TxDOT contract A00214298 bid tabulation

METAL BEAM GUARD FENCE REPAIR, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County). Let by Texas DOT on February 10, 2026, Montgomery, Houston District. 6 bids received; low bid $444,263 by BK Field Operations LLC, -32% against the engineer's estimate of $656,645.

Owner
Texas DOT
Letting
10 FEB 2026
Pay items
54
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1BK Field Operations LLC$444,263Low-32%
2Rhino Equity, LLC$503,372+13%-23%
3Roy Jorgensen Associates, Inc.$542,775+22%-17%
4Hazmat International, Inc.$542,798+22%-17%
5Above All Contracting LLC$586,866+32%-11%
6Isi Contracting, Inc.$681,474+53%+4.0%
TxDOT contract A00214298: bids by rank

Engineer's estimate: $656,645.

Bid tabulation

LinePay itemUnitQuantityEstimate1. BK Field Operations LLC2. Rhino Equity, LLC3. Roy Jorgensen Associates, Inc.4. Hazmat International, Inc.5. Above All Contracting LLC6. Isi Contracting, Inc.
1Removing concrete (mowstrip) (104-7005)LF125$11.00$20.00$5.00$10.00$18.50$20.00$48.00
2Backfill (type A) (134-7001)STA25$191.65$30.00$100.00$100.00$5.00$25.00$1,510.00
3Riprap (mow strip)(4 in) (432-7013)CY3$645.00$1,100.00$900.00$1,500.00$600.00$600.00$900.00
4Mobilization (callout) (500-7002)EACH36$1,200.00$1.00$1.00$500.00$100.00$1.00$250.00
5Mobilization (emergency) (500-7033)EACH3$950.00$1.00$1.00$500.00$250.00$500.00$1,000.00
6TMA (stationary) (505-7001)DAY80$200.29$1.00$1.00$400.00$250.00$1.00$250.00
7TMA (mobile operation) (505-7003)DAY75$157.69$1.00$1.00$10.00$250.00$1.00$150.00
8Metal W-beam guard fence (timber post) (540-7001)LF1,125$23.78$28.00$35.00$36.00$22.50$35.00$26.00
9Metal W-beam guard fence (steel post) (540-7002)LF150$32.69$10.00$10.00$40.00$50.00$50.00$50.00
10Metal beam guard fence trans (thrie-beam) (540-7005)EACH3$2,417.38$2,400.00$2,000.00$2,500.00$2,000.00$2,000.00$1,734.00
11Short radius (28") (540-7013)LF250$31.53$50.00$50.00$35.00$75.00$50.00$34.00
12Downstream anchor terminal section (540-7015)EACH6$1,440.00$1,250.00$1,500.00$1,400.00$2,500.00$1,300.00$1,952.00
13Metal beam guard fence (long span system) (540-7027)EACH5$357.35$600.00$1.00$250.00$10.00$800.00$408.00
14Remove terminal anchor section (542-7002)EACH1$136.69$1.00$1.00$100.00$1.00$200.00$379.00
15Remove downstream anchor terminal (542-7003)EACH1$247.99$1.00$1.00$100.00$1.00$200.00$379.00
16Guardrail end treatment (install) (544-7001)EACH1$3,198.04$3,500.00$3,500.00$3,200.00$6,000.00$4,000.00$3,163.00
17Guardrail end treatment (move & reset) (544-7002)EACH1$845.00$500.00$1,000.00$300.00$500.00$500.00$737.00
18Guardrail end treatment (remove) (544-7003)EACH1$266.91$7.00$1.00$1,200.00$1.00$500.00$627.00
19Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH3,000$5.00$1.00$5.00$3.00$3.50$5.00$9.00
20Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH4,000$25.00$1.00$5.00$5.00$5.00$20.00$12.50
21Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032)EACH4,000$5.00$1.00$5.00$3.00$4.00$5.00$9.00
22Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH250$25.00$10.00$5.00$5.00$5.00$20.00$13.00
23Replace delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7178)EACH3,000$5.00$1.00$5.00$5.00$3.50$5.00$8.00
24Replace delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7184)EACH1,500$5.00$1.00$5.00$15.00$5.00$20.00$13.00
25Replace delineator assembly (D-SY)SZ 1(BRF)CTB(BI) (658-7202)EACH1,500$5.00$1.00$5.00$5.00$4.00$5.00$8.00
26Replace rail element (W-beam) (770-7001)LF1,500$20.20$1.00$18.00$20.00$32.50$25.00$22.00
27Replace rail element (thrie-beam) (770-7002)LF50$67.34$5.00$25.00$25.00$25.00$60.00$36.00
28Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH25$93.27$5.00$300.00$50.00$250.00$500.00$953.00
29Replace short radius sys (TL-2) (770-7004)EACH5$80.60$1.00$1.00$10.00$1,000.00$100.00$773.00
30Replace short radius sys (TL-3) (770-7005)EACH5$20,000$1.00$1.00$10.00$1,000.00$100.00$773.00
31Replace timber post W/O concrete FND (770-7006)EACH50$60.83$450.00$50.00$50.00$50.00$30.00$107.00
32Replace steel post W/O concrete FND (770-7007)EACH25$102.78$1.00$1.00$50.00$50.00$50.00$144.00
33Replace timber post W/ concrete FND (770-7008)EACH25$61.15$600.00$50.00$150.00$50.00$100.00$145.00
34Replace steel post W/ concrete FND (770-7009)EACH25$123.57$1.00$100.00$50.00$30.00$100.00$165.00
35Realign posts (770-7010)EACH5$7.97$500.00$25.00$125.00$100.00$100.00$50.00
36Rem obsolete get & repl W/ SGT (770-7013)EACH30$2,751.12$3,900.00$3,700.00$4,000.00$3,000.00$3,800.00$3,250.00
37Repl single gdrail terminal impact head (770-7015)EACH35$1,113.41$1,900.00$1,100.00$1,050.00$750.00$600.00$1,261.00
38Replace single gdrail terminal rail (770-7016)LF1,500$19.33$30.00$50.00$35.00$75.00$30.00$36.00
39Replace single gdrail terminal post (770-7017)EACH250$66.37$1.00$65.00$80.00$30.00$100.00$53.00
40Replace blockout (770-7018)EACH100$9.79$400.00$50.00$20.00$50.00$50.00$26.00
41Reset SGT impact head (770-7020)EACH5$69.04$2,500.00$750.00$650.00$100.00$250.00$330.00
42Replace SGT object marker (770-7021)EACH35$43.17$1.00$30.00$30.00$25.00$30.00$35.00
43Replace SGT cable anchor (770-7022)EACH15$59.17$400.00$150.00$500.00$50.00$100.00$50.00
44Replace SGT cable assembly (770-7023)EACH5$67.43$500.00$150.00$500.00$50.00$100.00$156.00
45Replace SGT strut (770-7024)EACH15$130.37$1.00$200.00$80.00$50.00$100.00$109.00
46Raise rail (770-7025)LF75$2.73$10.00$25.00$25.00$10.00$25.00$10.00
47Repair rail element (curved rail) (770-7027)LF300$20.92$1.00$35.00$15.00$2.50$50.00$75.00
48Replace posts (TL-4)(gibraltar) (771-7005)EACH75$78.05$130.00$185.00$150.00$300.00$200.00$44.00
49Cable splice / turnbuckle (TL-4) (771-7010)EACH5$169.78$1.00$1.00$100.00$10.00$300.00$380.00
50Repair concrete foundation (TL-4) (771-7012)EACH5$146.91$1.00$1.00$100.00$1.00$50.00$1,249.00
51Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH3$1,785.13$1,000.00$1,500.00$1,250.00$1,000.00$2,500.00$3,650.00
52Replace cable (TL-4) (771-7016)LF250$1.86$1.00$1.00$1.50$2.50$10.00$6.00
53Check / RE-tension cable (TL-4) (771-7018)EACH15$125.38$1.00$400.00$250.00$1.00$150.00$4.00
54Replace post hardware (TL-4) (771-7020)EACH25$3.47$200.00$100.00$100.00$1.00$50.00$100.00
TxDOT contract A00214298: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy