TxDOT contract A00201302 bid tabulation
Repair Roadway, Various (At Dickinson Marine Lab - TPW to .). Let by Texas DOT on February 5, 2026, Galveston, Houston District. 8 bids received; low bid $736,599 by Castillo Aranda LLC, -20% against the engineer's estimate of $916,947.
- Owner
- Texas DOT
- Letting
- 05 FEB 2026
- Pay items
- 38
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Castillo Aranda LLC | $736,599 | Low | -20% |
| 2 | Professional Traffic Control LLC | $743,362 | +1.0% | -19% |
| 3 | MC2 Civil, LLC | $747,747 | +2.0% | -18% |
| 4 | Garret Shields Infrastructure | $765,896 | +4.0% | -16% |
| 5 | Matagorda Construction & Materials | $799,090 | +8.0% | -13% |
| 6 | Environmental Allies, Inc. | $866,487 | +18% | -6.0% |
| 7 | Ti-Zack Concrete, LLC | $932,612 | +27% | +2.0% |
| 8 | Icos Management, LLC | $1,340,714 | +82% | +46% |
Engineer's estimate: $916,947.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Castillo Aranda LLC | 2. Professional Traffic Control LLC | 3. MC2 Civil, LLC | 4. Garret Shields Infrastructure | 5. Matagorda Construction & Materials | 6. Environmental Allies, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Tree protection (install) (100-7013) | EACH | 17 | $500.00 | $250.00 | $750.00 | $700.00 | $100.00 | $200.00 | $265.00 |
| 2 | Tree protection (remove) (100-7015) | EACH | 17 | $100.00 | $50.00 | $300.00 | $100.00 | $100.00 | $50.00 | $75.00 |
| 3 | Removing concrete (pavement) (104-7001) | SY | 3,684 | $20.00 | $20.00 | $6.86 | $6.00 | $20.00 | $14.00 | $15.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 586 | $39.00 | $15.00 | $20.00 | $65.00 | $30.00 | $50.00 | $30.00 |
| 5 | Excavation (special) (110-7003) | CY | 120 | $42.00 | $30.00 | $28.00 | $100.00 | $30.00 | $30.00 | $35.00 |
| 6 | Embankment (final)(DC)(type C) (132-7006) | CY | 22 | $30.00 | $20.00 | $26.09 | $50.00 | $40.00 | $187.00 | $55.00 |
| 7 | Block sodding (162-7002) | SY | 538 | $7.09 | $6.00 | $7.80 | $9.50 | $10.00 | $7.00 | $8.50 |
| 8 | Fertilizer (166-7001) | ACRE | 0.13 | $1,500.00 | $2,500.00 | $580.00 | $8,500.00 | $2,000.00 | $5,000.00 | $1,500.00 |
| 9 | Vegetative watering (168-7001) | TGL | 0.16 | $425.00 | $100.00 | $35.38 | $3,000.00 | $1,000.00 | $3,000.00 | $500.00 |
| 10 | Rdside amenity (ADA parking sign) (194-7006) | EACH | 2 | $500.00 | $850.00 | $500.00 | $650.00 | $700.00 | $800.00 | $700.00 |
| 11 | Rdside amenity (wheel stop) (194-7007) | EACH | 15 | $307.00 | $250.00 | $300.00 | $120.00 | $100.00 | $300.00 | $200.00 |
| 12 | Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(6") (276-7343) | SY | 3,684 | $20.00 | $35.00 | $20.70 | $25.00 | $15.00 | $44.00 | $45.00 |
| 13 | Concrete pavement (CRCP) (7") (360-7001) | SY | 3,684 | $110.00 | $70.00 | $99.86 | $89.00 | $100.00 | $84.50 | $115.00 |
| 14 | Struct excavation (400-7001) | CY | 136 | $49.00 | $20.00 | $28.00 | $30.00 | $40.00 | $30.00 | $50.00 |
| 15 | Cem stabil BKFL (400-7010) | CY | 100 | $70.00 | $90.00 | $200.00 | $60.00 | $300.00 | $150.00 | $95.00 |
| 16 | RC pipe (CL III)(15 in) (464-7002) | LF | 250 | $80.00 | $85.00 | $75.00 | $90.00 | $80.00 | $75.00 | $65.00 |
| 17 | RC pipe (CL III)(18 in) (464-7003) | LF | 264 | $120.00 | $125.00 | $102.00 | $90.00 | $80.00 | $100.00 | $105.00 |
| 18 | RC pipe (CL III)(24 in) (464-7005) | LF | 43 | $150.00 | $140.00 | $150.00 | $130.00 | $150.00 | $200.00 | $195.00 |
| 19 | Inlet (complete)(type AZ)(hou) (465-7316) | EACH | 6 | $4,500.00 | $6,500.00 | $6,278.85 | $4,600.00 | $5,000.00 | $10,000 | $6,000.00 |
| 20 | Pipe (PVC) (schedule 80) (3 in) (481-7024) | LF | 24 | $10.00 | $50.00 | $15.86 | $140.00 | $25.00 | $44.00 | $90.00 |
| 21 | Removing structure (inlet) (496-7002) | EACH | 2 | $1,042.00 | $500.00 | $800.00 | $600.00 | $2,000.00 | $1,500.00 | $775.00 |
| 22 | Removing structure (pipe) (496-7007) | LF | 242 | $30.00 | $20.00 | $13.86 | $50.00 | $20.00 | $35.00 | $21.00 |
| 23 | Mobilization (500-7001) | LS | 1 | $92,556 | $55,000 | $56,000 | $75,000 | $50,000 | $18,000 | $25,000 |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $11,886 | $10,000 | $4,000.00 | $2,000.00 | $5,000.00 | $3,106.00 | $1,250.00 |
| 25 | Construction exits (install) (type 1) (506-7020) | SY | 67 | $32.00 | $30.00 | $53.00 | $40.00 | $20.00 | $37.00 | $23.00 |
| 26 | Construction exits (remove) (506-7024) | SY | 67 | $10.00 | $10.00 | $29.00 | $15.00 | $1.00 | $15.00 | $8.50 |
| 27 | Temporary sediment control fence (install) (506-7039) | LF | 1,478 | $5.00 | $5.00 | $5.30 | $2.50 | $5.00 | $6.00 | $3.00 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 1,478 | $5.00 | $2.00 | $2.00 | $0.50 | $1.00 | $0.85 | $1.50 |
| 29 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 60 | $10.00 | $8.00 | $5.39 | $13.00 | $5.00 | $12.00 | $9.00 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 60 | $4.00 | $2.00 | $2.00 | $6.00 | $1.00 | $1.00 | $4.50 |
| 31 | Concrete curb (slotted) (529-7013) | LF | 490 | $30.00 | $8.00 | $35.00 | $20.00 | $40.00 | $35.00 | $30.00 |
| 32 | Remove and install existing gate (550-7017) | EACH | 2 | $1,644.00 | $5,500.00 | $700.00 | $6,000.00 | $1,000.00 | $5,000.00 | $1,200.00 |
| 33 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 3 | $300.00 | $550.00 | $750.00 | $825.00 | $800.00 | $500.00 | $850.00 |
| 34 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $100.00 | $200.00 | $130.00 | $100.00 | $100.00 | $150.00 | $130.00 |
| 35 | Reflectorized pavement marking type III (Y)(4")(solid) (666-7245) | LF | 698 | $1.27 | $5.00 | $2.00 | $5.00 | $8.00 | $2.00 | $5.00 |
| 36 | Pavement sler 4" (666-7346) | LF | 698 | $24.00 | $8.00 | $0.38 | $1.00 | $0.30 | $1.50 | $1.50 |
| 37 | Pavement surface preparation for marking (4") (678-7001) | LF | 698 | $23.00 | $5.00 | $0.40 | $0.50 | $1.00 | $1.50 | $0.75 |
| 38 | Vehicle LP detect (sawcut) (688-7004) | LF | 276 | $29.00 | $10.00 | $14.00 | $20.00 | $20.00 | $8.00 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 5, 2026. Compiled by Mirage Metrics.