TxDOT contract A00196243 bid tabulation
Rehabilitate Existing Roadway, US 287 (BS 287Q to Dartmoor Drive (END OF CS 0172-05)). Let by Texas DOT on October 8, 2025, Ellis, Dallas District. 6 bids received; low bid $17,308,925 by Foutsco Paving Company, LLC, -4.5% against the engineer's estimate of $18,123,363.
- Owner
- Texas DOT
- Letting
- 08 OCT 2025
- Pay items
- 43
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Foutsco Paving Company, LLC | $17,308,925 | Low | -4.0% |
| 2 | Austin Bridge & Road Services, LP | $17,325,851 | 0.0% | -4.0% |
| 3 | Big Creek Construction, LTD. | $17,872,926 | +3.0% | -1.0% |
| 4 | Peachtree Construction, LTD. | $17,946,437 | +4.0% | -1.0% |
| 5 | Texas Materials Group, Inc. | $18,287,931 | +6.0% | +1.0% |
| 6 | Grey Sky Construction LLC | $19,742,932 | +14% | +9.0% |
Engineer's estimate: $18,123,363.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Foutsco Paving Company, LLC | 2. Austin Bridge & Road Services, LP | 3. Big Creek Construction, LTD. | 4. Peachtree Construction, LTD. | 5. Texas Materials Group, Inc. | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A or B) (134-7004) | STA | 453 | $400.00 | $200.00 | $236.00 | $350.00 | $350.00 | $238.00 | $250.00 |
| 2 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 85,119 | $132.00 | $130.00 | $125.15 | $126.00 | $132.85 | $143.00 | $140.00 |
| 3 | Tack coat (344-7077) | GAL | 81,066 | $2.00 | $0.10 | $4.00 | $3.00 | $0.50 | $4.39 | $5.00 |
| 4 | Flexible pavement structure repair(12") (351-7011) | SY | 22,000 | $118.00 | $95.00 | $104.00 | $100.00 | $93.60 | $106.00 | $110.00 |
| 5 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 736,961 | $2.00 | $1.40 | $2.00 | $3.00 | $3.10 | $2.50 | $3.00 |
| 6 | Mobilization (500-7001) | LS | 1 | $1,647,578 | $1,000,000 | $1,905,844 | $1,700,000 | $1,250,000 | $557,382 | $1,800,000 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $16,000 | $120,000 | $5,568.61 | $5,700.00 | $22,250 | $28,000 | $12,500 |
| 8 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $36,000 | $54.13 | $12,500 | $19,500 | $15,000 | $20,000 |
| 9 | TMA (stationary) (505-7001) | DAY | 202 | $220.00 | $1.00 | $493.03 | $250.00 | $150.00 | $365.00 | $250.00 |
| 10 | TMA (mobile operation) (505-7002) | HR | 304 | $100.00 | $1.00 | $1.00 | $50.00 | $35.00 | $1.00 | $55.00 |
| 11 | Temporary sediment control fence (install) (506-7039) | LF | 200 | $4.00 | $6.00 | $7.00 | $5.00 | $7.50 | $7.50 | $4.00 |
| 12 | Temporary sediment control fence (remove) (506-7041) | LF | 200 | $1.00 | $2.00 | $2.00 | $2.00 | $2.20 | $2.08 | $2.00 |
| 13 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 181,140 | $0.20 | $0.21 | $0.07 | $0.22 | $0.24 | $0.28 | $0.30 |
| 14 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 48 | $19.10 | $60.00 | $60.00 | $60.00 | $63.60 | $65.00 | $20.00 |
| 15 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 150 | $42.55 | $110.00 | $102.00 | $105.00 | $108.10 | $110.00 | $80.00 |
| 16 | Electrical conductor (no.12) insulated (620-7004) | LF | 504 | $1.57 | $8.00 | $6.90 | $8.00 | $7.30 | $7.50 | $3.00 |
| 17 | Ground box type A (122311) (624-7001) | EACH | 2 | $1,322.43 | $4,000.00 | $3,565.00 | $4,000.00 | $3,780.00 | $3,700.00 | $1,150.00 |
| 18 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 50 | $30.00 | $200.00 | $24.00 | $50.00 | $50.00 | $42.00 | $100.00 |
| 19 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 50 | $30.00 | $200.00 | $23.00 | $50.00 | $50.00 | $42.00 | $100.00 |
| 20 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 11,359 | $1.40 | $1.00 | $0.50 | $1.50 | $2.00 | $1.22 | $6.00 |
| 21 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 11,892 | $1.40 | $1.00 | $0.50 | $1.50 | $2.00 | $1.22 | $6.00 |
| 22 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 200 | $1.20 | $2.00 | $2.00 | $2.00 | $2.10 | $2.06 | $3.00 |
| 23 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 17,588 | $1.70 | $0.87 | $0.87 | $1.00 | $0.95 | $0.84 | $1.00 |
| 24 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 3,000 | $2.25 | $2.00 | $2.00 | $2.00 | $2.10 | $2.32 | $2.50 |
| 25 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,294 | $9.50 | $6.50 | $6.50 | $7.00 | $6.75 | $6.34 | $8.00 |
| 26 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 38 | $170.00 | $150.00 | $150.00 | $150.00 | $160.00 | $194.59 | $250.00 |
| 27 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 5 | $200.00 | $210.00 | $210.00 | $250.00 | $220.00 | $365.52 | $400.00 |
| 28 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 2 | $170.00 | $235.00 | $235.00 | $250.00 | $240.00 | $463.32 | $500.00 |
| 29 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 13 | $185.00 | $175.00 | $175.00 | $200.00 | $185.00 | $221.37 | $250.00 |
| 30 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 3 | $180.00 | $650.00 | $650.00 | $700.00 | $685.00 | $777.35 | $850.00 |
| 31 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 21 | $40.00 | $55.00 | $55.00 | $60.00 | $58.00 | $30.89 | $50.00 |
| 32 | Pavement sler 6" (666-7347) | LF | 12,579 | $0.25 | $0.17 | $0.17 | $0.20 | $0.18 | $0.12 | $0.25 |
| 33 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 37,663 | $0.70 | $0.53 | $0.53 | $0.55 | $0.55 | $0.57 | $0.55 |
| 34 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 227,922 | $0.65 | $0.49 | $0.49 | $0.50 | $0.52 | $0.51 | $0.55 |
| 35 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 900 | $1.40 | $0.55 | $0.55 | $0.60 | $0.60 | $0.57 | $0.55 |
| 36 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 232,426 | $0.65 | $0.49 | $0.49 | $0.50 | $0.52 | $0.51 | $0.55 |
| 37 | Reflectorized pavement marker type I-C (672-7002) | EACH | 2,623 | $3.50 | $3.75 | $3.75 | $4.00 | $3.90 | $3.35 | $5.00 |
| 38 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 422 | $4.00 | $3.75 | $3.75 | $4.00 | $4.00 | $3.35 | $5.00 |
| 39 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 2,491 | $4.80 | $3.75 | $3.75 | $4.00 | $4.00 | $3.47 | $5.00 |
| 40 | Eliminating existing PM & markers (4") (677-7001) | LF | 12,579 | $0.55 | $0.33 | $0.33 | $0.50 | $0.35 | $0.57 | $0.65 |
| 41 | Pavement surface preparation for marking (6") (678-7002) | LF | 12,579 | $0.14 | $0.01 | $0.01 | $0.10 | $0.01 | $0.05 | $0.65 |
| 42 | Loop installation (6041-7001) | LF | 8 | $2,200.00 | $35.00 | $35.65 | $40.00 | $37.80 | $37.00 | $100.00 |
| 43 | Sensor installation (6041-7002) | EACH | 4 | $1,650.00 | $20,000 | $8,500.00 | $8,500.00 | $9,010.00 | $8,800.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.