Colvico, Inc.: WSDOT bid record
Colvico, Inc. submitted 31 bids on Washington State DOT contracts in the data, from 01 MAR 2000 to 19 JAN 2023, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $8,957,623
- Latest bid
- 19 JAN 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2000 | 1 | 0 | 0% |
| 2001 | 4 | 3 | 75% |
| 2002 | 1 | 0 | 0% |
| 2003 | 4 | 1 | 25% |
| 2004 | 1 | 1 | 100% |
| 2005 | 2 | 0 | 0% |
| 2006 | 1 | 0 | 0% |
| 2007 | 1 | 1 | 100% |
| 2010 | 1 | 1 | 100% |
| 2011 | 1 | 0 | 0% |
| 2012 | 4 | 1 | 25% |
| 2013 | 2 | 2 | 100% |
| 2015 | 1 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2017 | 1 | 0 | 0% |
| 2019 | 1 | 1 | 100% |
| 2020 | 1 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2023 | 1 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| NCR region | 11 | 4 | 36% |
| ER region | 10 | 4 | 40% |
| SCR region | 4 | 1 | 25% |
| Region 9 | 2 | 2 | 100% |
| NWR region | 2 | 1 | 50% |
| Region 0 | 1 | 0 | 0% |
| OR region | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion and sediment control lead | DAY | 10 | 5 (50%) | $122.50 | $100.00 | |
| Sequential arrow sign | HR | 6 | 3 (50%) | $4.00 | $3.50 | |
| Cement concrete sidewalk | SY | 5 | 3 (60%) | $77.00 | $55.00 | |
| Beam guardrail anchor type 10 | EACH | 5 | 3 (60%) | $1,100.00 | $894.00 | |
| Construction signs class A | SF | 9 | 2 (22%) | $12.00 | $16.21 | |
| Inlet protection | EACH | 7 | 1 (14%) | $120.00 | $95.00 | |
| Removing guardrail anchor | EACH | 5 | 1 (20%) | $240.00 | $215.00 | |
| Beam guardrail type 31 non-flared terminal | EACH | 5 | 1 (20%) | $2,700.00 | $2,700.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Aztech Electric, Inc. | 11 | 2 of 11 |
| Northeast Electric, LLC | 11 | 7 of 11 |
| Power City Electric, Inc. | 8 | 7 of 8 |
| McCandlish Electric, Inc. | 8 | 3 of 8 |
| Totem Electric of Tacoma, Inc. | 7 | 0 of 7 |
| Intermountain Electric, Inc. | 6 | 1 of 6 |
| Transportation Systems, Inc. | 5 | 1 of 5 |
| Knobel'S Electric, Inc. | 4 | 0 of 4 |
| Elcon Corporation | 3 | 1 of 3 |
| Potelco Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 19 JAN 2023 | 009918 | SCR region | Sr 240 columbia center blvd - upgrade signal & illumination | 3 of 3 | $1,675,000 | +37% |
| 21 JAN 2021 | 009637 | NCR region | Us 97 eastside oroville rd railroad crossing improvements | 3 of 3 | $330,868 | +15% |
| 06 JAN 2021 | 009617 | Region 9 | Sr305 eagle harbor maintenance facility physical security infrastructure | 1 of 4 | $256,180 | Low, 11% under the second |
| 08 JAN 2020 | 009507 | ER region | I-90 us 2 garden springs to broadway ave - ramp meters | 3 of 3 | $2,989,831 | +4.0% |
| 27 FEB 2019 | 009387 | NCR region | Sr155 grand coulee bridge upgrade illumination | 1 of 4 | $242,086 | Low, 57% under the second |
| 25 JAN 2017 | 009012 | SCR region | Sr 129 sr129 spur intersection - replace signal | 2 of 4 | $349,428 | +2.0% |
| 06 APR 2016 | 008852 | ER region | Us 2 spotted rd to i-90 - its 16z008 | 3 of 3 | $396,984 | +6.0% |
| 07 JAN 2015 | 008695 | NCR region | Ncr its power backup and vms replacement 15b004 | 2 of 2 | $550,644 | +12% |
| 19 DEC 2013 | 008564 | ER region | I-90 vicinity liberty park to havana st - illumination rebuild 13z014 | 1 of 4 | $1,105,094 | Low, 9.0% under the second |
| 05 DEC 2013 | 008551 | ER region | Us 195 hatch rd to cheney-spokane rd congestion & safety management - its 13z013 | 1 of 3 | $610,254 | Low, 17% under the second |
| 13 DEC 2012 | 008394 | ER region | I-90 & us 2 variable message signs replacement - its | 1 of 4 | $790,104 | Low, 6.0% under the second |
| 06 DEC 2012 | 008386 | ER region | I-90 division st to vicinity liberty park - illumination rebuild | 2 of 5 | $1,321,972 | +10% |
| 19 APR 2012 | 008270 | NCR region | Us2 stevens pass variable message signs | 2 of 6 | $1,407,513 | +6.0% |
| 08 FEB 2012 | 008239 | NWR region | I-5 samish way and northwest ave to birch bay lynden rd vic - atis | 5 of 6 | $6,400,552 | +28% |
| 13 JAN 2011 | 008071 | NCR region | Ncr major electrical 2011 | 2 of 2 | $568,304 | +25% |
| 29 APR 2010 | 007932 | ER region | I-90 broadway interchange signal system rehabilitation | 1 of 4 | $117,154 | Low, 19% under the second |
| 15 MAR 2007 | 007297 | NCR region | Sr 215 omak area signal systems | 1 of 3 | $191,858 | Low, 4.0% under the second |
| 15 FEB 2006 | 007091 | SCR region | I-90 sr 970 interchange - illumination | 2 of 6 | $282,465 | +10% |
| 15 DEC 2005 | 007063 | ER region | I-90 medical lake i/c to us 195 i/c - its | 2 of 4 | $1,264,795 | +3.0% |
| 03 FEB 2005 | 006905 | ER region | I 90 argonne rd. i/c electrical systems | 2 of 5 | $420,603 | +3.0% |
| 14 JAN 2004 | 006693 | SCR region | Us 395 kennewick variable message sign | 1 of 5 | $109,521 | Low, 1.0% under the second |
| 27 FEB 2003 | 006504 | NCR region | Ncr electrical update 2003 | 3 of 4 | $278,000 | +44% |
| 20 FEB 2003 | 006503 | NCR region | Sr 17 patton blvd. signal repair | 2 of 2 | $149,189 | +4.0% |
| 13 FEB 2003 | 006501 | NCR region | Sr 285 sellar br. illumination repair | 1 of 4 | $356,819 | Low, 0.0% under the second |
| 05 FEB 2003 | 006490 | OR region | Us 101 / us 12 aberdeen vicinity signal rehabilitation | 2 of 5 | $1,185,106 | +24% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.