WisDOT contract 20250211033 bid tabulation
1590-18-71. Let by Wisconsin DOT on February 11, 2025, Forest. 5 bids received; low bid $17,389,817 by Integrity Grading and Excavating, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 285
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Integrity Grading and Excavating, Inc. | $17,389,817 | Low |
| 2 | Northeast Asphalt, Inc | $18,647,730 | +7.0% |
| 3 | Mashuda Contractors, Inc. | $18,775,920 | +8.0% |
| 4 | Musson Bros., Inc. | $19,603,337 | +13% |
| 5 | James Peterson Sons, Inc. | $19,828,371 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Integrity Grading and Excavating, Inc. | 2. Northeast Asphalt, Inc | 3. Mashuda Contractors, Inc. | 4. Musson Bros., Inc. | 5. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 119 | $329.00 | $329.00 | $329.00 | $329.00 | $329.06 |
| 2 | Grubbing (201.0215) | ACRE | 0.29 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 | $4,150.00 |
| 3 | Roadside clearing (202.0110) | SY | 30 | $99.00 | $99.00 | $99.00 | $99.00 | $99.00 |
| 4 | Removing small pipe culverts (203.0100) | EACH | 20 | $565.00 | $565.00 | $970.00 | $617.00 | $500.00 |
| 5 | Removing structure over waterway remove debris (structure) 001. C- 21-9703 (203.0250) | EACH | 1 | $15,000 | $15,000 | $15,000 | $15,000 | $11,111 |
| 6 | Removing asphaltic surface (204.0110) | SY | 812.60 | $4.35 | $10.00 | $3.00 | $4.50 | $10.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 905 | $13.90 | $13.90 | $13.90 | $13.90 | $13.90 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 199,310 | $3.40 | $3.40 | $3.40 | $3.40 | $3.40 |
| 9 | Removing curb & gutter (204.0150) | LF | 1,527 | $6.35 | $6.35 | $4.50 | $5.30 | $3.42 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 107 | $6.55 | $6.55 | $10.00 | $17.00 | $15.00 |
| 11 | Removing guardrail (204.0165) | LF | 205 | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 |
| 12 | Removing cable barrier (204.0167) | LF | 3,740 | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 |
| 13 | Removing fence (204.0170) | LF | 290 | $2.00 | $2.00 | $2.00 | $5.00 | $2.06 |
| 14 | Removing storm sewer (size) 001. 15-inch (204.0245) | LF | 37 | $20.00 | $20.00 | $20.00 | $6.90 | $20.00 |
| 15 | Abandoning culvert pipes (204.0270) | EACH | 1 | $10.00 | $10.00 | $1,500.00 | $935.00 | $2,463.00 |
| 16 | Excavation common (205.0100) | CY | 337,540 | $10.25 | $10.25 | $8.85 | $8.70 | $11.14 |
| 17 | Excavation for structures culverts (structure) 001. C-21-9703 (206.2001) | EACH | 1 | $9,239.00 | $9,239.00 | $17,000 | $5,336.00 | $13,603 |
| 18 | Excavation for structures culverts (structure) 002. B-21-35 (206.2001) | EACH | 1 | $46,500 | $46,500 | $65,000 | $37,644 | $79,925 |
| 19 | Cofferdams (structure) 001. 21008000215 (206.5001) | EACH | 1 | $500.00 | $50,000 | $10,000 | $15,670 | $6,500.00 |
| 20 | Select borrow (208.1100) | CY | 1,736 | $25.00 | $20.00 | $18.07 | $24.00 | $23.51 |
| 21 | Backfill structure type A (210.1500) | TON | 5,160 | $20.00 | $20.00 | $17.93 | $13.00 | $25.00 |
| 22 | Backfill structure type B (210.2500) | TON | 1,270 | $20.00 | $19.00 | $18.93 | $13.00 | $22.75 |
| 23 | Prepare foundation for asphaltic paving (project) 001. 1590-18-71 (211.0101) | EACH | 1 | $28,890 | $28,890 | $28,890 | $28,890 | $28,890 |
| 24 | Prepare foundation for asphaltic paving (project) 002. 1590-18-81 (211.0101) | EACH | 1 | $52,750 | $52,750 | $52,750 | $52,750 | $52,750 |
| 25 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 261 | $75.10 | $75.10 | $75.10 | $75.10 | $75.10 |
| 26 | Finishing roadway (project) 001. 1590-18-71 (213.0100) | EACH | 1 | $500.00 | $6,250.00 | $1,000.00 | $100.00 | $3,500.00 |
| 27 | Finishing roadway (project) 002. 1590-18-81 (213.0100) | EACH | 1 | $500.00 | $6,250.00 | $1,000.00 | $100.00 | $3,500.00 |
| 28 | Base aggregate dense 3/4-inch (305.0110) | TON | 19,657 | $19.00 | $19.00 | $17.28 | $0.01 | $23.37 |
| 29 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 35,863 | $15.50 | $15.50 | $14.43 | $16.00 | $15.76 |
| 30 | Base aggregate dense 3-inch (305.0130) | TON | 357 | $26.85 | $26.85 | $16.71 | $17.00 | $19.79 |
| 31 | Shaping shoulders (305.0500) | STA | 6 | $562.00 | $770.00 | $150.00 | $198.00 | $150.00 |
| 32 | Breaker run (311.0110) | TON | 140 | $32.80 | $32.80 | $21.90 | $37.00 | $30.19 |
| 33 | Concrete pavement 7-inch (415.0070) | SY | 1,938 | $95.50 | $95.50 | $105.57 | $105.57 | $95.50 |
| 34 | HMA cold weather paving (450.4000) | TON | 22,500 | $3.20 | $3.20 | $3.20 | $3.20 | $3.20 |
| 35 | Tack coat (455.0605) | GAL | 15,294 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 36 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,150.00 |
| 37 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 3 | $4,750.00 | $4,750.00 | $4,750.00 | $4,750.00 | $4,750.00 |
| 38 | Incentive density PWL HMA pavement (460.2005) | DOL | 41,097 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 39 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 29,840 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Incentive air voids HMA pavement (460.2010) | DOL | 51,010 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 41 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 29,490 | $70.20 | $70.20 | $70.20 | $70.20 | $70.20 |
| 42 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 21,520 | $82.90 | $82.90 | $82.90 | $82.90 | $82.90 |
| 43 | Asphaltic surface (465.0105) | TON | 3,924 | $121.90 | $121.90 | $121.90 | $121.90 | $121.90 |
| 44 | Asphaltic surface patching (465.0110) | TON | 525 | $121.90 | $121.90 | $121.90 | $121.90 | $121.90 |
| 45 | Asphaltic surface driveways and field entrances (465.0120) | TON | 275 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 46 | Asphaltic flumes (465.0315) | SY | 130 | $59.70 | $59.70 | $59.70 | $59.70 | $75.00 |
| 47 | Asphaltic rumble strips, shoulder (465.0520) | LF | 23,992 | $0.37 | $0.37 | $0.37 | $0.37 | $0.37 |
| 48 | Asphaltic rumble strips, centerline (465.0560) | LF | 46,685 | $0.37 | $0.37 | $0.37 | $0.37 | $0.37 |
| 49 | Pigmented surface sealer (502.3210) | SY | 121 | $2.50 | $2.50 | $2.50 | $2.50 | $3.75 |
| 50 | Adhesive anchors no. 5 bar (502.4205) | EACH | 52 | $25.00 | $25.00 | $25.00 | $25.00 | $19.00 |
| 51 | Concrete masonry culverts (504.0100) | CY | 944 | $745.50 | $745.50 | $745.50 | $745.50 | $810.00 |
| 52 | Bar steel reinforcement HS structures (505.0400) | LB | 91,920 | $1.30 | $1.30 | $1.30 | $1.30 | $0.96 |
| 53 | Bar steel reinforcement HS coated structures (505.0600) | LB | 19,030 | $1.40 | $1.40 | $1.40 | $1.40 | $1.06 |
| 54 | Temporary shoring (structure) 001. C-21-9703 (511.1200) | SF | 555 | $50.00 | $50.00 | $50.00 | $50.00 | $44.00 |
| 55 | Rubberized membrane waterproofing (516.0500) | SY | 72 | $18.00 | $18.00 | $18.00 | $18.00 | $44.00 |
| 56 | Sheet membrane waterproofing for buried structures (516.0610.S) | SY | 646 | $25.00 | $25.00 | $25.00 | $25.00 | $44.00 |
| 57 | Concrete staining (structure) 001. B-21-35 (517.1010.S) | SF | 2,997 | $4.21 | $4.21 | $4.21 | $4.21 | $2.85 |
| 58 | Concrete staining multi-color (structure) 001. B-21-35 (517.1015.S) | SF | 3,926 | $5.85 | $5.85 | $5.85 | $5.85 | $2.10 |
| 59 | Architectural surface treatment (structure) 001. B-21-35 (517.1050.S) | SF | 3,804 | $10.00 | $10.00 | $10.00 | $10.00 | $15.35 |
| 60 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 17 | $882.00 | $882.00 | $560.00 | $543.00 | $468.00 |
| 61 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 8 | $1,125.00 | $1,125.00 | $795.00 | $867.00 | $815.00 |
| 62 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 3 | $2,038.00 | $2,038.00 | $1,150.00 | $1,659.00 | $1,148.00 |
| 63 | Culvert pipe class III-A 24-inch (520.3324) | LF | 560 | $100.00 | $100.00 | $89.69 | $96.00 | $97.39 |
| 64 | Culvert pipe class III-A 30-inch (520.3330) | LF | 286 | $110.00 | $110.00 | $125.00 | $135.00 | $139.35 |
| 65 | Culvert pipe class III-A 36-inch (520.3336) | LF | 106 | $123.00 | $123.00 | $122.00 | $121.00 | $236.04 |
| 66 | Concrete collars for pipe (520.8000) | EACH | 6 | $493.00 | $493.00 | $600.00 | $1,776.00 | $748.63 |
| 67 | Apron endwalls for culvert pipe steel 48-inch (521.1048) | EACH | 2 | $2,711.00 | $2,711.00 | $1,800.00 | $2,604.00 | $1,942.14 |
| 68 | Culvert pipe corrugated steel 48- inch (521.3148) | LF | 93 | $220.00 | $220.00 | $200.00 | $299.00 | $218.29 |
| 69 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 36 | $162.00 | $162.00 | $165.00 | $161.00 | $156.05 |
| 70 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 8 | $501.00 | $501.00 | $245.00 | $414.00 | $187.34 |
| 71 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 156 | $129.00 | $129.00 | $82.00 | $115.00 | $113.18 |
| 72 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 68 | $168.00 | $168.00 | $117.00 | $147.00 | $140.83 |
| 73 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 15 | $275.00 | $275.00 | $240.00 | $241.00 | $272.23 |
| 74 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 11 | $1,205.00 | $1,205.00 | $882.00 | $1,421.00 | $1,315.00 |
| 75 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 10 | $1,352.00 | $1,352.00 | $1,050.00 | $1,591.00 | $1,516.00 |
| 76 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 10 | $1,518.00 | $1,518.00 | $1,225.00 | $1,575.00 | $1,740.00 |
| 77 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $3,013.00 | $3,013.00 | $2,195.00 | $2,530.00 | $2,746.00 |
| 78 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 14X23-inch (522.2314) | LF | 64 | $173.00 | $173.00 | $125.00 | $168.00 | $149.74 |
| 79 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 14X23-inch (522.2414) | LF | 16 | $199.00 | $199.00 | $160.00 | $208.00 | $228.35 |
| 80 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614) | EACH | 4 | $2,045.00 | $2,045.00 | $1,110.00 | $1,203.00 | $1,560.00 |
| 81 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 1 | $3,147.00 | $3,147.00 | $2,550.00 | $3,048.00 | $2,821.00 |
| 82 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 443 | $72.77 | $72.77 | $66.54 | $66.54 | $72.77 |
| 83 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 20 | $75.47 | $75.47 | $67.51 | $67.51 | $75.47 |
| 84 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 2,060 | $42.55 | $42.55 | $30.38 | $30.38 | $42.55 |
| 85 | Concrete curb & gutter 4-inch sloped 36-inch type T (601.0582) | LF | 12 | $81.31 | $81.31 | $67.51 | $67.51 | $81.31 |
| 86 | Concrete curb pedestrian (601.0600) | LF | 43 | $73.47 | $73.47 | $58.98 | $58.98 | $73.47 |
| 87 | Concrete sidewalk 5-inch (602.0410) | SF | 5,207 | $11.19 | $11.19 | $15.18 | $15.18 | $11.19 |
| 88 | Curb ramp detectable warning field yellow (602.0505) | SF | 10 | $52.93 | $52.93 | $62.51 | $62.51 | $52.93 |
| 89 | Curb ramp detectable warning field natural patina (602.0515) | SF | 260 | $49.05 | $49.05 | $60.38 | $60.38 | $49.05 |
| 90 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 105 | $67.82 | $67.82 | $67.84 | $67.84 | $67.82 |
| 91 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 145 | $62.88 | $62.88 | $65.71 | $65.71 | $62.88 |
| 92 | Concrete surface drains (602.3010) | CY | 1.95 | $855.20 | $855.20 | $1,543.66 | $1,543.66 | $855.20 |
| 93 | Riprap medium (606.0200) | CY | 390 | $192.50 | $192.50 | $80.00 | $308.00 | $88.34 |
| 94 | Riprap heavy (606.0300) | CY | 45 | $192.50 | $192.50 | $100.00 | $296.00 | $98.15 |
| 95 | Riprap extra-heavy (606.0400) | CY | 50 | $192.50 | $192.50 | $100.00 | $243.00 | $112.57 |
| 96 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 80 | $105.00 | $105.00 | $87.00 | $92.00 | $128.30 |
| 97 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 583 | $126.00 | $126.00 | $110.00 | $105.00 | $112.01 |
| 98 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 61 | $175.00 | $175.00 | $154.00 | $169.00 | $168.25 |
| 99 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 345 | $93.00 | $93.00 | $73.00 | $86.00 | $107.88 |
| 100 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 60 | $116.00 | $116.00 | $89.00 | $92.00 | $128.30 |
| 101 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 103 | $105.00 | $105.00 | $92.00 | $93.00 | $113.18 |
| 102 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 451 | $137.00 | $137.00 | $124.00 | $119.00 | $114.43 |
| 103 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329) | LF | 38 | $280.00 | $280.00 | $255.00 | $257.00 | $280.19 |
| 104 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 571 | $86.00 | $86.00 | $72.00 | $88.00 | $85.48 |
| 105 | Manhole covers type J (611.0530) | EACH | 4 | $644.00 | $644.00 | $640.00 | $1,002.00 | $1,195.00 |
| 106 | Inlet covers type C (611.0612) | EACH | 8 | $680.00 | $680.00 | $660.00 | $1,002.00 | $1,227.00 |
| 107 | Inlet covers type HM (611.0627) | EACH | 7 | $908.00 | $908.00 | $850.00 | $1,253.00 | $1,323.00 |
| 108 | Inlet covers type MS (611.0642) | EACH | 26 | $687.00 | $687.00 | $602.00 | $640.00 | $600.00 |
| 109 | Manholes 4-FT diameter (611.2004) | EACH | 6 | $3,963.00 | $3,963.00 | $3,700.00 | $3,585.00 | $3,380.00 |
| 110 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $5,131.00 | $5,131.00 | $4,500.00 | $4,288.00 | $4,562.00 |
| 111 | Manholes 8-FT diameter (611.2008) | EACH | 2 | $12,636 | $12,636 | $12,400 | $12,482 | $13,142 |
| 112 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,714.00 | $3,714.00 | $3,200.00 | $2,516.00 | $2,917.00 |
| 113 | Inlets 2X3-FT (611.3230) | EACH | 6 | $2,595.00 | $2,595.00 | $2,400.00 | $1,812.00 | $2,059.00 |
| 114 | Inlets median 1 grate (611.3901) | EACH | 18 | $3,727.00 | $3,727.00 | $2,650.00 | $2,531.00 | $2,992.00 |
| 115 | Inlets median 2 grate (611.3902) | EACH | 4 | $5,150.00 | $5,150.00 | $4,900.00 | $4,164.00 | $5,025.00 |
| 116 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 207 | $2.00 | $2.00 | $10.00 | $5.30 | $18.00 |
| 117 | Insulation board polystyrene (inch) 001. 2 -inch (612.0902.S) | SY | 676 | $18.08 | $18.08 | $38.00 | $45.00 | $29.00 |
| 118 | Maintenance and repair of haul roads (project) 001. 1590-18-71 (618.0100) | EACH | 1 | $500.00 | $10.00 | $1.00 | $1.00 | $100.00 |
| 119 | Maintenance and repair of haul roads (project) 002. 1590-18-81 (618.0100) | EACH | 1 | $500.00 | $10.00 | $1.00 | $1.00 | $100.00 |
| 120 | Mobilization (619.1000) | EACH | 1 | $678,000 | $1,832,460 | $1,191,691 | $1,662,282 | $1,697,865 |
| 121 | Water (624.0100) | MGAL | 1,419.80 | $30.00 | $50.00 | $30.00 | $18.00 | $45.00 |
| 122 | Topsoil (625.0100) | SY | 151,879 | $1.65 | $1.65 | $2.14 | $0.40 | $2.15 |
| 123 | Mulching (627.0200) | SY | 4,758 | $0.40 | $0.40 | $0.40 | $0.50 | $0.40 |
| 124 | Silt fence (628.1504) | LF | 14,110 | $2.00 | $2.00 | $2.00 | $2.05 | $2.00 |
| 125 | Silt fence maintenance (628.1520) | LF | 16,327 | $0.01 | $0.01 | $0.01 | $0.05 | $0.01 |
| 126 | Mobilizations erosion control (628.1905) | EACH | 23 | $100.00 | $100.00 | $100.00 | $400.00 | $100.00 |
| 127 | Mobilizations emergency erosion control (628.1910) | EACH | 10 | $100.00 | $100.00 | $100.00 | $125.00 | $100.00 |
| 128 | Erosion mat urban class I type A (628.2006) | SY | 6,252 | $1.75 | $1.75 | $1.75 | $1.98 | $1.75 |
| 129 | Erosion mat class II type B (628.2023) | SY | 140,720 | $1.95 | $1.95 | $1.95 | $1.98 | $1.95 |
| 130 | Soil stabilizer type B (628.6510) | ACRE | 3.39 | $850.00 | $850.00 | $850.00 | $4,500.00 | $850.00 |
| 131 | Inlet protection type A (628.7005) | EACH | 24 | $125.00 | $125.00 | $125.00 | $50.00 | $125.00 |
| 132 | Inlet protection type C (628.7015) | EACH | 19 | $50.00 | $50.00 | $50.00 | $75.00 | $50.00 |
| 133 | Inlet protection type D (628.7020) | EACH | 1 | $100.00 | $100.00 | $100.00 | $135.00 | $100.00 |
| 134 | Temporary ditch checks (628.7504) | LF | 1,891 | $10.00 | $10.00 | $10.00 | $7.25 | $10.00 |
| 135 | Stone ditch checks (628.7515.S) | CY | 161 | $80.00 | $80.00 | $60.00 | $463.00 | $80.00 |
| 136 | Culvert pipe checks (628.7555) | EACH | 155 | $8.00 | $8.00 | $8.00 | $14.00 | $8.00 |
| 137 | Tracking pads (628.7560) | EACH | 8 | $1,000.00 | $1,000.00 | $2,650.00 | $500.00 | $2,500.00 |
| 138 | Rock bags (628.7570) | EACH | 631 | $10.00 | $10.00 | $10.00 | $14.00 | $10.00 |
| 139 | Fertilizer type A (629.0205) | CWT | 14.02 | $125.00 | $125.00 | $125.00 | $115.00 | $125.00 |
| 140 | Fertilizer type B (629.0210) | CWT | 91 | $80.00 | $80.00 | $80.00 | $115.00 | $80.00 |
| 141 | Seeding mixture no. 20 (630.0120) | LB | 7,644 | $8.00 | $8.00 | $8.00 | $7.50 | $8.00 |
| 142 | Seed water (630.0500) | MGAL | 3,028 | $5.00 | $5.00 | $5.00 | $10.00 | $5.00 |
| 143 | Markers culvert end (633.5200) | EACH | 55 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 |
| 144 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $100.00 | $100.00 | $100.00 | $70.00 | $100.00 |
| 145 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 63 | $125.00 | $125.00 | $125.00 | $78.00 | $125.00 |
| 146 | Signs type II reflective H (637.2210) | SF | 174.56 | $35.00 | $35.00 | $35.00 | $22.70 | $35.00 |
| 147 | Signs type II reflective F (637.2230) | SF | 236.50 | $35.00 | $35.00 | $35.00 | $24.30 | $35.00 |
| 148 | Moving signs type II (638.2102) | EACH | 40 | $100.00 | $100.00 | $100.00 | $80.00 | $100.00 |
| 149 | Removing signs type II (638.2602) | EACH | 10 | $25.00 | $25.00 | $25.00 | $40.00 | $25.00 |
| 150 | Removing small sign supports (638.3000) | EACH | 41 | $25.00 | $25.00 | $25.00 | $40.00 | $25.00 |
| 151 | Moving small sign supports (638.4000) | EACH | 5 | $50.00 | $50.00 | $50.00 | $80.00 | $50.00 |
| 152 | Field office type B (642.5001) | EACH | 1 | $22,000 | $18,740 | $15,000 | $15,000 | $16,000 |
| 153 | Traffic control drums (643.0300) | DAY | 16,510 | $0.18 | $0.18 | $0.18 | $0.18 | $0.18 |
| 154 | Traffic control barricades type III (643.0420) | DAY | 27,305 | $0.34 | $0.34 | $0.34 | $0.34 | $0.34 |
| 155 | Traffic control warning lights type A (643.0705) | DAY | 47,918 | $0.11 | $0.11 | $0.11 | $0.11 | $0.11 |
| 156 | Traffic control warning lights type C (643.0715) | DAY | 5,865 | $0.11 | $0.11 | $0.11 | $0.11 | $0.11 |
| 157 | Traffic control arrow boards (643.0800) | DAY | 180 | $8.56 | $8.56 | $8.56 | $8.56 | $8.56 |
| 158 | Traffic control signs (643.0900) | DAY | 101,034 | $0.17 | $0.17 | $0.17 | $0.17 | $0.17 |
| 159 | Traffic control covering signs type II (643.0920) | EACH | 7 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 160 | Traffic control signs fixed message (643.1000) | SF | 89.50 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 161 | Temporary marking line paint 6- inch (643.3165) | LF | 84,407 | $0.25 | $0.25 | $0.33 | $0.25 | $0.25 |
| 162 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,895 | $2.45 | $2.45 | $2.45 | $2.45 | $2.45 |
| 163 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,094 | $1.91 | $1.91 | $1.91 | $1.91 | $1.91 |
| 164 | Traffic control (643.5000) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 165 | Temporary pedestrian surface plate (644.1430) | SF | 238 | $3.69 | $3.69 | $3.69 | $3.69 | $3.69 |
| 166 | Temporary pedestrian curb ramp (644.1601) | DAY | 120 | $19.44 | $19.44 | $19.44 | $19.44 | $19.44 |
| 167 | Temporary pedestrian detectable warning field (644.1605) | SF | 56 | $25.14 | $25.14 | $25.14 | $25.14 | $25.14 |
| 168 | Temporary pedestrian barricade (644.1810) | LF | 452 | $6.41 | $6.41 | $6.41 | $6.41 | $6.41 |
| 169 | Geotextile type C (645.0105) | SY | 275 | $1.75 | $1.75 | $4.90 | $3.10 | $7.27 |
| 170 | Geotextile type HR (645.0120) | SY | 951 | $2.31 | $2.31 | $3.70 | $5.60 | $4.21 |
| 171 | Geotextile type R (645.0130) | SY | 2,647 | $1.09 | $5.00 | $3.40 | $6.90 | $4.53 |
| 172 | Geotextile type SR (645.0135) | SY | 528 | $1.28 | $1.28 | $2.50 | $2.90 | $6.63 |
| 173 | Geogrid type SR (645.0220) | SY | 7,926 | $0.75 | $0.75 | $1.65 | $1.80 | $2.02 |
| 174 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 217,685 | $1.35 | $1.35 | $1.35 | $1.35 | $1.35 |
| 175 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 670 | $2.60 | $2.60 | $2.60 | $2.60 | $2.60 |
| 176 | Marking arrow epoxy (646.5020) | EACH | 12 | $299.00 | $299.00 | $299.00 | $299.00 | $299.00 |
| 177 | Marking stop line epoxy 18-inch (646.6120) | LF | 65 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 178 | Cold weather marking epoxy 6-inch (646.6466) | LF | 45,000 | $0.40 | $0.40 | $0.40 | $0.40 | $0.40 |
| 179 | Cold weather marking epoxy 10- inch (646.6470) | LF | 400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 180 | Marking diagonal epoxy 12-inch (646.7120) | LF | 2,550 | $7.50 | $7.50 | $7.50 | $7.50 | $7.50 |
| 181 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 596 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 |
| 182 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 90 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 183 | Marking removal line 4-inch (646.9000) | LF | 2,915 | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 184 | Locating no-passing zones (648.0100) | MI | 3.33 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 185 | Construction staking storm sewer (650.4000) | EACH | 65 | $115.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 186 | Construction staking subgrade (650.4500) | LF | 12,165 | $0.01 | $0.95 | $0.50 | $0.01 | $0.01 |
| 187 | Construction staking base (650.5000) | LF | 22,640 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 |
| 188 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,566 | $1.44 | $1.44 | $1.44 | $1.44 | $1.44 |
| 189 | Construction staking pipe culverts (650.6000) | EACH | 41 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 190 | Construction staking structure layout (structure) 001. C-21-9703 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 191 | Construction staking structure layout (structure) 002. B-21-35 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 192 | Construction staking concrete pavement (650.7000) | LF | 1,233 | $0.92 | $0.92 | $0.92 | $0.92 | $0.92 |
| 193 | Construction staking resurfacing reference (650.8000) | LF | 53,261 | $0.07 | $0.07 | $0.07 | $0.07 | $0.07 |
| 194 | Construction staking curb ramps (650.9000) | EACH | 27 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 195 | Construction staking sidewalk (project) 001. 1590-18-71 (650.9500) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 196 | Construction staking sidewalk (project) 003. 9813-02-70 (650.9500) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 197 | Construction staking supplemental control (project) 001. 1590-18-71 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 198 | Construction staking supplemental control (project) 002. 1590-18-81 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 199 | Construction staking supplemental control (project) 003. 1590-18-82 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 200 | Construction staking supplemental control (project) 004. 9813-02-70 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 201 | Construction staking slope stakes (650.9920) | LF | 12,565 | $0.98 | $0.98 | $0.98 | $0.98 | $0.98 |
| 202 | Conduit rigid metallic 3/4-inch (652.0105) | LF | 25 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 203 | Conduit rigid metallic 1-inch (652.0110) | LF | 23 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 204 | Conduit rigid nonmetallic schedule 40 3/4-inch (652.0205) | LF | 94 | $9.70 | $9.70 | $9.70 | $9.70 | $9.70 |
| 205 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 471 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 206 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 385 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 207 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 4 | $2,438.00 | $2,438.00 | $2,438.00 | $2,438.00 | $2,438.00 |
| 208 | Junction boxes 8X8X8-inch (653.0208) | EACH | 2 | $1,653.00 | $1,653.00 | $1,653.00 | $1,653.00 | $1,653.00 |
| 209 | Electrical wire lighting 10 AWG (655.0615) | LF | 1,686 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 210 | Sawing asphalt (690.0150) | LF | 7,749 | $1.69 | $1.75 | $1.75 | $1.75 | $1.80 |
| 211 | Sawing concrete (690.0250) | LF | 123 | $2.50 | $2.75 | $2.75 | $2.75 | $2.35 |
| 212 | Incentive strength concrete structures (715.0502) | DOL | 5,618 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 213 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 214 | Incentive iri ride (740.0440) | DOL | 45,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 215 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 216 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 217 | Special 201. utility trench rock excavation (SPV.0035) | CY | 500 | $60.00 | $60.00 | $52.50 | $88.00 | $200.00 |
| 218 | Special 001. adjusting water valves (SPV.0060) | EACH | 8 | $780.00 | $780.00 | $350.00 | $1,425.00 | $534.63 |
| 219 | Special 002. adjusting sanitary manhole covers (SPV.0060) | EACH | 4 | $580.00 | $580.00 | $525.00 | $860.00 | $810.79 |
| 220 | Special 003. foam sealant joint repair C-21-9703 (SPV.0060) | EACH | 1 | $14,213 | $14,213 | $14,213 | $14,213 | $6,500.00 |
| 221 | Special 101. precast concrete panel (SPV.0060) | EACH | 2 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $8,911.00 |
| 222 | Special 102. posts wood 4X4-inch X 12-FT (SPV.0060) | EACH | 23 | $61.00 | $61.00 | $61.00 | $60.00 | $61.00 |
| 223 | Special 103. posts wood 4X4-inch X 14-FT (SPV.0060) | EACH | 67 | $61.00 | $61.00 | $61.00 | $64.00 | $61.00 |
| 224 | Special 104. tunnel luminare (SPV.0060) | EACH | 6 | $987.00 | $987.00 | $987.00 | $987.00 | $987.00 |
| 225 | Special 106. electrical service meter breaker pedestal special (SPV.0060) | EACH | 1 | $8,050.00 | $8,050.00 | $8,050.00 | $8,050.00 | $8,050.00 |
| 226 | Special 106. precast concrete planter (SPV.0060) | EACH | 8 | $800.00 | $800.00 | $800.00 | $2,250.00 | $800.00 |
| 227 | Special 107. kiosks (SPV.0060) | EACH | 4 | $12,000 | $12,000 | $12,000 | $22,600 | $12,000 |
| 228 | Special 108. concrete footing (concrete base) (SPV.0060) | EACH | 39 | $50.00 | $50.00 | $50.00 | $150.00 | $50.00 |
| 229 | Special 109. benches (SPV.0060) | EACH | 8 | $900.00 | $900.00 | $900.00 | $2,700.00 | $900.00 |
| 230 | Special 202. removing sanitary manhole (SPV.0060) | EACH | 1 | $1,175.00 | $1,175.00 | $625.00 | $1,200.00 | $500.00 |
| 231 | Special 203. removing sanitary cleanout (SPV.0060) | EACH | 10 | $250.00 | $250.00 | $160.00 | $500.00 | $150.00 |
| 232 | Special 204. abandon sanitary manhole (SPV.0060) | EACH | 2 | $1,386.00 | $1,386.00 | $920.00 | $1,200.00 | $1,093.11 |
| 233 | Special 205. remove hydrant (SPV.0060) | EACH | 5 | $1,175.00 | $1,175.00 | $645.00 | $800.00 | $880.00 |
| 234 | Special 206. remove 6-inch gate valve (SPV.0060) | EACH | 6 | $250.00 | $250.00 | $415.00 | $800.00 | $450.00 |
| 235 | Special 207. remove 8-inch gate valve (SPV.0060) | EACH | 1 | $250.00 | $250.00 | $458.00 | $800.00 | $600.00 |
| 236 | Special 208. remove 12-inch gate valve (SPV.0060) | EACH | 2 | $250.00 | $250.00 | $645.00 | $800.00 | $750.00 |
| 237 | Special 209. remove valve box (SPV.0060) | EACH | 4 | $250.00 | $250.00 | $267.50 | $800.00 | $150.00 |
| 238 | Special 210. air release valve manhole (SPV.0060) | EACH | 1 | $24,000 | $24,000 | $33,000 | $44,300 | $41,740 |
| 239 | Special 211. connect to existing force main (SPV.0060) | EACH | 3 | $7,400.00 | $7,400.00 | $4,915.00 | $3,000.00 | $2,504.67 |
| 240 | Special 212. reconnect existing sanitary lateral (SPV.0060) | EACH | 10 | $3,550.00 | $3,550.00 | $1,125.00 | $700.00 | $261.05 |
| 241 | Special 213. temporary 4-inch sanitary connection (SPV.0060) | EACH | 5 | $5,140.00 | $5,140.00 | $3,150.00 | $1.00 | $1.00 |
| 242 | Special 214. temporary 6-inch force main connection (SPV.0060) | EACH | 6 | $5,240.00 | $5,240.00 | $3,250.00 | $1.00 | $1.00 |
| 243 | Special 215. reconnect existing water service lateral (SPV.0060) | EACH | 1 | $3,520.00 | $3,520.00 | $1,656.00 | $1,355.00 | $332.88 |
| 244 | Special 216. temporary water main connection, 6-inch (SPV.0060) | EACH | 7 | $9,700.00 | $9,700.00 | $3,250.00 | $1.00 | $1.00 |
| 245 | Special 217. connect to existing water main (SPV.0060) | EACH | 4 | $4,800.00 | $4,800.00 | $5,000.00 | $4,500.00 | $2,651.54 |
| 246 | Special 218. 6-inch gate valve and box (SPV.0060) | EACH | 11 | $1,826.00 | $1,826.00 | $2,613.00 | $2,900.00 | $2,423.40 |
| 247 | Special 219. 8-inch gate valve and box (SPV.0060) | EACH | 14 | $2,020.00 | $2,020.00 | $3,442.50 | $3,830.00 | $3,404.80 |
| 248 | Special 220. fire hydrant (SPV.0060) | EACH | 11 | $6,546.00 | $6,546.00 | $7,230.00 | $7,160.00 | $6,406.12 |
| 249 | Special 221. remove and reset gate and post (SPV.0060) | EACH | 1 | $750.00 | $750.00 | $750.00 | $4,500.00 | $750.00 |
| 250 | Special 222. utility line openings (SPV.0060) | EACH | 10 | $1,400.00 | $1,400.00 | $925.00 | $500.00 | $1,500.00 |
| 251 | Special 247. construction staking sanitary sewer and force main (project) 1590-18-83 (SPV.0060) | EACH | 1 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 252 | Special 248. construction staking water main (project) 1590-18-83 (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 253 | Special 253. sanitary sewer 8-inch cleanout (SPV.0060) | EACH | 1 | $520.00 | $520.00 | $2,105.00 | $2,100.00 | $672.25 |
| 254 | Special 101. railing (SPV.0090) | LF | 3,693 | $22.05 | $22.05 | $22.05 | $60.00 | $22.05 |
| 255 | Special 102. profile curb cut (SPV.0090) | LF | 86 | $34.88 | $36.35 | $30.00 | $30.00 | $64.50 |
| 256 | Special 103. staked wattles (SPV.0090) | LF | 21,923 | $7.00 | $7.00 | $7.00 | $5.50 | $7.00 |
| 257 | Special 223. remove existing sanitary force main 6-inch or smaller (SPV.0090) | LF | 3,648 | $6.05 | $6.05 | $9.70 | $1.00 | $19.56 |
| 258 | Special 224. remove existing casing pipe (SPV.0090) | LF | 60 | $6.05 | $6.05 | $25.00 | $1.00 | $73.34 |
| 259 | Special 225. remove existing water main 12-inch or smaller (SPV.0090) | LF | 3,346 | $6.05 | $6.05 | $9.70 | $1.00 | $22.00 |
| 260 | Special 226. remove 24-inch steel casing (SPV.0090) | LF | 50 | $6.05 | $6.05 | $25.00 | $1.00 | $88.00 |
| 261 | Special 227. abandon 6-inch or smaller sanitary or force main (SPV.0090) | LF | 9,863 | $2.82 | $2.82 | $4.50 | $1.00 | $1.00 |
| 262 | Special 228. abandon 8-inch or smaller water main (SPV.0090) | LF | 1,287 | $2.82 | $2.82 | $11.25 | $1.00 | $1.00 |
| 263 | Special 229. abandon 12-inch water main (SPV.0090) | LF | 1,115 | $2.82 | $2.82 | $18.30 | $1.00 | $1.00 |
| 264 | Special 230. 6-inch lift station force main (SPV.0090) | LF | 8,130 | $45.45 | $45.45 | $66.40 | $105.00 | $85.54 |
| 265 | Special 231. 6-inch effluent force main (SPV.0090) | LF | 6,682 | $45.45 | $45.45 | $66.40 | $105.00 | $84.92 |
| 266 | Special 232. 8-inch sanitary sewer pipe (SPV.0090) | LF | 6,516 | $73.75 | $73.75 | $187.40 | $169.00 | $84.42 |
| 267 | Special 233. 8-inch sanitary sewer SDR 26 pipe (SPV.0090) | LF | 400 | $127.00 | $127.00 | $176.75 | $203.00 | $84.74 |
| 268 | Special 234. 2-inch sanitary lateral (SPV.0090) | LF | 33 | $122.00 | $122.00 | $168.00 | $142.00 | $138.84 |
| 269 | Special 235. 4-inch sanitary laterall (SPV.0090) | LF | 435 | $62.00 | $62.00 | $158.50 | $119.00 | $69.47 |
| 270 | Special 236. 6-inch sanitary lateral (SPV.0090) | LF | 54 | $72.00 | $72.00 | $137.25 | $123.00 | $111.49 |
| 271 | Special 237. 1-inch water service lateral (SPV.0090) | LF | 43 | $88.00 | $88.00 | $95.25 | $116.00 | $110.08 |
| 272 | Special 238. 6-inch water main (includes hydrant leads) (SPV.0090) | LF | 189 | $80.00 | $80.00 | $126.75 | $154.00 | $116.80 |
| 273 | Special 239. 8-inch water main (SPV.0090) | LF | 5,862 | $70.00 | $70.00 | $113.00 | $146.00 | $88.39 |
| 274 | Special 241. over excavation for pipe bedding 0.5-FT to 1.5-FT (force main) (SPV.0090) | LF | 600 | $9.00 | $9.00 | $12.75 | $22.00 | $28.78 |
| 275 | Special 242. over excavation for pipe bedding 1.6-FT to 3.0-FT (force main) (SPV.0090) | LF | 600 | $18.00 | $18.00 | $25.50 | $33.00 | $58.01 |
| 276 | Special 243. over excavation for pipe bedding 0.5-FT to 1.5-FT (san 9-FT - 14FT deep) (SPV.0090) | LF | 400 | $9.00 | $9.00 | $12.75 | $23.00 | $30.77 |
| 277 | Special 244. over excavation for pipe bedding 1.6-FT to 3.0-FT (san 9-FT - 14FT deep) (SPV.0090) | LF | 400 | $18.00 | $18.00 | $25.50 | $34.00 | $58.01 |
| 278 | Special 245. over excavation for pipe bedding 0.5-FT to 1.5-FT (san 14.1-FT - 25FT deep) (SPV.0090) | LF | 400 | $9.00 | $9.00 | $12.75 | $25.00 | $35.77 |
| 279 | Special 246. over excavation for pipe bedding 1.6-FT to 3.0-FT (san 14.1-FT - 25FT deep) (SPV.0090) | LF | 400 | $18.00 | $18.00 | $25.50 | $36.00 | $72.01 |
| 280 | Special 247. 2-1/2 - inch lift station force main (SPV.0090) | LF | 95 | $41.00 | $41.00 | $151.00 | $119.00 | $105.23 |
| 281 | Special 001. protective thermoplastic coating at snowmobile trail crossings (SPV.0180) | SY | 315 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 282 | Special 249. 4-inch sanitary lateral riser (SPV.0200) | VF | 3 | $10.25 | $10.25 | $227.50 | $130.00 | $150.00 |
| 283 | Special 250. 6-inch sanitary lateral riser (SPV.0200) | VF | 3 | $21.30 | $21.30 | $240.00 | $135.00 | $150.00 |
| 284 | Special 251. sanitary sewer manhole 4-FT diameter (SPV.0200) | VF | 274.84 | $480.00 | $480.00 | $613.00 | $885.00 | $423.94 |
| 285 | Special 252. sanitary sewer outside drop manhole (SPV.0200) | VF | 19.56 | $1,525.00 | $1,525.00 | $1,042.00 | $950.00 | $788.68 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.