TxDOT contract A00064320 bid tabulation
Install/Rehabilitate Its, Various (VARIOUS LOCATIONS IN TARRANT CO to .). Let by Texas DOT on July 2, 2026, Tarrant, Fort Worth District. 6 bids received; low bid $3,181,301 by Sice, Inc., -24% against the engineer's estimate of $4,188,498.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $3,181,301 | Low | -24% |
| 2 | Florida Traffic Control Devices, Inc. | $3,438,000 | +8.0% | -18% |
| 3 | Mica Corporation | $3,484,188 | +10% | -17% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $3,582,948 | +13% | -14% |
| 5 | Elecnor Belco Electric, Inc. | $4,027,397 | +27% | -4.0% |
| 6 | Lumin8 Transportation Technologies, LLC | $5,263,462 | +65% | +26% |
Engineer's estimate: $4,188,498.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Florida Traffic Control Devices, Inc. | 3. Mica Corporation | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Elecnor Belco Electric, Inc. | 6. Lumin8 Transportation Technologies, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Block sodding (162-7002) | SY | 3,640 | $15.00 | $5.75 | $5.30 | $4.95 | $11.17 | $15.30 | $6.40 |
| 2 | Vegetative watering (168-7001) | TGL | 128 | $75.00 | $100.62 | $91.50 | $117.10 | $120.00 | $398.00 | $109.00 |
| 3 | Drilled shaft (48 in) (416-7008) | LF | 448 | $675.00 | $522.25 | $788.00 | $393.10 | $599.99 | $703.00 | $902.00 |
| 4 | Drilled shaft (54 in) (416-7009) | LF | 179 | $1,000.00 | $529.70 | $1,063.00 | $473.00 | $670.52 | $752.00 | $1,185.00 |
| 5 | Riprap (concrete)(CL A) (432-7004) | CY | 25 | $1,000.00 | $879.38 | $815.00 | $755.00 | $780.00 | $703.00 | $1,133.00 |
| 6 | Riprap (mow strip)(4 in) (432-7013) | CY | 41.20 | $740.00 | $809.27 | $750.00 | $695.00 | $900.00 | $730.00 | $785.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $376,140 | $314,917 | $200,000 | $297,116 | $352,963 | $528,000 | $487,930 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $12,000 | $9,395.87 | $2,290.00 | $26,356 | $7,544.18 | $8,138.00 | $26,253 |
| 9 | Portable changeable message sign (503-7001) | DAY | 151 | $100.00 | $153.06 | $169.00 | $101.20 | $51.71 | $89.00 | $220.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 141 | $167.00 | $307.68 | $169.00 | $317.25 | $218.62 | $97.00 | $287.00 |
| 11 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 360 | $10.00 | $9.55 | $7.15 | $6.65 | $9.60 | $16.00 | $8.50 |
| 12 | Biodegradable erosion control logs (remove) (506-7046) | LF | 360 | $5.00 | $1.48 | $1.40 | $1.27 | $2.40 | $5.00 | $1.60 |
| 13 | Metal W-beam guard fence (timber post) (540-7001) | LF | 500 | $50.00 | $30.89 | $28.60 | $33.20 | $37.20 | $31.00 | $38.00 |
| 14 | Downstream anchor terminal section (540-7015) | EACH | 5 | $1,400.00 | $1,482.64 | $1,375.00 | $1,516.00 | $1,740.00 | $1,468.00 | $1,590.00 |
| 15 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $500.00 | $247.11 | $230.06 | $424.00 | $240.00 | $245.00 | $314.00 |
| 16 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,500.00 | $3,644.82 | $3,375.00 | $3,467.00 | $3,930.00 | $3,607.00 | $4,640.00 |
| 17 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 205 | $29.00 | $12.96 | $14.40 | $11.70 | $14.76 | $19.00 | $41.00 |
| 18 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 10,234 | $27.00 | $15.31 | $17.65 | $10.90 | $30.60 | $17.50 | $43.00 |
| 19 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 3,825 | $33.00 | $16.07 | $32.70 | $21.55 | $29.41 | $27.00 | $29.00 |
| 20 | Conduit (RM) (3") (618-7082) | LF | 72 | $80.00 | $38.40 | $127.80 | $41.70 | $103.39 | $85.00 | $62.00 |
| 21 | Conduit (prepare) (618-7090) | LF | 5,515 | $4.30 | $0.62 | $4.50 | $1.62 | $3.36 | $7.40 | $1.50 |
| 22 | Electrical conductor (no.8) bare (620-7007) | LF | 2,822 | $2.00 | $1.43 | $1.80 | $2.21 | $2.09 | $2.00 | $2.50 |
| 23 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,816 | $2.50 | $1.66 | $2.15 | $2.21 | $2.30 | $2.00 | $2.50 |
| 24 | Electrical conductor (no.6) bare (620-7009) | LF | 292 | $3.00 | $1.95 | $2.05 | $2.77 | $2.54 | $2.50 | $3.10 |
| 25 | Electrical conductor (no.6) insulated (620-7010) | LF | 584 | $3.50 | $2.27 | $2.55 | $2.77 | $2.99 | $2.50 | $3.10 |
| 26 | Electrical conductor (no.4) bare (620-7011) | LF | 1,825 | $2.80 | $2.66 | $3.10 | $3.53 | $3.49 | $3.60 | $4.60 |
| 27 | Electrical conductor (no.4) insulated (620-7012) | LF | 3,984 | $3.10 | $3.18 | $3.60 | $3.53 | $3.91 | $3.50 | $4.60 |
| 28 | Electrical conductor (no.2) bare (620-7015) | LF | 1,934 | $4.20 | $3.96 | $4.25 | $5.40 | $4.78 | $5.00 | $5.50 |
| 29 | Electrical conductor (no.2) insulated (620-7016) | LF | 7,828 | $4.70 | $4.65 | $5.00 | $5.40 | $5.34 | $5.00 | $5.50 |
| 30 | Electrical conductor (no.1) bare (620-7017) | LF | 2,400 | $4.50 | $6.30 | $4.80 | $5.90 | $5.46 | $6.00 | $7.20 |
| 31 | Electrical conductor (no.1) insulated (620-7018) | LF | 4,800 | $4.80 | $7.02 | $6.30 | $5.90 | $5.93 | $6.00 | $7.20 |
| 32 | Electrical conductor (1/0) bare (620-7019) | LF | 2,090 | $8.00 | $6.89 | $5.65 | $6.85 | $6.46 | $7.00 | $8.40 |
| 33 | Electrical conductor (1/0) insulated (620-7020) | LF | 6,270 | $8.50 | $4.59 | $6.70 | $6.85 | $7.04 | $7.00 | $8.40 |
| 34 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 14 | $5,200.00 | $3,628.31 | $5,355.00 | $3,970.00 | $6,350.54 | $4,402.00 | $6,437.00 |
| 35 | ITS GND box(pcast) type 2 (366036)W/aprn (623-7008) | EACH | 12 | $7,500.00 | $5,560.03 | $8,390.00 | $5,729.00 | $9,341.78 | $8,574.00 | $8,837.00 |
| 36 | Ground box type D (162922)W/apron (624-7008) | EACH | 31 | $2,640.00 | $1,250.80 | $1,553.00 | $1,670.00 | $2,302.27 | $1,651.00 | $1,817.00 |
| 37 | Elc SRV type D 120/240 060(NS)SS(N)PS(U) (628-7154) | EACH | 6 | $10,000 | $6,202.06 | $8,400.00 | $9,110.00 | $8,149.39 | $7,459.00 | $12,803 |
| 38 | Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156) | EACH | 13 | $8,500.00 | $7,378.84 | $12,200 | $7,421.00 | $8,283.79 | $7,325.00 | $12,561 |
| 39 | Elc SRV type D 120/240 150(NS)SS(N)PS(U) (628-7290) | EACH | 1 | $10,000 | $6,616.53 | $11,100 | $9,721.00 | $8,703.79 | $7,927.00 | $12,803 |
| 40 | Install overhead sign support(35 FT bal tee) (650-7035) | EACH | 6 | $45,000 | $47,372 | $50,565 | $63,311 | $46,682 | $55,000 | $71,670 |
| 41 | Sign walkway (48 in) with HNDRL (654-7006) | LF | 49.98 | $650.00 | $640.14 | $648.00 | $534.00 | $748.00 | $1,000.00 | $707.00 |
| 42 | Install delineator assembly (D-SW)SZ 1(WFLX)GF2 (658-7001) | EACH | 9 | $50.00 | $30.89 | $40.00 | $38.00 | $30.00 | $31.00 | $126.00 |
| 43 | Install delineator assembly (D-SY)SZ 1(yflx)GF2 (658-7021) | EACH | 3 | $50.00 | $30.89 | $35.00 | $38.25 | $30.00 | $31.00 | $126.00 |
| 44 | Replace breaker panel (690-7233) | EACH | 1 | $5,000.00 | $3,703.35 | $1,600.00 | $3,823.00 | $1,098.02 | $1,338.00 | $611.00 |
| 45 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 6 | $23,300 | $10,437 | $12,725 | $16,475 | $12,745 | $15,138 | $10,576 |
| 46 | ITS com CBL (ethernet) (6005-7001) | LF | 335 | $5.00 | $1.40 | $3.05 | $8.15 | $8.83 | $2.00 | $1.90 |
| 47 | ITS RVSD (data collect & wwa) sys (6010-7001) | EACH | 19 | $21,000 | $13,560 | $11,900 | $14,602 | $9,492.11 | $15,434 | $13,634 |
| 48 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 20 | $23,600 | $28,017 | $26,140 | $21,405 | $23,123 | $27,175 | $47,331 |
| 49 | ITS pole MNT cab (type 3)(conf 2) (6011-7004) | EACH | 18 | $14,000 | $6,039.37 | $5,320.00 | $7,110.00 | $6,062.51 | $7,793.00 | $8,166.00 |
| 50 | Ground box (prepare) (6013-7006) | EACH | 21 | $350.00 | $494.21 | $330.00 | $373.00 | $830.83 | $245.00 | $957.00 |
| 51 | CCTV field equipment (digital) (6018-7002) | EACH | 20 | $9,500.00 | $7,342.48 | $8,930.00 | $10,805 | $7,757.68 | $11,049 | $9,028.00 |
| 52 | CCTV mount (pedestal) (6018-7010) | EACH | 20 | $650.00 | $846.03 | $465.00 | $976.00 | $848.83 | $2,224.00 | $412.00 |
| 53 | Fiber optic CBL (single-mode)(36 fiber) (6027-7002) | LF | 7,895 | $5.00 | $2.31 | $4.30 | $5.91 | $2.65 | $3.00 | $2.00 |
| 54 | Fiber optic fusion splice (6027-7004) | EACH | 192 | $100.00 | $71.66 | $54.00 | $66.10 | $72.00 | $65.00 | $49.00 |
| 55 | FO splice enclosure (type 1) (6027-7009) | EACH | 11 | $2,675.00 | $1,015.61 | $1,145.00 | $1,950.00 | $2,547.05 | $1,247.00 | $592.00 |
| 56 | FO CBL (12 SMF)(pigtail) (6027-7020) | LF | 740 | $5.00 | $2.05 | $2.40 | $10.45 | $8.74 | $16.00 | $62.00 |
| 57 | Preterm fiber patch panel (12 position) (6027-7021) | EACH | 8 | $2,000.00 | $684.48 | $972.00 | $1,940.00 | $2,173.52 | $1,614.00 | $8,188.00 |
| 58 | Preterm fiber patch panel (24 position) (6027-7044) | EACH | 4 | $2,800.00 | $983.48 | $1,315.00 | $2,290.00 | $2,898.02 | $3,227.00 | $8,251.00 |
| 59 | FO CBL (24 SMF)(pigtail) (6027-7045) | LF | 1,275 | $5.00 | $2.16 | $1.75 | $6.45 | $8.50 | $23.00 | $62.00 |
| 60 | Installation of ethernet switch (6052-7001) | EACH | 10 | $2,000.00 | $792.70 | $860.00 | $1,767.00 | $1,636.09 | $1,000.00 | $566.00 |
| 61 | Installation of cellular router (6052-7002) | EACH | 15 | $2,000.00 | $792.64 | $290.00 | $1,432.00 | $1,636.09 | $1,000.00 | $1,832.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.