WisDOT contract 20250114021 bid tabulation
C Kenosha, 52nd Street; Ih41/94 Frontage Rd to CTH H (STH 158, Kenosha County C Kenosha, 52nd Street). Let by Wisconsin DOT on January 14, 2025, Kenosha. 2 bids received; low bid $2,379,965 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 179
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $2,379,965 | Low |
| 2 | Stark Pavement Corporation | $2,445,445 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Stark Pavement Corporation |
|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $3,000.00 | $3,000.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 280 | $15.00 | $15.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 1,910 | $2.15 | $1.50 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 61,945 | $1.25 | $1.50 |
| 5 | Removing curb & gutter (204.0150) | LF | 420 | $10.00 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 50 | $10.00 | $10.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 22 | $331.47 | $331.47 |
| 8 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 27 | $35.00 | $35.00 |
| 9 | Removing storm sewer (size) 02. 30-inch (204.0245) | LF | 63 | $35.00 | $35.00 |
| 10 | Removing (item description) 01. traffic signals STH 158 & 104TH ave (204.9060.S) | EACH | 1 | $3,612.00 | $3,612.00 |
| 11 | Removing (item description) 02. traffic signals STH 158 & 88TH ave (204.9060.S) | EACH | 1 | $3,268.30 | $3,268.30 |
| 12 | Removing (item description) 03. loop detector wire & lead-in cable STH 158 & 104TH ave (204.9060.S) | EACH | 1 | $884.52 | $884.52 |
| 13 | Removing (item description) 04. loop detector wire & lead-in cable STH 158 & 88TH ave (204.9060.S) | EACH | 1 | $884.52 | $884.52 |
| 14 | Excavation common (205.0100) | CY | 450 | $21.00 | $21.00 |
| 15 | Backfill structure type A (210.1500) | TON | 127 | $16.00 | $16.00 |
| 16 | Finishing roadway (project) 01. 3220-09-71 (213.0100) | EACH | 1 | $1,500.00 | $3,500.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 822 | $46.00 | $46.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 526 | $21.00 | $21.00 |
| 19 | Base patching concrete shes (390.0405) | CY | 6 | $1,500.00 | $1,500.00 |
| 20 | Drilled tie bars (416.0610) | EACH | 164 | $12.00 | $12.00 |
| 21 | Drilled dowel bars (416.0620) | EACH | 50 | $22.00 | $22.00 |
| 22 | Concrete pavement replacement shes (416.1725) | SY | 180 | $112.00 | $112.00 |
| 23 | Tack coat (455.0605) | GAL | 7,540 | $2.25 | $2.90 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $800.00 | $4,500.00 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $10,250 | $4,500.00 |
| 26 | Incentive density PWL HMA pavement (460.2005) | DOL | 8,136 | $1.00 | $1.00 |
| 27 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 5,378.40 | $1.00 | $1.00 |
| 28 | Incentive air voids HMA pavement (460.2010) | DOL | 12,530 | $1.00 | $1.00 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 12,530 | $73.50 | $70.80 |
| 30 | Asphaltic surface (465.0105) | TON | 80 | $115.00 | $120.00 |
| 31 | Asphaltic surface patching (465.0110) | TON | 300 | $62.50 | $120.00 |
| 32 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 4,900 | $0.60 | $0.01 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 1,600 | $1.10 | $0.01 |
| 34 | Cleaning culvert pipes (520.8700) | EACH | 20 | $750.00 | $875.00 |
| 35 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 5 | $300.00 | $300.00 |
| 36 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 1 | $400.00 | $400.00 |
| 37 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $700.00 | $700.00 |
| 38 | Culvert pipe reinforced concrete class IV 72-inch (522.0472) | LF | 174 | $690.00 | $690.00 |
| 39 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 10 | $1,100.00 | $1,100.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,200.00 | $1,200.00 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $2,000.00 | $2,000.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 72-inch (522.1072) | EACH | 2 | $5,400.00 | $5,400.00 |
| 43 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 374 | $51.00 | $51.00 |
| 44 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 6 | $75.00 | $75.00 |
| 45 | Concrete sidewalk 5-inch (602.0410) | SF | 50 | $12.00 | $12.00 |
| 46 | Riprap heavy (606.0300) | CY | 11 | $135.00 | $135.00 |
| 47 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 25 | $100.00 | $100.00 |
| 48 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 63 | $183.00 | $183.00 |
| 49 | Reconstructing inlets (611.0430) | EACH | 2 | $1,450.00 | $1,450.00 |
| 50 | Adjusting manhole covers (611.8110) | EACH | 3 | $725.00 | $725.00 |
| 51 | Adjusting inlet covers (611.8115) | EACH | 30 | $640.00 | $640.00 |
| 52 | Cover plates temporary (611.8120.S) | EACH | 3 | $300.00 | $300.00 |
| 53 | Maintenance and repair of haul roads (project) 01. 3220-09-71 (618.0100) | EACH | 1 | $115.00 | $1.00 |
| 54 | Mobilization (619.1000) | EACH | 1 | $22,422 | $77,838 |
| 55 | Concrete corrugated median (620.0100) | SF | 2,480 | $11.30 | $11.30 |
| 56 | Concrete median sloped nose (620.0300) | SF | 94 | $15.00 | $15.00 |
| 57 | Water (624.0100) | MGAL | 16 | $1.86 | $50.00 |
| 58 | Topsoil (625.0100) | SY | 9,740 | $5.50 | $7.00 |
| 59 | Silt fence (628.1504) | LF | 350 | $2.15 | $2.15 |
| 60 | Silt fence maintenance (628.1520) | LF | 350 | $0.01 | $0.01 |
| 61 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $100.00 |
| 62 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $1.00 | $1.00 |
| 63 | Erosion mat urban class I type B (628.2008) | SY | 9,740 | $2.00 | $2.00 |
| 64 | Inlet protection type B (628.7010) | EACH | 2 | $70.00 | $70.00 |
| 65 | Inlet protection type C (628.7015) | EACH | 34 | $70.00 | $70.00 |
| 66 | Temporary ditch checks (628.7504) | LF | 200 | $8.00 | $8.00 |
| 67 | Culvert pipe checks (628.7555) | EACH | 48 | $23.40 | $23.40 |
| 68 | Fertilizer type B (629.0210) | CWT | 7 | $80.00 | $80.00 |
| 69 | Seeding mixture no. 30 (630.0130) | LB | 176 | $11.00 | $11.00 |
| 70 | Seed water (630.0500) | MGAL | 220 | $1.00 | $1.00 |
| 71 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 15 | $139.00 | $139.00 |
| 72 | Signs type II reflective H (637.2210) | SF | 343 | $21.00 | $21.00 |
| 73 | Signs type II reflective H folding (637.2215) | SF | 74.60 | $29.00 | $29.00 |
| 74 | Signs type II reflective F (637.2230) | SF | 6.25 | $23.00 | $23.00 |
| 75 | Removing signs type II (638.2602) | EACH | 26 | $5.00 | $5.00 |
| 76 | Removing small sign supports (638.3000) | EACH | 27 | $10.00 | $10.00 |
| 77 | Field office type D (642.5401) | EACH | 1 | $13,000 | $7,500.00 |
| 78 | Traffic control drums (643.0300) | DAY | 15,540 | $0.20 | $0.20 |
| 79 | Traffic control barricades type III (643.0420) | DAY | 4,060 | $0.65 | $0.65 |
| 80 | Traffic control warning lights type A (643.0705) | DAY | 4,816 | $0.11 | $0.11 |
| 81 | Traffic control warning lights type C (643.0715) | DAY | 5,180 | $0.11 | $0.11 |
| 82 | Traffic control signs (643.0900) | DAY | 12,110 | $0.34 | $0.34 |
| 83 | Traffic control covering signs type II (643.0920) | EACH | 10 | $40.00 | $40.00 |
| 84 | Traffic control signs fixed message (643.1000) | SF | 63 | $20.00 | $20.00 |
| 85 | Traffic control signs PCMS (643.1050) | DAY | 14 | $35.00 | $35.00 |
| 86 | Traffic control (643.5000) | EACH | 1 | $6,000.00 | $6,000.00 |
| 87 | Marking line epoxy 4-inch (646.1020) | LF | 3,230 | $0.32 | $0.32 |
| 88 | Marking line grooved wet ref epoxy 4-inch (646.1040) | LF | 50 | $1.26 | $1.25 |
| 89 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 40,190 | $1.31 | $1.30 |
| 90 | Marking line epoxy 8-inch (646.3020) | LF | 1,180 | $0.66 | $0.65 |
| 91 | Marking line epoxy 10-inch (646.4020) | LF | 371 | $0.81 | $0.80 |
| 92 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,765 | $2.68 | $2.65 |
| 93 | Marking arrow epoxy (646.5020) | EACH | 39 | $222.22 | $220.00 |
| 94 | Marking word epoxy (646.5120) | EACH | 16 | $242.42 | $240.00 |
| 95 | Marking symbol epoxy (646.5220) | EACH | 4 | $227.27 | $225.00 |
| 96 | Marking stop line epoxy 18-inch (646.6120) | LF | 540 | $12.63 | $12.50 |
| 97 | Marking diagonal epoxy 12-inch (646.7120) | LF | 615 | $9.60 | $9.50 |
| 98 | Marking corrugated median epoxy (646.8020) | SF | 1,200 | $8.08 | $8.00 |
| 99 | Marking curb epoxy (646.8120) | LF | 95 | $8.08 | $8.00 |
| 100 | Marking island nose epoxy (646.8220) | EACH | 5 | $272.73 | $270.00 |
| 101 | Locating no-passing zones (648.0100) | MI | 1 | $404.04 | $400.00 |
| 102 | Construction staking storm sewer (650.4000) | EACH | 2 | $100.00 | $295.00 |
| 103 | Construction staking pipe culverts (650.6000) | EACH | 1 | $250.00 | $486.00 |
| 104 | Construction staking resurfacing reference (650.8000) | LF | 9,647 | $0.22 | $0.65 |
| 105 | Construction staking electrical installations (project) 01. 3220-09- 71 (650.8501) | EACH | 1 | $5,500.00 | $1,886.00 |
| 106 | Construction staking supplemental control (project) 01. 3220-09-71 (650.9911) | EACH | 1 | $2,500.00 | $1,250.00 |
| 107 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 929 | $11.07 | $11.07 |
| 108 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,120 | $14.15 | $14.15 |
| 109 | Conduit special 2-inch (652.0605) | LF | 206 | $23.73 | $23.73 |
| 110 | Conduit special 3-inch (652.0615) | LF | 1,254 | $30.75 | $30.75 |
| 111 | Conduit loop detector (652.0800) | LF | 2,450 | $10.04 | $10.04 |
| 112 | Pull boxes steel 24X36-inch (653.0135) | EACH | 9 | $1,311.97 | $1,311.97 |
| 113 | Pull boxes steel 24X42-inch (653.0140) | EACH | 18 | $1,424.12 | $1,424.12 |
| 114 | Removing pull boxes (653.0905) | EACH | 37 | $98.06 | $98.06 |
| 115 | Concrete bases type 1 (654.0101) | EACH | 7 | $975.10 | $975.10 |
| 116 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,219.15 | $1,219.15 |
| 117 | Concrete bases type 10 (654.0110) | EACH | 1 | $6,142.21 | $6,142.21 |
| 118 | Concrete bases type 13 (654.0113) | EACH | 2 | $11,162 | $11,162 |
| 119 | Concrete bases type 10-special (654.0120) | EACH | 5 | $7,832.79 | $7,832.79 |
| 120 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 2 | $2,289.55 | $2,289.55 |
| 121 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,243 | $1.69 | $1.69 |
| 122 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,129 | $2.16 | $2.16 |
| 123 | Cable traffic signal 12-14 AWG (655.0260) | LF | 2,801 | $3.62 | $3.62 |
| 124 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 1,322 | $2.59 | $2.59 |
| 125 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,741 | $1.93 | $1.93 |
| 126 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,129 | $0.96 | $0.96 |
| 127 | Loop detector lead in cable (655.0700) | LF | 8,344 | $1.68 | $1.68 |
| 128 | Loop detector wire (655.0800) | LF | 5,726 | $0.96 | $0.96 |
| 129 | Traffic signal evp detector cable (655.0900) | LF | 2,305 | $1.52 | $1.52 |
| 130 | Electrical service meter breaker pedestal (location) 01. STH 158 & 104TH ave (656.0201) | EACH | 1 | $1,295.95 | $1,295.95 |
| 131 | Electrical service meter breaker pedestal (location) 02. STH 158 & 88TH ave (656.0201) | EACH | 1 | $1,295.95 | $1,295.95 |
| 132 | Pedestal bases (657.0100) | EACH | 7 | $369.67 | $369.67 |
| 133 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 1 | $734.13 | $734.13 |
| 134 | Poles type 3 (657.0310) | EACH | 1 | $4,504.65 | $4,504.65 |
| 135 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 1 | $864.02 | $864.02 |
| 136 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 6 | $905.98 | $905.98 |
| 137 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 1 | $338.90 | $338.90 |
| 138 | Traffic signal face 3S 12-inch (658.0173) | EACH | 24 | $876.41 | $876.41 |
| 139 | Traffic signal face 4S 12-inch (658.0174) | EACH | 14 | $1,228.89 | $1,228.89 |
| 140 | Signal mounting hardware (location) 01. STH 158 & 104TH ave (658.5070) | EACH | 1 | $5,554.93 | $5,554.93 |
| 141 | Signal mounting hardware (location) 02. STH 158 & 88TH ave (658.5070) | EACH | 1 | $6,136.40 | $6,136.40 |
| 142 | Luminaires utility LED C (659.1125) | EACH | 8 | $531.52 | $531.52 |
| 143 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 42 | $9.28 | $9.28 |
| 144 | Install ethernet switches (678.0600) | EACH | 3 | $1,158.94 | $1,158.94 |
| 145 | Sawing asphalt (690.0150) | LF | 1,070 | $1.15 | $1.80 |
| 146 | Sawing concrete (690.0250) | LF | 410 | $2.25 | $2.10 |
| 147 | Incentive iri ride (740.0440) | DOL | 9,650 | $1.00 | $1.00 |
| 148 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,300 | $5.00 | $5.00 |
| 149 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 |
| 150 | Special 01. backfill slurry (SPV.0035) | CY | 115 | $115.00 | $115.00 |
| 151 | Special 01. install polestype 10 (SPV.0060) | EACH | 1 | $1,454.56 | $1,454.56 |
| 152 | Special 02. install poles type 9 special (SPV.0060) | EACH | 1 | $1,626.41 | $1,626.41 |
| 153 | Special 03. install poles type 10 special (SPV.0060) | EACH | 4 | $1,626.41 | $1,626.41 |
| 154 | Special 04. install poles type 13 (SPV.0060) | EACH | 2 | $1,798.25 | $1,798.25 |
| 155 | Special 05. install monotube arms 30-FT (SPV.0060) | EACH | 1 | $1,565.57 | $1,565.57 |
| 156 | Special 06. install monotube arms 35-FT type 9/10 spec pole (SPV.0060) | EACH | 1 | $1,737.42 | $1,737.42 |
| 157 | Special 07. install monotube arms 40-FT type 9/10 spec pole (SPV.0060) | EACH | 1 | $1,737.42 | $1,737.42 |
| 158 | Special 08. install monotube arms 45-FT type 9/10 spec pole (SPV.0060) | EACH | 3 | $1,909.27 | $1,909.27 |
| 159 | Special 09. install monotube arms 50-FT (SPV.0060) | EACH | 2 | $2,580.17 | $2,580.17 |
| 160 | Special 10. install luminaire arms steel 15-FT (SPV.0060) | EACH | 7 | $299.85 | $299.85 |
| 161 | Special 11. TRNSPT & install state furn traffic signal cabinet STH 158 & 104TH ave (SPV.0060) | EACH | 1 | $6,337.38 | $6,337.38 |
| 162 | Special 12. TRNSPT & install state furn traffic signal cabinet STH 158 & 88TH ave (SPV.0060) | EACH | 1 | $7,524.73 | $7,524.73 |
| 163 | Special 13. TRNSPT traffic signal & inter lighting materials STH 158 & 104TH ave (SPV.0060) | EACH | 1 | $367.07 | $367.07 |
| 164 | Special 14. TRNSPT traffic signal & inter lighting materials STH 158 & 88TH ave (SPV.0060) | EACH | 1 | $367.07 | $367.07 |
| 165 | Special 15. TRNSPT & install state furn evp heads STH 158 & 104TH ave (SPV.0060) | EACH | 1 | $2,905.07 | $2,905.07 |
| 166 | Special 16. TRNSPT & install state furn evp heads STH 158 & 88TH ave (SPV.0060) | EACH | 1 | $2,905.07 | $2,905.07 |
| 167 | Special 17. install state-furnished radio antenna STH 158 & 104TH ave (SPV.0060) | EACH | 2 | $2,424.52 | $2,424.52 |
| 168 | Special 18. install state-furnished radio antenna STH 158 & 88TH ave (SPV.0060) | EACH | 2 | $2,424.52 | $2,424.52 |
| 169 | Special 19. install state furnished radar detection system STH 158 & 104TH ave (SPV.0060) | EACH | 1 | $4,623.56 | $4,623.56 |
| 170 | Special 20. install state furnished radar detection system STH 158 & 88TH ave (SPV.0060) | EACH | 1 | $4,623.56 | $4,623.56 |
| 171 | Special 21. remove, salvage, & reinstall GPS evp equipment STH 158 & 104TH ave (SPV.0060) | EACH | 1 | $2,169.15 | $2,169.15 |
| 172 | Special 22. remove, salvage, & reinstall GPS evp equipment STH 158 & 88TH ave (SPV.0060) | EACH | 1 | $2,169.15 | $2,169.15 |
| 173 | Special 23. section corner monuments (SPV.0060) | EACH | 4 | $7.44 | $500.00 |
| 174 | Special 24. clean storm sewer structure (SPV.0060) | EACH | 3 | $250.00 | $250.00 |
| 175 | Special 25. tuck point storm sewer structure (SPV.0060) | EACH | 27 | $250.00 | $250.00 |
| 176 | Special 26. install state-furnished radio antenna STH 158 & dairyland DR (SPV.0060) | EACH | 2 | $1,113.79 | $1,113.79 |
| 177 | Special 01. ditch cleaning (SPV.0090) | LF | 6,350 | $13.10 | $13.10 |
| 178 | Special 01. asphaltic repair (SPV.0195) | TON | 800 | $100.41 | $105.00 |
| 179 | Special 02. management of solid waste (SPV.0195) | TON | 176 | $75.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.