TxDOT contract A00216221 bid tabulation
Rehabilitate Bridge, FM 359 (At Jones Creek to .). Let by Texas DOT on April 8, 2026, Fort Bend, Houston District. 6 bids received; low bid $563,745 by Garret Shields Infrastructure, -22% against the engineer's estimate of $721,613.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 45
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $563,745 | Low | -22% |
| 2 | Trevway, Inc. | $792,793 | +41% | +10% |
| 3 | MC2 Civil, LLC | $1,046,443 | +86% | +45% |
| 4 | Isi Contracting, Inc. | $1,164,889 | +107% | +61% |
| 5 | Ragle Construction, Inc. | $1,209,454 | +115% | +68% |
| 6 | Forde Construction Company, Inc. | $1,563,117 | +177% | +117% |
Engineer's estimate: $721,613.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. Trevway, Inc. | 3. MC2 Civil, LLC | 4. Isi Contracting, Inc. | 5. Ragle Construction, Inc. | 6. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 2 | $4,000.00 | $1,000.00 | $1,500.00 | $25,000 | $8,705.57 | $50,000 | $82,000 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 196 | $45.00 | $40.00 | $55.00 | $25.00 | $19.25 | $20.00 | $56.00 |
| 3 | Removing concrete (retaining walls) (104-7025) | SY | 144 | $45.00 | $40.00 | $55.00 | $450.00 | $93.36 | $100.00 | $77.00 |
| 4 | Remove (5"-9") TRT/untrt base & asphalt pavement (105-7005) | SY | 222 | $4.00 | $10.00 | $40.00 | $25.00 | $51.17 | $30.00 | $45.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 384 | $27.00 | $30.00 | $22.00 | $25.00 | $110.72 | $150.00 | $50.00 |
| 6 | D-GR HMA type D PG70-22 (level-UP) (341-7051) | TON | 13 | $200.00 | $200.00 | $762.51 | $250.00 | $875.61 | $750.00 | $890.00 |
| 7 | Flexible pavement structure repair(9") (351-7008) | SY | 222 | $80.00 | $120.00 | $100.00 | $75.00 | $153.78 | $250.00 | $120.00 |
| 8 | Cem stabil BKFL (400-7010) | CY | 485 | $150.00 | $120.00 | $195.00 | $100.00 | $199.77 | $151.00 | $125.00 |
| 9 | Flowable fill (embankment) (401-7002) | CY | 70 | $360.00 | $300.00 | $170.00 | $350.00 | $499.83 | $230.00 | $569.00 |
| 10 | Steel piling (NZ-28) (407-7023) | SF | 2,921 | $90.00 | $40.00 | $96.00 | $117.00 | $81.54 | $81.00 | $138.00 |
| 11 | Soil nail anchors (410-7001) | LF | 495 | $80.00 | $40.00 | $50.00 | $250.00 | $317.06 | $235.25 | $551.00 |
| 12 | Verification tests (410-7003) | EACH | 1 | $5,400.00 | $4,000.00 | $500.00 | $10,000 | $78,072 | $26,000 | $10,000 |
| 13 | Blast finish (427-7007) | SF | 1,363 | $4.00 | $5.00 | $14.78 | $4.00 | $13.82 | $11.70 | $14.00 |
| 14 | Riprap (concrete)(6 in) (432-7003) | CY | 18 | $550.00 | $600.00 | $524.14 | $1,000.00 | $832.74 | $1,100.00 | $1,200.00 |
| 15 | Riprap (concrete)(flume) (432-7012) | CY | 8 | $900.00 | $600.00 | $631.32 | $1,000.00 | $598.08 | $1,100.00 | $1,675.00 |
| 16 | Riprap (stone protection)(30 in) (432-7047) | CY | 80 | $250.00 | $200.00 | $190.00 | $220.00 | $405.17 | $245.00 | $370.00 |
| 17 | Removing rock riprap (496-7040) | LF | 23 | $45.00 | $500.00 | $205.00 | $140.00 | $205.37 | $73.00 | $450.00 |
| 18 | Mobilization (500-7001) | LS | 1 | $65,000 | $60,000 | $80,000 | $100,000 | $100,000 | $120,000 | $155,000 |
| 19 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $3,600.00 | $5,000.00 | $1,000.00 | $5,000.00 | $14,703 | $25,000 | $12,000 |
| 20 | Portable changeable message sign (503-7002) | EACH | 2 | $7,825.00 | $1,000.00 | $5,000.00 | $10,000 | $17,523 | $15,000 | $5,000.00 |
| 21 | Rock filter dams (install) (type 1) (506-7001) | LF | 15 | $85.00 | $30.00 | $69.47 | $70.00 | $88.59 | $55.00 | $90.00 |
| 22 | Rock filter dams (remove) (506-7011) | LF | 15 | $30.00 | $10.00 | $1.00 | $15.00 | $64.97 | $20.00 | $10.00 |
| 23 | Construction exits (install) (type 1) (506-7020) | SY | 78 | $20.00 | $20.00 | $10.00 | $50.00 | $29.53 | $24.00 | $53.00 |
| 24 | Construction exits (remove) (506-7024) | SY | 78 | $8.00 | $10.00 | $1.00 | $10.00 | $11.81 | $9.00 | $12.00 |
| 25 | Temporary sediment control fence (install) (506-7039) | LF | 137 | $9.00 | $5.00 | $3.00 | $4.00 | $7.09 | $3.75 | $5.00 |
| 26 | Temporary sediment control fence (remove) (506-7041) | LF | 137 | $3.25 | $1.00 | $1.00 | $0.50 | $3.54 | $1.40 | $2.00 |
| 27 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 1,000 | $14.00 | $20.00 | $30.00 | $30.00 | $15.51 | $14.00 | $34.00 |
| 28 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 1,000 | $14.00 | $20.00 | $30.00 | $10.00 | $14.07 | $14.00 | $34.00 |
| 29 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 34 | $75.00 | $50.00 | $5.00 | $10.00 | $177.20 | $67.00 | $1.00 |
| 30 | Metal W-beam guard fence (timber post) (540-7001) | LF | 257 | $30.00 | $30.00 | $26.00 | $30.00 | $45.43 | $28.87 | $40.00 |
| 31 | Terminal anchor section (540-7041) | EACH | 1 | $1,800.00 | $1,000.00 | $2,272.00 | $1,800.00 | $1,467.26 | $1,369.00 | $1,800.00 |
| 32 | Remove metal beam guard fence (542-7001) | LF | 257 | $3.50 | $5.00 | $1.00 | $6.00 | $13.55 | $4.75 | $3.75 |
| 33 | Remove terminal anchor section (542-7002) | EACH | 1 | $225.00 | $500.00 | $1.00 | $550.00 | $576.19 | $200.00 | $273.00 |
| 34 | Guardrail end treatment (install) (544-7001) | EACH | 1 | $3,500.00 | $3,500.00 | $4,483.15 | $3,700.00 | $3,858.43 | $3,592.00 | $4,700.00 |
| 35 | Crash cushion attenuator (stockpile) (545-7003) | EACH | 2 | $1,350.00 | $1,000.00 | $1,524.38 | $500.00 | $463.17 | $900.00 | $1,275.00 |
| 36 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 2 | $25,000 | $26,000 | $25,000 | $25,000 | $27,118 | $35,000 | $34,000 |
| 37 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 1,725 | $1.50 | $1.60 | $1.58 | $2.50 | $2.36 | $1.25 | $2.00 |
| 38 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 1,725 | $1.50 | $1.60 | $1.89 | $2.50 | $2.36 | $1.50 | $2.00 |
| 39 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 1,725 | $0.70 | $2.50 | $1.58 | $1.25 | $2.36 | $1.25 | $1.10 |
| 40 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 575 | $0.70 | $4.00 | $3.16 | $1.25 | $2.95 | $2.50 | $3.00 |
| 41 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 1,725 | $0.70 | $2.60 | $2.53 | $1.25 | $2.36 | $2.50 | $3.00 |
| 42 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 26 | $9.00 | $40.00 | $11.37 | $15.00 | $11.81 | $9.00 | $12.00 |
| 43 | Eliminating existing PM & markers (6") (677-7002) | LF | 4,025 | $0.30 | $1.80 | $0.63 | $1.00 | $0.98 | $0.50 | $1.00 |
| 44 | Pavement surface preparation for marking (6") (678-7002) | LF | 4,025 | $0.15 | $1.80 | $0.13 | $0.15 | $0.01 | $0.10 | $0.13 |
| 45 | JT cleaning and sealing(trans CNTR JTS) (713-7001) | LF | 561 | $10.00 | $5.00 | $22.00 | $25.00 | $0.71 | $30.00 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.