S. B. Cox, Incorporated: VDOT bid record
S. B. Cox, Incorporated submitted 16 bids on Virginia DOT contracts in the data, from 17 NOV 2004 to 25 FEB 2026, and was the low bidder on 14 of them (88%).
- Owner
- Virginia DOT
- Low bid volume
- $16,874,858
- Latest bid
- 25 FEB 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2004 | 1 | 1 | 100% |
| 2005 | 1 | 1 | 100% |
| 2006 | 1 | 1 | 100% |
| 2008 | 3 | 2 | 67% |
| 2009 | 1 | 1 | 100% |
| 2011 | 3 | 2 | 67% |
| 2013 | 1 | 1 | 100% |
| 2015 | 3 | 3 | 100% |
| 2019 | 1 | 1 | 100% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Salem | 5 | 3 | 60% |
| Culpeper | 4 | 4 | 100% |
| Fredericksburg | 3 | 3 | 100% |
| Northern Virginia | 3 | 3 | 100% |
| Richmond | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| NS demolition with acm building type F4 with asbestos containing material (acm) | 522SX20-0003 | SF | 40 | 31 (78%) | $5.65 | $6.45 |
| Borrow excavation | 305SD20-0001 | CY | 13 | 10 (77%) | $4.00 | $20.00 |
| Closing well | 516SD20-0001 | EACH | 12 | 9 (75%) | $1,500.00 | $1,500.00 |
| Siltation control excavation | 303SD20-0029 | CY | 11 | 8 (73%) | $2.00 | $3.50 |
| Site restoration | 516SX20-0006 | SY | 10 | 8 (80%) | $2.00 | $3.00 |
| Underground storage tank removal TY. A | 516SX20-0001 | EACH | 9 | 8 (89%) | $375.00 | $750.00 |
| Close septic tank | 516SX20-0007 | EACH | 8 | 8 (100%) | $250.00 | $300.00 |
| Cat I NF acm | 522SP20-0007 | SF | 8 | 7 (88%) | $3.00 | $3.00 |
| Temp. filter barrier | 27506 | LF | 9 | 6 (67%) | $1.00 | $2.50 |
| Cat II NF acm | 522SP20-0005 | SF | 8 | 6 (75%) | $3.00 | $4.21 |
| NS demolition of BLDGS concrete slab, patio | 516SX20-0005 | SF | 13 | 5 (38%) | $5.09 | $2.83 |
| Friable acm | 522SP20-0004 | LF | 5 | 5 (100%) | $10.00 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Waco, Inc. | 8 | 1 of 8 |
| Tessa Construction & Tech Company, LLC | 2 | 0 of 2 |
| General Excavation, Inc. | 1 | 0 of 1 |
| R V I Constructors, Inc. | 1 | 0 of 1 |
| R.J. Smith Construction, Inc. | 1 | 0 of 1 |
| Shirley Contracting Company, LLC | 1 | 0 of 1 |
| G. D. C. Contractors, Inc. | 1 | 0 of 1 |
| The Anderson Company, L.L.C. | 1 | 0 of 1 |
| E. Luke Greene Company, Inc. | 1 | 1 of 1 |
| Carnell Construction Corporation | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 25 FEB 2026 | C0000127594R01 | Fredericksburg | On-call structure demolition and asbestos removal | 1 of 1 | $276,159 | Low |
| 22 MAY 2019 | C000114573N01B | Culpeper | On-call structure demo and abestos removal | 1 of 2 | $2,848,806 | Low, 13% under the second |
| 22 APR 2015 | C000106515R01 | Fredericksburg | Northeast structure demolition & asbestos removal (on-call) | 1 of 2 | $1,973,910 | Low, 25% under the second |
| 22 APR 2015 | C000106516R01 | Fredericksburg | Southeast structure demolition & asbestos removal (on-call) | 1 of 2 | $1,581,850 | Low, 32% under the second |
| 22 APR 2015 | C000106517R01 | Salem | Western structure demolition & asbestos removal (on-call) | 1 of 2 | $3,394,400 | Low, 11% under the second |
| 27 MAR 2013 | C00087618C01 | Richmond | 0.064 grade, drain, asp. pave. bridge demo | 1 of 3 | $583,365 | Low, 16% under the second |
| 03 AUG 2011 | C00099440R01 | Salem | Regional building demolition and asbestos removal | 2 of 2 | $749,648 | +1.0% |
| 03 AUG 2011 | C00099441R01 | Salem | Regional building demolition and asbestos removal | 1 of 2 | $235,457 | Low, 27% under the second |
| 03 AUG 2011 | C00099442R01 | Salem | Regional building demolition and asbestos removal | 1 of 2 | $662,497 | Low, 10% under the second |
| 22 JUL 2009 | C00092672N01 | Culpeper | Demolition and asbestos removal | 1 of 2 | $610,301 | Low, 105% under the second |
| 26 NOV 2008 | C00090836R01 | Salem | Demolition of buildings and asbestos abatement | 2 of 3 | $193,989 | +26% |
| 22 OCT 2008 | C00088427R01 | Northern Virginia | Im-066-1 (319)(fo) 0066-076-951,r201 | 1 of 3 | $527,834 | Low, 29% under the second |
| 27 FEB 2008 | C00087516R08 | Northern Virginia | None0029-029-119, r208 | 1 of 3 | $2,429,926 | Low, 18% under the second |
| 26 JUL 2006 | C00014693R201 | Northern Virginia | Building demolition & asbestos removal | 1 of 3 | $687,304 | Low, 5.0% under the second |
| 22 JUN 2005 | CSTRW05DEMO | Culpeper | Structure demolition and asbestos removal | 1 of 3 | $994,825 | Low, -7.0% under the second |
| 17 NOV 2004 | CM704SOA708 | Culpeper | Demo of buildings | 1 of 3 | $68,225 | Low, 93% under the second |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.