TxDOT contract A00188214 bid tabulation
Traffic Signal Improvements, Various (Districtwide to .). Let by Texas DOT on February 5, 2026, Travis, Austin District. 6 bids received; low bid $1,175,137 by The Levy Company, Inc., -15% against the engineer's estimate of $1,382,629.
- Owner
- Texas DOT
- Letting
- 05 FEB 2026
- Pay items
- 112
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Levy Company, Inc. | $1,175,137 | Low | -15% |
| 2 | E-Z Bel Construction, LLC | $1,200,839 | +2.0% | -13% |
| 3 | Austin Traffic Signal Construction Co., Inc. | $1,265,469 | +8.0% | -8.0% |
| 4 | Elecnor Belco Electric, Inc. | $1,389,779 | +18% | +1.0% |
| 5 | Sice, Inc. | $1,456,301 | +24% | +5.0% |
| 6 | Florida Traffic Control Devices, Inc. | $1,499,499 | +28% | +8.0% |
Engineer's estimate: $1,382,629.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Levy Company, Inc. | 2. E-Z Bel Construction, LLC | 3. Austin Traffic Signal Construction Co., Inc. | 4. Elecnor Belco Electric, Inc. | 5. Sice, Inc. | 6. Florida Traffic Control Devices, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 6 | $40.00 | $85.00 | $35.00 | $248.00 | $100.00 | $936.55 | $393.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 16 | $22.00 | $48.00 | $50.00 | $440.00 | $57.00 | $374.62 | $459.00 |
| 3 | Embankment (final)(OC)(type C) (132-7005) | CY | 15 | $25.00 | $48.00 | $100.00 | $440.00 | $78.00 | $499.49 | $455.00 |
| 4 | Block sodding (162-7002) | SY | 13 | $12.00 | $50.00 | $80.00 | $138.00 | $18.00 | $7.49 | $32.00 |
| 5 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 44 | $400.00 | $307.58 | $275.00 | $268.00 | $452.00 | $378.40 | $562.00 |
| 6 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 93 | $385.00 | $329.46 | $350.00 | $350.00 | $516.00 | $423.76 | $585.00 |
| 7 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 66 | $550.00 | $555.66 | $450.00 | $600.00 | $586.00 | $510.68 | $685.00 |
| 8 | Riprap (concrete)(5 in) (432-7002) | CY | 4 | $850.00 | $585.00 | $1,000.00 | $880.00 | $686.00 | $3,121.81 | $935.00 |
| 9 | Rail (handrail)(type B) (450-7059) | LF | 39 | $130.00 | $247.31 | $225.00 | $165.00 | $227.00 | $374.62 | $336.00 |
| 10 | RC pipe (CL III)(18 in) (464-7003) | LF | 24 | $90.00 | $254.26 | $350.00 | $275.00 | $298.00 | $561.93 | $1,226.00 |
| 11 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 2 | $2,500.00 | $2,850.00 | $4,800.00 | $2,600.00 | $3,340.00 | $3,677.50 | $1,980.00 |
| 12 | Removing structure (set) (496-7004) | EACH | 2 | $700.00 | $1,265.50 | $200.00 | $2,250.00 | $1,483.00 | $764.22 | $851.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $90,000 | $117,514 | $90,000 | $118,000 | $100,000 | $143,791 | $150,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $3,000.00 | $5,046.76 | $2,500.00 | $4,000.00 | $2,285.00 | $11,797 | $2,290.00 |
| 15 | Portable changeable message sign (503-7001) | DAY | 196 | $185.00 | $56.49 | $100.00 | $90.00 | $90.00 | $103.15 | $172.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 12 | $400.00 | $57.70 | $750.00 | $350.00 | $293.00 | $570.20 | $172.00 |
| 17 | TMA (mobile operation) (505-7002) | HR | 32 | $50.00 | $7.21 | $150.00 | $100.00 | $110.00 | $320.36 | $172.00 |
| 18 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 400 | $8.00 | $5.79 | $2.00 | $8.00 | $11.00 | $5.93 | $42.00 |
| 19 | Biodegradable erosion control logs (remove) (506-7046) | LF | 400 | $2.75 | $2.11 | $1.00 | $2.00 | $5.60 | $2.50 | $20.20 |
| 20 | Concrete curb (slotted) (529-7013) | LF | 62 | $75.00 | $65.00 | $65.00 | $75.00 | $76.20 | $114.88 | $55.00 |
| 21 | Concrete sidewalks (6") (531-7003) | SY | 28 | $200.00 | $156.00 | $150.00 | $277.00 | $183.00 | $327.17 | $236.00 |
| 22 | Curb ramps (type 5) (531-7008) | EACH | 3 | $5,700.00 | $3,850.00 | $1,900.00 | $5,000.00 | $4,511.00 | $3,566.36 | $7,265.00 |
| 23 | Curb ramps (type 5) (531-7018) | SY | 26 | $260.00 | $148.00 | $280.00 | $600.00 | $174.00 | $439.55 | $292.00 |
| 24 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 550 | $17.00 | $17.67 | $23.00 | $10.00 | $23.50 | $21.58 | $12.90 |
| 25 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 1,850 | $22.00 | $15.00 | $25.00 | $15.00 | $28.50 | $26.79 | $16.80 |
| 26 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 2,710 | $33.00 | $26.58 | $37.00 | $45.00 | $34.00 | $21.24 | $42.35 |
| 27 | Electrical conductor (no.14) insulated (620-7002) | LF | 1,170 | $1.15 | $0.89 | $1.35 | $2.00 | $1.20 | $0.81 | $1.50 |
| 28 | Electrical conductor (no.8) bare (620-7007) | LF | 3,915 | $2.10 | $1.70 | $2.00 | $1.20 | $2.00 | $1.82 | $1.75 |
| 29 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,780 | $2.35 | $1.80 | $2.10 | $1.40 | $2.00 | $2.20 | $2.30 |
| 30 | Electrical conductor (no.6) bare (620-7009) | LF | 90 | $2.60 | $2.26 | $3.00 | $1.70 | $2.50 | $2.50 | $2.25 |
| 31 | Electrical conductor (no.6) insulated (620-7010) | LF | 175 | $3.00 | $2.43 | $3.10 | $2.00 | $2.50 | $3.04 | $2.65 |
| 32 | Ground box type D (162922)W/apron (624-7008) | EACH | 21 | $1,750.00 | $1,578.61 | $1,400.00 | $1,800.00 | $3,050.00 | $1,886.51 | $1,704.00 |
| 33 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 4 | $9,000.00 | $7,804.79 | $8,500.00 | $5,770.00 | $7,600.00 | $7,985.61 | $9,615.00 |
| 34 | Aluminum signs (type A) (636-7001) | SF | 242.50 | $42.00 | $39.22 | $30.00 | $39.00 | $30.00 | $43.91 | $27.50 |
| 35 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $900.00 | $1,382.89 | $1,500.00 | $1,300.00 | $1,760.00 | $1,873.09 | $1,330.00 |
| 36 | Remove SM RD SN sup&AM (644-7073) | EACH | 12 | $130.00 | $181.59 | $100.00 | $125.00 | $293.00 | $312.18 | $214.00 |
| 37 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 50 | $8.00 | $5.50 | $5.00 | $5.00 | $6.00 | $6.24 | $4.75 |
| 38 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 657 | $4.00 | $2.00 | $2.75 | $4.00 | $3.50 | $3.43 | $4.15 |
| 39 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 658 | $8.00 | $15.50 | $12.00 | $10.00 | $14.00 | $14.99 | $11.50 |
| 40 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 14 | $240.00 | $235.00 | $325.00 | $155.00 | $381.00 | $405.84 | $176.00 |
| 41 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 14 | $270.00 | $395.00 | $325.00 | $165.00 | $381.00 | $405.84 | $188.00 |
| 42 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 2 | $200.00 | $310.00 | $200.00 | $115.00 | $235.00 | $249.75 | $129.00 |
| 43 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 2 | $270.00 | $375.00 | $325.00 | $160.00 | $381.00 | $405.84 | $176.00 |
| 44 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 62 | $7.00 | $15.50 | $12.00 | $10.00 | $14.00 | $14.99 | $10.60 |
| 45 | Pavement sler 6" (666-7347) | LF | 233 | $1.00 | $0.45 | $1.00 | $0.90 | $1.20 | $1.25 | $0.90 |
| 46 | Pavement sler 8" (666-7348) | LF | 137 | $1.00 | $0.85 | $1.00 | $1.20 | $1.20 | $1.25 | $1.30 |
| 47 | Pavement sler 24" (666-7352) | LF | 584 | $2.60 | $5.60 | $4.00 | $2.40 | $4.70 | $5.00 | $2.60 |
| 48 | Pavement sler (arrow) (666-7353) | EACH | 11 | $70.00 | $90.00 | $100.00 | $60.00 | $118.00 | $124.87 | $65.00 |
| 49 | Pavement sler (word) (666-7354) | EACH | 11 | $75.00 | $110.00 | $100.00 | $71.00 | $118.00 | $124.87 | $76.00 |
| 50 | Pavement sler (bike arrow) (666-7368) | EACH | 2 | $55.00 | $90.00 | $50.00 | $44.00 | $59.00 | $62.44 | $47.00 |
| 51 | Pavement sler (bike symbol) (666-7369) | EACH | 2 | $65.00 | $90.00 | $50.00 | $49.00 | $59.00 | $62.44 | $53.00 |
| 52 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 220 | $0.45 | $1.00 | $2.00 | $3.00 | $2.50 | $2.50 | $2.80 |
| 53 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 320 | $0.80 | $1.75 | $2.00 | $3.00 | $2.50 | $2.50 | $3.30 |
| 54 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,770 | $1.00 | $1.25 | $2.00 | $3.00 | $2.50 | $2.50 | $3.10 |
| 55 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 140 | $1.15 | $1.75 | $2.00 | $3.00 | $2.50 | $2.50 | $3.30 |
| 56 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,983 | $0.85 | $1.25 | $2.00 | $3.00 | $2.50 | $2.50 | $3.00 |
| 57 | Reflectorized pavement marker type I-C (672-7002) | EACH | 45 | $7.00 | $10.00 | $10.00 | $11.00 | $12.00 | $12.49 | $12.00 |
| 58 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 54 | $7.00 | $10.00 | $10.00 | $18.00 | $12.00 | $12.49 | $19.50 |
| 59 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 14 | $7.50 | $10.00 | $10.00 | $11.00 | $12.00 | $12.49 | $12.00 |
| 60 | Eliminating existing PM & markers (4") (677-7001) | LF | 585 | $0.60 | $1.85 | $2.00 | $2.00 | $2.50 | $2.50 | $2.00 |
| 61 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,770 | $1.35 | $2.80 | $2.00 | $2.50 | $2.50 | $2.50 | $2.60 |
| 62 | Eliminating existing PM & markers (8") (677-7004) | LF | 220 | $2.05 | $4.70 | $3.00 | $3.00 | $3.50 | $3.75 | $3.20 |
| 63 | Eliminating existing PM & markers (24") (677-7008) | LF | 57 | $5.10 | $7.30 | $6.00 | $7.00 | $7.00 | $7.49 | $7.90 |
| 64 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 9 | $115.00 | $110.00 | $300.00 | $99.00 | $352.00 | $374.62 | $105.00 |
| 65 | Eliminating existing PM & markers (word) (677-7015) | EACH | 9 | $130.00 | $120.00 | $300.00 | $105.00 | $352.00 | $374.62 | $112.00 |
| 66 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 2 | $90.00 | $110.00 | $250.00 | $82.00 | $293.00 | $312.18 | $88.00 |
| 67 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 2 | $110.00 | $110.00 | $250.00 | $93.00 | $293.00 | $312.18 | $100.00 |
| 68 | Pavement surface preparation for marking (4") (678-7001) | LF | 270 | $1.00 | $0.07 | $0.20 | $0.01 | $1.00 | $0.25 | $0.02 |
| 69 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,213 | $0.45 | $0.08 | $0.25 | $0.02 | $0.30 | $0.31 | $0.03 |
| 70 | Pavement surface preparation for marking (8") (678-7004) | LF | 657 | $0.65 | $0.35 | $0.35 | $0.06 | $1.00 | $0.44 | $0.06 |
| 71 | Pavement surface preparation for marking (24") (678-7008) | LF | 690 | $2.25 | $2.20 | $1.00 | $0.11 | $1.20 | $1.25 | $0.15 |
| 72 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 14 | $55.00 | $30.00 | $35.00 | $1.10 | $41.00 | $43.71 | $1.20 |
| 73 | Pavement surface preparation for marking (word) (678-7016) | EACH | 14 | $70.00 | $30.00 | $35.00 | $1.10 | $41.00 | $43.71 | $1.20 |
| 74 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 2 | $45.00 | $30.00 | $35.00 | $1.10 | $41.00 | $43.71 | $1.20 |
| 75 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 2 | $50.00 | $30.00 | $35.00 | $1.10 | $41.00 | $43.71 | $1.20 |
| 76 | Install highway traffic signal (isolated) (680-7002) | EACH | 4 | $20,000 | $7,193.66 | $8,500.00 | $7,500.00 | $31,700 | $5,442.86 | $17,325 |
| 77 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 35 | $325.00 | $331.13 | $295.00 | $275.00 | $219.00 | $252.19 | $360.00 |
| 78 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 9 | $350.00 | $331.13 | $295.00 | $275.00 | $219.00 | $254.96 | $375.00 |
| 79 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 35 | $325.00 | $331.13 | $295.00 | $275.00 | $219.00 | $252.19 | $365.00 |
| 80 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 14 | $350.00 | $331.13 | $295.00 | $275.00 | $219.00 | $253.77 | $365.00 |
| 81 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 35 | $325.00 | $331.13 | $295.00 | $275.00 | $219.00 | $252.19 | $360.00 |
| 82 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 9 | $350.00 | $331.13 | $295.00 | $275.00 | $219.00 | $254.96 | $365.00 |
| 83 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $750.00 | $794.29 | $600.00 | $550.00 | $690.00 | $631.17 | $725.00 |
| 84 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 4 | $200.00 | $195.66 | $240.00 | $200.00 | $189.00 | $290.42 | $360.00 |
| 85 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 10 | $160.00 | $182.11 | $160.00 | $190.00 | $840.00 | $243.92 | $300.00 |
| 86 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 1 | $215.00 | $195.69 | $240.00 | $200.00 | $943.00 | $256.41 | $360.00 |
| 87 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 29 | $195.00 | $182.10 | $160.00 | $190.00 | $122.00 | $287.18 | $240.00 |
| 88 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 940 | $2.25 | $1.56 | $1.85 | $1.30 | $3.00 | $2.74 | $2.20 |
| 89 | Traffic signal CBL (type A)(14 AWG)(2 conductor) (684-7028) | LF | 515 | $2.65 | $1.64 | $1.95 | $1.40 | $3.00 | $2.92 | $4.10 |
| 90 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 7,302 | $2.80 | $2.06 | $2.35 | $2.00 | $3.50 | $3.63 | $2.75 |
| 91 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 1,971 | $3.35 | $2.88 | $3.10 | $3.00 | $4.20 | $4.55 | $3.80 |
| 92 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 1 | $8,000.00 | $7,089.76 | $7,500.00 | $12,000 | $8,560.00 | $5,519.67 | $9,569.59 |
| 93 | Removing RDSD FLSH BCN AM (solar PWRD) (685-7006) | EACH | 2 | $1,200.00 | $204.31 | $150.00 | $500.00 | $431.00 | $1,274.47 | $545.00 |
| 94 | Ins traffic signal PL AM(S)1 arm(24')lum (686-7027) | EACH | 2 | $13,000 | $10,824 | $12,000 | $11,000 | $9,650.00 | $13,177 | $12,000 |
| 95 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 1 | $14,500 | $10,883 | $13,000 | $12,000 | $9,790.00 | $13,004 | $12,400 |
| 96 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $15,000 | $12,033 | $14,000 | $13,000 | $10,730 | $13,304 | $12,200 |
| 97 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 2 | $15,500 | $13,371 | $15,500 | $14,286 | $11,770 | $15,311 | $14,050 |
| 98 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 3 | $17,000 | $14,473 | $16,500 | $14,723 | $12,500 | $16,231 | $15,000 |
| 99 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $17,500 | $14,976 | $17,000 | $15,232 | $12,800 | $16,111 | $15,260 |
| 100 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $37,100 | $37,879 | $30,000 | $38,712 | $33,500 | $38,303 | $38,700 |
| 101 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 2 | $40,500 | $39,397 | $32,000 | $41,000 | $35,100 | $36,273 | $36,300 |
| 102 | Ins traffic signal PL AM(S)2 arm(44-36')lum (686-7167) | EACH | 1 | $26,800 | $21,819 | $20,000 | $22,000 | $18,850 | $18,811 | $19,200 |
| 103 | Pedestrian pole assembly (687-7001) | EACH | 7 | $3,750.00 | $2,609.82 | $1,500.00 | $3,500.00 | $3,800.00 | $2,486.93 | $4,410.00 |
| 104 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,200.00 | $947.69 | $1,100.00 | $875.00 | $1,160.00 | $944.28 | $1,030.00 |
| 105 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $4,500.00 | $3,874.96 | $4,500.00 | $3,760.00 | $3,900.00 | $4,722.44 | $4,015.00 |
| 106 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 8 | $1,600.00 | $1,227.90 | $1,000.00 | $350.00 | $782.00 | $1,534.83 | $980.00 |
| 107 | ITS com CBL (ethernet) (6005-7001) | LF | 250 | $4.00 | $1.28 | $2.00 | $2.00 | $3.00 | $2.19 | $1.70 |
| 108 | Bbu system (external battery cabinet) (6007-7001) | EACH | 4 | $9,000.00 | $8,491.23 | $9,000.00 | $8,600.00 | $9,010.00 | $10,117 | $8,250.00 |
| 109 | RVDS (presence detection only) (6008-7001) | EACH | 15 | $8,250.00 | $5,509.75 | $6,000.00 | $5,600.00 | $6,325.00 | $6,425.04 | $6,660.00 |
| 110 | RVDS (advance detection only) (6008-7002) | EACH | 10 | $8,500.00 | $5,509.75 | $6,500.00 | $5,600.00 | $7,461.00 | $7,483.84 | $7,780.00 |
| 111 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 1,235 | $4.35 | $2.88 | $3.50 | $5.00 | $2.00 | $7.21 | $6.60 |
| 112 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 2 | $1,500.00 | $1,213.39 | $675.00 | $4,200.00 | $1,500.00 | $8,399.63 | $833.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.