TxDOT contract A00123433 bid tabulation
Advanced Traffic Management System, SS 10 (SH 36(N) to IH 69). Let by Texas DOT on May 6, 2026, Fort Bend, Houston District. 7 bids received; low bid $5,436,519 by Third Coast Services LLC, -17% against the engineer's estimate of $6,524,455.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 46
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Third Coast Services LLC | $5,436,519 | Low | -17% |
| 2 | Sice, Inc. | $5,688,473 | +5.0% | -13% |
| 3 | Allstate Signal & Construction, LLC | $5,940,503 | +9.0% | -9.0% |
| 4 | Traf-Tex, Inc. | $5,988,371 | +10% | -8.0% |
| 5 | Highway Intelligent Traffic Solutions, Inc. | $9,514,754 | +75% | +46% |
| 6 | The Levy Company, Inc. | $9,977,761 | +84% | +53% |
| 7 | Mica Corporation | $11,730,903 | +116% | +80% |
Engineer's estimate: $6,524,455.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Third Coast Services LLC | 2. Sice, Inc. | 3. Allstate Signal & Construction, LLC | 4. Traf-Tex, Inc. | 5. Highway Intelligent Traffic Solutions, Inc. | 6. The Levy Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (42 in) (416-7007) | LF | 170 | $375.00 | $284.34 | $512.15 | $388.99 | $573.80 | $545.23 | $680.00 |
| 2 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 37 | $695.70 | $745.80 | $691.18 | $641.00 | $696.91 | $870.00 | |
| 3 | Riprap (mow strip)(4 in) (432-7013) | CY | 37 | $622.86 | $812.51 | $575.00 | $764.00 | $903.23 | $1,000.00 | |
| 4 | Mobilization (500-7001) | LS | 1 | $882,473 | $543,652 | $509,461 | $105,500 | $179,072 | $770,222 | $997,776 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $3,500.00 | $1,850.91 | $2,367.18 | $2,433.34 | $1,245.00 | $10,703 | $10,400 |
| 6 | TMA (stationary) (505-7001) | DAY | 225 | $270.00 | $355.49 | $325.48 | $500.00 | $245.00 | $227.95 | $55.00 |
| 7 | Temporary sediment control fence (install) (506-7039) | LF | 2,500 | $3.00 | $2.84 | $4.29 | $4.00 | $5.30 | $3.54 | $5.00 |
| 8 | Temporary sediment control fence (remove) (506-7041) | LF | 2,500 | $1.00 | $1.01 | $0.99 | $2.00 | $0.90 | $1.18 | $1.25 |
| 9 | Metal W-beam guard fence (timber post) (540-7001) | LF | 700 | $34.75 | $33.46 | $24.44 | $30.85 | $37.81 | $32.00 | |
| 10 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,113.97 | $1,911.79 | $1,716.00 | $1,827.00 | $2,293.92 | $2,100.00 | |
| 11 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,618.39 | $4,182.04 | $3,328.00 | $3,938.00 | $4,378.98 | $4,300.00 | |
| 12 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 3,230 | $11.00 | $11.47 | $14.04 | $8.44 | $13.60 | $37.64 | $14.00 |
| 13 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 265 | $30.83 | $13.77 | $38.63 | $31.50 | $70.68 | $86.00 | |
| 14 | Conduit (prepare) (618-7090) | LF | 1,554 | $5.00 | $4.45 | $1.01 | $10.00 | $1.35 | $1.26 | $1.50 |
| 15 | ITS multi-duct CND (PVC-40)(concrete encse) (619-7003) | LF | 120,005 | $24.00 | $18.53 | $21.66 | $23.94 | $23.00 | $35.99 | $36.00 |
| 16 | ITS multi-duct CND (PVC-80)(bore) (619-7006) | LF | 12,550 | $45.00 | $46.46 | $23.78 | $48.98 | $62.90 | $108.49 | $160.00 |
| 17 | ITS multi-duct CND (RMC) (619-7008) | LF | 3,820 | $120.00 | $103.02 | $119.49 | $115.00 | $104.00 | $122.53 | $120.00 |
| 18 | Electrical conductor (no.14) insulated (620-7002) | LF | 66,920 | $0.80 | $0.59 | $0.70 | $0.94 | $1.00 | $0.85 | $1.00 |
| 19 | Electrical conductor (no.8) bare (620-7007) | LF | 1,160 | $1.75 | $2.13 | $1.17 | $1.92 | $1.75 | $1.62 | $1.60 |
| 20 | Electrical conductor (no.8) insulated (620-7008) | LF | 2,320 | $2.00 | $1.56 | $1.84 | $1.97 | $2.00 | $1.99 | $1.60 |
| 21 | Electrical conductor (no.6) bare (620-7009) | LF | 1,945 | $2.50 | $1.72 | $1.61 | $2.08 | $2.20 | $2.19 | $2.05 |
| 22 | Electrical conductor (no.6) insulated (620-7010) | LF | 2,660 | $2.14 | $1.96 | $2.35 | $2.60 | $2.66 | $2.05 | |
| 23 | Electrical conductor (no.4) bare (620-7011) | LF | 625 | $2.81 | $2.38 | $3.29 | $3.20 | $2.80 | $2.90 | |
| 24 | Electrical conductor (no.4) insulated (620-7012) | LF | 1,250 | $2.98 | $2.70 | $3.40 | $3.35 | $3.17 | $2.90 | |
| 25 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 105 | $3,800.00 | $4,114.70 | $4,354.96 | $4,583.00 | $4,170.00 | $4,981.72 | $5,000.00 |
| 26 | Ground box type A (122311) (624-7001) | EACH | 17 | $800.00 | $817.63 | $900.86 | $870.00 | $1,110.00 | $1,345.46 | $900.00 |
| 27 | Elc SRV type D 120/240 100(NS)SS(N)SP(O) (628-7259) | EACH | 13 | $6,500.00 | $8,218.39 | $6,576.87 | $6,555.00 | $7,408.00 | $9,319.26 | $6,500.00 |
| 28 | Install overhead sign support(35 FT bal tee) (650-7035) | EACH | 1 | $51,291 | $53,560 | $53,021 | $52,905 | $57,003 | $58,000 | |
| 29 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 16 | $38.75 | $41.82 | $33.80 | $39.00 | $47.20 | $35.00 | |
| 30 | Install DMS (foundation MTD cabinet) (6004-7002) | EACH | 1 | $8,040.48 | $13,432 | $12,750 | $19,100 | $7,853.31 | $12,500 | |
| 31 | System integration (6009-7001) | LS | 1 | $4,020.25 | $7,291.09 | $10,000 | $23,400 | $39,174 | $35,000 | |
| 32 | ITS RVSD system (data collection only) (6010-7002) | EACH | 5 | $10,000 | $7,960.69 | $9,102.84 | $10,260 | $15,196 | $14,548 | $11,700 |
| 33 | ITS pole (55 FT)(110 MPH) (6011-7027) | EACH | 8 | $21,000 | $22,219 | $23,129 | $22,737 | $20,185 | $29,003 | $24,500 |
| 34 | ITS pole MNTD cab (type 2)(conf 1) (6011-7028) | EACH | 9 | $6,500.00 | $5,016.50 | $4,489.59 | $6,105.00 | $6,680.00 | $11,074 | $5,500.00 |
| 35 | CCTV field equipment (digital) (6018-7002) | EACH | 9 | $6,750.00 | $6,303.82 | $7,171.67 | $8,275.00 | $8,238.00 | $8,580.75 | $8,800.00 |
| 36 | CCTV mount (mast) (6018-7009) | EACH | 1 | $737.71 | $648.11 | $100.00 | $2,038.00 | $377.22 | $240.00 | |
| 37 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 28,815 | $1.25 | $1.05 | $1.33 | $0.81 | $1.37 | $3.41 | $2.20 |
| 38 | Fiber optic fusion splice (6027-7004) | EACH | 156 | $100.00 | $67.26 | $102.16 | $292.05 | $45.50 | $71.89 | $65.00 |
| 39 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 14 | $1,200.00 | $1,301.10 | $1,661.15 | $883.90 | $201.30 | $1,734.22 | $1,200.00 |
| 40 | Fiber optic CBL(single-mode)(144 fiber) (6027-7006) | LF | 72,115 | $2.75 | $2.67 | $2.66 | $2.62 | $3.05 | $4.58 | $3.20 |
| 41 | Fiber optic patch panel (144 positions) (6027-7008) | EACH | 4 | $2,500.00 | $2,801.99 | $2,827.74 | $1,761.78 | $3,023.00 | $13,351 | $3,700.00 |
| 42 | Fiber optic CBL (single-mode)(6 fiber) (6027-7011) | LF | 20,185 | $1.00 | $1.13 | $1.62 | $0.70 | $1.45 | $1.59 | $2.20 |
| 43 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 4 | $2,500.00 | $1,010.63 | $1,363.91 | $922.34 | $300.00 | $1,344.82 | $1,200.00 |
| 44 | ITS GRND MNT cab (type 6)(conf 2) (6050-7009) | EACH | 3 | $17,000 | $12,553 | $14,973 | $15,850 | $15,300 | $21,305 | $17,500 |
| 45 | Communications hub building (6053-7001) | EACH | 1 | $34,935 | $40,906 | $37,700 | $38,100 | $54,155 | $47,000 | |
| 46 | Subsurface util locate (outside rdbed) (7019-7001) | EACH | 20 | $1,500.00 | $1,174.71 | $1,000.29 | $2,695.00 | $748.00 | $882.70 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way