| 0010 | Mobilization (1031000) | LS | 1 | $290,000 | $320,500 | $135,500 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $115,000 | $128,000 | $73,364 |
| 0030 | Railroad insurance and flagging L and C railroad (1071403) | LS | 1 | $17,500 | $38,400 | $7,500.00 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 956.50 | $35.00 | $35.00 | $24.41 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 30 | $16.00 | $16.00 | $92.97 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 512 | $4.00 | $1.00 | $4.53 |
| 0070 | Unclassified excavation (2031000) | CY | 991.40 | $14.00 | $23.00 | $28.24 |
| 0080 | Borrow excavation (2033000) | CY | 483 | $40.00 | $192.00 | $60.00 |
| 0090 | Station grading (2035000) | STA | 5 | $1,750.00 | $2,500.00 | $1,124.46 |
| 0100 | Maintenance stone (3059900) | TON | 187.50 | $35.00 | $106.00 | $106.92 |
| 0110 | Cement modified recycled base (8" unif)-curing method B (3063222) | SY | 119,648.40 | $6.50 | $7.00 | $7.40 |
| 0120 | Portland cement for cement modified recycled base course (3064000) | TON | 3,016 | $225.00 | $197.00 | $230.00 |
| 0130 | Liquid asphalt binder PG64-22 (4011004) | TON | 1,305.50 | $570.00 | $647.00 | $650.00 |
| 0140 | Full depth asph. pav. patching 8" unif (4012080) | SY | 180 | $205.00 | $324.00 | $95.00 |
| 0150 | Full depth asph. pav. patching 10"unif (4012100) | SY | 4,190 | $75.00 | $108.00 | $95.50 |
| 0160 | Milling existing asphalt pavement 1.5" (4013115) | SY | 6,968 | $2.75 | $2.00 | $3.69 |
| 0170 | Milling existing asphalt pavement 1.75" (4013117) | SY | 40,735 | $4.00 | $2.00 | $4.60 |
| 0180 | Milling existing asphalt pavement (variable) (4013990) | SY | 37,066 | $4.50 | $3.00 | $4.70 |
| 0190 | Asphalt surface course type B (4040320) | TON | 8,156.43 | $67.00 | $77.00 | $83.67 |
| 0200 | Asphalt surface course type C (4040340) | TON | 12,020.99 | $69.00 | $82.00 | $106.25 |
| 0210 | Driveway paving-surface type C (4047220) | TON | 1,580.50 | $195.00 | $196.00 | $195.00 |
| 0220 | Asphalt surface treat (single treatment) (4060010) | SY | 20,087.40 | $3.00 | $6.00 | $2.83 |
| 0230 | Traffic control (6011000) | LS | 1 | $115,000 | $135,300 | $212,000 |
| 0240 | Permanent construction signs (ground mounted) (6051120) | SF | 2,843 | $5.50 | $5.50 | $8.38 |
| 0250 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 2,011 | $0.01 | $0.01 | $0.01 |
| 0260 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 277,128 | $0.10 | $0.10 | $0.11 |
| 0270 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 1,568 | $0.05 | $0.05 | $0.06 |
| 0280 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 2,432 | $0.25 | $0.25 | $0.28 |
| 0290 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 24 | $5.00 | $5.00 | $5.66 |
| 0300 | White word message "only"- fast dry paint (6240035) | EACH | 12 | $5.00 | $5.00 | $5.66 |
| 0310 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 12 | $5.00 | $5.00 | $5.66 |
| 0320 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 4 | $25.00 | $25.00 | $28.31 |
| 0330 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 4,220 | $0.14 | $0.14 | $0.16 |
| 0340 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 322,657 | $0.14 | $0.14 | $0.16 |
| 0350 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 75 | $1.00 | $1.00 | $1.13 |
| 0360 | 6"yel solid lines on 6"conc.curb(top&side)-fast dry PNT (6240113) | LF | 760 | $1.00 | $1.00 | $1.13 |
| 0370 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 1,622 | $0.75 | $0.75 | $0.85 |
| 0380 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 106,785 | $0.50 | $0.50 | $0.57 |
| 0390 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 1,968 | $2.35 | $2.35 | $2.66 |
| 0400 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,792 | $6.75 | $6.75 | $7.64 |
| 0410 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 16 | $75.00 | $75.00 | $84.91 |
| 0420 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 8 | $75.00 | $75.00 | $84.91 |
| 0430 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 6 | $100.00 | $100.00 | $113.22 |
| 0440 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 4 | $400.00 | $400.00 | $452.87 |
| 0450 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 4,225 | $0.42 | $0.42 | $0.48 |
| 0460 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 114,141 | $0.42 | $0.42 | $0.48 |
| 0470 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 57 | $5.50 | $5.50 | $6.23 |
| 0480 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 15 | $5.50 | $5.50 | $6.23 |
| 0490 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 1,080 | $5.50 | $5.50 | $6.23 |
| 0500 | Milled-in rumble strip (6321000) | MI | 12.46 | $1,015.00 | $500.00 | $566.08 |
| 0510 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 64 | $20.00 | $20.00 | $22.64 |
| 0520 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 3,704 | $4.00 | $4.00 | $4.53 |
| 0530 | Sawcut for loop detector (6780495) | LF | 1,506 | $12.00 | $12.00 | $13.59 |
| 0540 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 5 | $800.00 | $800.00 | $905.73 |
| 0550 | Temporary adjustment of traffic signal equipment (6885993) | EACH | 4 | $19,200 | $19,200 | $21,738 |
| 0560 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 55 | $41.00 | $41.00 | $42.42 |
| 0570 | Concrete sidewalk(4" uniform) (7204100) | SY | 80 | $102.00 | $102.00 | $63.43 |
| 0580 | Detectable warning material (7204900) | SF | 425 | $55.00 | $55.00 | $19.87 |
| 0590 | Concrete driveway(6" uniform) (7205000) | SY | 60 | $115.00 | $115.00 | $84.57 |
| 0600 | Pedestrian ramp construction (7209000) | SY | 850 | $142.00 | $142.00 | $83.34 |
| 0610 | Surface applied detectable warning (7209100) | SF | 62.50 | $55.00 | $105.60 | $19.87 |
| 0620 | Reseal deck expansion joint (7261127) | LF | 120 | $108.00 | $108.00 | $160.38 |
| 0630 | Premash thrie with base PL 3.125 spacing (8051208) | LF | 56 | $120.00 | $148.10 | $135.86 |
| 0640 | Premash type T TL3 leading 50' (8057100) | EACH | 8 | $3,800.00 | $3,932.16 | $4,302.22 |
| 0650 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 2.29 | $3,450.00 | $3,300.00 | $3,905.97 |