WisDOT contract 20250311008 bid tabulation
Ferryville - Rolling Ground; Flowing Stream Structure C-12-0063 (STH 171, Crawford County Ferryville - Rolling Ground). Let by Wisconsin DOT on March 11, 2025, Crawford. 4 bids received; low bid $488,191 by Brennan Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 54
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brennan Construction Company | $488,191 | Low |
| 2 | Concrete Structures, Inc. | $518,115 | +6.0% |
| 3 | Lunda Construction Company | $655,594 | +34% |
| 4 | Janke General Contractors, Inc. | $783,980 | +61% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brennan Construction Company | 2. Concrete Structures, Inc. | 3. Lunda Construction Company | 4. Janke General Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. C-12-1709 (203.0220) | EACH | 1 | $10,000 | $10,000 | $110,000 | $32,600 |
| 2 | Removing guardrail (204.0165) | LF | 699 | $3.00 | $3.70 | $3.70 | $3.70 |
| 3 | Excavation common (205.0100) | CY | 1,907 | $16.00 | $19.50 | $16.00 | $53.00 |
| 4 | Excavation for structures culverts (structure) 01. C-12-0063 (206.2001) | EACH | 1 | $12,500 | $25,000 | $12,500 | $70,000 |
| 5 | Backfill structure type B (210.2500) | TON | 1,300 | $26.00 | $18.75 | $26.00 | $34.00 |
| 6 | Finishing roadway (project) 01. 5790-01-80 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $1,000.00 | $350.00 |
| 7 | Base aggregate dense 3/4-inch (305.0110) | TON | 44 | $30.00 | $24.00 | $30.00 | $50.00 |
| 8 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 974 | $20.00 | $19.50 | $20.00 | $25.00 |
| 9 | Breaker run (311.0115) | CY | 241 | $20.00 | $25.00 | $20.00 | $33.00 |
| 10 | Select crushed material (312.0110) | TON | 1,606 | $22.00 | $19.50 | $22.00 | $35.00 |
| 11 | Tack coat (455.0605) | GAL | 90 | $5.00 | $5.00 | $5.00 | $5.00 |
| 12 | Asphaltic surface (465.0105) | TON | 400 | $115.00 | $115.00 | $115.00 | $115.00 |
| 13 | Concrete masonry culverts (504.0100) | CY | 140 | $850.00 | $1,150.00 | $900.00 | $1,135.00 |
| 14 | Bar steel reinforcement HS structures (505.0400) | LB | 18,635 | $1.35 | $1.30 | $1.54 | $1.40 |
| 15 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,480 | $1.45 | $1.50 | $1.60 | $3.00 |
| 16 | Rubberized membrane waterproofing (516.0500) | SY | 31 | $40.00 | $37.00 | $25.00 | $40.00 |
| 17 | Riprap heavy (606.0300) | CY | 89 | $80.00 | $75.00 | $80.00 | $100.00 |
| 18 | Grouted riprap light (606.0500) | CY | 2 | $500.00 | $100.00 | $500.00 | $635.00 |
| 19 | Steel plate beam guard class A (614.0305) | LF | 638 | $30.50 | $29.95 | $29.95 | $30.00 |
| 20 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 3 | $3,755.00 | $3,731.00 | $3,731.00 | $3,731.00 |
| 21 | Maintenance and repair of haul roads (project) 01. 5790-01-80 (618.0100) | EACH | 1 | $1.00 | $500.00 | $1.00 | $350.00 |
| 22 | Mobilization (619.1000) | EACH | 1 | $40,000 | $35,950 | $75,287 | $70,000 |
| 23 | Water (624.0100) | MGAL | 16 | $30.00 | $0.01 | $30.00 | $12.00 |
| 24 | Salvaged topsoil (625.0500) | SY | 932 | $3.00 | $3.00 | $3.00 | $5.00 |
| 25 | Mulching (627.0200) | SY | 932 | $0.40 | $0.55 | $0.55 | $0.55 |
| 26 | Silt fence (628.1504) | LF | 1,126 | $3.00 | $2.55 | $2.55 | $2.55 |
| 27 | Silt fence maintenance (628.1520) | LF | 1,126 | $0.05 | $0.08 | $0.08 | $0.08 |
| 28 | Mobilizations erosion control (628.1905) | EACH | 4 | $500.00 | $420.00 | $420.00 | $420.00 |
| 29 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $500.00 | $250.00 | $250.00 | $200.00 |
| 30 | Erosion mat class III type C (628.2037) | SY | 365 | $7.00 | $14.00 | $14.00 | $14.00 |
| 31 | Temporary ditch checks (628.7504) | LF | 30 | $10.00 | $8.95 | $8.95 | $8.98 |
| 32 | Fertilizer type B (629.0210) | CWT | 1.78 | $150.00 | $96.00 | $96.00 | $96.00 |
| 33 | Seeding mixture no. 20 (630.0120) | LB | 42.80 | $12.00 | $13.00 | $13.00 | $13.00 |
| 34 | Seeding temporary (630.0200) | LB | 35 | $12.00 | $3.55 | $3.55 | $3.55 |
| 35 | Seed water (630.0500) | MGAL | 54 | $30.00 | $49.00 | $49.00 | $49.00 |
| 36 | Moving signs type II (638.2102) | EACH | 1 | $200.00 | $122.00 | $122.00 | $122.00 |
| 37 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $1,500.00 | $3,500.00 | $3,000.00 |
| 38 | Traffic control barricades type III (643.0420) | DAY | 1,140 | $0.55 | $0.60 | $0.60 | $0.60 |
| 39 | Traffic control warning lights type A (643.0705) | DAY | 1,800 | $0.11 | $0.17 | $0.17 | $0.17 |
| 40 | Traffic control signs (643.0900) | DAY | 8,760 | $0.10 | $0.20 | $0.20 | $0.20 |
| 41 | Traffic control covering signs type II (643.0920) | EACH | 11 | $19.00 | $105.00 | $105.00 | $105.00 |
| 42 | Traffic control signs PCMS (643.1050) | DAY | 14 | $85.00 | $40.00 | $40.00 | $40.00 |
| 43 | Traffic control (643.5000) | EACH | 1 | $3,600.00 | $11,985 | $11,985 | $11,985 |
| 44 | Geotextile type C (645.0105) | SY | 310 | $6.00 | $3.00 | $6.00 | $2.78 |
| 45 | Geotextile type HR (645.0120) | SY | 208 | $6.00 | $6.00 | $6.00 | $3.24 |
| 46 | Marking line epoxy 6-inch (646.2020) | LF | 2,000 | $2.90 | $2.90 | $4.00 | $2.90 |
| 47 | Construction staking subgrade (650.4500) | LF | 500 | $0.01 | $0.01 | $0.01 | $0.01 |
| 48 | Construction staking base (650.5000) | LF | 500 | $0.01 | $0.01 | $1.50 | $0.01 |
| 49 | Construction staking structure layout (structure) 01. C-12-0063 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $2,500.00 | $3,000.00 |
| 50 | Construction staking supplemental control (project) 01. 5790-01-80 (650.9911) | EACH | 1 | $1,300.00 | $1,300.00 | $500.00 | $1,300.00 |
| 51 | Construction staking slope stakes (650.9920) | LF | 500 | $0.01 | $0.01 | $1.50 | $0.01 |
| 52 | Sawing asphalt (690.0150) | LF | 64 | $5.00 | $6.00 | $5.00 | $2.35 |
| 53 | Incentive strength concrete structures (715.0502) | DOL | 840 | $1.00 | $1.00 | $1.00 | $1.00 |
| 54 | Special 01. temporary water diversion, culvert C-12-0063 (SPV.0060) | EACH | 1 | $20,000 | $2,000.00 | $30,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.