| 1 | Removing concrete (riprap) (104-7006) | SY | 869 | $25.00 | $30.00 | $30.00 | $30.00 |
| 2 | Remove (6"-10") TRT/untrt base & asphalt pavement (105-7006) | SY | 2,478 | $12.00 | $28.00 | $10.00 | $4.00 |
| 3 | Excavation (roadway) (110-7001) | CY | 22 | $20.00 | $28.00 | $75.00 | $900.00 |
| 4 | Embankment (final)(DC)(type C) (132-7006) | CY | 491 | $15.00 | $28.00 | $75.00 | $35.00 |
| 5 | Blading (150-7002) | HR | 30 | $280.00 | $100.00 | $100.00 | $157.00 |
| 6 | Broadcast seed (permanent_rural_sand) (164-7033) | ACRE | 4,632 | $0.25 | $2.30 | $2.30 | $0.57 |
| 7 | Proof rolling (216-7001) | HR | 30 | $200.00 | $100.00 | $150.00 | $85.00 |
| 8 | FL BS (compacted in place)(type A GR 4) (8") (247-7069) | SY | 2,523 | $30.00 | $60.00 | $30.00 | $50.00 |
| 9 | Asphalt (AC-20-5TR or AC-20XP) (316-7067) | GAL | 1,438 | $6.00 | $10.00 | $40.00 | $10.00 |
| 10 | Aggregate (type-PB, GR-4)(sac-A) (316-7136) | CY | 38 | $230.00 | $150.00 | $500.00 | $450.00 |
| 11 | Tom-C PG76-22 sac-A (347-7001) | TON | 114 | $400.00 | $300.00 | $300.00 | $400.00 |
| 12 | Struct excavation (400-7001) | CY | 287 | $180.00 | $30.00 | $12.00 | $450.00 |
| 13 | Temporary special shoring (403-7001) | SF | 538 | $28.00 | $22.00 | $45.00 | $75.00 |
| 14 | Drilled shaft (18 in) (416-7002) | LF | 88 | $280.00 | $280.00 | $300.00 | $250.00 |
| 15 | Drilled shaft (36 in) (416-7006) | LF | 264 | $400.00 | $500.00 | $440.00 | $600.00 |
| 16 | Drilled shaft (42 in) (416-7007) | LF | 200 | $500.00 | $600.00 | $540.00 | $750.00 |
| 17 | Class C concrete (abutment)(HPC) (420-7013) | CY | 92.50 | $2,000.00 | $1,600.00 | $2,100.00 | $2,000.00 |
| 18 | Class C concrete (cap)(HPC) (420-7023) | CY | 60.80 | $2,000.00 | $1,600.00 | $2,100.00 | $3,000.00 |
| 19 | Class C concrete (column)(HPC) (420-7039) | CY | 26.40 | $2,000.00 | $1,700.00 | $2,100.00 | $1,900.00 |
| 20 | Reinforced concrete slab (HPC) (422-7002) | SF | 15,597 | $30.00 | $26.00 | $32.00 | $50.50 |
| 21 | Approach slab (HPC) (422-7014) | CY | 144.80 | $900.00 | $750.00 | $1,095.00 | $1,175.00 |
| 22 | Prestressed concrete girder (TX46) (425-7004) | LF | 2,020.30 | $265.00 | $320.00 | $283.00 | $286.00 |
| 23 | Riprap (mow strip)(4 in) (432-7013) | CY | 42 | $800.00 | $650.00 | $850.00 | $950.00 |
| 24 | Rail (type SSTR)(HPC) (450-7025) | LF | 762 | $120.00 | $135.00 | $225.00 | $110.00 |
| 25 | Sealed expansion joint (4 in) (SEJ - M) (454-7004) | LF | 126 | $225.00 | $260.00 | $300.00 | $300.00 |
| 26 | Gabion mattresses (galvanized)(12 in) (459-7007) | SY | 1,517 | $225.00 | $200.00 | $125.00 | $135.00 |
| 27 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 175 | $300.00 | $425.00 | $175.00 | $325.00 |
| 28 | Gabion (1.5' X 3')(galvanized) (459-7014) | CY | 39 | $300.00 | $310.00 | $175.00 | $500.00 |
| 29 | Removing structure (wingwall) (496-7005) | EACH | 3 | $3,000.00 | $2,300.00 | $3,000.00 | $1,500.00 |
| 30 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 1 | $120,000 | $135,000 | $180,000 | $250,000 |
| 31 | Removing structure (approach slab) (496-7022) | EACH | 2 | $6,000.00 | $17,500 | $5,000.00 | $7,500.00 |
| 32 | Mobilization (500-7001) | LS | 1 | $310,000 | $290,000 | $300,000 | $425,000 |
| 33 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $20,000 | $2,500.00 | $3,500.00 | $15,000 |
| 34 | Portable changeable message sign (503-7002) | EACH | 2 | $17,900 | $12,000 | $15,000 | $10,000 |
| 35 | TMA (stationary) (505-7001) | DAY | 434 | $240.00 | $175.00 | $400.00 | $110.00 |
| 36 | TMA (mobile operation) (505-7003) | DAY | 16 | $500.00 | $250.00 | $500.00 | $615.00 |
| 37 | Construction exits (install) (type 1) (506-7020) | SY | 230 | $34.00 | $120.00 | $60.00 | $62.50 |
| 38 | Construction exits (remove) (506-7024) | SY | 230 | $12.00 | $17.00 | $20.00 | $16.00 |
| 39 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 1,886 | $12.00 | $10.00 | $15.00 | $4.75 |
| 40 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,886 | $2.50 | $2.00 | $2.00 | $1.00 |
| 41 | One-way traffic control (port traffic signal) (510-7003) | MO | 10 | $7,000.00 | $9,500.00 | $5,500.00 | $3,000.00 |
| 42 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 960 | $65.00 | $115.00 | $105.00 | $35.00 |
| 43 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 960 | $20.00 | $20.00 | $15.00 | $4.00 |
| 44 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 960 | $25.00 | $35.00 | $25.00 | $30.00 |
| 45 | Metal W-beam guard fence (steel post) (540-7002) | LF | 350 | $39.00 | $50.00 | $40.00 | $45.00 |
| 46 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $3,000.00 | $2,250.00 | $1,800.00 | $3,000.00 |
| 47 | Remove metal beam guard fence (542-7001) | LF | 1,529 | $4.00 | $2.00 | $2.00 | $5.00 |
| 48 | Remove terminal anchor section (542-7002) | EACH | 2 | $340.00 | $300.00 | $250.00 | $500.00 |
| 49 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,800.00 | $3,500.00 | $4,000.00 | $4,500.00 |
| 50 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $340.00 | $300.00 | $250.00 | $500.00 |
| 51 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $1,700.00 | $2,000.00 | $1,500.00 | $800.00 |
| 52 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $1,400.00 | $1,500.00 | $2,000.00 | $800.00 |
| 53 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $10,000 | $9,000.00 | $10,000 | $10,000 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $1,000.00 | $650.00 | $1,000.00 | $2,000.00 |
| 55 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $150.00 | $150.00 | $150.00 | $150.00 |
| 56 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 8 | $40.00 | $45.00 | $50.00 | $85.00 |
| 57 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 8 | $40.00 | $45.00 | $50.00 | $85.00 |
| 58 | Remove delin & object marker assms (658-7078) | EACH | 8 | $40.00 | $50.00 | $20.00 | $35.00 |
| 59 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 6,534 | $0.35 | $1.50 | $1.50 | $0.35 |
| 60 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 24 | $10.00 | $21.00 | $23.00 | $6.30 |
| 61 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 7,200 | $0.35 | $2.00 | $1.50 | $0.40 |
| 62 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 840 | $0.80 | $4.00 | $3.50 | $1.30 |
| 63 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 420 | $0.80 | $4.00 | $3.50 | $1.30 |
| 64 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 100 | $0.80 | $4.00 | $3.50 | $2.50 |
| 65 | Pavement sler 6" (666-7347) | LF | 1,360 | $0.60 | $2.00 | $1.75 | $0.65 |
| 66 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 10,994 | $0.80 | $2.50 | $2.30 | $0.85 |
| 67 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 494 | $0.80 | $2.50 | $2.30 | $1.05 |
| 68 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 7,531 | $0.80 | $2.50 | $2.30 | $0.85 |
| 69 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 148 | $5.00 | $12.00 | $11.50 | $4.75 |
| 70 | Eliminating existing PM & markers (4") (677-7001) | LF | 6,216 | $1.00 | $5.00 | $1.50 | $2.85 |
| 71 | Eliminating existing PM & markers (24") (677-7008) | LF | 24 | $6.00 | $6.00 | $10.00 | $30.00 |
| 72 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,360 | $0.60 | $1.50 | $1.75 | $0.90 |