WisDOT contract 20250211040 bid tabulation

Redgranite - CTH H; Little Silver Lake Creek, B-69-0054 (CTH E, Waushara, County Redgranite - CTH H). Let by Wisconsin DOT on February 11, 2025, Waushara. 5 bids received; low bid $570,905 by Pheifer Brothers Construction Co., Inc..

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
63
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pheifer Brothers Construction Co., Inc.$570,905Low
2Sheet Piling Services LLC$584,470+2.0%
3Radtke Contractors Inc.$607,905+6.0%
4Larson Construction Co., Inc.$619,921+9.0%
5Lunda Construction Company$657,023+15%
WisDOT contract 20250211040: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pheifer Brothers Construction Co., Inc.2. Sheet Piling Services LLC3. Radtke Contractors Inc.4. Larson Construction Co., Inc.5. Lunda Construction Company
1Grubbing (201.0205)STA4$500.00$613.00$500.00$613.00$775.00
2Removing structure over waterway debris capture (structure) 01. B-69- 0202 (203.0270)EACH1$138,350$45,000$48,068$31,490$130,000
3Removing asphaltic surface (204.0110)SY550$10.00$3.87$10.00$3.87$5.34
4Excavation common (205.0100)CY610$17.50$17.87$17.50$17.87$24.69
5Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S)TON540$78.00$69.75$78.00$89.75$79.00
6Excavation for structures bridges (structure) 01. B-69-0054 (206.1001)EACH1$24,500$20,000$31,635$41,746$5,000.00
7Backfill structure type A (210.1500)TON330$24.75$34.33$24.75$34.33$30.00
8Prepare foundation for asphaltic paving (project) 01. 6987-02-70 (211.0101)EACH1$1,500.00$0.01$4,940.00$5,000.00$4,940.00
9Finishing roadway (project) 01. 6987-02-70 (213.0100)EACH1$1,000.00$1,000.00$500.00$1,000.00$1,000.00
10Base aggregate dense 3/4-inch (305.0110)TON160$32.50$28.00$32.50$28.00$71.50
11Base aggregate dense 1 1/4-inch (305.0120)TON830$24.10$21.75$24.10$21.75$21.49
12Tack coat (455.0605)GAL49$12.00$12.00$10.20$10.20$10.20
13Asphaltic surface (465.0105)TON310$105.00$105.00$121.70$121.70$121.70
14Concrete masonry bridges (502.0100)CY141$580.00$990.00$738.22$743.00$850.00
15Protective surface treatment (502.3200)SY197$4.70$2.50$3.60$4.00$5.00
16Bar steel reinforcement HS structures (505.0400)LB4,660$0.91$1.35$1.20$1.50$0.90
17Bar steel reinforcement HS coated structures (505.0600)LB23,190$1.02$1.44$1.27$1.50$1.05
18Railing tubular type M (513.4061)LF90$240.00$225.00$249.97$279.00$275.00
19Rubberized membrane waterproofing (516.0500)SY12$60.00$18.00$63.87$65.00$25.00
20Piling cip concrete 10 3/4 X 0.25- inch (550.2104)LF1,400$15.00$30.00$28.57$39.50$55.00
21Riprap heavy (606.0300)CY110$72.50$90.00$72.50$100.00$70.00
22Pipe underdrain wrapped 6-inch (612.0406)LF150$6.05$6.00$6.05$6.00$4.00
23MGS thrie beam transition (614.2500)LF160$90.00$90.00$90.00$90.00$90.00
24MGS guardrail terminal eat (614.2610)EACH4$3,433.00$3,433.00$3,433.00$3,433.00$3,433.00
25Mobilization (619.1000)EACH1$37,598$68,992$104,297$81,474$40,267
26Water (624.0100)MGAL15$40.00$1.00$40.00$1.00$50.00
27Salvaged topsoil (625.0500)SY1,330$3.15$3.83$3.15$3.83$4.44
28Mulching (627.0200)SY1,330$0.95$0.95$0.95$0.95$0.95
29Silt fence (628.1504)LF660$2.50$2.50$2.50$2.50$2.50
30Silt fence maintenance (628.1520)LF1,320$0.02$0.02$0.02$0.02$0.02
31Mobilizations erosion control (628.1905)EACH3$301.00$301.00$301.00$301.00$301.00
32Mobilizations emergency erosion control (628.1910)EACH2$301.00$301.00$301.00$301.00$301.00
33Turbidity barriers (628.6005)SY200$35.00$35.00$35.00$35.00$35.00
34Temporary ditch checks (628.7504)LF88$9.85$9.85$9.85$9.85$9.85
35Fertilizer type B (629.0210)CWT1$150.00$150.00$150.00$150.00$150.00
36Seeding mixture no. 20 (630.0120)LB32$12.85$12.85$12.85$12.85$12.85
37Seeding mixture no. 60 (630.0160)LB17$25.00$25.00$25.00$25.00$25.00
38Seeding temporary (630.0200)LB20$4.95$4.95$4.95$4.95$4.95
39Seed water (630.0500)MGAL40$30.00$30.00$30.00$30.00$30.00
40Markers row (633.5100)EACH11$85.00$85.00$85.00$85.00$85.00
41Posts wood 4X6-inch X 12-FT (634.0612)EACH6$115.00$115.00$115.00$115.00$115.00
42Signs type II reflective F (637.2230)SF32.25$29.00$29.00$29.00$29.00$29.00
43Removing signs type II (638.2602)EACH9$35.00$35.00$35.00$35.00$35.00
44Removing small sign supports (638.3000)EACH7$35.00$35.00$35.00$35.00$35.00
45Field office type B (642.5001)EACH1$3,200.00$3,500.00$1,993.04$4,000.00$2,500.00
46Traffic control barricades type III (643.0420)DAY1,190$0.40$0.40$0.65$0.40$1.71
47Traffic control warning lights type A (643.0705)DAY1,850$0.15$0.15$0.15$0.15$0.09
48Traffic control signs (643.0900)DAY925$0.40$0.40$0.65$0.40$1.66
49Traffic control signs PCMS (643.1050)DAY14$50.00$50.00$50.00$50.00$35.00
50Traffic control (643.5000)EACH1$2,678.00$2,678.00$1,250.00$2,678.00$750.00
51Geotextile type DF schedule A (645.0111)SY96$4.95$5.00$4.95$4.00$1.00
52Geotextile type HR (645.0120)SY185$5.95$5.00$5.95$4.00$2.11
53Marking line epoxy 4-inch (646.1020)LF1,400$3.62$3.00$3.00$3.62$3.00
54Construction staking subgrade (650.4500)LF310$0.01$0.01$0.01$8.35$0.01
55Construction staking base (650.5000)LF310$1.21$2.50$2.50$1.21$2.50
56Construction staking structure layout (structure) 01. B-69-0054 (650.6501)EACH1$2,245.40$2,000.00$2,000.00$2,245.40$2,000.00
57Construction staking supplemental control (project) 01. 6987-02-70 (650.9911)EACH1$422.81$750.00$750.00$422.81$750.00
58Construction staking slope stakes (650.9920)LF310$0.84$2.50$2.50$0.84$2.50
59Sawing asphalt (690.0150)LF59$2.95$4.00$2.95$4.00$2.95
60Incentive strength concrete structures (715.0502)DOL846$1.00$1.00$1.00$1.00$1.00
61Maintaining bird deterrent system (station) 01. sta. 10+72 (999.2005.S)EACH1$0.01$0.01$0.01$2,400.00$0.01
62Special 01. flashing stainless steel (SPV.0090)LF75$81.00$50.00$75.92$65.00$45.00
63Special 01. select crushed material for travel corridor (SPV.0195)TON52$57.00$50.00$30.00$55.00$30.00
WisDOT contract 20250211040: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.