TxDOT contract A00002054 bid tabulation
State Park Improvements, PR 28A (FT PARKER STATE PARK to .). Let by Texas DOT on July 2, 2026, Limestone, Waco District. 6 bids received; low bid $1,849,328 by Big Creek Construction, LTD., -14% against the engineer's estimate of $2,150,633.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 65
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $1,849,328 | Low | -14% |
| 2 | Texas Materials Group, Inc. | $1,878,858 | +2.0% | -13% |
| 3 | Knife River Corporation - South | $2,358,241 | +28% | +10% |
| 4 | Prater Dirt Work LLC | $2,659,820 | +44% | +24% |
| 5 | Joe Bland Construction LLC | $2,791,999 | +51% | +30% |
| 6 | A. L. Helmcamp, Inc. | $3,464,815 | +87% | +61% |
Engineer's estimate: $2,150,633.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Texas Materials Group, Inc. | 3. Knife River Corporation - South | 4. Prater Dirt Work LLC | 5. Joe Bland Construction LLC | 6. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 3 | $925.00 | $1,500.00 | $1,220.00 | $2,765.00 | $800.00 | $975.00 | $2,700.00 |
| 2 | Preparation row (tree prune and trim) (100-7010) | STA | 5 | $860.00 | $1,200.00 | $1,465.00 | $3,105.00 | $2,000.00 | $1,150.00 | $10,000 |
| 3 | Tree protection (install) (100-7013) | EACH | 3 | $539.52 | $500.00 | $520.00 | $600.00 | $400.00 | $350.00 | $530.00 |
| 4 | Tree protection (remove) (100-7015) | EACH | 3 | $105.50 | $100.00 | $420.00 | $300.00 | $100.00 | $50.00 | $210.00 |
| 5 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 98 | $25.00 | $15.00 | $28.00 | $36.00 | $30.00 | $60.00 | $45.00 |
| 6 | Removing concrete (curb) (104-7016) | LF | 95 | $15.00 | $15.00 | $28.00 | $35.00 | $14.00 | $30.00 | $20.00 |
| 7 | Remove (8") TRT/untrt base & asphalt pavement (105-7028) | SY | 2,600 | $25.00 | $11.00 | $8.20 | $10.00 | $9.00 | $32.00 | $30.00 |
| 8 | Excavation (roadway) (110-7001) | CY | 89 | $19.00 | $65.00 | $35.00 | $45.00 | $200.00 | $90.00 | $100.00 |
| 9 | Embankment (vehicle)(DC)(type C) (132-7018) | CY | 192 | $34.79 | $65.00 | $38.00 | $60.00 | $150.00 | $60.00 | $100.00 |
| 10 | Backfill (type A)(vehicle) (134-7005) | CY | 605 | $50.00 | $50.00 | $33.00 | $150.00 | $75.00 | $100.00 | $100.00 |
| 11 | Backfill (type A or B)(vehicle) (134-7009) | CY | 27 | $40.00 | $95.00 | $148.00 | $150.00 | $200.00 | $105.00 | $145.00 |
| 12 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 2,665 | $1.75 | $1.00 | $1.00 | $1.15 | $1.10 | $0.50 | $1.25 |
| 13 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 2,665 | $0.25 | $0.75 | $1.00 | $0.85 | $1.10 | $0.50 | $0.90 |
| 14 | Vegetative watering (168-7001) | TGL | 43.30 | $25.50 | $25.00 | $70.00 | $10.00 | $100.00 | $50.00 | $35.00 |
| 15 | Rdside amenity (wheel stop) (194-7007) | EACH | 28 | $250.00 | $165.00 | $150.00 | $60.00 | $300.00 | $175.00 | $150.00 |
| 16 | Rdside amenity (194-7011) | EACH | 2 | $500.00 | $450.00 | $2,500.00 | $3,000.00 | $20,000 | $925.00 | $2,900.00 |
| 17 | Rdside amenity (type 1) (194-7012) | EACH | 1 | $1,500.00 | $500.00 | $1,650.00 | $950.00 | $15,000 | $15,500 | $2,900.00 |
| 18 | Rdside amenity (removing) (194-7025) | EACH | 28 | $140.00 | $70.00 | $45.00 | $40.00 | $1,500.00 | $425.00 | $215.00 |
| 19 | Proof rolling (216-7001) | HR | 16 | $115.00 | $200.00 | $121.00 | $105.00 | $100.00 | $450.00 | $230.00 |
| 20 | Rework BS metal (type C)(6")(ord comp) (251-7049) | SY | 23,296 | $2.40 | $1.50 | $1.10 | $1.75 | $2.35 | $5.00 | $6.00 |
| 21 | Cement (275-7001) | TON | 176 | $225.00 | $250.00 | $240.00 | $270.00 | $235.00 | $450.00 | $275.00 |
| 22 | Cement TRT (existing material)(5") (275-7031) | SY | 23,296 | $3.25 | $2.75 | $1.60 | $2.95 | $7.00 | $14.00 | $7.00 |
| 23 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 4,660 | $9.12 | $6.00 | $5.50 | $5.00 | $7.00 | $5.50 | $8.25 |
| 24 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 73 | $207.66 | $175.00 | $163.00 | $200.00 | $150.00 | $135.00 | $220.00 |
| 25 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 6,408 | $118.00 | $110.00 | $125.00 | $149.00 | $148.00 | $130.00 | $205.00 |
| 26 | Tack coat (344-7077) | GAL | 63 | $4.40 | $10.00 | $3.20 | $6.85 | $50.00 | $5.00 | $24.00 |
| 27 | Flexible pavement structure repair(6") (351-7005) | SY | 500 | $61.00 | $65.00 | $65.00 | $89.35 | $45.00 | $58.00 | $174.00 |
| 28 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 2,600 | $3.00 | $5.00 | $4.90 | $2.15 | $6.00 | $4.00 | $7.00 |
| 29 | Retaining wall (concrete block) (423-7013) | SF | 295 | $60.00 | $65.00 | $79.69 | $95.00 | $72.00 | $36.00 | $98.00 |
| 30 | Riprap (concrete)(CL A) (432-7004) | CY | 36 | $841.00 | $650.00 | $710.00 | $785.00 | $852.00 | $1,400.00 | $1,630.00 |
| 31 | Riprap (stone protection)(18 in) (432-7043) | CY | 25 | $200.00 | $300.00 | $300.00 | $140.00 | $360.00 | $190.00 | $530.00 |
| 32 | Clean existing culverts (480-7001) | EACH | 14 | $1,750.00 | $1,000.00 | $2,000.00 | $935.00 | $2,400.00 | $1,150.00 | $2,500.00 |
| 33 | Removing structure (RR timber ties) (496-7025) | EACH | 18 | $200.00 | $300.00 | $137.00 | $60.00 | $200.00 | $350.00 | $325.00 |
| 34 | Removing structure (wood STR) (496-7042) | LF | 3,473 | $25.00 | $4.50 | $3.55 | $5.50 | $5.00 | $10.00 | $6.50 |
| 35 | Mobilization (500-7001) | LS | 1 | $195,924 | $120,000 | $133,110 | $194,385 | $210,000 | $125,000 | $400,000 |
| 36 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $5,000.00 | $1,500.00 | $1,002.00 | $3,550.00 | $7,500.00 | $1,500.00 | $6,250.00 |
| 37 | Portable changeable message sign (503-7002) | EACH | 2 | $8,500.00 | $10,000 | $5,500.00 | $295.00 | $18,000 | $12,000 | $12,000 |
| 38 | TMA (stationary) (505-7001) | DAY | 34 | $160.00 | $250.00 | $91.00 | $100.00 | $200.00 | $215.00 | $280.00 |
| 39 | TMA (mobile operation) (505-7003) | DAY | 9 | $260.00 | $400.00 | $1.00 | $100.00 | $300.00 | $975.00 | $675.00 |
| 40 | Rock filter dams (install) (type 1) (506-7001) | LF | 30 | $53.00 | $40.00 | $65.00 | $47.00 | $70.00 | $50.00 | $42.00 |
| 41 | Rock filter dams (remove) (506-7011) | LF | 30 | $13.00 | $10.00 | $25.00 | $12.00 | $30.00 | $20.00 | $11.00 |
| 42 | Temporary sediment control fence (install) (506-7039) | LF | 6,180 | $4.30 | $3.25 | $4.00 | $3.80 | $4.00 | $6.00 | $3.75 |
| 43 | Temporary sediment control fence (remove) (506-7041) | LF | 6,180 | $1.10 | $1.00 | $1.00 | $1.20 | $1.05 | $1.00 | $1.25 |
| 44 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 654 | $6.00 | $4.85 | $7.00 | $5.70 | $7.35 | $8.00 | $5.75 |
| 45 | Biodegradable erosion control logs (remove) (506-7046) | LF | 654 | $1.45 | $1.00 | $1.00 | $1.20 | $1.10 | $2.00 | $1.25 |
| 46 | Concrete curb (type II) (529-7002) | LF | 6,003 | $30.00 | $30.00 | $30.00 | $33.40 | $36.00 | $45.00 | $48.00 |
| 47 | Concrete curb (ribbon) (529-7028) | LF | 65 | $35.00 | $60.00 | $43.00 | $79.00 | $51.60 | $120.00 | $300.00 |
| 48 | Turnouts (ACP) (530-7018) | SY | 2,600 | $69.80 | $70.00 | $70.00 | $92.85 | $105.00 | $130.00 | $80.00 |
| 49 | Concrete sidewalks (6") (531-7003) | SY | 89 | $90.00 | $115.00 | $96.00 | $115.00 | $115.20 | $120.00 | $250.00 |
| 50 | Curb ramps (type 10) (531-7011) | EACH | 1 | $3,250.00 | $2,650.00 | $3,000.00 | $1,625.00 | $3,600.00 | $3,500.00 | $3,300.00 |
| 51 | Fixed bollard (531-7027) | EACH | 28 | $1,500.00 | $1,200.00 | $800.00 | $1,000.00 | $960.00 | $575.00 | $950.00 |
| 52 | Pipe underdrains (type 6)(4") (556-7012) | LF | 165 | $18.00 | $65.00 | $40.00 | $13.55 | $48.00 | $130.00 | $90.00 |
| 53 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 1 | $715.00 | $500.00 | $675.00 | $795.00 | $708.75 | $600.00 | $775.00 |
| 54 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 10 | $350.00 | $225.00 | $275.00 | $325.00 | $288.75 | $260.00 | $350.00 |
| 55 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 1 | $441.00 | $250.00 | $285.00 | $335.00 | $300.00 | $290.00 | $325.00 |
| 56 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,273 | $1.25 | $1.50 | $1.00 | $1.00 | $2.00 | $1.25 | $0.75 |
| 57 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 174 | $8.50 | $7.50 | $10.00 | $14.00 | $10.05 | $12.00 | $11.00 |
| 58 | Reflectorized pavement marking type II (R&W) 6" (fire lane) (666-7230) | LF | 155 | $25.00 | $2.00 | $2.00 | $2.35 | $2.10 | $2.25 | $2.25 |
| 59 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 662 | $0.76 | $0.65 | $1.60 | $3.55 | $1.70 | $2.00 | $2.00 |
| 60 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 27,864 | $0.74 | $0.65 | $0.58 | $1.00 | $0.61 | $0.75 | $0.75 |
| 61 | Prefabricated PM type C (W)(number) (668-7102) | EACH | 50 | $200.00 | $150.00 | $150.00 | $141.00 | $158.00 | $175.00 | $158.00 |
| 62 | Prefabricated PM type C (W)(symbol) (668-7109) | EACH | 3 | $361.82 | $300.00 | $300.00 | $0.01 | $315.00 | $350.00 | $320.00 |
| 63 | Pre PM type C(BL&WH)(acc PRK)(W/bordr)LG (668-7133) | EACH | 2 | $500.00 | $450.00 | $250.00 | $295.00 | $263.00 | $290.00 | $260.00 |
| 64 | Pre PM type C(BL&WH)(acc PRK)(W/bordr)SM (668-7134) | EACH | 1 | $300.00 | $250.00 | $250.00 | $235.00 | $263.00 | $290.00 | $260.00 |
| 65 | Underseal course (3006-7001) | GAL | 13,925 | $3.50 | $4.50 | $4.25 | $5.30 | $4.00 | $5.00 | $3.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.