TxDOT contract A00188199 bid tabulation
Rehabilitate Traffic Signal, Various (Districtwide to .). Let by Texas DOT on January 7, 2025, Travis, Austin District. 5 bids received; low bid $1,886,974 by Elecnor Belco Electric, Inc., -17% against the engineer's estimate of $2,279,039.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 122
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elecnor Belco Electric, Inc. | $1,886,974 | Low | -17% |
| 2 | E-Z Bel Construction, LLC | $1,920,000 | +2.0% | -16% |
| 3 | Austin Traffic Signal Construction Co., Inc. | $2,070,784 | +10% | -9.0% |
| 4 | Florida Traffic Control Devices, Inc. | $2,220,220 | +18% | -3.0% |
| 5 | WG Engineering & Construction, LLC | $3,108,379 | +65% | +36% |
Engineer's estimate: $2,279,039.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elecnor Belco Electric, Inc. | 2. E-Z Bel Construction, LLC | 3. Austin Traffic Signal Construction Co., Inc. | 4. Florida Traffic Control Devices, Inc. | 5. WG Engineering & Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type C) (132-7005) | CY | 50 | $135.00 | $148.00 | $70.00 | $300.00 | $95.00 | $130.00 |
| 2 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 124 | $275.00 | $330.00 | $350.00 | $300.00 | $450.00 | $820.00 |
| 3 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 157 | $450.00 | $370.00 | $465.00 | $400.00 | $480.00 | $920.00 |
| 4 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $625.00 | $500.00 | $600.00 | $600.00 | $705.00 | $1,440.00 |
| 5 | Riprap (concrete)(5 in) (432-7002) | CY | 5 | $775.00 | $831.00 | $800.00 | $1,000.00 | $1,790.00 | $1,100.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $185,000 | $40,000 | $191,966 | $200,000 | $220,000 | $255,800 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $6,000.00 | $1,485.00 | $4,079.00 | $4,200.00 | $1,570.00 | $6,780.00 |
| 8 | Portable changeable message sign (503-7001) | DAY | 8 | $300.00 | $100.00 | $300.00 | $365.00 | $155.00 | $250.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 24 | $285.00 | $480.00 | $300.00 | $216.00 | $575.00 | $300.00 |
| 10 | TMA (mobile operation) (505-7002) | HR | 64 | $150.00 | $100.00 | $1.00 | $55.00 | $175.00 | $240.00 |
| 11 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 800 | $8.00 | $4.00 | $5.00 | $8.00 | $155.00 | $8.00 |
| 12 | Biodegradable erosion control logs (remove) (506-7046) | LF | 800 | $2.75 | $2.00 | $1.00 | $1.00 | $7.25 | $4.00 |
| 13 | Concrete curb (slotted) (529-7013) | LF | 52 | $22.00 | $97.00 | $75.00 | $100.00 | $95.00 | $50.00 |
| 14 | Concrete curb (dowel) (529-7014) | LF | 26 | $25.00 | $98.00 | $75.00 | $150.00 | $95.00 | $20.00 |
| 15 | Concrete sidewalks (5") (531-7002) | SY | 11 | $150.00 | $251.00 | $250.00 | $195.00 | $120.00 | $100.00 |
| 16 | Curb ramps (type 5) (531-7008) | EACH | 3 | $4,200.00 | $5,690.00 | $5,500.00 | $8,000.00 | $6,580.00 | $4,985.00 |
| 17 | Concrete sidewalks (special) (531-7025) | SY | 11 | $300.00 | $490.00 | $250.00 | $800.00 | $195.00 | $550.00 |
| 18 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 2,240 | $20.00 | $22.00 | $18.00 | $41.00 | $11.00 | $26.00 |
| 19 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 1,610 | $27.50 | $26.00 | $23.00 | $43.00 | $20.00 | $28.00 |
| 20 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 4,715 | $37.50 | $30.00 | $40.00 | $55.00 | $15.25 | $34.00 |
| 21 | Conduit (prepare) (618-7090) | LF | 900 | $2.00 | $4.00 | $1.00 | $3.00 | $4.00 | $12.00 |
| 22 | Electrical conductor (no.8) bare (620-7007) | LF | 8,195 | $2.25 | $1.85 | $1.20 | $1.70 | $1.75 | $4.00 |
| 23 | Electrical conductor (no.8) insulated (620-7008) | LF | 10,332 | $2.35 | $1.85 | $1.50 | $1.80 | $2.00 | $4.00 |
| 24 | Electrical conductor (no.6) bare (620-7009) | LF | 790 | $2.50 | $2.30 | $2.20 | $2.00 | $1.75 | $4.00 |
| 25 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,565 | $2.75 | $2.30 | $2.40 | $3.00 | $2.50 | $4.00 |
| 26 | Ground box type D (162922) (624-7007) | EACH | 1 | $1,500.00 | $1,387.00 | $1,300.00 | $2,123.00 | $755.00 | $1,685.00 |
| 27 | Ground box type D (162922)W/apron (624-7008) | EACH | 31 | $1,750.00 | $1,718.00 | $1,650.00 | $2,100.00 | $1,435.00 | $2,230.00 |
| 28 | Elc SRV type D 120/240 070(NS)AL(E)PS(U) (628-7168) | EACH | 1 | $5,300.00 | $6,508.00 | $11,000 | $7,000.00 | $6,740.00 | $9,054.00 |
| 29 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 6 | $8,500.00 | $7,148.00 | $9,000.00 | $6,000.00 | $7,650.00 | $9,258.00 |
| 30 | Aluminum signs (type A) (636-7001) | SF | 34 | $45.00 | $63.00 | $50.00 | $30.00 | $25.00 | $65.00 |
| 31 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 4 | $950.00 | $910.00 | $1,100.00 | $1,500.00 | $750.00 | $1,150.00 |
| 32 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 13 | $1,100.00 | $910.00 | $1,350.00 | $1,500.00 | $1,340.00 | $1,150.00 |
| 33 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $825.00 | $285.00 | $1,000.00 | $1,000.00 | $800.00 | $550.00 |
| 34 | Remove SM RD SN sup&AM (644-7073) | EACH | 23 | $175.00 | $165.00 | $175.00 | $100.00 | $195.00 | $300.00 |
| 35 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 94 | $2.30 | $1.50 | $1.25 | $8.55 | $1.50 | $2.00 |
| 36 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,294 | $2.50 | $1.50 | $1.25 | $4.60 | $1.50 | $2.00 |
| 37 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 162 | $8.50 | $5.00 | $4.00 | $11.70 | $5.00 | $6.00 |
| 38 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,200 | $12.50 | $11.40 | $10.00 | $16.90 | $12.00 | $14.00 |
| 39 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 19 | $290.00 | $399.00 | $350.00 | $235.00 | $420.00 | $469.00 |
| 40 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 2 | $125.00 | $455.00 | $400.00 | $460.00 | $480.00 | $536.00 |
| 41 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 19 | $300.00 | $398.00 | $350.00 | $255.00 | $420.00 | $469.00 |
| 42 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 5 | $65.00 | $86.00 | $75.00 | $105.00 | $90.00 | $100.50 |
| 43 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 75 | $8.00 | $4.60 | $4.00 | $11.70 | $5.00 | $6.00 |
| 44 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 1 | $550.00 | $513.00 | $450.00 | $520.00 | $540.00 | $603.00 |
| 45 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 310 | $6.00 | $11.40 | $10.00 | $5.00 | $12.00 | $14.00 |
| 46 | Pavement sler 6" (666-7347) | LF | 4,818 | $2.00 | $0.50 | $0.40 | $2.00 | $0.50 | $1.00 |
| 47 | Pavement sler 8" (666-7348) | LF | 829 | $5.00 | $1.00 | $0.60 | $2.00 | $0.75 | $1.00 |
| 48 | Pavement sler 24" (666-7352) | LF | 307 | $12.00 | $2.00 | $1.80 | $5.00 | $2.25 | $3.00 |
| 49 | Pavement sler (arrow) (666-7353) | EACH | 9 | $175.00 | $52.00 | $45.00 | $100.00 | $53.00 | $63.00 |
| 50 | Pavement sler (word) (666-7354) | EACH | 9 | $175.00 | $52.00 | $45.00 | $100.00 | $53.00 | $63.00 |
| 51 | Pavement sler (yld tri) (666-7365) | EACH | 5 | $50.00 | $35.00 | $30.00 | $50.00 | $35.00 | $42.00 |
| 52 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 550 | $2.25 | $1.50 | $1.25 | $3.40 | $1.50 | $2.00 |
| 53 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 4,304 | $2.25 | $1.50 | $1.25 | $2.25 | $1.50 | $2.00 |
| 54 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 5,396 | $2.00 | $1.50 | $1.25 | $2.25 | $1.50 | $2.00 |
| 55 | Reflectorized pavement marker type I-C (672-7002) | EACH | 34 | $9.00 | $14.00 | $12.00 | $10.00 | $14.50 | $18.00 |
| 56 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 180 | $9.00 | $14.00 | $12.00 | $9.00 | $14.50 | $18.00 |
| 57 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 54 | $8.00 | $14.00 | $12.00 | $10.00 | $14.50 | $18.00 |
| 58 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,299 | $2.25 | $1.14 | $1.00 | $1.50 | $1.25 | $2.00 |
| 59 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,170 | $3.50 | $1.73 | $1.50 | $2.50 | $2.00 | $2.00 |
| 60 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,163 | $4.75 | $2.30 | $2.00 | $3.50 | $2.25 | $3.00 |
| 61 | Eliminating existing PM & markers (12") (677-7006) | LF | 22 | $8.50 | $3.00 | $2.50 | $5.00 | $3.00 | $4.00 |
| 62 | Eliminating existing PM & markers (24") (677-7008) | LF | 186 | $10.25 | $6.00 | $5.00 | $7.00 | $6.00 | $7.00 |
| 63 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 13 | $275.00 | $86.00 | $75.00 | $100.00 | $90.00 | $110.00 |
| 64 | Eliminating existing PM & markers (word) (677-7015) | EACH | 11 | $325.00 | $86.00 | $75.00 | $100.00 | $90.00 | $110.00 |
| 65 | Eliminating existing PM & markers (med nose) (677-7021) | EACH | 1 | $200.00 | $114.00 | $100.00 | $150.00 | $120.00 | $135.00 |
| 66 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 30 | $20.00 | $40.00 | $35.00 | $35.00 | $42.00 | $50.00 |
| 67 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 18 | $45.00 | $40.00 | $35.00 | $35.00 | $43.00 | $50.00 |
| 68 | Pavement surface preparation for marking (6") (678-7002) | LF | 10,250 | $0.60 | $0.30 | $0.25 | $0.01 | $0.30 | $1.00 |
| 69 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,238 | $1.00 | $0.60 | $0.50 | $0.03 | $0.60 | $1.00 |
| 70 | Pavement surface preparation for marking (12") (678-7006) | LF | 75 | $2.00 | $0.90 | $0.75 | $0.10 | $1.00 | $1.00 |
| 71 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,128 | $4.00 | $1.15 | $1.00 | $0.20 | $1.25 | $1.50 |
| 72 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 14 | $40.00 | $29.00 | $25.00 | $5.00 | $29.00 | $35.00 |
| 73 | Pavement surface preparation for marking (word) (678-7016) | EACH | 14 | $40.00 | $29.00 | $25.00 | $5.00 | $29.00 | $35.00 |
| 74 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 5 | $25.00 | $23.00 | $20.00 | $5.00 | $24.00 | $30.00 |
| 75 | Install highway traffic signal (flash beacon) (680-7001) | EACH | 1 | $8,000.00 | $3,500.00 | $5,000.00 | $1,500.00 | $9,530.00 | $20,858 |
| 76 | Install highway traffic signal (isolated) (680-7002) | EACH | 6 | $12,500 | $32,600 | $6,000.00 | $8,000.00 | $16,490 | $58,503 |
| 77 | Removing traffic signals (680-7004) | EACH | 3 | $9,000.00 | $7,900.00 | $8,500.00 | $4,000.00 | $13,370 | $14,250 |
| 78 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $5,000.00 | $3,500.00 | $3,000.00 | $5,000.00 | $6,340.45 | $60,005 |
| 79 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 55 | $375.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 80 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 18 | $390.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 81 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 65 | $375.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 82 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 18 | $380.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 83 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 59 | $375.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 84 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 11 | $385.00 | $270.00 | $285.00 | $300.00 | $300.00 | $405.00 |
| 85 | Vehicle signal section (12")LED(green U-turn arrow) (682-7007) | EACH | 1 | $315.00 | $285.00 | $300.00 | $400.00 | $300.00 | $405.00 |
| 86 | Vehicle signal section (12")LED(yel U-turn arrow) (682-7008) | EACH | 1 | $315.00 | $285.00 | $300.00 | $400.00 | $300.00 | $405.00 |
| 87 | Vehicle signal section (12")LED(red U-turn arrow) (682-7009) | EACH | 1 | $315.00 | $285.00 | $300.00 | $400.00 | $300.00 | $405.00 |
| 88 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 20 | $900.00 | $675.00 | $685.00 | $600.00 | $1,480.00 | $1,352.00 |
| 89 | Back plate (12")(1 sec) (682-7021) | EACH | 12 | $225.00 | $248.00 | $120.00 | $200.00 | $200.00 | $320.00 |
| 90 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 5 | $215.00 | $444.00 | $200.00 | $200.00 | $315.00 | $240.00 |
| 91 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 15 | $230.00 | $269.00 | $135.00 | $150.00 | $300.00 | $250.00 |
| 92 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 4 | $250.00 | $444.00 | $200.00 | $200.00 | $315.00 | $285.00 |
| 93 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 8 | $220.00 | $269.00 | $135.00 | $150.00 | $325.00 | $300.00 |
| 94 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 3 | $260.00 | $444.00 | $200.00 | $200.00 | $300.00 | $350.00 |
| 95 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 33 | $225.00 | $269.00 | $135.00 | $150.00 | $300.00 | $320.00 |
| 96 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 2,550 | $2.00 | $2.90 | $2.00 | $1.00 | $2.00 | $4.00 |
| 97 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 335 | $3.50 | $5.00 | $2.00 | $1.00 | $1.50 | $5.00 |
| 98 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 12,819 | $2.85 | $3.00 | $2.00 | $2.00 | $2.00 | $4.00 |
| 99 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 2,706 | $4.00 | $4.00 | $2.00 | $3.00 | $2.75 | $5.50 |
| 100 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 7 | $8,500.00 | $7,700.00 | $7,200.00 | $9,000.00 | $14,780 | $14,940 |
| 101 | Ins traffic signal PL AM (S)1 arm(24') (686-7025) | EACH | 1 | $11,500 | $10,545 | $10,000 | $6,500.00 | $12,450 | $9,300.00 |
| 102 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 1 | $13,000 | $12,313 | $12,150 | $8,500.00 | $12,810 | $1,000.00 |
| 103 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 2 | $10,500 | $11,000 | $10,150 | $7,000.00 | $13,260 | $10,100 |
| 104 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 1 | $12,500 | $11,200 | $11,100 | $8,000.00 | $12,845 | $10,700 |
| 105 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 6 | $15,000 | $13,000 | $13,050 | $10,000 | $13,215 | $12,300 |
| 106 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 5 | $14,250 | $14,400 | $14,000 | $11,000 | $14,415 | $13,700 |
| 107 | Ins traffic signal PL AM(S)1 arm(40') (686-7041) | EACH | 2 | $16,000 | $13,200 | $12,100 | $10,000 | $15,115 | $13,100 |
| 108 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $13,500 | $15,100 | $14,300 | $11,000 | $15,740 | $14,900 |
| 109 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 4 | $17,500 | $15,500 | $14,625 | $12,000 | $17,200 | $15,400 |
| 110 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 2 | $33,000 | $35,000 | $37,800 | $35,000 | $36,100 | $30,800 |
| 111 | Pedestrian pole assembly (687-7001) | EACH | 15 | $3,500.00 | $2,400.00 | $1,900.00 | $3,000.00 | $4,000.00 | $3,450.00 |
| 112 | Pedestrian detect push button (APS) (688-7001) | EACH | 20 | $1,200.00 | $847.00 | $875.00 | $870.00 | $540.00 | $2,410.00 |
| 113 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $4,000.00 | $2,800.00 | $3,200.00 | $3,000.00 | $4,895.00 | $5,200.00 |
| 114 | ITS com CBL (ethernet) (6005-7001) | LF | 493 | $3.00 | $2.00 | $2.00 | $6.00 | $3.75 | $6.00 |
| 115 | Bbu system (external battery cabinet) (6007-7001) | EACH | 4 | $9,500.00 | $8,200.00 | $8,000.00 | $8,000.00 | $7,000.00 | $8,500.00 |
| 116 | RVDS (presence detection only) (6008-7001) | EACH | 19 | $9,000.00 | $6,150.00 | $6,500.00 | $6,000.00 | $6,300.00 | $9,800.00 |
| 117 | RVDS (advance detection only) (6008-7002) | EACH | 8 | $8,750.00 | $6,880.00 | $7,300.00 | $6,000.00 | $7,140.00 | $10,200 |
| 118 | RVDS (presence and advance detection) (6008-7003) | EACH | 6 | $12,500 | $7,400.00 | $7,600.00 | $7,000.00 | $8,780.00 | $16,400 |
| 119 | Ground box (prepare) (6013-7006) | EACH | 5 | $250.00 | $200.00 | $200.00 | $500.00 | $1,650.00 | $840.00 |
| 120 | Tree trimming (7012-7004) | EACH | 1 | $350.00 | $5,257.00 | $500.00 | $942.00 | $5,825.00 | $6,520.00 |
| 121 | Subsurface util locate (outside rdbed) (7019-7001) | EACH | 16 | $1,500.00 | $650.00 | $650.00 | $300.00 | $2,400.00 | $2,500.00 |
| 122 | Subsurface util locate (within rdbed) (7019-7002) | EACH | 1 | $2,100.00 | $650.00 | $2,000.00 | $2,600.00 | $6,000.00 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.