WisDOT contract 20250311040 bid tabulation

New Auburn - Rice Lake; B-03-14,16,18,20,26,30,37,218 (USH 053, Barron County New Auburn - Rice Lake). Let by Wisconsin DOT on March 11, 2025, Barron. 2 bids received; low bid $10,907,031 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
11 MAR 2025
Pay items
216
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$10,907,031Low
2Lunda Construction Company$11,688,148+7.0%
WisDOT contract 20250311040: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Lunda Construction Company
1Abatement of asbestos containing material (structure) 01. B-3-18 (203.0211.S)EACH1$6,000.00$6,000.00
2Abatement of asbestos containing material (structure) 02. B-3-26 (203.0211.S)EACH1$5,000.00$5,000.00
3Abatement of asbestos containing material (structure) 03. B-3-30 (203.0211.S)EACH1$5,000.00$5,000.00
4Removing structure (structure) 01. B-3-14 (203.0220)EACH1$15,000$20,000
5Removing structure (structure) 02. B-3-16 (203.0220)EACH1$200,000$150,000
6Removing structure (structure) 03. B-3-18 (203.0220)EACH1$200,000$150,000
7Removing structure (structure) 04. B-3-24 (203.0220)EACH1$150,000$200,000
8Removing structure (structure) 05. B-3-26 (203.0220)EACH1$20,000$20,000
9Removing structure (structure) 06. B-3-30 (203.0220)EACH1$200,000$150,000
10Removing structure (structure) 07. B-3-37 (203.0220)EACH1$35,000$20,000
11Removing structure over waterway debris capture (structure) 01. B-3- 20 (203.0270)EACH1$300,000$250,000
12Debris containment (structure) 02. B-3-24 (203.0330)EACH1$5,000.00$500.00
13Debris containment (structure) 03. B-3-30 (203.0330)EACH1$15,000$500.00
14Removing concrete pavement (204.0100)SY1,510$34.60$34.60
15Removing concrete pavement butt joints (204.0105)SY525$14.18$14.18
16Removing asphaltic surface (204.0110)SY7,258$4.75$4.75
17Removing asphaltic surface butt joints (204.0115)SY6,400$6.39$6.39
18Removing asphaltic surface milling (204.0120)SY50,950$3.17$3.17
19Removing curb & gutter (204.0150)LF56$14.50$14.50
20Removing concrete sidewalk (204.0155)SY310$7.10$7.10
21Removing guardrail (204.0165)LF9,110$2.30$2.30
22Removing fence (204.0170)LF595$3.55$3.55
23Removing delineators and markers (204.0180)EACH5$71.00$71.00
24Removing surface drains (204.0190)EACH3$600.00$600.00
25Removing inlets (204.0220)EACH10$350.00$350.00
26Removing storm sewer (size) 01. 15-inch (204.0245)LF114$17.00$17.00
27Removing storm sewer (size) 02. 18-inch (204.0245)LF200$17.00$17.00
28Abandoning culvert pipes (204.0270)EACH5$500.00$500.00
29Excavation common (205.0100)CY151$39.50$39.50
30Excavation for structures bridges (structure) 01. B-3-14 (206.1001)EACH1$5,000.00$20,000
31Excavation for structures bridges (structure) 02. B-3-16 (206.1001)EACH1$5,000.00$20,000
32Excavation for structures bridges (structure) 03. B-3-18 (206.1001)EACH1$8,500.00$50,000
33Excavation for structures bridges (structure) 04. B-3-20 (206.1001)EACH1$15,000$50,000
34Excavation for structures bridges (structure) 05. B-3-218 (206.1001)EACH1$20,000$75,000
35Excavation for structures bridges (structure) 06. B-3-26 (206.1001)EACH1$5,000.00$20,000
36Excavation for structures bridges (structure) 07. B-3-30 (206.1001)EACH1$5,000.00$20,000
37Excavation for structures bridges (structure) 08. B-3-37 (206.1001)EACH1$6,000.00$20,000
38Backfill structure type A (210.1500)TON1,041$27.55$27.55
39Prepare foundation for asphaltic paving (project) 01. 1196-04-77 (211.0101)EACH1$10,060$10,060
40Prepare foundation for asphaltic shoulders (211.0400)STA141$87.21$87.21
41Finishing roadway (project) 01. 1196-04-77 (213.0100)EACH1$2,000.00$4,000.00
42Base aggregate dense 3/4-inch (305.0110)TON1,510$41.75$41.75
43Base aggregate dense 1 1/4-inch (305.0120)TON759$46.65$46.65
44Shaping shoulders (305.0500)STA40$81.30$81.30
45Concrete pavement 7-inch (415.0070)SY405$74.68$74.68
46Concrete pavement 10-inch (415.0100)SY250$109.42$109.42
47Concrete pavement approach slab (415.0410)SY1,170$171.00$171.00
48HMA cold weather paving (450.4000)TON700$4.09$4.09
49Tack coat (455.0605)GAL5,950$4.07$4.07
50Incentive density HMA pavement (460.2000)DOL6,380$1.00$1.00
51HMA pavement 4 MT 58-28 S (460.6224)TON3,556$118.25$118.25
52HMA pavement 4 MT 58-34 S (460.6244)TON2,785$119.99$119.99
53HMA pavement 5 MT 58-34 V (460.6645)TON3,569$130.81$130.81
54Asphaltic surface patching (465.0110)TON8$208.76$208.76
55Asphaltic rumble strips, shoulder divided roadway (465.0510)LF26,230$0.36$0.32
56Concrete masonry bridges (502.0100)CY2,211$1,050.00$800.00
57Compression joint sealer preformed elastomeric (width) 01. 2-1/4 inch (502.2000)LF106$90.00$50.00
58Expansion device (502.3101)LF472$230.00$250.00
59Protective surface treatment (502.3200)SY7,462$3.50$3.00
60Pigmented surface sealer (502.3210)SY1,680$10.00$4.00
61Adhesive anchors 3/4-inch (502.4106)EACH5$120.00$20.00
62Adhesive anchors no. 4 bar (502.4204)EACH296$22.00$20.00
63Adhesive anchors no. 5 bar (502.4205)EACH1,038$25.00$20.00
64Prestressed girder type I 36W-inch (503.0137)LF1,049$250.00$300.00
65Prestressed girder type I 45-inch (503.0145)LF67$550.00$750.00
66Bar steel reinforcement HS structures (505.0400)LB18,750$1.51$1.53
67Bar steel reinforcement HS coated structures (505.0600)LB441,110$1.70$1.82
68Bar steel reinforcement HS stainless structures (505.0800.S)LB1,500$3.82$4.07
69Bar couplers no. 4 (505.0904)EACH42$33.00$30.00
70Bar couplers no. 5 (505.0905)EACH2,662$37.00$45.00
71Bar couplers no. 6 (505.0906)EACH67$45.00$50.00
72Bar couplers no. 7 (505.0907)EACH22$68.00$75.00
73Bar couplers no. 8 (505.0908)EACH42$100.00$135.00
74Bearing pads elastomeric non- laminated (506.2605)EACH25$120.00$75.00
75Bearing pads elastomeric laminated (506.2610)EACH19$1,050.00$85.00
76Steel diaphragms (structure) 01. B- 3-16 (506.4000)EACH9$1,800.00$2,200.00
77Steel diaphragms (structure) 02. B- 3-20 (506.4000)EACH15$1,650.00$2,000.00
78Steel diaphragms (structure) 03. B- 3-218 (506.4000)EACH20$900.00$600.00
79Steel diaphragms (structure) 04. B- 3-30 (506.4000)EACH12$1,600.00$1,900.00
80Bearing assemblies expansion (structure) 01. B-3-16 (506.6000)EACH1$1,000.00$7,000.00
81Removing bearings (structure) 01. B-3-16 (506.7050.S)EACH4$1,300.00$1,350.00
82Removing bearings (structure) 02. B-3-18 (506.7050.S)EACH10$1,100.00$1,350.00
83Removing bearings (structure) 04. B-3-30 (506.7050.S)EACH5$1,100.00$1,350.00
84Preparation decks type 1 (509.0301)SY275$140.00$125.00
85Preparation decks type 2 (509.0302)SY138$160.00$150.00
86Cleaning decks to reapply concrete masonry overlay (509.0505.S)SY2,360$14.00$15.00
87Joint repair (509.1000)SY76$1,200.00$1,200.00
88Concrete surface repair (509.1500)SF651$195.00$150.00
89Full-depth deck repair (509.2000)SY8$850.00$500.00
90Concrete masonry overlay decks (509.2500)CY339$860.00$1,625.00
91Removing concrete masonry deck overlay (structure) 01. B-3-14 (509.9005.S)SY615$25.00$38.81
92Removing concrete masonry deck overlay (structure) 02. B-3-26 (509.9005.S)SY671$20.00$38.81
93Removing concrete masonry deck overlay (structure) 03. B-3-37 (509.9005.S)SY1,074$20.00$38.81
94Epoxy crack sealing (509.9020.S)LF66$25.00$100.00
95Cleaning parapets (509.9050.S)LF1,066$5.00$10.00
96Temporary shoring (structure) 01. B-3-20 (511.1200)SF720$55.00$35.00
97Temporary shoring (structure) 02. B-3-218 (511.1200)SF1,020$35.00$35.00
98Temporary shoring (structure) 03. B-3-30 (511.1200)SF264$65.00$35.00
99Floor drains type WF (514.0450)EACH3$5,200.00$5,000.00
100Downspout 8-inch (514.2608)LF113$320.00$325.00
101Rubberized membrane waterproofing (516.0500)SY114$45.00$20.00
102Preparation and coating of top flanges (structure) 01. B-3-18 (517.0901.S)EACH1$25,516$25,516
103Structure overcoating cleaning and priming (structure) 01. B-3-18 (517.3001.S)EACH1$21,667$21,667
104Structure overcoating cleaning and priming (structure) 02. B-3-37 (517.3001.S)EACH1$14,347$14,347
105Containment and collection of waste materials (structure) 01. B-3- 18 (517.4001.S)EACH1$1,000.00$1,000.00
106Containment and collection of waste materials (structure) 02. B-3- 37 (517.4001.S)EACH1$1,000.00$1,000.00
107Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH7$460.00$460.00
108Culvert pipe corrugated polyethylene 18-inch (530.0118)LF378$43.85$43.85
109Pre-boring unconsolidated materials (550.0010)LF618$125.00$175.00
110Pre-boring rock or consolidated materials (550.0020)LF135$220.00$175.00
111Piling steel HP 10-inch X 42 LB (550.1100)LF753$50.00$40.00
112Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF28$85.90$85.90
113Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF112$62.98$62.98
114Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF202$47.88$47.88
115Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF94$71.24$71.24
116Concrete surface drains (602.3010)CY12$750.80$750.80
117Concrete barrier temporary precast delivered (603.8000)LF8,315$11.98$11.98
118Concrete barrier temporary precast installed (603.8125)LF15,480$3.91$3.91
119Anchoring concrete barrier temporary precast (603.8500)LF8,995$5.00$8.25
120Anchoring concrete barrier temporary precast on bridge decks (603.8505)LF2,235$8.00$12.25
121Slope paving crushed aggregate (604.0500)SY365$47.15$47.15
122Riprap light (606.0100)CY4$150.00$150.00
123Riprap medium (606.0200)CY64$86.20$86.20
124Inlet covers type F (611.0615)EACH4$2,460.00$2,460.00
125Inlet covers type V (611.0654)EACH3$995.00$995.00
126Inlets 2X2.5-FT (611.3225)EACH3$2,325.00$2,325.00
127Inlets 2.5X3-FT (611.3253)EACH4$3,715.00$3,715.00
128Pipe underdrain wrapped 6-inch (612.0406)LF370$8.00$8.00
129Anchor assemblies for steel plate beam guard (614.0150)EACH17$400.00$150.00
130Steel thrie beam bullnose terminal (614.0220)EACH2$17,700$17,700
131Steel thrie beam (614.0230)LF400$36.80$36.80
132Guardrail mow strip asphalt (614.0396)SY460$43.10$43.10
133Guardrail mow strip emulsified asphalt (614.0397)SY3,750$6.25$6.25
134Adjusting steel plate beam guard (614.0400)LF2,410$6.10$6.10
135Crash cushions temporary (614.0905)EACH17$4,500.00$4,500.00
136MGS guardrail 3 (614.2300)LF6,889$20.70$20.70
137MGS thrie beam transition (614.2500)LF640$88.25$88.25
138MGS guardrail terminal eat (614.2610)EACH16$3,472.00$3,472.00
139MGS guardrail terminal type 2 (614.2620)EACH1$3,195.00$3,195.00
140Fence woven wire (height) 01. 4- FT (616.0100)LF1,610$18.55$18.55
141Maintenance and repair of haul roads (project) 01. 1196-04-77 (618.0100)EACH1$3,096.02$0.01
142Mobilization (619.1000)EACH1$1,260,000$2,319,670
143Water (624.0100)MGAL52$75.00$75.00
144Salvaged topsoil (625.0500)SY4,730$3.10$3.10
145Silt fence (628.1504)LF3,960$1.92$1.92
146Silt fence maintenance (628.1520)LF3,960$0.01$0.01
147Mobilizations erosion control (628.1905)EACH9$431.00$431.00
148Mobilizations emergency erosion control (628.1910)EACH9$1.00$1.00
149Erosion mat class I type B (628.2004)SY4,730$1.20$1.20
150Inlet protection type A (628.7005)EACH11$175.00$175.00
151Inlet protection type B (628.7010)EACH13$35.00$35.00
152Temporary ditch checks (628.7504)LF220$8.00$8.00
153Fertilizer type B (629.0210)CWT3$210.00$210.00
154Seeding mixture no. 20 (630.0120)LB214$25.00$25.00
155Seeding temporary (630.0200)LB127$3.35$3.35
156Seed water (630.0500)MGAL105$1.00$1.00
157Markers culvert end (633.5200)EACH7$36.00$59.00
158Field office type C (642.5201)EACH1$22,000$15,000
159Traffic control drums (643.0300)DAY166,447$0.30$0.30
160Traffic control barricades type III (643.0420)DAY14,402$0.50$0.50
161Traffic control warning lights type A (643.0705)DAY28,292$0.10$0.10
162Traffic control warning lights type C (643.0715)DAY39,565$0.10$0.10
163Traffic control arrow boards (643.0800)DAY1,216$20.00$20.00
164Traffic control signs (643.0900)DAY79,607$0.55$0.55
165Traffic control covering signs type II (643.0920)EACH15$35.00$35.00
166Traffic control signs PCMS (643.1050)DAY289$40.00$40.00
167Temporary marking line epoxy 6- inch (643.3170)LF52,858$0.60$0.60
168Temporary marking line removable tape 6-inch (643.3180)LF6,575$1.65$1.65
169Temporary marking line epoxy 10- inch (643.3270)LF1,255$1.20$1.20
170Traffic control (643.5000)EACH1$6,000.00$6,000.00
171Geotextile type DF schedule A (645.0111)SY78$4.30$4.30
172Geotextile type HR (645.0120)SY149$5.00$5.00
173Marking line epoxy 6-inch (646.2020)LF36,006$0.85$0.85
174Marking line epoxy 10-inch (646.4020)LF2,360$1.55$1.55
175Marking removal line 4-inch (646.9000)LF20,119$0.45$0.45
176Marking removal line 8-inch (646.9100)LF1,320$0.90$0.90
177Construction staking storm sewer (650.4000)EACH14$200.00$200.00
178Construction staking curb gutter and curb & gutter (650.5500)LF350$2.00$2.00
179Construction staking structure layout (structure) 01. B-3-16 (650.6501)EACH1$2,500.00$2,500.00
180Construction staking structure layout (structure) 02. B-3-18 (650.6501)EACH1$2,500.00$2,500.00
181Construction staking structure layout (structure) 03. B-3-20 (650.6501)EACH1$2,500.00$2,500.00
182Construction staking structure layout (structure) 04. B-3-218 (650.6501)EACH1$2,500.00$2,500.00
183Construction staking structure layout (structure) 05. B-3-30 (650.6501)EACH1$2,500.00$2,500.00
184Construction staking concrete pavement (650.7000)LF415$2.00$2.00
185Construction staking resurfacing reference (650.8000)LF15,779$0.08$0.08
186Construction staking supplemental control (project) 01. 1196-04-77 (650.9911)EACH1$2,500.00$2,500.00
187Construction staking slope stakes (650.9920)LF770$0.50$0.50
188Sawing asphalt (690.0150)LF19,104$1.75$1.75
189Sawing concrete (690.0250)LF1,360$2.75$2.75
190Incentive strength concrete structures (715.0502)DOL13,266$1.00$1.00
191Incentive compressive strength concrete pavement (715.0720)DOL548$1.00$1.00
192Incentive iri ride (740.0440)DOL2,315$1.00$1.00
193Maintaining bird deterrent system (station) 01. 68+00 SB (999.2005.S)EACH1$1.00$10.00
194Maintaining bird deterrent system (station) 02. 221+50 SB (999.2005.S)EACH1$5,000.00$10.00
195Maintaining bird deterrent system (station) 03. 365+00 SB (999.2005.S)EACH1$1.00$10.00
196Maintaining bird deterrent system (station) 04. 429+00 SB (999.2005.S)EACH1$1.00$10.00
197Maintaining bird deterrent system (station) 05. 492+00 SB (999.2005.S)EACH1$1.00$10.00
198Maintaining bird deterrent system (station) 06. 797+50 SB (999.2005.S)EACH1$5,000.00$10.00
199Maintaining bird deterrent system (station) 07. 415+50 SB (999.2005.S)EACH1$1.00$10.00
200Maintaining bird deterrent system (station) 08. 871+00 SB (999.2005.S)EACH1$1.00$10.00
201Special 01. cleaning and painting bearings (SPV.0060)EACH21$863.00$863.00
202Special 02. embedded galvanic anodes (SPV.0060)EACH495$30.00$40.00
203Special 03. temporary support B-3- 16 (SPV.0060)EACH1$10,000$5,000.00
204Special 04. temporary support B-3- 18 (SPV.0060)EACH1$20,000$8,000.00
205Special 05. temporary support B-3- 218 (existing deck) (SPV.0060)EACH1$12,000$5,000.00
206Special 06. temporary support B-3- 30 (SPV.0060)EACH1$80,000$5,000.00
207Special 07. temporary support B-3- 218 (new deck) (SPV.0060)EACH1$12,000$1,500.00
208Special 08. temporary pier support B-3-218 (SPV.0060)EACH1$60,000$15,000
209Special 09. inlet covers type DW (SPV.0060)EACH4$1,230.00$1,230.00
210Special 10. salvage and reinstall eat terminal (SPV.0060)EACH8$750.00$750.00
211Special 01. PVC waterstop (SPV.0090)LF34$30.00$60.00
212Special 02. concrete curb & gutter 30-inch type DW (SPV.0090)LF36$87.57$87.57
213Special 03. profile curb cut (SPV.0090)LF880$30.00$30.00
214Special 01. fiber wrap reinforcing non-structural (SPV.0165)SF900$47.34$45.00
215Special 01. abutment seat cleaning and sealing (SPV.0180)SY141$100.00$75.00
216Special 02. epoxy sealer (SPV.0180)SY29$220.00$6.00
WisDOT contract 20250311040: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy