WisDOT contract 20250211047 bid tabulation
1535-07-73. Let by Wisconsin DOT on February 11, 2025, Trempealeau. 9 bids received; low bid $5,783,566 by Haas Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 221
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Haas Sons, Inc. | $5,783,566 | Low |
| 2 | McCabe Construction, Inc. | $5,826,698 | +1.0% |
| 3 | Chippewa Concrete Services, Inc. | $5,962,052 | +3.0% |
| 4 | A-1 Excavating LLC | $6,137,566 | +6.0% |
| 5 | James Peterson Sons, Inc. | $6,299,676 | +9.0% |
| 6 | Hoffman Construction Company | $6,366,761 | +10% |
| 7 | Zignego Company, Inc. | $6,475,625 | +12% |
| 8 | Integrity Grading and Excavating, Inc. | $6,618,006 | +14% |
| 9 | Gerke Excavating Inc | $6,927,016 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haas Sons, Inc. | 2. McCabe Construction, Inc. | 3. Chippewa Concrete Services, Inc. | 4. A-1 Excavating LLC | 5. James Peterson Sons, Inc. | 6. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 5 | $600.00 | $599.00 | $700.00 | $700.00 | $599.00 | $500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $450.00 | $482.40 | $500.00 | $500.00 | $733.00 | $1,000.00 |
| 3 | Abatement of asbestos containing material (structure) 01. B-61-282 (203.0211.S) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,400.00 | $8,000.00 | $8,000.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 2,089 | $13.00 | $7.59 | $8.00 | $8.00 | $2.00 | $10.00 |
| 5 | Removing asphaltic surface (204.0110) | SY | 1,217 | $4.00 | $4.89 | $4.00 | $4.00 | $2.80 | $10.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 8,199 | $2.50 | $2.68 | $3.00 | $3.00 | $5.40 | $5.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 2,030 | $4.00 | $6.12 | $7.00 | $7.00 | $9.75 | $10.00 |
| 8 | Removing manholes (204.0210) | EACH | 27 | $650.00 | $731.68 | $500.00 | $500.00 | $500.00 | $300.00 |
| 9 | Removing inlets (204.0220) | EACH | 30 | $450.00 | $482.40 | $400.00 | $400.00 | $400.00 | $300.00 |
| 10 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 1,165 | $12.00 | $19.45 | $13.00 | $13.00 | $16.99 | $12.00 |
| 11 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 482 | $12.00 | $23.55 | $14.00 | $14.00 | $6.46 | $12.00 |
| 12 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 561 | $12.00 | $23.37 | $15.00 | $15.00 | $8.92 | $12.00 |
| 13 | Removing storm sewer (size) 04. 21-inch (204.0245) | LF | 529 | $15.00 | $26.98 | $17.00 | $17.00 | $7.65 | $12.00 |
| 14 | Removing storm sewer (size) 05. 24-inch (204.0245) | LF | 76 | $15.00 | $30.17 | $18.00 | $18.00 | $9.61 | $16.00 |
| 15 | Removing storm sewer (size) 06. 30-inch (204.0245) | LF | 527 | $22.00 | $38.17 | $21.00 | $21.00 | $8.99 | $16.00 |
| 16 | Removing storm sewer (size) 07. 36-inch (204.0245) | LF | 1,345 | $22.00 | $38.81 | $22.00 | $22.00 | $16.44 | $16.00 |
| 17 | Removing (item description) 01. landscaping retaining wall (204.9090.S) | LF | 125 | $15.00 | $8.87 | $24.00 | $24.00 | $14.00 | $10.00 |
| 18 | Excavation common (205.0100) | CY | 12,915 | $11.65 | $17.90 | $14.00 | $14.00 | $14.38 | $15.00 |
| 19 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 625 | $71.00 | $53.65 | $70.00 | $70.00 | $82.00 | $80.00 |
| 20 | Prepare foundation for concrete pavement (project) 01. 1535-07-73 (211.0201) | EACH | 1 | $5,000.01 | $5,050.00 | $5,000.00 | $5,500.00 | $5,000.00 | $5,000.00 |
| 21 | Finishing roadway (project) 01. 1535-07-73 (213.0100) | EACH | 1 | $0.01 | $1,524.25 | $5,000.00 | $300.00 | $5,000.00 | $100.00 |
| 22 | Base aggregate dense 3/4-inch (305.0110) | TON | 831 | $19.72 | $29.90 | $29.00 | $29.00 | $28.12 | $0.01 |
| 23 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 11,161 | $12.72 | $15.64 | $22.00 | $22.00 | $9.40 | $0.01 |
| 24 | Concrete pavement 8 1/2-inch (415.0085) | SY | 25,047 | $54.10 | $53.63 | $53.10 | $54.16 | $53.10 | $53.10 |
| 25 | Concrete pavement gaps (415.0210) | EACH | 2 | $3,750.00 | $2,525.00 | $2,500.00 | $2,550.00 | $2,500.00 | $2,500.00 |
| 26 | Concrete pavement approach slab (415.0410) | SY | 447 | $296.72 | $243.13 | $240.72 | $245.53 | $240.72 | $240.72 |
| 27 | Concrete pavement joint filling (415.4100) | SY | 25,463 | $3.15 | $2.91 | $2.88 | $2.94 | $2.88 | $2.88 |
| 28 | Drilled tie bars (416.0610) | EACH | 877 | $10.23 | $10.33 | $10.23 | $10.43 | $10.23 | $10.23 |
| 29 | Drilled dowel bars (416.0620) | EACH | 497 | $13.35 | $13.48 | $13.35 | $13.62 | $13.35 | $13.35 |
| 30 | Concrete pavement repair (416.1710) | SY | 300 | $103.53 | $104.57 | $103.53 | $105.60 | $103.53 | $103.53 |
| 31 | Concrete pavement replacement (416.1720) | SY | 930 | $107.89 | $108.97 | $107.89 | $110.05 | $107.89 | $107.89 |
| 32 | HMA cold weather paving (450.4000) | TON | 92 | $3.82 | $3.82 | $3.82 | $4.00 | $3.82 | $3.82 |
| 33 | Tack coat (455.0605) | GAL | 138 | $20.00 | $20.00 | $20.00 | $21.00 | $20.00 | $20.00 |
| 34 | Incentive density HMA pavement (460.2000) | DOL | 630 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 35 | HMA pavement 3 LT 58-34 S (460.5243) | TON | 207 | $115.00 | $115.00 | $115.00 | $121.00 | $115.00 | $115.00 |
| 36 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 138 | $150.00 | $150.00 | $150.00 | $157.00 | $150.00 | $150.00 |
| 37 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 639 | $125.00 | $125.00 | $125.00 | $131.00 | $125.00 | $125.00 |
| 38 | Asphaltic surface driveways and field entrances (465.0120) | TON | 130 | $150.00 | $150.00 | $150.00 | $170.00 | $150.00 | $150.00 |
| 39 | Asphaltic surface temporary (465.0125) | TON | 110 | $150.00 | $150.00 | $150.00 | $190.00 | $150.00 | $150.00 |
| 40 | Compression joint sealer preformed elastomeric (width) 01. 2-inch (502.2000) | LF | 62 | $85.00 | $85.00 | $85.00 | $87.55 | $85.00 | $85.00 |
| 41 | Expansion device (502.3101) | LF | 62 | $500.00 | $500.00 | $500.00 | $515.00 | $500.00 | $500.00 |
| 42 | Protective surface treatment (502.3200) | SY | 344 | $3.99 | $3.99 | $3.99 | $4.11 | $3.99 | $3.99 |
| 43 | Pigmented surface sealer (502.3210) | SY | 3 | $12.74 | $12.74 | $12.74 | $13.12 | $12.74 | $12.74 |
| 44 | Adhesive anchors no. 5 bar (502.4205) | EACH | 61 | $30.00 | $30.00 | $30.00 | $30.90 | $30.00 | $30.00 |
| 45 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,060 | $2.93 | $2.93 | $2.93 | $3.02 | $2.93 | $2.93 |
| 46 | Bearing assemblies fixed (structure) 01. B-61-282 (506.5000) | EACH | 13 | $1,900.00 | $1,900.00 | $1,900.00 | $1,957.00 | $1,900.00 | $1,900.00 |
| 47 | Removing bearings (structure) 01. B-61-282 (506.7050.S) | EACH | 13 | $990.00 | $990.00 | $990.00 | $1,019.70 | $990.00 | $990.00 |
| 48 | Preparation decks type 1 (509.0301) | SY | 2 | $1,057.44 | $1,057.44 | $1,057.44 | $1,089.16 | $1,057.44 | $1,057.44 |
| 49 | Preparation decks type 2 (509.0302) | SY | 2 | $1,197.12 | $1,197.12 | $1,197.12 | $1,233.03 | $1,197.12 | $1,197.12 |
| 50 | Cleaning decks (509.0500) | SY | 306 | $40.00 | $40.00 | $40.00 | $41.20 | $40.00 | $40.00 |
| 51 | Joint repair (509.1000) | SY | 28 | $1,360.00 | $1,360.00 | $1,360.00 | $1,400.80 | $1,360.00 | $1,360.00 |
| 52 | Concrete surface repair (509.1500) | SF | 122 | $205.00 | $205.00 | $205.00 | $211.15 | $205.00 | $205.00 |
| 53 | Full-depth deck repair (509.2000) | SY | 3 | $1,543.81 | $1,543.81 | $1,543.81 | $1,590.12 | $1,543.81 | $1,543.81 |
| 54 | Concrete masonry overlay decks (509.2500) | CY | 46 | $1,390.00 | $1,390.00 | $1,390.00 | $1,431.70 | $1,390.00 | $1,390.00 |
| 55 | Removing and resetting tubular railing (structure) 01. B-61-282 (513.9006.S) | EACH | 1 | $3,600.00 | $3,600.00 | $3,600.00 | $3,708.00 | $3,600.00 | $3,600.00 |
| 56 | Structure overcoating cleaning and priming (structure) 01. B-61-282 (517.3001.S) | EACH | 1 | $46,000 | $46,000 | $46,000 | $47,380 | $46,000 | $46,000 |
| 57 | Containment and collection of waste materials (structure) 01. B- 61-282 (517.4001.S) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,030.00 | $1,000.00 | $1,000.00 |
| 58 | Portable decontamination facility (517.6001.S) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,030.00 | $1,000.00 | $1,000.00 |
| 59 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 1 | $825.00 | $475.99 | $640.00 | $640.00 | $434.62 | $1,000.00 |
| 60 | Concrete collars for pipe (520.8000) | EACH | 6 | $750.00 | $750.00 | $1,000.00 | $1,000.00 | $550.00 | $1,200.00 |
| 61 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 50 | $126.00 | $84.56 | $92.00 | $92.00 | $110.89 | $100.00 |
| 62 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,575.00 | $1,169.49 | $1,134.00 | $1,134.00 | $1,374.12 | $1,500.00 |
| 63 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 1 | $3,100.00 | $2,604.75 | $2,800.00 | $2,800.00 | $2,614.87 | $3,000.00 |
| 64 | Concrete curb integral type D (601.0150) | LF | 7,593 | $11.55 | $10.15 | $10.05 | $10.25 | $10.05 | $10.05 |
| 65 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 194 | $56.89 | $57.46 | $56.89 | $58.03 | $56.89 | $56.89 |
| 66 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 686 | $56.89 | $57.46 | $56.89 | $58.03 | $56.89 | $56.89 |
| 67 | Concrete sidewalk 4-inch (602.0405) | SF | 20,504 | $6.98 | $6.80 | $6.73 | $6.86 | $6.73 | $6.73 |
| 68 | Concrete sidewalk 6-inch (602.0415) | SF | 270 | $17.11 | $17.03 | $16.86 | $17.20 | $16.86 | $16.86 |
| 69 | Curb ramp detectable warning field yellow (602.0505) | SF | 370 | $62.51 | $63.14 | $62.51 | $63.76 | $62.51 | $62.51 |
| 70 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 181 | $67.84 | $68.52 | $67.84 | $69.20 | $67.84 | $67.84 |
| 71 | Concrete driveway 6-inch (602.0810) | SY | 913 | $67.59 | $68.27 | $67.59 | $68.94 | $67.59 | $67.59 |
| 72 | Concrete safety islands (602.2400) | SF | 260 | $29.16 | $29.45 | $29.16 | $29.74 | $29.16 | $29.16 |
| 73 | Riprap heavy (606.0300) | CY | 30 | $115.00 | $78.48 | $200.00 | $200.00 | $105.00 | $150.00 |
| 74 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 844 | $204.00 | $221.00 | $230.00 | $230.00 | $239.93 | $250.00 |
| 75 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 42 | $75.00 | $54.50 | $64.00 | $64.00 | $62.86 | $100.00 |
| 76 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 34X53-inch (608.2334) | LF | 526 | $195.25 | $250.00 | $230.00 | $230.00 | $275.48 | $250.00 |
| 77 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 969 | $44.75 | $44.00 | $43.00 | $43.00 | $59.23 | $40.00 |
| 78 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 270 | $47.00 | $45.00 | $47.00 | $47.00 | $50.55 | $45.00 |
| 79 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 125 | $50.50 | $49.00 | $52.00 | $52.00 | $54.02 | $50.00 |
| 80 | Storm sewer pipe class III-A 21- inch (608.3021) | LF | 70 | $58.00 | $58.50 | $64.00 | $64.00 | $61.93 | $55.00 |
| 81 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 862 | $58.00 | $59.00 | $57.00 | $57.00 | $52.16 | $55.00 |
| 82 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 555 | $70.80 | $77.50 | $66.00 | $66.00 | $61.60 | $65.00 |
| 83 | Storm sewer pipe class III-A 36- inch (608.3036) | LF | 528 | $78.55 | $96.00 | $75.00 | $75.00 | $79.22 | $75.00 |
| 84 | Manhole covers type J-special (611.0535) | EACH | 16 | $700.00 | $750.33 | $663.00 | $663.00 | $1,155.97 | $759.59 |
| 85 | Inlet covers type H (611.0624) | EACH | 23 | $850.00 | $859.73 | $918.00 | $918.00 | $1,415.97 | $1,100.00 |
| 86 | Inlet covers type H-S (611.0639) | EACH | 11 | $850.00 | $859.73 | $918.00 | $918.00 | $1,415.97 | $1,100.00 |
| 87 | Inlet covers type MS (611.0642) | EACH | 2 | $700.00 | $550.20 | $716.00 | $716.00 | $585.20 | $850.00 |
| 88 | Manholes 4-FT diameter (611.2004) | EACH | 4 | $2,800.00 | $2,610.47 | $3,383.00 | $3,383.00 | $2,943.09 | $4,000.00 |
| 89 | Manholes 5-FT diameter (611.2005) | EACH | 5 | $4,850.00 | $4,622.13 | $5,678.00 | $5,678.00 | $5,281.65 | $6,500.00 |
| 90 | Manholes 6-FT diameter (611.2006) | EACH | 5 | $8,550.00 | $8,376.40 | $10,403 | $10,403 | $10,006 | $12,500 |
| 91 | Manholes 8-FT diameter (611.2008) | EACH | 2 | $20,303 | $19,196 | $21,550 | $21,550 | $22,116 | $25,000 |
| 92 | Inlets 4-FT diameter (611.3004) | EACH | 4 | $2,800.00 | $2,610.47 | $3,383.00 | $3,383.00 | $2,938.56 | $4,000.00 |
| 93 | Inlets 2X3-FT (611.3230) | EACH | 31 | $1,650.00 | $1,593.92 | $1,939.00 | $1,939.00 | $1,569.64 | $2,000.00 |
| 94 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,450.00 | $2,352.02 | $3,534.00 | $3,534.00 | $2,170.74 | $3,000.00 |
| 95 | Cover plates temporary (611.8120.S) | EACH | 51 | $75.00 | $290.68 | $200.00 | $200.00 | $150.00 | $200.00 |
| 96 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 500 | $23.25 | $28.02 | $26.00 | $26.00 | $30.00 | $28.09 |
| 97 | Crash cushions permanent (614.0800) | EACH | 1 | $29,875 | $28,000 | $28,000 | $36,565 | $35,500 | $35,500 |
| 98 | MGS thrie beam transition (614.2500) | LF | 39.40 | $100.00 | $100.00 | $100.00 | $103.00 | $100.00 | $100.00 |
| 99 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $3,633.00 | $3,633.00 | $3,633.00 | $3,742.00 | $3,633.00 | $3,633.00 |
| 100 | Maintenance and repair of haul roads (project) 01. 1535-07-73 (618.0100) | EACH | 1 | $0.01 | $1.00 | $1.00 | $300.00 | $1.00 | $100.00 |
| 101 | Mobilization (619.1000) | EACH | 1 | $297,100 | $246,310 | $413,100 | $480,100 | $619,620 | $749,600 |
| 102 | Concrete median sloped nose (620.0300) | SF | 31 | $17.55 | $17.73 | $17.55 | $17.90 | $17.55 | $17.55 |
| 103 | Water (624.0100) | MGAL | 118 | $80.00 | $43.75 | $30.00 | $30.00 | $50.00 | $150.00 |
| 104 | Salvaged topsoil (625.0500) | SY | 6,386 | $6.00 | $5.37 | $3.00 | $3.00 | $5.80 | $0.01 |
| 105 | Silt fence (628.1504) | LF | 1,510 | $2.25 | $2.25 | $2.25 | $2.36 | $2.25 | $2.25 |
| 106 | Silt fence maintenance (628.1520) | LF | 1,510 | $0.03 | $0.03 | $0.03 | $0.03 | $0.03 | $0.03 |
| 107 | Mobilizations erosion control (628.1905) | EACH | 10 | $101.00 | $101.00 | $101.00 | $106.00 | $101.00 | $101.00 |
| 108 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $201.00 | $201.00 | $201.00 | $211.00 | $201.00 | $201.00 |
| 109 | Erosion mat urban class I type A (628.2006) | SY | 5,884 | $1.80 | $1.80 | $1.80 | $1.90 | $1.80 | $1.80 |
| 110 | Erosion mat urban class I type B (628.2008) | SY | 502 | $1.80 | $1.80 | $1.80 | $1.90 | $1.80 | $1.80 |
| 111 | Inlet protection type A (628.7005) | EACH | 40 | $100.00 | $100.00 | $100.00 | $105.00 | $100.00 | $100.00 |
| 112 | Inlet protection type C (628.7015) | EACH | 42 | $55.00 | $55.00 | $55.00 | $58.00 | $55.00 | $55.00 |
| 113 | Culvert pipe checks (628.7555) | EACH | 3 | $35.00 | $35.00 | $35.00 | $37.00 | $35.00 | $35.00 |
| 114 | Fertilizer type B (629.0210) | CWT | 5.20 | $115.00 | $115.00 | $115.00 | $121.00 | $115.00 | $115.00 |
| 115 | Seeding mixture no. 40 (630.0140) | LB | 300 | $8.35 | $8.35 | $8.35 | $8.80 | $8.35 | $8.35 |
| 116 | Seeding temporary (630.0200) | LB | 190 | $4.05 | $4.05 | $4.05 | $4.25 | $4.05 | $4.05 |
| 117 | Seed water (630.0500) | MGAL | 145 | $5.00 | $5.00 | $5.00 | $5.25 | $5.00 | $5.00 |
| 118 | Markers culvert end (633.5200) | EACH | 5 | $70.00 | $70.00 | $70.00 | $74.00 | $70.00 | $70.00 |
| 119 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 28 | $95.00 | $95.00 | $95.00 | $100.00 | $95.00 | $95.00 |
| 120 | Signs type II reflective H (637.2210) | SF | 164.75 | $20.35 | $20.35 | $20.35 | $21.40 | $20.35 | $20.35 |
| 121 | Signs type II reflective F (637.2230) | SF | 35 | $21.25 | $21.25 | $21.25 | $22.30 | $21.25 | $21.25 |
| 122 | Moving signs type II (638.2102) | EACH | 107 | $75.00 | $75.00 | $75.00 | $79.00 | $75.00 | $75.00 |
| 123 | Removing small sign supports (638.3000) | EACH | 1 | $45.00 | $45.00 | $45.00 | $47.00 | $45.00 | $45.00 |
| 124 | Moving small sign supports (638.4000) | EACH | 77 | $75.00 | $75.00 | $75.00 | $79.00 | $75.00 | $75.00 |
| 125 | Field office type B (642.5001) | EACH | 1 | $17,500 | $2,500.00 | $7,500.00 | $9,000.00 | $16,500 | $10,000 |
| 126 | Traffic control drums (643.0300) | DAY | 19,050 | $0.18 | $0.18 | $0.18 | $0.19 | $0.18 | $0.18 |
| 127 | Traffic control barricades type II (643.0410) | DAY | 3,800 | $0.71 | $0.71 | $0.71 | $0.73 | $0.71 | $0.71 |
| 128 | Traffic control barricades type III (643.0420) | DAY | 18,835 | $0.45 | $0.45 | $0.45 | $0.46 | $0.45 | $0.45 |
| 129 | Traffic control warning lights type A (643.0705) | DAY | 37,670 | $0.06 | $0.06 | $0.06 | $0.07 | $0.06 | $0.06 |
| 130 | Traffic control warning lights type C (643.0715) | DAY | 1,222 | $0.25 | $0.25 | $0.25 | $0.26 | $0.25 | $0.25 |
| 131 | Traffic control arrow boards (643.0800) | DAY | 141 | $12.00 | $12.00 | $12.00 | $12.36 | $12.00 | $12.00 |
| 132 | Traffic control signs (643.0900) | DAY | 111,367 | $0.17 | $0.17 | $0.17 | $0.18 | $0.17 | $0.17 |
| 133 | Traffic control covering signs type I (643.0910) | EACH | 1 | $350.00 | $350.00 | $350.00 | $360.00 | $350.00 | $350.00 |
| 134 | Traffic control covering signs type II (643.0920) | EACH | 56 | $35.00 | $35.00 | $35.00 | $36.00 | $35.00 | $35.00 |
| 135 | Traffic control signs fixed message (643.1000) | SF | 18 | $25.00 | $25.00 | $25.00 | $26.00 | $25.00 | $25.00 |
| 136 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 | $46.00 | $45.00 | $45.00 |
| 137 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,270 | $2.18 | $2.18 | $2.18 | $2.25 | $2.18 | $2.18 |
| 138 | Traffic control (643.5000) | EACH | 1 | $5,900.00 | $5,811.44 | $5,811.44 | $14,900 | $5,811.44 | $5,811.44 |
| 139 | Temporary pedestrian surface matting (644.1440) | SF | 11,474 | $2.13 | $0.63 | $0.63 | $0.65 | $0.63 | $0.63 |
| 140 | Temporary pedestrian curb ramp (644.1601) | DAY | 2,096 | $2.38 | $2.38 | $2.38 | $2.45 | $2.38 | $2.38 |
| 141 | Temporary pedestrian detectable warning field (644.1605) | SF | 300 | $18.72 | $13.72 | $13.72 | $14.13 | $13.72 | $13.72 |
| 142 | Temporary pedestrian barricade (644.1810) | LF | 5,672 | $3.94 | $2.27 | $2.27 | $2.34 | $2.27 | $2.27 |
| 143 | Geotextile type HR (645.0120) | SY | 23 | $20.00 | $7.09 | $10.00 | $10.00 | $50.00 | $25.00 |
| 144 | Marking line epoxy 4-inch (646.1020) | LF | 2,538 | $0.85 | $0.39 | $0.39 | $0.88 | $0.85 | $0.39 |
| 145 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 17,998 | $2.00 | $1.40 | $1.40 | $2.06 | $2.00 | $1.40 |
| 146 | Marking line epoxy 8-inch (646.3020) | LF | 357 | $1.75 | $1.00 | $1.00 | $1.80 | $1.75 | $1.00 |
| 147 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 263 | $4.00 | $2.85 | $2.85 | $4.12 | $4.00 | $2.85 |
| 148 | Marking arrow epoxy (646.5020) | EACH | 55 | $275.00 | $330.25 | $330.25 | $283.00 | $275.00 | $330.25 |
| 149 | Marking symbol epoxy (646.5220) | EACH | 27 | $250.00 | $320.00 | $320.00 | $258.00 | $250.00 | $320.00 |
| 150 | Marking stop line epoxy 18-inch (646.6120) | LF | 27 | $37.00 | $14.05 | $14.05 | $38.00 | $37.00 | $14.05 |
| 151 | Cold weather marking epoxy 6-inch (646.6466) | LF | 249 | $0.50 | $0.50 | $0.50 | $0.52 | $0.50 | $0.50 |
| 152 | Marking diagonal epoxy 12-inch (646.7120) | LF | 120 | $17.00 | $13.50 | $13.50 | $17.50 | $17.00 | $13.50 |
| 153 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 963 | $16.50 | $13.10 | $13.10 | $17.00 | $16.50 | $13.10 |
| 154 | Marking island nose epoxy (646.8220) | EACH | 2 | $325.00 | $265.00 | $265.00 | $335.00 | $325.00 | $265.00 |
| 155 | Marking removal line 6-inch (646.9002) | LF | 488 | $3.20 | $3.20 | $2.50 | $3.50 | $3.20 | $3.20 |
| 156 | Construction staking storm sewer (650.4000) | EACH | 51 | $250.00 | $250.00 | $250.00 | $262.00 | $250.00 | $250.00 |
| 157 | Construction staking subgrade (650.4500) | LF | 5,109 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 158 | Construction staking base (650.5000) | LF | 665 | $1.00 | $1.00 | $1.00 | $1.05 | $1.00 | $0.01 |
| 159 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 709 | $1.50 | $1.50 | $1.50 | $1.58 | $1.50 | $1.50 |
| 160 | Construction staking pipe culverts (650.6000) | EACH | 1 | $300.00 | $300.00 | $300.00 | $315.00 | $300.00 | $300.00 |
| 161 | Construction staking concrete pavement (650.7000) | LF | 4,444 | $2.70 | $1.70 | $1.70 | $1.79 | $1.70 | $1.70 |
| 162 | Construction staking electrical installations (project) 01. 1535-07- 73 (650.8501) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 | $2,000.00 |
| 163 | Construction staking curb ramps (650.9000) | EACH | 43 | $10.00 | $10.00 | $10.00 | $10.50 | $10.00 | $10.00 |
| 164 | Construction staking sidewalk (project) 01. 1535-07-73 (650.9500) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 | $2,000.00 |
| 165 | Construction staking supplemental control (project) 01. 1535-07-73 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,150.00 | $3,000.00 | $3,000.00 |
| 166 | Construction staking slope stakes (650.9920) | LF | 5,109 | $1.00 | $1.00 | $1.00 | $1.05 | $1.00 | $1.00 |
| 167 | Adjusting pull boxes (653.0900) | EACH | 1 | $440.00 | $190.00 | $190.00 | $196.00 | $200.00 | $190.00 |
| 168 | Concrete bases type 1 (654.0101) | EACH | 4 | $4,800.00 | $1,200.00 | $1,200.00 | $1,236.00 | $3,000.00 | $1,200.00 |
| 169 | Pedestal bases (657.0100) | EACH | 4 | $1,400.00 | $350.00 | $350.00 | $360.00 | $625.00 | $350.00 |
| 170 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 3 | $3,225.00 | $1,075.00 | $1,075.00 | $1,107.00 | $800.00 | $1,075.00 |
| 171 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 1 | $1,125.00 | $1,125.00 | $1,125.00 | $1,159.00 | $850.00 | $1,125.00 |
| 172 | Pedestrian push buttons (658.0500) | EACH | 2 | $1,150.00 | $1,150.00 | $1,150.00 | $1,185.00 | $1,200.00 | $1,150.00 |
| 173 | Sawing asphalt (690.0150) | LF | 2,487 | $2.00 | $1.62 | $1.62 | $2.00 | $1.80 | $1.62 |
| 174 | Sawing concrete (690.0250) | LF | 2,497 | $2.50 | $2.39 | $2.39 | $2.50 | $2.25 | $2.39 |
| 175 | Incentive compressive strength concrete pavement (715.0720) | DOL | 7,477 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 176 | Incentive iri ride (740.0440) | DOL | 1,430 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 177 | Installing and maintaining bird deterrent system (station) 01. 14+23 (999.2000.S) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,650.00 | $1,500.00 | $1,500.00 |
| 178 | Special 01. sanitary sewer manhole W/casting 4-FT diameter (SPV.0060) | EACH | 14 | $4,550.00 | $4,713.87 | $6,032.00 | $6,032.00 | $5,478.83 | $4,730.00 |
| 179 | Special 02. connect to existing sanitary sewer main (SPV.0060) | EACH | 10 | $2,450.00 | $716.06 | $1,150.00 | $1,150.00 | $1,594.53 | $236.00 |
| 180 | Special 03. connect to existing sanitary sewer service (SPV.0060) | EACH | 47 | $125.00 | $104.08 | $118.00 | $118.00 | $215.94 | $58.22 |
| 181 | Special 04. sanitary sewer wye, 8- inch X 6-inch (SPV.0060) | EACH | 49 | $215.00 | $394.09 | $222.00 | $222.00 | $422.48 | $661.20 |
| 182 | Special 05. sanitary sewer saddle, 8-inch X 6-inch (SPV.0060) | EACH | 2 | $690.00 | $1,724.05 | $590.00 | $590.00 | $2,126.42 | $3,211.00 |
| 183 | Special 06. exploratory excavation (SPV.0060) | EACH | 15 | $1.00 | $695.19 | $300.00 | $300.00 | $1,000.00 | $3,000.00 |
| 184 | Special 07. remove existing hydrant and lead (SPV.0060) | EACH | 8 | $650.00 | $932.52 | $600.00 | $600.00 | $1,453.75 | $1,000.00 |
| 185 | Special 08. remove existing gate valve (SPV.0060) | EACH | 19 | $200.00 | $466.26 | $300.00 | $300.00 | $507.50 | $500.00 |
| 186 | Special 09. connect to existing water main (SPV.0060) | EACH | 11 | $5,614.00 | $2,655.14 | $2,500.00 | $2,500.00 | $2,015.68 | $1,924.00 |
| 187 | Special 10. lower water main (SPV.0060) | EACH | 6 | $2,250.00 | $4,082.43 | $600.00 | $600.00 | $5,421.65 | $10,390 |
| 188 | Special 11. gate valve and box 6- inch (SPV.0060) | EACH | 15 | $2,575.00 | $2,164.89 | $2,300.00 | $2,300.00 | $2,995.86 | $3,103.00 |
| 189 | Special 12. gate valve and box 8- inch (SPV.0060) | EACH | 15 | $3,450.00 | $2,845.64 | $3,400.00 | $3,400.00 | $4,162.90 | $4,020.00 |
| 190 | Special 13. gate valve and box 12- inch (SPV.0060) | EACH | 8 | $5,875.00 | $4,966.47 | $5,500.00 | $5,500.00 | $7,458.08 | $6,859.00 |
| 191 | Special 14. hydrant 8.5-FT bury depth (SPV.0060) | EACH | 11 | $5,050.00 | $5,715.54 | $6,200.00 | $6,200.00 | $7,751.46 | $8,069.00 |
| 192 | Special 15. connect to existing water service (SPV.0060) | EACH | 38 | $67.75 | $135.80 | $200.00 | $200.00 | $258.64 | $158.00 |
| 193 | Special 16. corporation stop 1-inch (SPV.0060) | EACH | 37 | $400.00 | $509.37 | $420.00 | $420.00 | $371.98 | $541.00 |
| 194 | Special 17. corporation stop 2-inch (SPV.0060) | EACH | 2 | $750.00 | $925.91 | $850.00 | $850.00 | $786.02 | $1,024.00 |
| 195 | Special 18. curb stop & box 1-inch (SPV.0060) | EACH | 37 | $325.00 | $379.21 | $430.00 | $430.00 | $358.64 | $581.00 |
| 196 | Special 19. curb stop & box 2-inch (SPV.0060) | EACH | 2 | $675.00 | $803.34 | $840.00 | $840.00 | $814.08 | $1,034.00 |
| 197 | Special 20. adjust existing gate valve box (SPV.0060) | EACH | 2 | $600.00 | $340.28 | $200.00 | $200.00 | $200.00 | $400.00 |
| 198 | Special 21. maintain water service during construction (SPV.0060) | EACH | 1 | $16,000 | $3,500.00 | $15,000 | $15,000 | $29,250 | $7,000.00 |
| 199 | Special 22. water valve manhole W/casting 6-FT diameter (SPV.0060) | EACH | 1 | $21,015 | $22,219 | $24,206 | $24,206 | $26,197 | $22,196 |
| 200 | Special 23. bollard (SPV.0060) | EACH | 3 | $3,475.00 | $1,505.91 | $1,491.00 | $1,800.00 | $2,600.00 | $1,500.00 |
| 201 | Special 24. rectangular rapid flashing beacon (RRFB) system (SPV.0060) | EACH | 1 | $18,450 | $18,000 | $18,000 | $18,540 | $15,700 | $18,000 |
| 202 | Special 25. inlet covers type H-D (SPV.0060) | EACH | 1 | $950.00 | $937.27 | $1,003.00 | $1,003.00 | $1,524.72 | $1,200.00 |
| 203 | Special 26. adjusting sanitary manhole covers (SPV.0060) | EACH | 1 | $550.00 | $821.35 | $600.00 | $600.00 | $2,125.03 | $400.00 |
| 204 | Special 27. solar powered flashing beacon - 12" LED system (SPV.0060) | EACH | 1 | $11,700 | $11,250 | $11,250 | $11,588 | $8,550.00 | $11,250 |
| 205 | Special 01. water main fittings (SPV.0085) | LB | 3,751 | $12.75 | $10.96 | $12.00 | $12.00 | $13.63 | $16.71 |
| 206 | Special 01. sanitary sewer service PVC 6-inch (SPV.0090) | LF | 1,649 | $60.75 | $64.41 | $57.00 | $57.00 | $66.45 | $57.29 |
| 207 | Special 02. sanitary sewer main 8- inch (SPV.0090) | LF | 3,030 | $49.75 | $66.16 | $55.00 | $55.00 | $49.97 | $60.71 |
| 208 | Special 03. televise sanitary sewer main (SPV.0090) | LF | 3,030 | $2.00 | $1.50 | $2.00 | $2.00 | $3.88 | $4.00 |
| 209 | Special 04. water service 1-inch (SPV.0090) | LF | 1,090 | $53.50 | $58.93 | $57.00 | $57.00 | $60.09 | $50.47 |
| 210 | Special 05. water service 2-inch (SPV.0090) | LF | 88 | $57.00 | $54.79 | $59.00 | $59.00 | $91.27 | $52.41 |
| 211 | Special 06. water main C900 6-inch (SPV.0090) | LF | 398 | $51.25 | $57.11 | $63.00 | $63.00 | $73.59 | $74.63 |
| 212 | Special 07. water main C900 8-inch (SPV.0090) | LF | 2,720 | $58.00 | $51.97 | $64.00 | $64.00 | $59.36 | $86.92 |
| 213 | Special 08. water main C900 12- inch (SPV.0090) | LF | 795 | $80.75 | $76.63 | $89.00 | $89.00 | $83.32 | $110.73 |
| 214 | Special 09. water main horizontal directional drilling HDPE 14-inch (SPV.0090) | LF | 170 | $212.00 | $378.31 | $283.00 | $283.00 | $397.46 | $163.69 |
| 215 | Special 10. water main wrapped ductile iron 12-inch (SPV.0090) | LF | 100 | $134.00 | $109.17 | $114.00 | $114.00 | $120.13 | $159.60 |
| 216 | Special 11. strip seal gland replacement (SPV.0090) | LF | 220 | $72.00 | $72.00 | $72.00 | $77.00 | $72.00 | $72.00 |
| 217 | Special 12. concrete curb & gutter cure and seal treatment (SPV.0090) | LF | 8,473 | $0.36 | $0.36 | $0.36 | $0.37 | $0.36 | $0.36 |
| 218 | Special 01. concrete sidewalk cure and seal treatment (SPV.0165) | SF | 20,774 | $0.08 | $0.08 | $0.08 | $0.09 | $0.08 | $0.08 |
| 219 | Special 01. concrete centerline repair 30-inch (SPV.0180) | SY | 115 | $103.53 | $104.57 | $103.53 | $129.00 | $103.53 | $103.53 |
| 220 | Special 01. crushed rock for pipe stabilization (SPV.0195) | TON | 200 | $55.00 | $20.36 | $50.00 | $50.00 | $55.25 | $56.00 |
| 221 | Special 01. sanitary manhole excess depth 4-FT diameter (SPV.0200) | VF | 24.30 | $300.00 | $277.05 | $340.00 | $340.00 | $756.77 | $312.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.