 | Asphalt surface course type B (4040320) | TON | 17,932.84 | $80.00 | $88.95 | $93.00 |
| 0230 | Asphalt surface course type C (4040340) | TON | 13,821 | $80.00 | $86.85 | $84.00 |
| 0240 | Driveway paving-surface type C (4047220) | TON | 2,673.88 | $250.00 | $190.00 | $240.00 |
| 0250 | Traffic control (6011000) | LS | 1 | $400,000 | $576,370 | $525,000 |
| 0260 | Permanent construction signs (ground mounted) (6051120) | SF | 4,818 | $5.75 | $5.35 | $5.75 |
| 0270 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 18,290 | $0.11 | $0.11 | $0.11 |
| 0280 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 484,200 | $0.11 | $0.11 | $0.11 |
| 0290 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 7,150 | $0.30 | $0.30 | $0.30 |
| 0300 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 6,806 | $1.00 | $1.00 | $1.00 |
| 0310 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 85 | $10.00 | $10.00 | $10.00 |
| 0320 | White word message "only"- fast dry paint (6240035) | EACH | 35 | $10.00 | $10.00 | $10.00 |
| 0330 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 19 | $15.00 | $15.00 | $15.00 |
| 0340 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 19,480 | $0.13 | $0.13 | $0.13 |
| 0350 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 420,510 | $0.11 | $0.11 | $0.11 |
| 0360 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 3,280 | $0.50 | $0.50 | $0.50 |
| 0370 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 270 | $1.00 | $1.00 | $1.00 |
| 0380 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 5,865 | $0.50 | $0.50 | $0.50 |
| 0390 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 210 | $1.00 | $1.00 | $1.00 |
| 0400 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 137,200 | $0.48 | $0.48 | $0.48 |
| 0410 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 25,400 | $1.00 | $1.00 | $1.00 |
| 0420 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 2,525 | $3.00 | $3.00 | $3.00 |
| 0430 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 20 | $8.00 | $8.00 | $8.00 |
| 0440 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 2,440 | $9.00 | $9.00 | $9.00 |
| 0450 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 28 | $65.00 | $65.00 | $65.00 |
| 0460 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 12 | $70.00 | $70.00 | $70.00 |
| 0470 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 5 | $95.00 | $95.00 | $95.00 |
| 0480 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 4,140 | $0.50 | $0.50 | $0.50 |
| 0490 | 6" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271066) | LF | 1,700 | $1.00 | $1.00 | $1.00 |
| 0500 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 126,760 | $0.48 | $0.48 | $0.48 |
| 0510 | 6" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076) | LF | 17,000 | $1.00 | $1.00 | $1.00 |
| 0520 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 90 | $9.00 | $9.00 | $9.00 |
| 0530 | Evaluation of pavement marking retroreflectivity (6290001) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0540 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 239 | $5.00 | $5.00 | $5.00 |
| 0550 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 115 | $5.00 | $5.00 | $5.00 |
| 0560 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,311 | $5.00 | $5.00 | $5.00 |
| 0570 | Milled-in rumble strip (6321000) | MI | 23.28 | $500.00 | $500.00 | $500.00 |
| 0580 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 135 | $24.75 | $10.50 | $13.75 |
| 0590 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 615 | $16.25 | $11.98 | $14.50 |
| 0600 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 25 | $100.00 | $34.00 | $150.00 |
| 0610 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 640 | $3.99 | $4.00 | $4.50 |
| 0620 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 25 | $4.28 | $4.85 | $4.00 |
| 0630 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 4,135 | $0.56 | $1.20 | $1.20 |
| 0640 | Sawcut for loop detector (6780495) | LF | 1,310 | $12.00 | $8.40 | $8.40 |
| 0650 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 5 | $365.00 | $450.00 | $450.00 |
| 0660 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 1 | $703.00 | $589.00 | $695.00 |
| 0670 | Adjust drop inlet adjust D. I. (7197130) | EACH | 6 | $2,000.00 | $2,925.00 | $2,200.00 |
| 0680 | Concrete curb and gutter(2'-0") sloping face (7203220) | LF | 750 | $37.00 | $36.35 | $50.00 |
| 0690 | Detectable warning material (7204900) | SF | 325 | $40.00 | $45.30 | $65.00 |
| 0700 | Pedestrian ramp construction (7209000) | SY | 650 | $130.00 | $115.40 | $140.00 |
| 0710 | MT3 leading end treatment TL3 (8051151) | EACH | 4 | $3,100.00 | $3,100.00 | $3,100.00 |
| 0720 | Premash thrie with base PL 6.25 space (8051207) | LF | 200 | $65.00 | $65.00 | $65.00 |
| 0730 | MGS3CS GR compressed shoulder (8052150) | LF | 1,000 | $27.00 | $27.00 | $27.00 |
| 0740 | Premash type T TL3 leading 50' (8057100) | EACH | 9 | $3,100.00 | $3,100.00 | $3,100.00 |
| 0750 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 16.21 | $3,110.00 | $2,750.00 | $3,110.00 |