TxDOT contract A00218942 bid tabulation
DRAINAGE IMPROVEMENT AND/OR REPAIRS, SL0008 (FALLBROOK to WEST ROAD). Let by Texas DOT on April 14, 2026, Harris, Houston District. 5 bids received; low bid $177,984 by Garret Shields Infrastructure, -25% against the engineer's estimate of $237,549.
- Owner
- Texas DOT
- Letting
- 14 APR 2026
- Pay items
- 21
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Garret Shields Infrastructure | $177,984 | Low | -25% |
| 2 | Icos Management, LLC | $233,561 | +31% | -2.0% |
| 3 | Jackson Excavation, LLC | $240,989 | +35% | +1.0% |
| 4 | MC2 Civil, LLC | $265,365 | +49% | +12% |
| 5 | Forde Construction Company, Inc. | $265,574 | +49% | +12% |
Engineer's estimate: $237,549.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Garret Shields Infrastructure | 2. Icos Management, LLC | 3. Jackson Excavation, LLC | 4. MC2 Civil, LLC | 5. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.36 | $4,000.00 | $10,000 | $10,700 | $500.00 | $70,000 | $25,000 |
| 2 | Embankment (final)(DC)(type E)(csbe) (132-7036) | CY | 418.20 | $60.00 | $40.00 | $86.00 | $180.00 | $90.00 | $85.00 |
| 3 | Block sodding (162-7002) | SY | 505 | $5.50 | $10.00 | $11.00 | $3.00 | $7.50 | $10.00 |
| 4 | Vegetative watering (168-7001) | TGL | 12.52 | $30.00 | $50.00 | $107.00 | $10.00 | $75.00 | $52.00 |
| 5 | Trench excavation protection (402-7001) | LF | 150 | $100.00 | $10.00 | $11.00 | $100.00 | $20.00 | $20.00 |
| 6 | Riprap (concrete)(6 in) (432-7003) | CY | 20 | $500.00 | $600.00 | $910.00 | $700.00 | $1,100.00 | $1,350.00 |
| 7 | Riprap (stone protection)(12 in) (432-7041) | CY | 52 | $200.00 | $200.00 | $321.00 | $200.00 | $330.00 | $275.00 |
| 8 | RC pipe (CL III)(48 in) (464-7011) | LF | 300 | $425.00 | $250.00 | $321.00 | $340.00 | $360.00 | $440.00 |
| 9 | Removing structure (pipe) (496-7007) | LF | 300 | $25.00 | $20.00 | $11.00 | $30.00 | $10.00 | $34.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $21,595 | $25,000 | $32,100 | $1,000.00 | $25,000 | $12,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 1 | $2,000.00 | $10,000 | $1.00 | $2,500.00 | $5,000.00 | $1,700.00 |
| 12 | Portable changeable message sign (503-7001) | DAY | 5 | $125.00 | $100.00 | $428.00 | $10.00 | $100.00 | $200.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 6 | $175.00 | $300.00 | $321.00 | $100.00 | $400.00 | $200.00 |
| 14 | Rock filter dams (install) (type 1) (506-7001) | LF | 43 | $50.00 | $20.00 | $22.00 | $20.00 | $45.00 | $61.00 |
| 15 | Rock filter dams (remove) (506-7011) | LF | 43 | $13.00 | $10.00 | $11.00 | $1.00 | $15.00 | $27.00 |
| 16 | Construction exits (install) (type 1) (506-7020) | SY | 78 | $27.00 | $20.00 | $86.00 | $60.00 | $35.00 | $30.00 |
| 17 | Construction exits (remove) (506-7024) | SY | 78 | $12.00 | $10.00 | $11.00 | $10.00 | $10.00 | $13.00 |
| 18 | Temporary sediment control fence (install) (506-7039) | LF | 715 | $4.00 | $5.00 | $2.00 | $1.00 | $3.50 | $3.75 |
| 19 | Temporary sediment control fence (remove) (506-7041) | LF | 715 | $1.00 | $1.00 | $1.00 | $1.00 | $0.50 | $1.70 |
| 20 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 310 | $7.50 | $5.00 | $10.00 | $4.00 | $7.00 | $4.00 |
| 21 | Biodegradable erosion control logs (remove) (506-7046) | LF | 310 | $1.75 | $1.00 | $1.00 | $1.00 | $2.00 | $2.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 14, 2026. Compiled by Mirage Metrics.