Hazard Elimination & Safety, FM 1456 (2 Mi West of SH 159 to SH 159). Let by Texas DOT on May 6, 2026, Austin, Yoakum District. 8 bids received; low bid $2,587,895 by Big Creek Construction, LTD., -6.1% against the engineer's estimate of $2,755,374.
- Owner
- Texas DOT
- Letting
- 06 MAY 2026
- Pay items
- 59
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $2,587,895 | Low | -6.0% |
| 2 | Matagorda Construction & Materials | $2,697,120 | +4.0% | -2.0% |
| 3 | Hunter Industries, LTD. | $2,718,147 | +5.0% | -1.0% |
| 4 | Clark Construction of Texas, Inc. | $2,862,555 | +11% | +4.0% |
| 5 | Knife River Corporation - South | $2,971,971 | +15% | +8.0% |
| 6 | Texas Materials Group, Inc. | $3,126,638 | +21% | +13% |
| 7 | STX Civil | $3,261,137 | +26% | +18% |
| 8 | Acme Bridge Company, Inc. | $3,659,350 | +41% | +33% |
Engineer's estimate: $2,755,374.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Matagorda Construction & Materials | 3. Hunter Industries, LTD. | 4. Clark Construction of Texas, Inc. | 5. Knife River Corporation - South | 6. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 26.70 | $20.00 | $25.00 | $17.00 | $29.70 | $48.30 | $82.00 | $77.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 10,116 | $23.00 | $15.00 | $10.00 | $14.30 | $14.15 | $11.25 | $13.00 |
| 3 | Embankment (final)(OC)(type C) (132-7005) | CY | 9,859 | $13.00 | $15.00 | $12.00 | $14.30 | $11.93 | $6.15 | $16.85 |
| 4 | Broadcast seed (temporary_warm) (164-7005) | SY | 515 | $0.50 | $0.90 | $0.30 | $0.30 | $0.30 | $0.34 | $0.41 |
| 5 | Broadcast seed (temporary_cool) (164-7006) | SY | 515 | $0.50 | $0.90 | $0.30 | $0.30 | $0.30 | $0.34 | $0.41 |
| 6 | Drill seed (permanent_rural_clay) (164-7010) | SY | 85,728 | $0.25 | $0.23 | $0.20 | $0.18 | $0.18 | $0.20 | $0.20 |
| 7 | Drill seed (temporary_warm) (164-7013) | SY | 21,432 | $0.25 | $0.19 | $0.20 | $0.17 | $0.17 | $0.19 | $0.20 |
| 8 | Drill seed (temporary_cool) (164-7014) | SY | 21,432 | $0.33 | $0.19 | $0.20 | $0.17 | $0.17 | $0.19 | $0.20 |
| 9 | Vegetative watering (168-7001) | TGL | 126 | $60.00 | $25.00 | $40.00 | $26.40 | $40.00 | $50.00 | $28.00 |
| 10 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 9,994 | $70.00 | $92.00 | $113.00 | $99.39 | $106.95 | $106.25 | $115.00 |
| 11 | Cement (275-7001) | TON | 359 | $215.00 | $195.00 | $176.00 | $209.00 | $225.00 | $230.00 | $218.00 |
| 12 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 47,863 | $3.00 | $2.50 | $1.58 | $2.20 | $1.28 | $0.55 | $2.85 |
| 13 | Asphalt (RC-250) (316-7016) | GAL | 8,289 | $8.00 | $5.25 | $5.00 | $5.28 | $7.29 | $4.75 | $5.35 |
| 14 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 293 | $400.00 | $150.00 | $213.00 | $122.69 | $168.26 | $164.00 | $203.00 |
| 15 | Aggregate (type-PE, GR-3)(sac-B) (316-7229) | CY | 473 | $160.00 | $150.00 | $205.00 | $164.93 | $163.06 | $179.00 | $221.00 |
| 16 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 325 | $200.00 | $160.00 | $202.00 | $164.90 | $192.69 | $173.00 | $225.00 |
| 17 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 30,290 | $4.00 | $4.00 | $4.50 | $4.62 | $4.82 | $4.00 | $4.75 |
| 18 | Cut & restoring pavement (400-7006) | SY | 54 | $200.00 | $150.00 | $85.00 | $154.00 | $44.00 | $16.00 | $164.00 |
| 19 | Cem stabil BKFL (400-7010) | CY | 141 | $170.00 | $185.00 | $75.00 | $215.00 | $140.00 | $149.00 | $141.00 |
| 20 | Temporary special shoring (403-7001) | SF | 200 | $50.00 | $50.00 | $20.00 | $46.00 | $30.00 | $28.00 | $88.00 |
| 21 | Riprap (concrete)(5 in) (432-7002) | CY | 17.82 | $675.00 | $850.00 | $1,100.00 | $750.00 | $660.00 | $598.00 | $566.00 |
| 22 | Concrete box culvert (5 FT X 3 FT) (462-7007) | LF | 240 | $530.00 | $425.00 | $675.00 | $605.00 | $1,058.00 | $769.00 | $728.00 |
| 23 | Concrete box culvert (5 FT X 2 FT)(extend) (462-7061) | LF | 90 | $900.00 | $600.00 | $850.00 | $900.00 | $600.00 | $452.00 | $428.00 |
| 24 | RC pipe (CL III)(18 in) (464-7003) | LF | 153 | $115.00 | $90.00 | $87.00 | $205.00 | $196.70 | $169.00 | $160.00 |
| 25 | Set (type I)(S= 5 FT)(HW= 3 FT)(4:1)(C) (467-7096) | EACH | 6 | $9,500.00 | $3,000.00 | $6,500.00 | $4,100.00 | $6,000.00 | $6,337.00 | $5,638.00 |
| 26 | Set (type I)(S= 5 FT)(HW= 4 FT)(4:1)(C) (467-7100) | EACH | 8 | $9,000.00 | $4,000.00 | $7,600.00 | $4,400.00 | $5,050.00 | $6,076.00 | $5,481.00 |
| 27 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 14 | $1,400.00 | $1,400.00 | $3,000.00 | $3,200.00 | $2,310.00 | $2,577.00 | $2,439.00 |
| 28 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 10 | $1,500.00 | $1,500.00 | $3,500.00 | $3,700.00 | $2,715.00 | $2,327.00 | $2,203.00 |
| 29 | Removing structure (box culvert) (496-7001) | EACH | 1 | $13,000 | $6,000.00 | $12,000 | $18,000 | $10,000 | $4,337.00 | $4,105.00 |
| 30 | Mobilization (500-7001) | LS | 1 | $245,000 | $250,000 | $38,000 | $197,102 | $134,500 | $270,670 | $232,879 |
| 31 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $3,500.00 | $5,000.00 | $5,000.00 | $3,759.61 | $2,992.00 | $24,393 | $3,550.00 |
| 32 | Portable changeable message sign (503-7002) | EACH | 6 | $8,000.00 | $5,000.00 | $5,000.00 | $1,125.80 | $8,500.00 | $8,216.00 | $9,458.00 |
| 33 | TMA (stationary) (505-7001) | DAY | 20 | $250.00 | $300.00 | $275.00 | $100.00 | $218.50 | $608.00 | $450.00 |
| 34 | TMA (mobile operation) (505-7003) | DAY | 20 | $300.00 | $550.00 | $630.00 | $150.00 | $300.00 | $986.00 | $450.00 |
| 35 | Rock filter dams (install) (type 1) (506-7001) | LF | 200 | $50.00 | $45.00 | $32.00 | $45.97 | $45.97 | $52.00 | $37.00 |
| 36 | Rock filter dams (remove) (506-7011) | LF | 200 | $40.00 | $10.00 | $8.00 | $17.93 | $17.93 | $20.00 | $25.00 |
| 37 | Sandbags for erosion control (506-7035) | EACH | 100 | $14.00 | $25.00 | $15.00 | $22.43 | $22.43 | $25.00 | $3.55 |
| 38 | Temporary sediment control fence (install) (506-7039) | LF | 1,080 | $5.00 | $5.00 | $5.00 | $4.87 | $4.87 | $5.50 | $5.00 |
| 39 | Temporary sediment control fence (remove) (506-7041) | LF | 1,080 | $2.00 | $1.00 | $1.00 | $1.24 | $1.24 | $1.50 | $2.15 |
| 40 | Driveways (concrete) (530-7006) | SY | 27 | $150.00 | $200.00 | $125.00 | $200.00 | $135.00 | $265.00 | $212.00 |
| 41 | Driveways (surface treat) (530-7016) | SY | 1,167 | $35.00 | $30.00 | $20.00 | $39.60 | $33.37 | $67.00 | $80.00 |
| 42 | Turnouts (surface treat) (530-7019) | SY | 131 | $60.00 | $30.00 | $25.00 | $39.60 | $133.41 | $64.00 | $121.00 |
| 43 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 21 | $250.00 | $225.00 | $350.00 | $215.00 | $215.00 | $511.00 | $231.00 |
| 44 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 2 | $250.00 | $250.00 | $450.00 | $240.00 | $240.00 | $625.00 | $258.00 |
| 45 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 3 | $1,200.00 | $850.00 | $1,300.00 | $830.00 | $830.00 | $738.00 | $893.00 |
| 46 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,200.00 | $1,000.00 | $1,300.00 | $1,000.00 | $1,000.00 | $738.00 | $1,075.00 |
| 47 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 6 | $550.00 | $500.00 | $650.00 | $500.00 | $500.00 | $738.00 | $538.00 |
| 48 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 6 | $600.00 | $550.00 | $550.00 | $550.00 | $550.00 | $738.00 | $592.00 |
| 49 | Install object marker assembly (OM-2Z)(WFLX)GNDHH(BI) (658-7253) | EACH | 20 | $150.00 | $70.00 | $275.00 | $68.00 | $68.00 | $113.00 | $73.00 |
| 50 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 66,600 | $0.25 | $0.33 | $0.42 | $0.30 | $0.35 | $0.34 | $0.32 |
| 51 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 8,520 | $0.25 | $0.33 | $0.42 | $0.30 | $0.35 | $0.34 | $0.32 |
| 52 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 10,287 | $0.25 | $0.33 | $0.42 | $0.30 | $0.35 | $0.34 | $0.32 |
| 53 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,405 | $0.75 | $1.50 | $1.50 | $1.06 | $2.00 | $1.14 | $1.08 |
| 54 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 22,200 | $1.75 | $0.80 | $1.00 | $0.75 | $2.00 | $0.85 | $0.81 |
| 55 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 4,301 | $1.25 | $0.80 | $1.00 | $0.80 | $2.00 | $0.91 | $0.86 |
| 56 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 2,920 | $2.00 | $0.80 | $1.00 | $0.80 | $2.00 | $0.91 | $0.86 |
| 57 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 12 | $15.00 | $25.00 | $25.00 | $25.00 | $12.00 | $28.00 | $37.00 |
| 58 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 193 | $7.00 | $7.00 | $10.00 | $6.00 | $5.00 | $7.00 | $6.45 |
| 59 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $8,000.00 | $7,000.00 | $10,000 | $5,864.44 | $12,500 | $13,980 | $13,300 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.