TxDOT contract A00215469 bid tabulation

METAL BEAM GUARD FENCE REPAIR, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS). Let by Texas DOT on July 2, 2025, El Paso, El Paso District. 3 bids received; low bid $1,905,746 by E. G. L. Construction, Inc., +17% against the engineer's estimate of $1,632,025.

Owner
Texas DOT
Letting
02 JUL 2025
Pay items
69
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1E. G. L. Construction, Inc.$1,905,746Low+17%
2Apache Barricade & Sign$2,277,098+19%+40%
3Synergy Project Contractors, Inc.$2,367,665+24%+45%
TxDOT contract A00215469: bids by rank

Engineer's estimate: $1,632,025.

Bid tabulation

LinePay itemUnitQuantityEstimate1. E. G. L. Construction, Inc.2. Apache Barricade & Sign3. Synergy Project Contractors, Inc.
1Rail (handrail)(type B) (450-7059)LF10$140.00$900.00$322.00$345.00
2Mobilization (500-7001)LS1$25,000$25,000$1,000.00$72,000
3Mobilization (callout 1) (500-7003)EACH5$5,000.00$2,500.00$2,500.00$6,900.00
4Portable changeable message sign (503-7001)DAY60$150.00$350.00$25.00$115.00
5TMA (stationary) (505-7001)DAY250$300.00$160.00$195.00$299.00
6Metal W-beam guard fence (timber post) (540-7001)LF15$55.00$32.00$65.00$49.45
7Metal W-beam guard fence (steel post) (540-7002)LF15$60.00$42.00$65.00$59.80
8Downstream anchor terminal section (540-7015)EACH12$1,400.00$1,000.00$1,100.00$1,276.50
9Remove metal beam guard fence (542-7001)LF400$15.00$8.00$15.00$6.90
10Remove downstream anchor terminal (542-7003)EACH5$250.00$500.00$425.00$402.50
11Chain link fence (install) (6') (550-7001)LF25$50.00$40.00$48.00$24.15
12Chain link fence (repair) (6') (550-7002)LF500$25.00$48.00$48.00$21.85
13Chain link fence (install) (8') (550-7005)LF100$43.00$50.00$48.00$34.50
14Chain link fence (remove) (550-7007)LF25$15.00$25.00$34.00$4.60
15Gate (install) (double) (6' X 14') (550-7009)EACH2$1,800.00$3,000.00$1,210.00$2,530.00
16Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH25$25.00$45.00$10.00$34.50
17Install delineator assembly (D-SW)SZ 1(BRF)GF2(BR) (658-7020)EACH25$25.00$45.00$10.00$44.85
18Install delineator assembly (D-SY)SZ 1(BRF)GF2(BR) (658-7038)EACH25$25.00$45.00$10.00$40.25
19Replace rail element (W-beam) (770-7001)LF6,000$29.00$34.00$28.00$44.85
20Replace rail element (thrie-beam) (770-7002)LF100$55.00$26.00$111.00$54.05
21Replace short radius sys (TL-3) (770-7005)EACH2$5,000.00$20,000$23,000$26,450
22Replace timber post W/O concrete FND (770-7006)EACH200$60.00$120.00$61.00$55.20
23Replace steel post W/O concrete FND (770-7007)EACH200$80.00$150.00$89.00$86.25
24Realign posts (770-7010)EACH500$15.00$7.50$22.00$11.50
25Repair of terminal anchors posts (770-7011)EACH20$15.00$135.00$1,200.00$17.25
26Replace terminal anchor posts (770-7012)EACH200$300.00$250.00$1,700.00$368.00
27Repl single gdrail terminal impact head (770-7015)EACH80$2,000.00$1,700.00$1,316.00$1,955.00
28Replace single gdrail terminal rail (770-7016)LF3,000$35.00$27.00$37.00$42.55
29Replace single gdrail terminal post (770-7017)EACH300$95.00$75.00$56.00$63.25
30Replace blockout (770-7018)EACH100$50.00$10.00$22.00$28.75
31Replace SGT object marker (770-7021)EACH20$25.00$20.00$79.00$34.50
32Replace SGT cable anchor (770-7022)EACH20$115.00$87.50$151.00$46.00
33Replace SGT cable assembly (770-7023)EACH20$120.00$86.00$152.00$172.50
34Replace SGT strut (770-7024)EACH20$90.00$55.00$79.00$95.45
35Replace downstream anchor terminal (770-7026)EACH5$300.00$1,200.00$1,583.00$1,265.00
36Repair rail element (curved rail) (770-7027)LF200$35.00$35.00$99.00$37.95
37Replace posts (TL-4)(gibraltar) (771-7005)EACH600$200.00$150.00$273.00$253.00
38Replace posts (TL-4)(trinity) (771-7007)EACH300$270.00$350.00$323.00$287.50
39Cable splice / turnbuckle (TL-4) (771-7010)EACH8$300.00$350.00$373.00$506.00
40Repair concrete foundation (TL-4) (771-7012)EACH8$1,000.00$450.00$683.00$172.50
41Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH20$2,300.00$5,655.00$1,500.00$8,050.00
42Replace cable (TL-4) (771-7016)LF100$20.00$10.00$72.00$17.25
43Check / RE-tension cable (TL-4) (771-7018)EACH10$250.00$150.00$192.00$299.00
44Post and cable fence (new installation) (772-7003)LF100$50.00$135.00$685.00$25.30
45Post and cable fence (new concrete anchor) (772-7004)EACH6$300.00$500.00$385.00$149.50
46Post and cable fence(remv / repl posts) (772-7005)EACH100$150.00$50.00$295.00$155.25
47Post and cable fence (remv/ repl cable) (772-7007)LF100$55.00$7.50$290.00$10.35
48Post and cable fence (repair) (772-7008)LF200$40.00$15.00$221.00$9.20
49Replace (react)(M) (774-7014)EACH5$26,000$32,625$28,000$35,650
50Repair (react)(M) (774-7015)LF12$300.00$300.00$1,800.00$2,300.00
51Replace (react) wide (774-7017)EACH2$20,000$79,856$49,000$62,100
52Repair (react) wide (774-7018)LF20$500.00$250.00$2,462.00$1,380.00
53Replace (tau II-R) narrow (774-7020)EACH1$25,000$35,000$19,000$34,500
54Repair (tau II-R) narrow (774-7021)LF10$1,000.00$400.00$265.00$1,322.50
55Repair (tau II-R) wide (774-7024)LF40$700.00$350.00$1,800.00$1,610.00
56Replace (narrow quad) (774-7026)EACH1$25,000$24,000$19,000$27,600
57Repair (narrow quad) (774-7027)LF20$500.00$250.00$2,200.00$1,495.00
58Replace (wide quad) (774-7031)EACH1$25,000$26,000$36,000$40,250
59Repair (wide quad) (774-7032)LF2$550.00$500.00$2,130.00$977.50
60Repair (wide quad nose) (774-7033)EACH2$1,000.00$900.00$2,665.00$1,552.50
61Repair (wide quad bay) (774-7034)EACH2$2,000.00$800.00$1,600.00$6,325.00
62Replace (tau-M) narrow (774-7036)EACH1$20,000$28,500$19,000$31,050
63Repair (tau-M) narrow (774-7037)LF10$500.00$450.00$1,200.00$1,840.00
64Replace (tau II) wide (774-7040)EACH1$25,000$67,979$27,000$30,475
65Replace (wide tracc) (774-7051)EACH2$25,000$49,500$30,000$59,800
66Repair (wide tracc) (774-7052)LF25$350.00$450.00$900.00$977.50
67Replace (fastracc) (774-7056)EACH2$20,000$34,800$19,000$42,550
68Wall with metal fence and panels (4022-7001)LF20$800.00$450.00$438.00$805.00
69Stone masonry (rock wall) (5017-7001)SF1,200$60.00$40.00$56.00$23.00
TxDOT contract A00215469: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy