TxDOT contract A00217600 bid tabulation
METAL BEAM GUARD FENCE REPAIR, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS). Let by Texas DOT on October 14, 2025, Hale, Lubbock District. 5 bids received; low bid $467,721 by Ross Sa Enterprise LLC, -36% against the engineer's estimate of $732,750.
- Owner
- Texas DOT
- Letting
- 14 OCT 2025
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ross Sa Enterprise LLC | $467,721 | Low | -36% |
| 2 | Rhino Equity, LLC | $606,598 | +30% | -17% |
| 3 | BK Field Operations LLC | $623,244 | +33% | -15% |
| 4 | E.V.G. Enterprise | $669,363 | +43% | -9.0% |
| 5 | Above All Contracting LLC | $1,077,950 | +130% | +47% |
Engineer's estimate: $732,750.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ross Sa Enterprise LLC | 2. Rhino Equity, LLC | 3. BK Field Operations LLC | 4. E.V.G. Enterprise | 5. Above All Contracting LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 28 | $500.00 | $1.00 | $50.00 | $75.00 | $1.00 | $200.00 |
| 2 | Backfill (type A) (134-7006) | LF | 80 | $200.00 | $10.00 | $70.00 | $10.00 | $1.00 | $150.00 |
| 3 | Riprap (concrete) (CL B) (6 in) (432-7009) | CY | 12 | $750.00 | $155.00 | $500.00 | $1,000.00 | $1.00 | $300.00 |
| 4 | Mobilization (callout) (500-7002) | EACH | 12 | $2,000.00 | $1.00 | $1.00 | $1.00 | $1.00 | $500.00 |
| 5 | Mobilization (emergency) (500-7033) | EACH | 12 | $2,500.00 | $1.00 | $2,500.00 | $1.00 | $1.00 | $1,000.00 |
| 6 | TMA (stationary) (505-7001) | DAY | 200 | $100.00 | $1.00 | $1.00 | $1.00 | $1.00 | $500.00 |
| 7 | Metal W-beam guard fence (steel post) (540-7002) | LF | 5,000 | $25.00 | $15.00 | $40.00 | $24.00 | $30.00 | $45.00 |
| 8 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 10 | $1,000.00 | $800.00 | $2,000.00 | $1,200.00 | $1,500.00 | $3,000.00 |
| 9 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 4 | $1,000.00 | $1.00 | $500.00 | $1,500.00 | $1.00 | $1,000.00 |
| 10 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,000.00 | $680.00 | $1,200.00 | $1,200.00 | $850.00 | $2,000.00 |
| 11 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 20 | $750.00 | $1.00 | $600.00 | $400.00 | $433.00 | $500.00 |
| 12 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 50 | $75.00 | $10.00 | $100.00 | $80.00 | $1.00 | $50.00 |
| 13 | Metal beam guard fence trans (31"-28") (540-7028) | EACH | 20 | $100.00 | $100.00 | $100.00 | $1.00 | $1.00 | $500.00 |
| 14 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 10 | $500.00 | $100.00 | $300.00 | $300.00 | $1.00 | $500.00 |
| 15 | Metal W-beam guard fence (nested)(steel post) (540-7038) | LF | 75 | $50.00 | $20.00 | $40.00 | $30.00 | $1.00 | $100.00 |
| 16 | MBGF (W-beam) (med bar) (540-7040) | LF | 500 | $50.00 | $1.00 | $25.00 | $25.00 | $1.00 | $100.00 |
| 17 | Remove metal beam guard fence (542-7001) | LF | 5,000 | $5.00 | $0.01 | $5.00 | $10.00 | $1.00 | $5.00 |
| 18 | Remove terminal anchor section (542-7002) | EACH | 10 | $125.00 | $1.00 | $1.00 | $1.00 | $10.00 | $250.00 |
| 19 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 10 | $750.00 | $1.00 | $1.00 | $1,250.00 | $10.00 | $500.00 |
| 20 | Guardrail end treatment (install) (544-7001) | EACH | 10 | $2,000.00 | $2,500.00 | $5,000.00 | $6,000.00 | $10,000 | $4,000.00 |
| 21 | Guardrail end treatment (move & reset) (544-7002) | EACH | 10 | $150.00 | $1.00 | $1.00 | $800.00 | $100.00 | $1,500.00 |
| 22 | Guardrail end treatment (remove) (544-7003) | EACH | 10 | $100.00 | $100.00 | $1,000.00 | $1.00 | $100.00 | $500.00 |
| 23 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 450 | $5.00 | $1.00 | $1.00 | $6.00 | $1.00 | $40.00 |
| 24 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 600 | $5.00 | $1.00 | $1.00 | $6.00 | $1.00 | $40.00 |
| 25 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 300 | $5.00 | $1.00 | $1.00 | $6.00 | $1.00 | $40.00 |
| 26 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BI) (658-7037) | EACH | 100 | $5.00 | $1.00 | $1.00 | $1.00 | $1.00 | $40.00 |
| 27 | Replace rail element (W-beam) (770-7001) | LF | 5,000 | $20.00 | $10.00 | $10.00 | $5.00 | $13.00 | $40.00 |
| 28 | Replace timber post W/O concrete FND (770-7006) | EACH | 250 | $100.00 | $5.00 | $5.00 | $250.00 | $60.00 | $50.00 |
| 29 | Replace steel post W/O concrete FND (770-7007) | EACH | 250 | $100.00 | $5.00 | $5.00 | $1.00 | $200.00 | $75.00 |
| 30 | Replace timber post W/ concrete FND (770-7008) | EACH | 250 | $100.00 | $5.00 | $5.00 | $50.00 | $60.00 | $60.00 |
| 31 | Replace steel post W/ concrete FND (770-7009) | EACH | 250 | $100.00 | $5.00 | $5.00 | $1.00 | $200.00 | $85.00 |
| 32 | Realign posts (770-7010) | EACH | 100 | $20.00 | $1.00 | $1.00 | $1.00 | $10.00 | $20.00 |
| 33 | Replace blockout (770-7018) | EACH | 100 | $175.00 | $20.00 | $300.00 | $300.00 | $300.00 | $50.00 |
| 34 | Repair steel post with base plate (770-7019) | EACH | 10 | $150.00 | $20.00 | $1.00 | $100.00 | $600.00 | $300.00 |
| 35 | Reset SGT impact head (770-7020) | EACH | 10 | $250.00 | $20.00 | $1.00 | $100.00 | $100.00 | $200.00 |
| 36 | Replace SGT object marker (770-7021) | EACH | 10 | $25.00 | $20.00 | $1.00 | $100.00 | $100.00 | $50.00 |
| 37 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 250 | $250.00 | $750.00 | $300.00 | $300.00 | $300.00 | $250.00 |
| 38 | Replace posts (TL-4)(trinity) (771-7007) | EACH | 100 | $250.00 | $500.00 | $300.00 | $450.00 | $300.00 | $250.00 |
| 39 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 5 | $50.00 | $100.00 | $100.00 | $1,000.00 | $500.00 | $350.00 |
| 40 | Repair concrete foundation (TL-4) (771-7012) | EACH | 5 | $250.00 | $1.00 | $0.10 | $1.00 | $10.00 | $3,000.00 |
| 41 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 5 | $3,000.00 | $6,000.00 | $2,000.00 | $5,000.00 | $5,000.00 | $3,000.00 |
| 42 | Replace cable (TL-4) (771-7016) | LF | 1,000 | $5.00 | $3.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| 43 | Check / RE-tension cable (TL-4) (771-7018) | EACH | 25 | $750.00 | $250.00 | $1.00 | $1.00 | $200.00 | $500.00 |
| 44 | Replace post hardware (TL-4) (771-7020) | EACH | 25 | $50.00 | $280.00 | $150.00 | $200.00 | $200.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 14, 2025. Compiled by Mirage Metrics.