TxDOT contract A00132160 bid tabulation
Hazard Elimination & Safety, US 183 (0.70 MI S. of SH 16 to Lampasas County Line). Let by Texas DOT on June 5, 2025, Mills, Brownwood District. 11 bids received; low bid $4,457,730 by Big Creek Construction, LTD., -20% against the engineer's estimate of $5,573,792.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 38
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $4,457,730 | Low | -20% |
| 2 | Prater Dirt Work LLC | $4,709,045 | +6.0% | -16% |
| 3 | CK Newberry, LLC | $4,746,060 | +6.0% | -15% |
| 4 | Cornerstone Paving and Construction, L.L.C. | $5,249,983 | +18% | -6.0% |
| 5 | Acme Bridge Company, Inc. | $5,297,613 | +19% | -5.0% |
| 6 | Knife River Corporation - South | $5,561,714 | +25% | 0.0% |
| 7 | A. L. Helmcamp, Inc. | $5,643,514 | +27% | +1.0% |
| 8 | Jay Mills Contracting, Incorporated | $5,794,822 | +30% | +4.0% |
| 9 | Allen Keller Company | $5,828,606 | +31% | +5.0% |
| 10 | Texas Materials Group, Inc. | $5,959,322 | +34% | +7.0% |
| 11 | STX Civil | $6,637,492 | +49% | +19% |
Engineer's estimate: $5,573,792.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Prater Dirt Work LLC | 3. CK Newberry, LLC | 4. Cornerstone Paving and Construction, L.L.C. | 5. Acme Bridge Company, Inc. | 6. Knife River Corporation - South |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type C) (132-7005) | CY | 10 | $300.00 | $100.00 | $750.00 | $300.00 | $100.00 | $235.00 | $500.00 |
| 2 | FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188) | CY | 23,133 | $65.00 | $57.00 | $44.50 | $65.00 | $79.50 | $68.80 | $70.00 |
| 3 | Rework BS metal (type C)(6")(ord comp) (251-7049) | SY | 175,998 | $1.95 | $2.40 | $2.00 | $1.45 | $2.00 | $2.04 | $2.00 |
| 4 | Prime coat (MC-30) (310-7004) | GAL | 31,463 | $7.00 | $3.00 | $6.10 | $5.00 | $4.90 | $4.55 | $4.00 |
| 5 | Asphalt (AC-20-5TR) (316-7007) | GAL | 168,826 | $5.00 | $3.90 | $5.10 | $3.50 | $4.30 | $4.45 | $4.00 |
| 6 | Asphalt (AC-20-5TR or CRS-2P) (316-7086) | GAL | 53,744 | $5.00 | $3.90 | $5.46 | $4.00 | $5.70 | $4.66 | $4.30 |
| 7 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 4,020 | $160.00 | $105.00 | $140.00 | $125.00 | $130.20 | $136.00 | $175.00 |
| 8 | Aggregate (type-PB or type-B, GR- 3 )(sac-B) (316-7282) | CY | 1,245 | $180.00 | $100.00 | $140.00 | $165.00 | $180.40 | $174.00 | $235.00 |
| 9 | Riprap (mow strip)(4 in) (432-7013) | CY | 32 | $900.00 | $750.00 | $550.00 | $700.00 | $1,200.00 | $880.00 | $1,250.00 |
| 10 | Retrofit rail (type T631) (451-7020) | LF | 50 | $200.00 | $200.00 | $125.00 | $200.00 | $118.00 | $180.00 | $125.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $489,000 | $280,000 | $430,000 | $450,000 | $250,000 | $432,000 | $540,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $10,000 | $4,600.00 | $3,500.00 | $5,000.00 | $4,000.00 | $14,600 | $9,000.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 165 | $250.00 | $240.00 | $250.00 | $325.00 | $110.00 | $157.00 | $250.00 |
| 14 | TMA (mobile operation) (505-7003) | DAY | 6 | $250.00 | $500.00 | $450.00 | $750.00 | $110.00 | $540.00 | $450.00 |
| 15 | Temporary sediment control fence (install) (506-7039) | LF | 400 | $6.00 | $4.00 | $10.00 | $10.00 | $8.00 | $8.40 | $15.00 |
| 16 | Temporary sediment control fence (remove) (506-7041) | LF | 400 | $2.00 | $1.00 | $5.00 | $3.00 | $3.00 | $3.15 | $5.00 |
| 17 | Driveways (surface treat) (530-7016) | SY | 4,055 | $33.00 | $34.00 | $22.50 | $27.84 | $51.40 | $42.90 | $50.00 |
| 18 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,575 | $40.00 | $34.00 | $35.00 | $35.00 | $29.00 | $33.70 | $32.00 |
| 19 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $3,500.00 | $3,000.00 | $2,400.00 | $2,800.00 | $2,255.00 | $3,010.00 | $3,300.00 |
| 20 | Metal beam guard fence (long span system) (540-7027) | EACH | 6 | $1,000.00 | $1,500.00 | $900.00 | $1,500.00 | $1,250.00 | $1,460.00 | $1,350.00 |
| 21 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 4 | $1,000.00 | $1,400.00 | $950.00 | $1,400.00 | $850.00 | $1,370.00 | $1,100.00 |
| 22 | Remove metal beam guard fence (542-7001) | LF | 950 | $10.00 | $8.50 | $4.00 | $10.00 | $8.00 | $8.40 | $3.00 |
| 23 | Guardrail end treatment (install) (544-7001) | EACH | 20 | $3,500.00 | $3,975.00 | $3,250.00 | $4,000.00 | $2,870.00 | $3,830.00 | $3,350.00 |
| 24 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 2 | $600.00 | $875.00 | $700.00 | $700.00 | $835.00 | $701.00 | $900.00 |
| 25 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 21 | $220.00 | $220.00 | $250.00 | $250.00 | $200.00 | $259.00 | $220.00 |
| 26 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 4 | $400.00 | $250.00 | $250.00 | $300.00 | $220.00 | $296.00 | $240.00 |
| 27 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 8 | $1,000.00 | $950.00 | $900.00 | $800.00 | $890.00 | $792.00 | $950.00 |
| 28 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 37 | $700.00 | $700.00 | $550.00 | $700.00 | $665.00 | $701.00 | $720.00 |
| 29 | Remove SM RD SN sup&AM (644-7073) | EACH | 45 | $200.00 | $300.00 | $100.00 | $100.00 | $270.00 | $113.00 | $270.00 |
| 30 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 76 | $50.00 | $38.00 | $40.00 | $40.00 | $35.00 | $43.10 | $35.00 |
| 31 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 9,617 | $2.00 | $1.50 | $1.90 | $1.00 | $1.00 | $1.45 | $1.60 |
| 32 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 6,412 | $2.00 | $1.50 | $1.90 | $1.00 | $1.10 | $1.45 | $1.60 |
| 33 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 128,230 | $0.90 | $0.90 | $0.85 | $0.75 | $0.72 | $0.76 | $0.87 |
| 34 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 256,460 | $0.90 | $0.90 | $0.84 | $0.75 | $0.72 | $0.76 | $0.86 |
| 35 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 32,070 | $0.70 | $0.65 | $0.63 | $0.80 | $0.78 | $0.83 | $0.64 |
| 36 | Reflectorized pavement marker type I-C (672-7002) | EACH | 1,600 | $5.00 | $6.00 | $6.36 | $5.00 | $4.75 | $5.00 | $6.50 |
| 37 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 3,224 | $5.00 | $6.00 | $6.36 | $5.00 | $4.75 | $5.00 | $6.50 |
| 38 | Eliminating existing PM & markers (4") (677-7001) | LF | 128,230 | $0.55 | $0.15 | $0.12 | $0.25 | $0.25 | $0.27 | $0.11 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.