TxDOT contract A00217600 bid tabulation

METAL BEAM GUARD FENCE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS). Let by Texas DOT on October 14, 2025, Hale, Lubbock District. 5 bids received; low bid $467,721 by Ross Sa Enterprise LLC, -36% against the engineer's estimate of $732,750.

Owner
Texas DOT
Letting
14 OCT 2025
Pay items
44
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ross Sa Enterprise LLC$467,721Low-36%
2Rhino Equity, LLC$606,598+30%-17%
3BK Field Operations LLC$623,244+33%-15%
4E.V.G. Enterprise$669,363+43%-9.0%
5Above All Contracting LLC$1,077,950+130%+47%
TxDOT contract A00217600: bids by rank

Engineer's estimate: $732,750.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ross Sa Enterprise LLC2. Rhino Equity, LLC3. BK Field Operations LLC4. E.V.G. Enterprise5. Above All Contracting LLC
1Removing concrete (riprap) (104-7006)SY28$500.00$1.00$50.00$75.00$1.00$200.00
2Backfill (type A) (134-7006)LF80$200.00$10.00$70.00$10.00$1.00$150.00
3Riprap (concrete) (CL B) (6 in) (432-7009)CY12$750.00$155.00$500.00$1,000.00$1.00$300.00
4Mobilization (callout) (500-7002)EACH12$2,000.00$1.00$1.00$1.00$1.00$500.00
5Mobilization (emergency) (500-7033)EACH12$2,500.00$1.00$2,500.00$1.00$1.00$1,000.00
6TMA (stationary) (505-7001)DAY200$100.00$1.00$1.00$1.00$1.00$500.00
7Metal W-beam guard fence (steel post) (540-7002)LF5,000$25.00$15.00$40.00$24.00$30.00$45.00
8Metal beam guard fence trans (thrie-beam) (540-7005)EACH10$1,000.00$800.00$2,000.00$1,200.00$1,500.00$3,000.00
9Metal beam guard fence trans (TL2) (540-7006)EACH4$1,000.00$1.00$500.00$1,500.00$1.00$1,000.00
10Downstream anchor terminal section (540-7015)EACH10$1,000.00$680.00$1,200.00$1,200.00$850.00$2,000.00
11Metal beam guard fence trans (non - sym) (540-7016)EACH20$750.00$1.00$600.00$400.00$433.00$500.00
12Metal W - beam guard fence (low fill culvert) (540-7018)LF50$75.00$10.00$100.00$80.00$1.00$50.00
13Metal beam guard fence trans (31"-28") (540-7028)EACH20$100.00$100.00$100.00$1.00$1.00$500.00
14Metal beam guard fence trans (anchor plate) (540-7029)EACH10$500.00$100.00$300.00$300.00$1.00$500.00
15Metal W-beam guard fence (nested)(steel post) (540-7038)LF75$50.00$20.00$40.00$30.00$1.00$100.00
16MBGF (W-beam) (med bar) (540-7040)LF500$50.00$1.00$25.00$25.00$1.00$100.00
17Remove metal beam guard fence (542-7001)LF5,000$5.00$0.01$5.00$10.00$1.00$5.00
18Remove terminal anchor section (542-7002)EACH10$125.00$1.00$1.00$1.00$10.00$250.00
19RM metal beam guard fence trans (thrie-beam) (542-7004)EACH10$750.00$1.00$1.00$1,250.00$10.00$500.00
20Guardrail end treatment (install) (544-7001)EACH10$2,000.00$2,500.00$5,000.00$6,000.00$10,000$4,000.00
21Guardrail end treatment (move & reset) (544-7002)EACH10$150.00$1.00$1.00$800.00$100.00$1,500.00
22Guardrail end treatment (remove) (544-7003)EACH10$100.00$100.00$1,000.00$1.00$100.00$500.00
23Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH450$5.00$1.00$1.00$6.00$1.00$40.00
24Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH600$5.00$1.00$1.00$6.00$1.00$40.00
25Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH300$5.00$1.00$1.00$6.00$1.00$40.00
26Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037)EACH100$5.00$1.00$1.00$1.00$1.00$40.00
27Replace rail element (W-beam) (770-7001)LF5,000$20.00$10.00$10.00$5.00$13.00$40.00
28Replace timber post W/O concrete FND (770-7006)EACH250$100.00$5.00$5.00$250.00$60.00$50.00
29Replace steel post W/O concrete FND (770-7007)EACH250$100.00$5.00$5.00$1.00$200.00$75.00
30Replace timber post W/ concrete FND (770-7008)EACH250$100.00$5.00$5.00$50.00$60.00$60.00
31Replace steel post W/ concrete FND (770-7009)EACH250$100.00$5.00$5.00$1.00$200.00$85.00
32Realign posts (770-7010)EACH100$20.00$1.00$1.00$1.00$10.00$20.00
33Replace blockout (770-7018)EACH100$175.00$20.00$300.00$300.00$300.00$50.00
34Repair steel post with base plate (770-7019)EACH10$150.00$20.00$1.00$100.00$600.00$300.00
35Reset SGT impact head (770-7020)EACH10$250.00$20.00$1.00$100.00$100.00$200.00
36Replace SGT object marker (770-7021)EACH10$25.00$20.00$1.00$100.00$100.00$50.00
37Replace posts (TL-4)(gibraltar) (771-7005)EACH250$250.00$750.00$300.00$300.00$300.00$250.00
38Replace posts (TL-4)(trinity) (771-7007)EACH100$250.00$500.00$300.00$450.00$300.00$250.00
39Cable splice / turnbuckle (TL-4) (771-7010)EACH5$50.00$100.00$100.00$1,000.00$500.00$350.00
40Repair concrete foundation (TL-4) (771-7012)EACH5$250.00$1.00$0.10$1.00$10.00$3,000.00
41Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH5$3,000.00$6,000.00$2,000.00$5,000.00$5,000.00$3,000.00
42Replace cable (TL-4) (771-7016)LF1,000$5.00$3.00$1.00$1.00$1.00$10.00
43Check / RE-tension cable (TL-4) (771-7018)EACH25$750.00$250.00$1.00$1.00$200.00$500.00
44Replace post hardware (TL-4) (771-7020)EACH25$50.00$280.00$150.00$200.00$200.00$100.00
TxDOT contract A00217600: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy