TxDOT contract A00218278 bid tabulation

Performance Based Contract, IH0035E (IH0035E and US0067 Managed Lanes to In Dallas County). Let by Texas DOT on July 1, 2026, Dallas, Dallas District. 2 bids received; low bid $2,424,622 by Roy Jorgensen Associates, Inc., -21% against the engineer's estimate of $3,077,247.

Owner
Texas DOT
Letting
01 JUL 2026
Pay items
87
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Roy Jorgensen Associates, Inc.$2,424,622Low-21%
2DCS Asset Maintenance LLC$3,989,583+65%+30%
TxDOT contract A00218278: bids by rank

Engineer's estimate: $3,077,247.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Roy Jorgensen Associates, Inc.2. DCS Asset Maintenance LLC
1Opaque sealer finish (427-7003)SF33,190$1.40$1.00$1.30
2Concrete structure repair(rapid deck rep(PRT DPT) (429-7004)SF12$67.50$80.00$38.00
3Concrete structure repair (vertical & overhead) (429-7007)SF25$219.00$150.00$39.00
4Concrete structure repair (standard) (429-7009)SF50$229.00$100.00$22.00
5Cleaning existing joints (438-7008)LF200$5.50$12.50$2.00
6Cleaning and sealing joints (foam) (438-7010)LF800$79.50$40.00$20.00
7Mobilization (callout 1) (500-7003)EACH5$1,162.00$250.00$93.00
8Mobilization (callout 2) (500-7004)EACH3$1,162.00$250.00$475.00
9Mobilization (callout 3) (500-7005)EACH6$1,162.00$1,500.00$475.00
10Mobilization (callout 4) (500-7006)EACH6$1,162.00$1,000.00$475.00
11Mobilization (callout 5) (500-7007)EACH3$1,162.00$5,000.00$6,875.00
12Mobilization (callout 6) (500-7008)EACH4$1,162.00$250.00$475.00
13Mobilization (callout 7) (500-7009)EACH10$1,162.00$250.00$250.00
14Mobilization (callout 8) (500-7010)EACH4$1,162.00$2,000.00$475.00
15Mobilization (callout 9) (500-7011)EACH24$1,162.00$250.00$125.00
16Mobilization (callout 10) (500-7012)EACH3$1,162.00$3,000.00$2,010.00
17Mobilization (callout 11) (500-7013)EACH14$1,162.00$500.00$2,010.00
18Mobilization (callout 12) (500-7014)EACH2$1,162.00$250.00$1,030.00
19Mobilization (callout 13) (500-7015)EACH39$1,162.00$1,500.00$475.00
20Mobilization (callout 14) (500-7016)EACH3$1,162.00$2,000.00$475.00
21TMA (stationary) (505-7001)DAY730$200.00$10.00$365.00
22TMA (mobile operation) (505-7003)DAY25$250.00$10.00$365.00
23Replace existing aluminum signs(type A) (636-7004)SF36$70.00$50.00$20.00
24Replace existing aluminum signs(type G) (636-7005)SF36$21.00$50.00$21.00
25Install small roadside sign support and assembly TYS80(1)SB(T) (644-7040)EACH3$1,020.00$1,000.00$1,268.00
26In bridge MNT clearance sign assembly(type N) (644-7061)EACH3$3,371.10$500.00$1,155.00
27Install small roadside sign support and assembly (rail mount) (644-7063)EACH3$1,500.00$1,000.00$3,570.00
28Replace SRS & S TYS80 (1) (T) (644-7101)EACH3$640.00$500.00$380.00
29Replace SRS & S TYS80 (1) (T-exal) (644-7102)EACH3$640.00$500.00$380.00
30Replace SRS & S TYS80 (1) (U-exal) (644-7105)EACH3$640.00$500.00$417.00
31Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013)EACH628$20.50$35.00$18.00
32Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH10$27.00$30.00$22.00
33Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH10$27.20$30.00$22.00
34Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031)EACH30$24.50$35.00$14.00
35Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH5$20.50$30.00$22.00
36Install delineator assembly (D-DW)SZ 1(WFLX)SRFHH (658-7143)EACH85$112.00$115.00$139.00
37Replace delineator assembly (D-DW)SZ 1(WFLX)SRFHH (658-7225)EACH40$130.00$115.00$149.00
38Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF86,255$1.50$0.90$0.75
39Reflectorized pavement marking type III (W)(6")(broken) (666-7237)LF5,861$1.80$0.74$1.00
40Reflectorized pavement marking type III (W)(6")(DOT) (666-7238)LF473$2.09$2.84$3.00
41Reflectorized pavement marking type III (W)(8")(solid) (666-7239)LF6,840$1.30$1.00$1.20
42Reflectorized pavement marking type III (W)(12")(solid) (666-7242)LF1,280$3.00$6.83$7.00
43Reflectorized pavement marking type III (W)(24")(solid) (666-7244)LF36$20.14$9.45$10.00
44Reflectorized pavement marking type III (Y)(8")(solid) (666-7251)LF684$2.06$1.05$1.20
45Reflectorized pavement marking type III (Y)(12")(solid) (666-7252)LF128$3.80$9.45$9.00
46Reflectorized pavement marking type III (W)(word) (666-7257)EACH5$271.65$278.25$292.00
47Reflectorized pavement marker type II-C-C (672-7005)EACH497$4.75$4.99$6.50
48Reflectorized pavement marker type II-C-R (672-7006)EACH513$5.25$4.99$6.50
49Eliminating existing PM & markers (6") (677-7002)LF86,255$1.20$0.05$0.50
50Eliminating existing PM & markers (8") (677-7004)LF684$4.00$0.90$1.00
51Eliminating existing PM & markers (12") (677-7006)LF1,408$1.36$2.42$2.50
52Eliminating existing PM & markers (24") (677-7008)LF36$3.20$5.25$5.00
53Eliminating existing PM & markers (word) (677-7015)EACH5$70.00$105.00$103.00
54Pavement surface preparation for marking (6") (678-7002)LF86,255$0.40$0.06$0.05
55Pavement surface preparation for marking (12") (678-7006)LF1,408$0.43$0.11$0.10
56Pavement surface preparation for marking (24") (678-7008)LF36$0.82$0.21$0.25
57Pavement surface preparation for marking (word) (678-7016)EACH5$27.50$15.75$15.00
58Spalling repair (hydraulic cement) (720-7001)CF10$232.26$125.00$28.00
59Fiber reinforced polymer patching materials (721-7001)LB500$6.15$6.00$2.00
60Full - width mowing (730-7022)ACRE202$30.00$80.00$185.00
61Broadcast application (731-7002)MI6$917.00$850.00$942.00
62Pavement edges, structures & fixtures (731-7003)MI28.80$600.00$650.00$140.00
63Litter removal (734-7001)ACRE402.96$20.00$25.00$100.00
64Graffiti removal (painting) (740-7003)SF17$7.70$5.00$5.00
65Replace rail element (W-beam) (770-7001)LF49$20.90$5.00$14.00
66Replace rail element (thrie-beam) (770-7002)LF38$27.50$5.00$15.00
67Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH25$38.50$5.00$192.00
68Replace timber post W/O concrete FND (770-7006)EACH10$55.01$10.00$43.00
69Realign posts (770-7010)EACH96$11.00$2.50$6.00
70Replace terminal anchor posts (770-7012)EACH12$88.01$5.00$416.00
71Rem obsolete get & repl W/ SGT (770-7013)EACH3$3,032.00$1,500.00$2,734.00
72Repl single gdrail terminal impact head (770-7015)EACH4$1,320.11$500.00$728.00
73Replace single gdrail terminal rail (770-7016)LF250$35.20$10.00$20.00
74Replace single gdrail terminal post (770-7017)EACH12$35.20$50.00$283.00
75Replace blockout (770-7018)EACH12$11.00$30.00$10.00
76Reset SGT impact head (770-7020)EACH4$220.02$50.00$45.00
77Replace downstream anchor terminal (770-7026)EACH2$1,760.15$50.00$928.00
78Realign existing rail (770-7028)LF100$11.00$5.00$6.00
79Replace (SMTC) narrow (774-7002)EACH10$26,718$2,500.00$27,148
80Repair (SMTC) narrow (774-7003)LF150$228.00$50.00$520.00
81Replace crash cushion attenuator (L)(N)(TL3) (774-7077)EACH7$19,763$1,000.00$23,730
82Bridge joint repair (SEJ) (785-7005)LF25$227.00$350.00$818.00
83Partial abg replacements (7105-7001)LF200$425.00$750.00$1,510.00
84Complete abg replacements (7105-7002)EACH6$25,000$17,500$21,400
85Replace vab systems-nets (7105-7003)EACH4$30,768$18,000$31,080
86Replace vab systems-tapes (7105-7004)EACH16$5,600.00$500.00$5,180.00
87Perf based oper & maintenance managed lanes (7105-7005)MO24$54,875$66,000$85,686
TxDOT contract A00218278: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy