WisDOT contract 20250311011 bid tabulation
IH 43 North South Freeway; Oak Leaf Trail to Bender (IH 043, Milwaukee County IH 43 North South Freeway). Let by Wisconsin DOT on March 11, 2025, Milwaukee. 2 bids received; low bid $13,229,408 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 226
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $13,229,408 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $13,372,042 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $1,000.00 | $1,000.00 |
| 2 | Grubbing (201.0210) | SY | 3,088 | $1.59 | $1.61 |
| 3 | Removing structure (structure) 01. B-40-578 (203.0220) | EACH | 1 | $125,000 | $150,000 |
| 4 | Removing structure (structure) 02. R-40-156 (203.0220) | EACH | 1 | $80,000 | $30,000 |
| 5 | Removing structure (structure) 03. R-40-159 (203.0220) | EACH | 1 | $200,000 | $210,000 |
| 6 | Removing structure (structure) 04. R-40-636 (203.0220) | EACH | 1 | $25,000 | $15,000 |
| 7 | Removing concrete pavement (204.0100) | SY | 2,452 | $10.00 | $14.50 |
| 8 | Removing concrete surface partial depth (204.0109.S) | SF | 50 | $1.70 | $1.48 |
| 9 | Removing asphaltic surface butt joints (204.0115) | SY | 6,814 | $9.50 | $10.22 |
| 10 | Removing asphaltic surface milling (204.0120) | SY | 89,282 | $2.00 | $3.01 |
| 11 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 14,265 | $2.10 | $2.28 |
| 12 | Removing curb & gutter (204.0150) | LF | 88 | $20.00 | $25.00 |
| 13 | Removing concrete sidewalk (204.0155) | SY | 87 | $20.00 | $20.00 |
| 14 | Removing concrete barrier (204.0157) | LF | 3,350 | $20.00 | $39.43 |
| 15 | Removing fence (204.0170) | LF | 574 | $4.00 | $4.00 |
| 16 | Removing inlets (204.0220) | EACH | 15 | $325.00 | $400.00 |
| 17 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 224 | $25.00 | $30.00 |
| 18 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 10 | $25.00 | $40.00 |
| 19 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 10 | $35.00 | $50.00 |
| 20 | Sealing pipes (204.0280) | EACH | 3 | $250.00 | $750.00 |
| 21 | Removing (item description) 01. removing lighting units (204.9060.S) | EACH | 5 | $271.00 | $271.00 |
| 22 | Removing (item description) 01. temporary precast trench drain (204.9090.S) | LF | 514 | $30.00 | $35.00 |
| 23 | Excavation common (205.0100) | CY | 3,825 | $26.00 | $35.00 |
| 24 | Excavation for structures bridges (structure) 01. B-40-578 (206.1001) | EACH | 1 | $2,000.00 | $8,000.00 |
| 25 | Backfill structure type A (210.1500) | TON | 60 | $100.00 | $60.00 |
| 26 | Finishing roadway (project) 01. 1228-03-76 (213.0100) | EACH | 1 | $1,000.00 | $2,500.00 |
| 27 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 747 | $30.00 | $35.00 |
| 28 | Base aggregate open-graded (310.0110) | TON | 85 | $30.00 | $50.00 |
| 29 | Breaker run (311.0110) | TON | 330 | $30.00 | $94.00 |
| 30 | Select crushed material (312.0110) | TON | 1,993 | $30.00 | $35.00 |
| 31 | Removing pavement for base patching (390.0100) | CY | 4,950 | $30.00 | $101.20 |
| 32 | Base patching concrete shes (390.0405) | CY | 4,950 | $150.00 | $99.29 |
| 33 | Concrete pavement 9-inch (415.0090) | SY | 122 | $90.00 | $131.85 |
| 34 | Concrete pavement 10-inch (415.0100) | SY | 2,468 | $90.00 | $91.65 |
| 35 | Drilled tie bars (416.0610) | EACH | 10,842 | $10.00 | $4.00 |
| 36 | Drilled dowel bars (416.0620) | EACH | 12,079 | $15.00 | $10.00 |
| 37 | Concrete pavement repair (416.1710) | SY | 68 | $125.00 | $185.93 |
| 38 | Concrete pavement repair shes (416.1715) | SY | 929 | $155.00 | $141.77 |
| 39 | Concrete pavement replacement (416.1720) | SY | 486 | $125.00 | $189.39 |
| 40 | Concrete pavement replacement shes (416.1725) | SY | 1,117 | $155.00 | $148.35 |
| 41 | HMA cold weather paving (450.4000) | TON | 1,400 | $5.00 | $2.50 |
| 42 | Tack coat (455.0605) | GAL | 11,172 | $3.50 | $2.25 |
| 43 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $3,500.00 | $275.00 |
| 44 | HMA pavement test strip density (460.0120.S) | EACH | 2 | $3,500.00 | $7,185.00 |
| 45 | Incentive density HMA pavement (460.2000) | DOL | 12,320 | $1.00 | $1.00 |
| 46 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 15 | $520.00 | $420.00 |
| 47 | HMA pavement 5 SMA 58-28 V (460.8625) | TON | 26,281 | $118.75 | $112.30 |
| 48 | Material transfer vehicle (460.9000.S) | EACH | 1 | $0.01 | $34,200 |
| 49 | Cold patch (495.1000.S) | TON | 10 | $0.01 | $350.00 |
| 50 | Concrete masonry bridges (502.0100) | CY | 68 | $1,200.00 | $1,800.00 |
| 51 | Protective surface treatment (502.3200) | SY | 12 | $18.00 | $10.00 |
| 52 | Pigmented surface sealer (502.3210) | SY | 915 | $14.00 | $10.00 |
| 53 | Adhesive anchors no. 5 bar (502.4205) | EACH | 32 | $22.00 | $30.00 |
| 54 | Concrete masonry retaining walls (504.0500) | CY | 1,295 | $575.00 | $665.00 |
| 55 | Bar steel reinforcement HS coated structures (505.0600) | LB | 178,980 | $1.47 | $1.51 |
| 56 | Joint repair (509.1000) | SY | 11 | $1,800.00 | $2,200.00 |
| 57 | Concrete surface repair (509.1500) | SF | 10 | $205.00 | $350.00 |
| 58 | Removing asphaltic concrete deck overlay (structure) 01. B-40-578 (509.9010.S) | SY | 22 | $500.00 | $215.00 |
| 59 | Epoxy crack sealing (509.9020.S) | LF | 100 | $21.00 | $40.00 |
| 60 | Temporary shoring (structure) 01. B-40-578 (511.1200) | SF | 300 | $23.50 | $70.00 |
| 61 | Rubberized membrane waterproofing (516.0500) | SY | 93 | $35.00 | $55.00 |
| 62 | Sheet membrane waterproofing for asphalt overlays (516.0600.S) | SY | 105 | $296.00 | $150.00 |
| 63 | Preparation and coating of top flanges (structure) 01. B-40-578 (517.0901.S) | EACH | 1 | $2,211.00 | $2,211.00 |
| 64 | Structure overcoating cleaning and priming (structure) 01. N-40-28 (517.3001.S) | EACH | 1 | $10,400 | $10,400 |
| 65 | Containment and collection of waste materials (structure) 01. N- 40-28 (517.4001.S) | EACH | 1 | $1,600.00 | $1,600.00 |
| 66 | Concrete masonry ancillary structures type NS (531.1100) | CY | 4 | $2,000.00 | $2,000.00 |
| 67 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 440 | $5.00 | $5.00 |
| 68 | Drilling shaft 24-inch (531.2024) | LF | 32 | $125.00 | $125.00 |
| 69 | Anchor assemblies poles on structures (531.8990) | EACH | 5 | $1,196.00 | $1,196.00 |
| 70 | Noise barriers double-sided sound absorptive (structure) 01. N-40-106 (541.0300.S) | SF | 14,835 | $68.00 | $66.00 |
| 71 | Concrete curb & gutter 31-inch (601.0331) | LF | 314 | $44.00 | $54.48 |
| 72 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 11 | $44.00 | $50.54 |
| 73 | Concrete curb pedestrian (601.0600) | LF | 52 | $40.00 | $34.37 |
| 74 | Concrete sidewalk 5-inch (602.0410) | SF | 695 | $11.00 | $11.96 |
| 75 | Curb ramp detectable warning field yellow (602.0505) | SF | 31 | $45.00 | $30.52 |
| 76 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 38 | $55.00 | $54.50 |
| 77 | Concrete barrier single-faced 32- inch (603.0105) | LF | 428 | $225.00 | $141.22 |
| 78 | Concrete barrier double-faced 32- inch (603.0205) | LF | 257 | $225.00 | $134.65 |
| 79 | Concrete barrier transition section 32-inch (603.0405) | LF | 115 | $85.00 | $236.50 |
| 80 | Concrete barrier type S42 (603.1142) | LF | 2,268 | $95.00 | $112.92 |
| 81 | Concrete barrier type S56 (603.1156) | LF | 36 | $225.00 | $359.35 |
| 82 | Concrete barrier transition type NJ32SF to S36 (603.3113) | EACH | 2 | $10,000 | $6,308.84 |
| 83 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 2 | $10,000 | $5,838.81 |
| 84 | Concrete barrier transition type S42 to S56 (603.3559) | EACH | 1 | $10,000 | $8,942.15 |
| 85 | Concrete barrier temporary precast delivered (603.8000) | LF | 4,152 | $7.00 | $11.00 |
| 86 | Concrete barrier temporary precast installed (603.8125) | LF | 4,889 | $4.00 | $5.00 |
| 87 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 181 | $155.00 | $158.00 |
| 88 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 8 | $165.00 | $290.00 |
| 89 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 10 | $165.00 | $300.00 |
| 90 | Reconstructing inlets (611.0430) | EACH | 19 | $650.00 | $1,500.00 |
| 91 | Manhole covers type J (611.0530) | EACH | 1 | $800.00 | $600.00 |
| 92 | Inlet covers type V (611.0654) | EACH | 13 | $1,100.00 | $700.00 |
| 93 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $5,500.00 | $4,000.00 |
| 94 | Inlets 2X2.5-FT (611.3225) | EACH | 13 | $3,550.00 | $3,000.00 |
| 95 | Adjusting manhole covers (611.8110) | EACH | 9 | $600.00 | $1,000.00 |
| 96 | Adjusting inlet covers (611.8115) | EACH | 2 | $800.00 | $1,200.00 |
| 97 | Cover plates temporary (611.8120.S) | EACH | 9 | $250.00 | $750.00 |
| 98 | Pipe underdrain 6-inch (612.0106) | LF | 1,552 | $30.00 | $24.00 |
| 99 | Pipe underdrain wrapped 4-inch (612.0404) | LF | 1,399 | $30.00 | $24.00 |
| 100 | Crash cushions temporary (614.0905) | EACH | 4 | $4,500.00 | $3,000.00 |
| 101 | Fence chain link 6-FT (616.0206) | LF | 588 | $32.50 | $59.70 |
| 102 | Gates chain link (width) 01. 6-FT (616.0329) | EACH | 1 | $2,250.00 | $2,580.00 |
| 103 | Maintenance and repair of haul roads (project) 01. 1228-03-76 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 104 | Mobilization (619.1000) | EACH | 1 | $2,436,000 | $2,231,986 |
| 105 | Concrete median sloped nose (620.0300) | SF | 48 | $20.00 | $57.36 |
| 106 | Topsoil (625.0100) | SY | 2,548 | $10.00 | $10.00 |
| 107 | Silt fence (628.1504) | LF | 804 | $4.00 | $4.00 |
| 108 | Silt fence maintenance (628.1520) | LF | 804 | $0.01 | $0.01 |
| 109 | Erosion mat class I type B (628.2004) | SY | 2,461 | $5.00 | $5.00 |
| 110 | Inlet protection type A (628.7005) | EACH | 8 | $200.00 | $200.00 |
| 111 | Inlet protection type B (628.7010) | EACH | 6 | $100.00 | $100.00 |
| 112 | Inlet protection type C (628.7015) | EACH | 17 | $100.00 | $100.00 |
| 113 | Inlet protection type D (628.7020) | EACH | 122 | $130.00 | $130.00 |
| 114 | Fertilizer type B (629.0210) | CWT | 2 | $500.00 | $500.00 |
| 115 | Seeding mixture no. 30 (630.0130) | LB | 23 | $40.00 | $40.00 |
| 116 | Seeding mixture no. 70 (630.0170) | LB | 7 | $350.00 | $350.00 |
| 117 | Seeding temporary (630.0200) | LB | 16 | $5.00 | $5.00 |
| 118 | Seed water (630.0500) | MGAL | 59 | $20.00 | $20.00 |
| 119 | Sod water (631.0300) | MGAL | 2 | $500.00 | $500.00 |
| 120 | Sod lawn (631.1000) | SY | 87 | $15.00 | $15.00 |
| 121 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 52 | $150.00 | $150.00 |
| 122 | Posts wood 4X6-inch X 22-FT (634.0622) | EACH | 15 | $225.00 | $225.00 |
| 123 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 9 | $225.00 | $225.00 |
| 124 | Sign supports structural steel HS (635.0200) | LB | 2,200 | $6.50 | $6.50 |
| 125 | Sign supports replacing base connection bolts (635.0300) | EACH | 4 | $750.00 | $750.00 |
| 126 | Signs type I reflective SH (637.1220) | SF | 408.50 | $24.00 | $24.00 |
| 127 | Signs type II reflective H (637.2210) | SF | 698.21 | $26.00 | $26.00 |
| 128 | Signs type II reflective H folding (637.2215) | SF | 116.98 | $40.00 | $40.00 |
| 129 | Signs type II reflective F (637.2230) | SF | 393.25 | $27.00 | $27.00 |
| 130 | Moving signs type I (638.2101) | EACH | 2 | $2,500.00 | $2,500.00 |
| 131 | Moving signs type II (638.2102) | EACH | 4 | $150.00 | $150.00 |
| 132 | Removing signs type I (638.2601) | EACH | 5 | $750.00 | $750.00 |
| 133 | Removing signs type II (638.2602) | EACH | 109 | $50.00 | $50.00 |
| 134 | Removing small sign supports (638.3000) | EACH | 71 | $50.00 | $50.00 |
| 135 | Removing structural steel sign supports (638.3100) | EACH | 4 | $750.00 | $750.00 |
| 136 | Traffic control drums (643.0300) | DAY | 83,866 | $0.05 | $0.10 |
| 137 | Traffic control barricades type III (643.0420) | DAY | 7,944 | $0.45 | $0.45 |
| 138 | Traffic control warning lights type A (643.0705) | DAY | 15,773 | $0.10 | $0.05 |
| 139 | Traffic control warning lights type C (643.0715) | DAY | 15,694 | $0.10 | $0.05 |
| 140 | Traffic control arrow boards (643.0800) | DAY | 799 | $5.00 | $5.00 |
| 141 | Traffic control signs (643.0900) | DAY | 20,877 | $0.15 | $0.35 |
| 142 | Traffic control covering signs type II (643.0920) | EACH | 68 | $50.00 | $25.00 |
| 143 | Traffic control signs fixed message (643.1000) | SF | 28 | $50.00 | $22.00 |
| 144 | Traffic control signs PCMS (643.1050) | DAY | 453 | $30.00 | $20.00 |
| 145 | Portable automated real-time traffic queue warning system (643.1200.S) | DAY | 95 | $110.00 | $475.00 |
| 146 | Temporary marking line epoxy 4- inch (643.3120) | LF | 1,515 | $0.60 | $0.55 |
| 147 | Temporary marking line epoxy 6- inch (643.3170) | LF | 198,341 | $0.55 | $0.60 |
| 148 | Temporary marking line epoxy 8- inch (643.3220) | LF | 566 | $0.80 | $1.00 |
| 149 | Temporary marking line epoxy 10- inch (643.3270) | LF | 9,266 | $0.90 | $1.10 |
| 150 | Temporary marking raised pavement marker type I (643.3760) | EACH | 446 | $6.00 | $5.50 |
| 151 | Traffic control interim lane closure (643.4100) | EACH | 335 | $750.00 | $750.00 |
| 152 | Traffic control (643.5000) | EACH | 1 | $95,090 | $254,895 |
| 153 | Temporary pedestrian curb ramp (644.1601) | DAY | 6 | $100.00 | $10.00 |
| 154 | Temporary pedestrian barricade (644.1810) | LF | 786 | $4.00 | $4.00 |
| 155 | Geotextile type DF schedule A (645.0111) | SY | 862 | $1.00 | $3.00 |
| 156 | Marking line epoxy 4-inch (646.1020) | LF | 38 | $3.25 | $1.50 |
| 157 | Marking line epoxy 6-inch (646.2020) | LF | 17 | $5.00 | $2.50 |
| 158 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 12,101 | $1.15 | $1.30 |
| 159 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 62,516 | $1.50 | $1.35 |
| 160 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 12,101 | $7.95 | $8.00 |
| 161 | Marking line epoxy 8-inch (646.3020) | LF | 134 | $6.50 | $1.50 |
| 162 | Marking line epoxy 10-inch (646.4020) | LF | 26 | $10.00 | $2.50 |
| 163 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 198 | $5.00 | $4.00 |
| 164 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 9,222 | $2.45 | $2.25 |
| 165 | Marking arrow epoxy (646.5020) | EACH | 25 | $225.00 | $350.00 |
| 166 | Marking word epoxy (646.5120) | EACH | 11 | $250.00 | $360.00 |
| 167 | Marking symbol epoxy (646.5220) | EACH | 4 | $250.00 | $325.00 |
| 168 | Marking stop line epoxy 18-inch (646.6120) | LF | 258 | $15.00 | $16.00 |
| 169 | Marking yield line epoxy 18-inch (646.6220) | EACH | 17 | $75.00 | $40.00 |
| 170 | Marking diagonal epoxy 12-inch (646.7120) | LF | 6,293 | $8.50 | $6.25 |
| 171 | Marking chevron epoxy 24-inch (646.7220) | LF | 583 | $14.00 | $13.50 |
| 172 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 479 | $11.00 | $13.00 |
| 173 | Marking curb epoxy (646.8120) | LF | 29 | $20.00 | $12.00 |
| 174 | Marking island nose epoxy (646.8220) | EACH | 3 | $300.00 | $325.00 |
| 175 | Marking removal line 4-inch (646.9000) | LF | 22,841 | $0.10 | $0.50 |
| 176 | Marking removal line grooved permanent tape 4-inch (646.9050) | LF | 10,269 | $0.40 | $0.65 |
| 177 | Marking removal line grooved permanent tape 8-inch (646.9150) | LF | 3,304 | $1.30 | $1.50 |
| 178 | Marking removal line wide (646.9200) | LF | 3,276 | $1.50 | $0.75 |
| 179 | Marking removal special marking (646.9300) | EACH | 4 | $600.00 | $250.00 |
| 180 | Conduit rigid metallic 2-inch (652.0125) | LF | 108 | $59.55 | $59.55 |
| 181 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,308 | $8.84 | $8.84 |
| 182 | Junction boxes 18X6X6-inch (653.0220) | EACH | 13 | $1,640.00 | $1,640.00 |
| 183 | Junction boxes 18X12X6-inch (653.0222) | EACH | 5 | $1,962.00 | $1,962.00 |
| 184 | Adjusting pull boxes (653.0900) | EACH | 2 | $1,144.00 | $1,144.00 |
| 185 | Electrical wire lighting 12 AWG (655.0610) | LF | 300 | $0.98 | $0.98 |
| 186 | Electrical wire lighting 6 AWG (655.0625) | LF | 5,420 | $2.09 | $2.09 |
| 187 | Signal mounting hardware (location) 01. IH 43 NB and port washington road (658.5070) | EACH | 1 | $1.00 | $1.00 |
| 188 | Luminaires utility LED D (659.1130) | EACH | 5 | $349.00 | $349.00 |
| 189 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 5 | $30.00 | $30.00 |
| 190 | Sawing concrete (690.0250) | LF | 6,643 | $10.00 | $2.35 |
| 191 | Incentive strength concrete structures (715.0502) | DOL | 8,448 | $1.00 | $1.00 |
| 192 | Incentive strength concrete barrier (715.0603) | DOL | 1,494.50 | $1.00 | $1.00 |
| 193 | Incentive compressive strength concrete pavement (715.0720) | DOL | 943 | $1.00 | $1.00 |
| 194 | Incentive iri ride (740.0440) | DOL | 16,225 | $1.00 | $1.00 |
| 195 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,950 | $5.00 | $5.00 |
| 196 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 6,300 | $5.00 | $5.00 |
| 197 | Special 01. backfill slurry (SPV.0035) | CY | 50 | $200.00 | $200.00 |
| 198 | Special 01. mobilizations emergency pavement repair (SPV.0060) | EACH | 2 | $6,000.00 | $3,075.00 |
| 199 | Special 02. traffic control full freeway closure (SPV.0060) | EACH | 15 | $2,200.00 | $750.00 |
| 200 | Special 03. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 63 | $400.00 | $450.00 |
| 201 | Special 04. traffic control local road lane closures (SPV.0060) | EACH | 50 | $400.00 | $350.00 |
| 202 | Special 05. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 1 | $4,500.00 | $3,500.00 |
| 203 | Special 06. emergency response to traffic involving crash cushion (SPV.0060) | EACH | 1 | $3,000.00 | $1,000.00 |
| 204 | Special 07. field office special (SPV.0060) | EACH | 1 | $60,000 | $20,000 |
| 205 | Special 08. tension structural bolt (SPV.0060) | EACH | 4 | $650.00 | $650.00 |
| 206 | Special 09. catwalk repair (SPV.0060) | EACH | 1 | $8,500.00 | $8,500.00 |
| 207 | Special 10. reconnect storm sewer laterals (SPV.0060) | EACH | 14 | $500.00 | $1,000.00 |
| 208 | Special 11. inlet adjustment castings (SPV.0060) | EACH | 89 | $500.00 | $325.00 |
| 209 | Special 12. survey project 1228-03- 76 (SPV.0060) | EACH | 1 | $70,000 | $70,000 |
| 210 | Special 13. fastening sewer access covers (SPV.0060) | EACH | 100 | $250.00 | $400.00 |
| 211 | Special 21. lighting unit salvaged (SPV.0060) | EACH | 5 | $1,957.40 | $1,957.40 |
| 212 | Special 22. lighting system integrator (1228-03-76) (SPV.0060) | EACH | 1 | $3,074.00 | $3,074.00 |
| 213 | Special 23. lighting system survey (1228-03-76) (SPV.0060) | EACH | 1 | $1,000.00 | $2,000.00 |
| 214 | Special 30. anchor assemblies noise barrier structures B-40-578 (SPV.0060) | EACH | 30 | $250.00 | $150.00 |
| 215 | Special 31. anchor assemblies noise barrier structures R-40-159 (SPV.0060) | EACH | 258 | $250.00 | $150.00 |
| 216 | Special 32. bolt and paint girder holes (SPV.0060) | EACH | 7 | $50.00 | $1,200.00 |
| 217 | Special 33. removing and reinstalling sound panels (SPV.0060) | EACH | 24 | $325.00 | $680.00 |
| 218 | Special 34. precast sound barrier panel support repair (SPV.0060) | EACH | 6 | $500.00 | $1,350.00 |
| 219 | Special 01. pavement cleanup project 1228-03-76 (SPV.0075) | HRS | 100 | $300.00 | $308.78 |
| 220 | Special 01. cleaning storm sewer (SPV.0090) | LF | 1,000 | $20.00 | $20.00 |
| 221 | Special 02. maintain and salvage temporary precast concrete barrier left in place (SPV.0090) | LF | 737.50 | $1.50 | $12.00 |
| 222 | Special 03. marking epoxy 10-inch black non grooved (SPV.0090) | LF | 26 | $10.00 | $6.60 |
| 223 | Special 30. joint sealing (SPV.0090) | LF | 2,115 | $5.50 | $5.50 |
| 224 | Special 01. concrete barrier wall surface repair (SPV.0165) | SF | 15 | $78.00 | $300.00 |
| 225 | Special 02. wall panel concrete surface repair (SPV.0165) | SF | 210 | $205.00 | $250.00 |
| 226 | Special 01. HMA longitudinal joint repair (SPV.0195) | TON | 100 | $310.00 | $410.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.