Unit prices bid on 7,628 Virginia DOT contracts let from 29 JAN 2002 to 28 OCT 2026, read from VDOT's own tabulations. 81 pay items have enough recent bids for a page of their own; every item is in the explorer.
- Contracts
- 7,628
- Bids
- 18,240
- Unit prices
- 674,864
- Latest letting
- 28 OCT 2026
Price a VDOT pay item
Loading the bids.
Check my bid
Add the lines you are pricing, with your quantity and unit price. Each line is placed against what bidders carried in the last 24 months, at a similar quantity when enough bids exist. Your numbers stay in this browser.
Competitors
Who bids, how often they are low, how far off they are when they lose, and how much they leave on the table when they win.
Lettings
Open any contract to read the full tabulation: every line, every bidder.
Where the numbers come from
Each price is copied from a bid tabulation the owner published after the letting. Nothing is estimated or averaged before it reaches this page.
How each bid was checked
For every bidder, quantity times unit price was summed over all lines of the contract and compared with the total bid printed by the owner. A bid is published only when the two match to within one dollar. The states marked not checkable or third party are explained in the table.
Read the numbers like an estimator
- Item codes and measurement rules are each owner's. Prices are compared inside one state and never pooled across states.
- Unit price moves with quantity, location and season. Set your quantity and region before you trust a median.
- Some bidders price a line at a cent and load the cost elsewhere. Those token prices, and bids more than three times the low bid, are left out of statistics by default and stay visible in tabulations.
- The low bidder's price on one line is not always the lowest price on that line. Orange marks the bidder who was low on the whole contract.
- Prices are bid prices, not paid prices, and are not adjusted for inflation. Use them as a reference range, never as a quote.
The VDOT pay items bid most often
| Pay item | Code | Unit | Low-bid median | Low bids | Window | Bids, all time |
|---|---|---|---|---|---|---|
| Flagger service | 512SD20-0027 | HR | $39.00 | 256 | Last 24 months | 733 |
| Type b class i pvmt line mrkg 4" | 704SD20-0006 | LF | $1.00 | 185 | Last 24 months | 518 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | $1.50 | 133 | Last 24 months | 464 |
| Temp. pvmt mrkg ty. a, 4" | 512SD20-0046 | LF | $0.14 | 186 | Last 24 months | 449 |
| Port.changeable mess. sign | 512SD20-0025 | HR | $9.00 | 131 | Last 24 months | 439 |
| Type b class i pvmt line mrkg 6" | 704SD20-0007 | LF | $1.21 | 151 | Last 24 months | 417 |
| Eradicate linear pvmt mrkg | 512SD20-0042 | LF | $1.41 | 170 | Last 24 months | 413 |
| Temp. silt fence type a | 303SD20-0034 | LF | $6.17 | 118 | Last 24 months | 404 |
| Truck mounted attenuator | 512SD20-0023 | HR | $33.37 | 117 | Last 24 months | 401 |
| Temporary sign | 512SD20-0014 | SF | $30.75 | 111 | Last 24 months | 391 |
| Type b class i pvmt line mrkg 24" | 704SD20-0010 | LF | $15.00 | 147 | Last 24 months | 382 |
| Electronic arrow board | 512SD20-0026 | HR | $5.74 | 109 | Last 24 months | 372 |
| Tack coat | 310SD20-0001 | GAL | $0.01 | 132 | Last 24 months | 372 |
| Inlaid pavement marker asphalt | 704SD20-0032 | EACH | $49.95 | 129 | Last 24 months | 338 |
| Sign panel | 701SD20-0001 | SF | $51.00 | 99 | Last 24 months | 336 |
| Regular seed | 603SD20-0003 | LB | $15.38 | 97 | Last 24 months | 332 |
| Fertilizer phosphorous - p | 603SD20-0015 | LB | $4.01 | 96 | Last 24 months | 329 |
| Fertilizer potassium - k | 603SD20-0016 | LB | $4.01 | 96 | Last 24 months | 329 |
| Fertilizer nitrogen - n | 603SD20-0014 | LB | $4.00 | 95 | Last 24 months | 327 |
| Overseeding | 603SD20-0004 | LB | $14.00 | 95 | Last 24 months | 324 |
| Temporary seed | 603SD20-0002 | LB | $16.64 | 91 | Last 24 months | 312 |
| Flexible pave.planing 0"-2" | 515SD20-0013 | SY | $1.95 | 109 | Last 24 months | 307 |
| Demo. of pavement flexible | 508SD20-0004 | SY | $27.50 | 89 | Last 24 months | 300 |
| Conc. found. stp-1, ty. a | 700SD20-0038 | EACH | $701.76 | 85 | Last 24 months | 289 |
| Lime | 603SD20-0017 | TON | $350.00 | 83 | Last 24 months | 282 |
| Regular excavation | 303SD20-0001 | CY | $85.35 | 84 | Last 24 months | 281 |
| Siltation control excavation | 303SD20-0029 | CY | $5.88 | 82 | Last 24 months | 273 |
| Asphalt concrete bm-25.0 | 315SD20-0010 | TON | $215.00 | 79 | Last 24 months | 273 |
| Pvmt symb mrkg sgl turn arr. ty b cl i | 704SD20-0047 | EACH | $150.00 | 91 | Last 24 months | 267 |
| Hydraulic erosion control product type 3 | 603SD20-0009 | SY | $1.44 | 77 | Last 24 months | 266 |
| Type 3 barricade 8' | 512SD20-0013 | EACH | $560.00 | 76 | Last 24 months | 265 |
| Sign post stp-1, 2", 14 gauge | 700SD20-0034 | LF | $26.62 | 76 | Last 24 months | 264 |
| Agr. base mat. ty.i or ii no. 21A or 21B | 305SP20-0003 | TON | $60.00 | 93 | Last 24 months | 259 |
| Type b class ii pvmt line mrkg 24" | 704SD20-0015 | LF | $25.90 | 103 | Last 24 months | 259 |
| Inlet protection type b | 303SD20-0031 | EACH | $405.00 | 78 | Last 24 months | 256 |
| Flexible pave.planing 0"-2" | 515SD20-0004 | SY | $12.00 | 76 | Last 24 months | 254 |
| Remove existing 1 post sign structure | 700SD20-0003 | EACH | $394.03 | 74 | Last 24 months | 247 |
| Inlet protection type a | 303SD20-0030 | EACH | $500.00 | 75 | Last 24 months | 244 |
| Check dam rock ty. ii | 303SD20-0023 | EACH | $637.64 | 71 | Last 24 months | 236 |
| Temp. pvmt mrkg ty. a, 6" | 512SD20-0047 | LF | $0.20 | 90 | Last 24 months | 230 |
| Eradicate nonlinear pvmt mrkg | 512SD20-0043 | SF | $10.25 | 114 | Last 24 months | 229 |
| Aggr. base matl. ty. i no. 21B | 308SD20-0012 | TON | $85.00 | 63 | Last 24 months | 227 |
| Remove existing guardrail | 505SD20-0073 | LF | $10.00 | 69 | Last 24 months | 222 |
| Sign post stp-1, 2 1/2", 12 gauge | 700SD20-0037 | LF | $32.50 | 68 | Last 24 months | 211 |
| Pvmt symb mrkg sgl turn arr. ty b cl ii | 704SD20-0048 | EACH | $447.00 | 83 | Last 24 months | 210 |
| Hydraulic erosion control product type 2 | 603SD20-0008 | SY | $1.15 | 62 | Last 24 months | 209 |
| Temp. pvmt mrkg ty. a, 12" | 512SD20-0049 | LF | $2.32 | 86 | Last 24 months | 204 |
| Guardrail gr-MGS1 | 505SD20-0011 | LF | $39.00 | 61 | Last 24 months | 190 |
| Guardrail terminal gr- MGS2 | 505SD20-0017 | EACH | $4,600.00 | 61 | Last 24 months | 188 |
| Rumble strip cylindrical asphalt | 315SD20-0015 | LF | $0.48 | 70 | Last 24 months | 184 |
| Type a pvmt line mrkg 4" | 704SD20-0001 | LF | $0.34 | 87 | Last 24 months | 182 |
| Guardrail height transition gr-MGS4 | 505SD20-0019 | EACH | $1,650.00 | 55 | Last 24 months | 171 |
| Portable temporary rumble strip array | 512SP20-0001 | DAY | $100.00 | 46 | Last 24 months | 168 |
| Concrete class A3 misc. | 504SD20-0001 | CY | $1,729.01 | 50 | Last 24 months | 165 |
| Allaying dust | 511SD20-0001 | HR | $30.00 | 44 | Last 24 months | 156 |
| Trench excavation eci-1 | 700SD20-0197 | LF | $20.00 | 52 | Last 24 months | 156 |
| Borrow excavation | 303SD20-0007 | CY | $65.00 | 48 | Last 24 months | 155 |
| Type b class i pvmt line mrkg 12" | 704SD20-0009 | LF | $4.00 | 57 | Last 24 months | 154 |
| Conc. found. stp-1, ty. b | 700SD20-0039 | EACH | $994.00 | 51 | Last 24 months | 152 |
| Dbl turn arr.thru/lt or rt ty b, cl i | 704SD20-0050 | EACH | $235.00 | 51 | Last 24 months | 151 |
| Sign post stp-1, 2 1/2", 10 gauge | 700SD20-0036 | LF | $36.00 | 51 | Last 24 months | 151 |
| Type b class i pvmt line mrkg 8" | 704SD20-0008 | LF | $2.76 | 50 | Last 24 months | 150 |
| Relocate ex. 1 post grnd mount sgn panel | 700SD20-0012 | EACH | $365.00 | 46 | Last 24 months | 149 |
| Asph. conc. bmd p+vo sm- 9.5D | 315SP20-0049 | TON | $109.00 | 49 | Last 24 months | 142 |
| Outlet pipe | 501SD20-0009 | LF | $43.06 | 45 | Last 24 months | 142 |
| Asph. conc. bmd p+vo sm- 12.5D | 315SP20-0051 | TON | $105.00 | 53 | Last 24 months | 139 |
| Temp. pvmt mrkg ty. a, 24" | 512SD20-0050 | LF | $4.75 | 51 | Last 24 months | 136 |
| Legume seed | 603SD20-0005 | LB | $30.00 | 40 | Last 24 months | 136 |
| Legume overseeding | 603SD20-0006 | LB | $25.00 | 40 | Last 24 months | 136 |
| Loop saw cut 3/8" | 703SD20-0042 | LF | $25.10 | 40 | Last 24 months | 135 |
| Loop saw cut 5/8" | 703SD20-0043 | LF | $37.90 | 40 | Last 24 months | 135 |
| Frame & cover mh-1 | 302SD20-0663 | EACH | $1,236.98 | 47 | Last 24 months | 128 |
| Guardrail end anchorage gr-MGS3 | 505SD20-0018 | EACH | $1,748.07 | 47 | Last 24 months | 126 |
| Rolled erosion ctrl product ec-2 type 1 | 606SD20-0001 | SY | $3.50 | 39 | Last 24 months | 125 |
| Manhole mh-1 or 2 | 302SD20-0662 | LF | $1,446.84 | 45 | Last 24 months | 124 |
| Ns select material alternate shoulder material | 305SX20-0006 | TON | $59.01 | 44 | Last 24 months | 121 |
| Type b class vi pvmt line mrkg 6" | 704SD20-0027 | LF | $5.38 | 44 | Last 24 months | 121 |
| Temp. pvmt. symb. mrkg sngl turn arrow ty. a | 512SD20-0052 | EACH | $63.00 | 41 | Last 24 months | 120 |
| Flex. pave. tie-in planing 0"-2" | 515SD20-0011 | SY | $5.00 | 45 | Last 24 months | 120 |
| Underdrain ud-4 | 501SD20-0004 | LF | $35.00 | 41 | Last 24 months | 120 |
| Junction box jb-S2 | 700SD20-0178 | EACH | $3,106.99 | 41 | Last 24 months | 120 |
Latest lettings
| Let | Contract | District | Project | Bids | Low bid | Source |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | CM127LMC129763 | Bristol | 2027 latex modified - primary/secondary | 2 | $3,527,981 | VDOT |
| 28 OCT 2026 | CM127LMG129771 | Bristol | 2027 latex modified - secondary | 2 | $2,929,586 | VDOT |
| 28 OCT 2026 | CM227SSA128911 | Salem | 2027 slurry seal - secondary | 2 | $2,590,041 | VDOT |
| 28 OCT 2026 | CM327STA128956 | Lynchburg | 2027 surface treatment - secondary | 1 | $1,936,668 | VDOT |
| 28 OCT 2026 | CM327STB128958 | Lynchburg | 2027 surface treatment - secondary | 1 | $1,759,982 | VDOT |
| 28 OCT 2026 | CM327STC128960 | Lynchburg | 2027 surface treatment - secondary | 1 | $2,030,033 | VDOT |
| 28 OCT 2026 | CM427STC129167 | Richmond | 2027 surface treatment - secondary | 2 | $661,803 | VDOT |
| 28 OCT 2026 | CM427STD129169 | Richmond | 2027 surface treatment - secondary | 1 | $1,572,016 | VDOT |
| 28 OCT 2026 | CM427SSA129170 | Richmond | 2027 cape seal - secondary | 2 | $3,277,134 | VDOT |
| 28 OCT 2026 | CM427SSB129171 | Richmond | 2027 cape seal - secondary | 2 | $1,981,514 | VDOT |
| 28 OCT 2026 | CM427STA129161 | Richmond | 2027 surface treatment - secondary | 1 | $1,725,156 | VDOT |
| 28 OCT 2026 | CM427STB129165 | Richmond | 2027 surface treatment - secondary | 1 | $2,071,908 | VDOT |
Where these numbers come from
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
| Year | Contracts |
|---|---|
| 2002 | 405 |
| 2003 | 425 |
| 2004 | 424 |
| 2005 | 404 |
| 2006 | 333 |
| 2007 | 365 |
| 2008 | 391 |
| 2009 | 273 |
| 2010 | 405 |
| 2011 | 419 |
| 2012 | 377 |
| 2013 | 400 |
| 2014 | 338 |
| 2015 | 356 |
| 2016 | 416 |
| 2017 | 321 |
| 2018 | 286 |
| 2019 | 262 |
| 2020 | 312 |
| 2021 | 325 |
| 2025 | 131 |
| 2026 | 260 |
Every state's coverage and check is on the bid results hub.