SCDOT contract 3270680 bid tabulation

2025 Primary Pavement Improvement Program. Let by South Carolina DOT on January 14, 2025, Lexington, District 1. 3 bids received; low bid $10,165,729 by Blythe Construction, Inc..

Owner
South Carolina DOT
Letting
14 JAN 2025
Pay items
65
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blythe Construction, Inc.$10,165,729Low
2C.R. Jackson, Inc.$10,377,864+2.0%
3Palmetto Corp. of Conway$10,668,176+5.0%
SCDOT contract 3270680: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blythe Construction, Inc.2. C.R. Jackson, Inc.3. Palmetto Corp. of Conway
0010Mobilization (1031000)LS1$371,347$518,000$440,000
0020Bonds and insurance (1032010)LS1$55,000$207,000$199,100
0030Removal & disposal of existing pavement (2023000)SY663.99$45.00$65.00$58.70
0040Unclassified excavation (2031000)CY98$280.00$275.00$108.30
0050Borrow excavation (2033000)CY1,258$102.95$50.00$58.35
0060Excavation for shoulder paving (2036000)STA651.10$85.00$75.00$43.10
0070Hauling of excavated shoulder material (2072000)STA651.10$60.00$63.00$88.75
0080Maintenance stone (3059900)TON35.25$50.00$250.00$140.00
0090HMA shoulder widening course (3104000)TON4,337.08$96.25$78.00$87.10
0100Liquid asphalt binder PG64-22 (4011004)TON2,698.45$665.00$655.00$725.00
0110Full depth asph. pav. patching 8" unif (4012080)SY3,525$103.00$80.00$87.30
0120Milling existing asphalt pavement 2.0" (4013120)SY294,510$3.20$2.75$3.40
0130Milling existing asphalt pavement (variable) (4013990)SY23,455$4.60$4.50$3.60
0140Asphalt intermediate course type B (4030320)TON11,454.91$92.75$90.00$93.55
0150Asphalt surface course type B (4040320)TON33,287.87$95.62$90.00$95.50
0160Driveway paving-surface type C (4047220)TON511$345.00$225.00$240.00
0170Traffic control (6011000)LS1$610,000$1,108,000$800,000
0180Permanent construction signs (ground mounted) (6051120)SF2,220$5.30$5.30$5.30
01904" white broken lines -(gaps excluded)-fast dry paint (6240005)LF49,690$0.11$0.11$0.11
02004" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF270,700$0.11$0.11$0.11
02108"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF23,510$0.11$0.11$0.11
022024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF5,080$1.00$1.00$1.00
0230White single arrow (left, straight, right)-fast dry paint (6240030)EACH223$10.00$10.00$10.00
0240White word message "only"- fast dry paint (6240035)EACH75$10.00$10.00$10.00
0250White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040)EACH8$15.00$15.00$15.00
0260White lane drop arrow (left or right)-fast dry paint (6240043)EACH18$30.00$30.00$30.00
02704" yellow broken lines(gaps exc) - fast dry paint (6240105)LF26,960$0.11$0.11$0.11
02804"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF267,200$0.11$0.11$0.11
02906" yellow solid line on curb/median - fast dry paint (6240112)LF5,200$0.50$0.50$0.50
03004" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF16,430$0.48$0.48$0.48
03104" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF78,080$0.46$0.46$0.46
03208" white solid lines thermoplastic - 125 mil. (6271015)LF8,710$3.00$3.00$3.00
033012IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023)LF90$9.00$9.00$9.00
034024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF1,970$9.00$9.00$9.00
0350White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH89$65.00$65.00$65.00
0360White word message "only" - thermoplastic - 125 mil. (6271035)EACH28$70.00$70.00$70.00
0370White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040)EACH4$80.00$80.00$80.00
0380White lane drop arrow(LT.or RT.)thermo-125MIL (6271043)EACH6$150.00$150.00$150.00
03904" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF9,090$0.48$0.48$0.48
04004" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF89,700$0.46$0.46$0.46
0410Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH879$5.00$5.00$5.00
0420Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH636$4.00$4.00$4.00
0430Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,039$5.00$5.00$5.00
0440Milled-in rumble strip (6321000)MI20.99$500.00$500.00$500.00
0450Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF680$13.75$15.00$13.75
0460Furnish & install 2.0" schedule 80 PVC conduit (6750278)LF4,920$14.50$18.00$14.50
0470Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065)LF200$28.00$28.00$28.00
0480Furnish & install no. 14 copper wire, 4 conductor - gray (6770389)LF5,120$4.50$5.00$4.50
0490Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394)LF200$4.90$8.00$4.90
0500Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF15,680$1.45$3.00$1.45
0510Sawcut for loop detector (6780495)LF5,080$8.60$7.00$8.60
0520F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508)EACH40$395.00$850.00$395.00
0530F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518)EACH8$700.00$1,800.00$700.00
0540Adjust catch basin (7197110)EACH15$2,500.00$2,500.00$2,440.00
0550Catch basin T-17 (convert C.B. type 5) (7198291)EACH40$4,500.00$4,500.00$7,060.00
0560Catch basin T-17 (convert C.B. type 6) (7198292)EACH1$5,000.00$5,000.00$7,300.00
0570Catch basin T-18 (convert C.B. type 7) (7198293)EACH4$6,000.00$6,000.00$7,925.00
0580Concrete curb and gutter(1'-6") vertical face (7203110)LF400$60.00$60.00$54.70
0590Concrete curb and gutter(1'-6") - sloping face (7203120)LF50$70.00$70.00$76.15
0600Concrete curb and gutter (2'-6") - sloping face (7203245)LF50$75.00$75.00$80.70
0610Detectable warning material (7204900)SF112.50$50.00$50.00$40.00
0620Concrete driveway(6" uniform) (7205000)SY50$110.00$110.00$220.00
0630Pedestrian ramp construction (7209000)SY225$145.00$145.00$148.25
0640Premash reset type T TL3 leading 50' (8052420)EACH4$1,000.00$1,255.00$1,000.00
0650Permanent grassing for non-permitted resurfacing projects (8100102)ACRE6.09$2,750.00$3,300.00$2,750.00
SCDOT contract 3270680: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy