TxDOT contract A00213687 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, IH0020 (Various locations in to the Abilene District). Let by Texas DOT on April 1, 2025, Taylor, Abilene District. 12 bids received; low bid $643,004 by Blacksmith Ventures LLC, -33% against the engineer's estimate of $956,650.
- Owner
- Texas DOT
- Letting
- 01 APR 2025
- Pay items
- 15
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Blacksmith Ventures LLC | $643,004 | Low | -33% |
| 2 | Road Doctors LLC | $716,500 | +11% | -25% |
| 3 | Premier Contractors LLC | $744,170 | +16% | -22% |
| 4 | BK Field Operations LLC | $763,320 | +19% | -20% |
| 5 | Pathfield Investments LLC | $765,024 | +19% | -20% |
| 6 | Icos Management, LLC | $768,950 | +20% | -20% |
| 7 | Shalom Services Corporation | $797,200 | +24% | -17% |
| 8 | Beck-Reit & Sons, LTD. | $805,850 | +25% | -16% |
| 9 | Structural Integrity Group LLC | $829,024 | +29% | -13% |
| 10 | Garret Shields Infrastructure | $835,000 | +30% | -13% |
| 11 | Rhino Equity, LLC | $887,700 | +38% | -7.0% |
| 12 | SCR Civil Construction, LLC | $1,298,100 | +102% | +36% |
Engineer's estimate: $956,650.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Blacksmith Ventures LLC | 2. Road Doctors LLC | 3. Premier Contractors LLC | 4. BK Field Operations LLC | 5. Pathfield Investments LLC | 6. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 30 | $105.00 | $50.00 | $250.00 | $70.00 | $100.00 | $65.00 | $220.00 |
| 2 | Removing concrete (miscellaneous) (104-7047) | CY | 50 | $230.00 | $50.00 | $250.00 | $340.00 | $175.00 | $350.00 | $110.00 |
| 3 | Flowable backfill (401-7001) | CY | 25 | $400.00 | $500.00 | $500.00 | $340.00 | $400.00 | $350.00 | $550.00 |
| 4 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 300 | $175.00 | $100.00 | $250.00 | $190.00 | $400.00 | $200.00 | $275.00 |
| 5 | Concrete structure repair(rapid deck rep(full DPT)) (429-7006) | SF | 200 | $250.00 | $150.00 | $250.00 | $200.00 | $450.00 | $200.00 | $330.00 |
| 6 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 2,400 | $250.00 | $150.00 | $120.00 | $200.00 | $140.00 | $200.00 | $110.00 |
| 7 | Concrete structure repair (standard) (429-7009) | SF | 300 | $230.00 | $200.00 | $120.00 | $150.00 | $200.00 | $200.00 | $132.00 |
| 8 | Riprap (concrete)(4 in) (432-7001) | CY | 30 | $750.00 | $500.00 | $1,000.00 | $700.00 | $600.00 | $800.00 | $825.00 |
| 9 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 500 | $55.00 | $45.00 | $80.00 | $60.00 | $58.00 | $60.00 | $55.00 |
| 10 | Joint sealant (454-7010) | LF | 100 | $50.00 | $45.00 | $80.00 | $40.00 | $60.00 | $40.00 | $55.00 |
| 11 | Mobilization (callout) (500-7002) | EACH | 4 | $3,000.00 | $1.00 | $20,000 | $500.00 | $10,000 | $1.00 | $15,000 |
| 12 | TMA (stationary) (505-7001) | DAY | 70 | $300.00 | $350.00 | $100.00 | $1.00 | $1.00 | $1.00 | $275.00 |
| 13 | Permanent concrete traffic barrier repair(single slope) (777-7003) | LF | 100 | $250.00 | $400.00 | $300.00 | $190.00 | $100.00 | $200.00 | $770.00 |
| 14 | Permanent concrete traffic barrier repl(single slope) (777-7004) | LF | 50 | $700.00 | $400.00 | $500.00 | $220.00 | $100.00 | $200.00 | $880.00 |
| 15 | Concrete rail repair (miscellaneous) (778-7002) | LF | 50 | $250.00 | $400.00 | $300.00 | $150.00 | $550.00 | $175.00 | $660.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way