TxDOT contract A00213946 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, US0190 (VARIOUS BRIDGE REPAIRS to ACROSS WACO DISTRICT). Let by Texas DOT on June 18, 2025, Bell, Waco District. 7 bids received; low bid $897,734 by Pathfield Investments LLC, +0.7% against the engineer's estimate of $891,854.
- Owner
- Texas DOT
- Letting
- 18 JUN 2025
- Pay items
- 42
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Pathfield Investments LLC | $897,734 | Low | +1.0% |
| 2 | BK Field Operations LLC | $899,095 | 0.0% | +1.0% |
| 3 | Premier Contractors LLC | $932,018 | +4.0% | +5.0% |
| 4 | Road Doctors LLC | $986,058 | +10% | +11% |
| 5 | Beck-Reit & Sons, LTD. | $986,100 | +10% | +11% |
| 6 | Rhino Equity, LLC | $1,251,070 | +39% | +40% |
| 7 | Icos Management, LLC | $1,813,858 | +102% | +103% |
Engineer's estimate: $891,854.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Pathfield Investments LLC | 2. BK Field Operations LLC | 3. Premier Contractors LLC | 4. Road Doctors LLC | 5. Beck-Reit & Sons, LTD. | 6. Rhino Equity, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 2 | $2,500.00 | $2,100.00 | $4,000.00 | $2,500.00 | $1,000.00 | $10,000 | $8,000.00 |
| 2 | Removing concrete (riprap) (104-7007) | CY | 34 | $225.00 | $20.00 | $85.00 | $100.00 | $80.00 | $50.00 | $150.00 |
| 3 | Removing concrete (wingwall) (104-7028) | CY | 1.50 | $350.00 | $425.00 | $850.00 | $400.00 | $900.00 | $200.00 | $500.00 |
| 4 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 20 | $100.00 | $31.00 | $100.00 | $40.00 | $100.00 | $200.00 | $50.00 |
| 5 | Cem stabil BKFL (400-7010) | CY | 9 | $250.00 | $185.00 | $375.00 | $200.00 | $500.00 | $350.00 | $300.00 |
| 6 | Flowable backfill (401-7001) | CY | 126 | $400.00 | $260.00 | $350.00 | $250.00 | $330.00 | $444.00 | $400.00 |
| 7 | Temporary special shoring (403-7001) | SF | 36 | $30.00 | $30.00 | $30.00 | $50.00 | $40.00 | $22.00 | $70.00 |
| 8 | Temporary special shoring (cofferdam) (403-7002) | SF | 1,804 | $25.00 | $28.50 | $30.00 | $50.00 | $17.00 | $22.00 | $40.00 |
| 9 | Class C concrete (pile encasement) (420-7060) | CY | 9.80 | $2,200.00 | $240.00 | $1,300.00 | $1,400.00 | $1,700.00 | $1,100.00 | $6,000.00 |
| 10 | Class C concrete (wingwalls) (420-7146) | CY | 2.40 | $1,000.00 | $500.00 | $2,500.00 | $1,000.00 | $10,400 | $1,200.00 | $3,000.00 |
| 11 | Penetrating concrete surface treatment (428-7001) | SY | 877 | $25.00 | $16.50 | $18.00 | $40.00 | $20.00 | $28.00 | $70.00 |
| 12 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 26 | $300.00 | $180.00 | $200.00 | $170.00 | $200.00 | $40.00 | $250.00 |
| 13 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 180 | $225.00 | $170.00 | $350.00 | $180.00 | $150.00 | $185.00 | $200.00 |
| 14 | Concrete structure repair(deck rep (full depth)) (429-7005) | SF | 20 | $300.00 | $240.00 | $450.00 | $250.00 | $275.00 | $550.00 | $500.00 |
| 15 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 555 | $225.00 | $165.00 | $150.00 | $220.00 | $100.00 | $188.00 | $180.00 |
| 16 | Concrete structure repair (standard) (429-7009) | SF | 25 | $250.00 | $120.00 | $200.00 | $150.00 | $200.00 | $188.00 | $150.00 |
| 17 | Riprap (concrete)(5 in) (432-7002) | CY | 34 | $750.00 | $620.00 | $550.00 | $1,000.00 | $350.00 | $900.00 | $800.00 |
| 18 | Riprap (stone protection)(12 in) (432-7041) | CY | 138 | $275.00 | $175.00 | $200.00 | $180.00 | $210.00 | $200.00 | $230.00 |
| 19 | Riprap (stone protection)(18 in) (432-7043) | CY | 100 | $300.00 | $190.00 | $200.00 | $250.00 | $190.00 | $200.00 | $240.00 |
| 20 | Riprap (stone protection)(24 in) (432-7045) | CY | 318 | $325.00 | $195.00 | $200.00 | $300.00 | $190.00 | $200.00 | $250.00 |
| 21 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 344 | $50.00 | $62.00 | $50.00 | $75.00 | $50.00 | $55.00 | $90.00 |
| 22 | Wingwall (FW - 0) (HW=10 FT) (466-7152) | EACH | 4 | $5,000.00 | $38,000 | $4,750.00 | $20,000 | $22,000 | $22,500 | $35,000 |
| 23 | Clean existing culverts (480-7001) | EACH | 1 | $3,500.00 | $1,800.00 | $2,500.00 | $10,000 | $5,000.00 | $10,000 | $8,000.00 |
| 24 | Removing structure (wingwall) (496-7005) | EACH | 4 | $2,000.00 | $1,050.00 | $800.00 | $10,000 | $2,500.00 | $1,500.00 | $3,000.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $80,689 | $80,000 | $75,000 | $50,000 | $90,000 | $62,000 | $100,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $2,500.00 | $7,000.00 | $1.00 | $1.00 | $2,500.00 | $4,000.00 | $8,000.00 |
| 27 | Portable changeable message sign (503-7001) | DAY | 14 | $150.00 | $100.00 | $300.00 | $1.00 | $150.00 | $200.00 | $300.00 |
| 28 | TMA (stationary) (505-7001) | DAY | 50 | $250.00 | $215.00 | $1.00 | $1.00 | $150.00 | $1.00 | $200.00 |
| 29 | Temporary sediment control fence (install) (506-7039) | LF | 500 | $5.00 | $5.00 | $2.00 | $5.00 | $5.00 | $3.00 | $4.00 |
| 30 | Temporary sediment control fence (remove) (506-7041) | LF | 500 | $2.00 | $1.20 | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 |
| 31 | Spalling repair (polymeric) (semirigid) (720-7003) | GAL | 50 | $50.00 | $105.00 | $190.00 | $100.00 | $100.00 | $115.00 | $400.00 |
| 32 | Litter removal (spot) (734-7003) | ACRE | 2 | $1,000.00 | $1.00 | $500.00 | $2,000.00 | $2,000.00 | $1,500.00 | $300.00 |
| 33 | Driftwood removal (735-7060) | CY | 158 | $150.00 | $90.00 | $80.00 | $100.00 | $75.00 | $150.00 | $200.00 |
| 34 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 1 | $2,500.00 | $1,500.00 | $5,000.00 | $2,000.00 | $4,000.00 | $4,500.00 | $8,000.00 |
| 35 | Downspout cleaning (764-7004) | EACH | 13 | $200.00 | $150.00 | $385.00 | $80.00 | $180.00 | $200.00 | $500.00 |
| 36 | Storm sewer clean (box culvert) (>96 SF) (764-7020) | LF | 48 | $75.00 | $95.00 | $85.00 | $100.00 | $100.00 | $100.00 | $200.00 |
| 37 | Bridge joint repair (armor) (785-7004) | LF | 10 | $750.00 | $400.00 | $950.00 | $300.00 | $1,300.00 | $200.00 | $500.00 |
| 38 | Replacing elastomeric bearing pads (787-7001) | EACH | 4 | $10,000 | $7,200.00 | $8,000.00 | $8,000.00 | $13,000 | $12,000 | $15,000 |
| 39 | Concrete beam repair (788-7001) | EACH | 10 | $3,500.00 | $6,000.00 | $6,500.00 | $3,000.00 | $9,000.00 | $1,500.00 | $8,000.00 |
| 40 | Steel bridge zone painting ref STR #1 (4010-7001) | EACH | 1 | $50,000 | $70,000 | $163,000 | $50,000 | $190,000 | $188,000 | $60,000 |
| 41 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 21 | $850.00 | $1,400.00 | $1,000.00 | $1,800.00 | $350.00 | $1,000.00 | $1,500.00 |
| 42 | Maintenance speed limit signing (7010-7002) | DAY | 10 | $500.00 | $350.00 | $200.00 | $250.00 | $500.00 | $1.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 18, 2025. Compiled by Mirage Metrics.