| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $10,907,031 | Low |
| 2 | Lunda Construction Company | $11,688,148 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Lunda Construction Company |
|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-3-18 (203.0211.S) | EACH | 1 | $6,000.00 | $6,000.00 |
| 2 | Abatement of asbestos containing material (structure) 02. B-3-26 (203.0211.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 3 | Abatement of asbestos containing material (structure) 03. B-3-30 (203.0211.S) | EACH | 1 | $5,000.00 | $5,000.00 |
| 4 | Removing structure (structure) 01. B-3-14 (203.0220) | EACH | 1 | $15,000 | $20,000 |
| 5 | Removing structure (structure) 02. B-3-16 (203.0220) | EACH | 1 | $200,000 | $150,000 |
| 6 | Removing structure (structure) 03. B-3-18 (203.0220) | EACH | 1 | $200,000 | $150,000 |
| 7 | Removing structure (structure) 04. B-3-24 (203.0220) | EACH | 1 | $150,000 | $200,000 |
| 8 | Removing structure (structure) 05. B-3-26 (203.0220) | EACH | 1 | $20,000 | $20,000 |
| 9 | Removing structure (structure) 06. B-3-30 (203.0220) | EACH | 1 | $200,000 | $150,000 |
| 10 | Removing structure (structure) 07. B-3-37 (203.0220) | EACH | 1 | $35,000 | $20,000 |
| 11 | Removing structure over waterway debris capture (structure) 01. B-3- 20 (203.0270) | EACH | 1 | $300,000 | $250,000 |
| 12 | Debris containment (structure) 02. B-3-24 (203.0330) | EACH | 1 | $5,000.00 | $500.00 |
| 13 | Debris containment (structure) 03. B-3-30 (203.0330) | EACH | 1 | $15,000 | $500.00 |
| 14 | Removing concrete pavement (204.0100) | SY | 1,510 | $34.60 | $34.60 |
| 15 | Removing concrete pavement butt joints (204.0105) | SY | 525 | $14.18 | $14.18 |
| 16 | Removing asphaltic surface (204.0110) | SY | 7,258 | $4.75 | $4.75 |
| 17 | Removing asphaltic surface butt joints (204.0115) | SY | 6,400 | $6.39 | $6.39 |
| 18 | Removing asphaltic surface milling (204.0120) | SY | 50,950 | $3.17 | $3.17 |
| 19 | Removing curb & gutter (204.0150) | LF | 56 | $14.50 | $14.50 |
| 20 | Removing concrete sidewalk (204.0155) | SY | 310 | $7.10 | $7.10 |
| 21 | Removing guardrail (204.0165) | LF | 9,110 | $2.30 | $2.30 |
| 22 | Removing fence (204.0170) | LF | 595 | $3.55 | $3.55 |
| 23 | Removing delineators and markers (204.0180) | EACH | 5 | $71.00 | $71.00 |
| 24 | Removing surface drains (204.0190) | EACH | 3 | $600.00 | $600.00 |
| 25 | Removing inlets (204.0220) | EACH | 10 | $350.00 | $350.00 |
| 26 | Removing storm sewer (size) 01. 15-inch (204.0245) | LF | 114 | $17.00 | $17.00 |
| 27 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 200 | $17.00 | $17.00 |
| 28 | Abandoning culvert pipes (204.0270) | EACH | 5 | $500.00 | $500.00 |
| 29 | Excavation common (205.0100) | CY | 151 | $39.50 | $39.50 |
| 30 | Excavation for structures bridges (structure) 01. B-3-14 (206.1001) | EACH | 1 | $5,000.00 | $20,000 |
| 31 | Excavation for structures bridges (structure) 02. B-3-16 (206.1001) | EACH | 1 | $5,000.00 | $20,000 |
| 32 | Excavation for structures bridges (structure) 03. B-3-18 (206.1001) | EACH | 1 | $8,500.00 | $50,000 |
| 33 | Excavation for structures bridges (structure) 04. B-3-20 (206.1001) | EACH | 1 | $15,000 | $50,000 |
| 34 | Excavation for structures bridges (structure) 05. B-3-218 (206.1001) | EACH | 1 | $20,000 | $75,000 |
| 35 | Excavation for structures bridges (structure) 06. B-3-26 (206.1001) | EACH | 1 | $5,000.00 | $20,000 |
| 36 | Excavation for structures bridges (structure) 07. B-3-30 (206.1001) | EACH | 1 | $5,000.00 | $20,000 |
| 37 | Excavation for structures bridges (structure) 08. B-3-37 (206.1001) | EACH | 1 | $6,000.00 | $20,000 |
| 38 | Backfill structure type A (210.1500) | TON | 1,041 | $27.55 | $27.55 |
| 39 | Prepare foundation for asphaltic paving (project) 01. 1196-04-77 (211.0101) | EACH | 1 | $10,060 | $10,060 |
| 40 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 141 | $87.21 | $87.21 |
| 41 | Finishing roadway (project) 01. 1196-04-77 (213.0100) | EACH | 1 | $2,000.00 | $4,000.00 |
| 42 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,510 | $41.75 | $41.75 |
| 43 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 759 | $46.65 | $46.65 |
| 44 | Shaping shoulders (305.0500) | STA | 40 | $81.30 | $81.30 |
| 45 | Concrete pavement 7-inch (415.0070) | SY | 405 | $74.68 | $74.68 |
| 46 | Concrete pavement 10-inch (415.0100) | SY | 250 | $109.42 | $109.42 |
| 47 | Concrete pavement approach slab (415.0410) | SY | 1,170 | $171.00 | $171.00 |
| 48 | HMA cold weather paving (450.4000) | TON | 700 | $4.09 | $4.09 |
| 49 | Tack coat (455.0605) | GAL | 5,950 | $4.07 | $4.07 |
| 50 | Incentive density HMA pavement (460.2000) | DOL | 6,380 | $1.00 | $1.00 |
| 51 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,556 | $118.25 | $118.25 |
| 52 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 2,785 | $119.99 | $119.99 |
| 53 | HMA pavement 5 MT 58-34 V (460.6645) | TON | 3,569 | $130.81 | $130.81 |
| 54 | Asphaltic surface patching (465.0110) | TON | 8 | $208.76 | $208.76 |
| 55 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 26,230 | $0.36 | $0.32 |
| 56 | Concrete masonry bridges (502.0100) | CY | 2,211 | $1,050.00 | $800.00 |
| 57 | Compression joint sealer preformed elastomeric (width) 01. 2-1/4 inch (502.2000) | LF | 106 | $90.00 | $50.00 |
| 58 | Expansion device (502.3101) | LF | 472 | $230.00 | $250.00 |
| 59 | Protective surface treatment (502.3200) | SY | 7,462 | $3.50 | $3.00 |
| 60 | Pigmented surface sealer (502.3210) | SY | 1,680 | $10.00 | $4.00 |
| 61 | Adhesive anchors 3/4-inch (502.4106) | EACH | 5 | $120.00 | $20.00 |
| 62 | Adhesive anchors no. 4 bar (502.4204) | EACH | 296 | $22.00 | $20.00 |
| 63 | Adhesive anchors no. 5 bar (502.4205) | EACH | 1,038 | $25.00 | $20.00 |
| 64 | Prestressed girder type I 36W-inch (503.0137) | LF | 1,049 | $250.00 | $300.00 |
| 65 | Prestressed girder type I 45-inch (503.0145) | LF | 67 | $550.00 | $750.00 |
| 66 | Bar steel reinforcement HS structures (505.0400) | LB | 18,750 | $1.51 | $1.53 |
| 67 | Bar steel reinforcement HS coated structures (505.0600) | LB | 441,110 | $1.70 | $1.82 |
| 68 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,500 | $3.82 | $4.07 |
| 69 | Bar couplers no. 4 (505.0904) | EACH | 42 | $33.00 | $30.00 |
| 70 | Bar couplers no. 5 (505.0905) | EACH | 2,662 | $37.00 | $45.00 |
| 71 | Bar couplers no. 6 (505.0906) | EACH | 67 | $45.00 | $50.00 |
| 72 | Bar couplers no. 7 (505.0907) | EACH | 22 | $68.00 | $75.00 |
| 73 | Bar couplers no. 8 (505.0908) | EACH | 42 | $100.00 | $135.00 |
| 74 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 25 | $120.00 | $75.00 |
| 75 | Bearing pads elastomeric laminated (506.2610) | EACH | 19 | $1,050.00 | $85.00 |
| 76 | Steel diaphragms (structure) 01. B- 3-16 (506.4000) | EACH | 9 | $1,800.00 | $2,200.00 |
| 77 | Steel diaphragms (structure) 02. B- 3-20 (506.4000) | EACH | 15 | $1,650.00 | $2,000.00 |
| 78 | Steel diaphragms (structure) 03. B- 3-218 (506.4000) | EACH | 20 | $900.00 | $600.00 |
| 79 | Steel diaphragms (structure) 04. B- 3-30 (506.4000) | EACH | 12 | $1,600.00 | $1,900.00 |
| 80 | Bearing assemblies expansion (structure) 01. B-3-16 (506.6000) | EACH | 1 | $1,000.00 | $7,000.00 |
| 81 | Removing bearings (structure) 01. B-3-16 (506.7050.S) | EACH | 4 | $1,300.00 | $1,350.00 |
| 82 | Removing bearings (structure) 02. B-3-18 (506.7050.S) | EACH | 10 | $1,100.00 | $1,350.00 |
| 83 | Removing bearings (structure) 04. B-3-30 (506.7050.S) | EACH | 5 | $1,100.00 | $1,350.00 |
| 84 | Preparation decks type 1 (509.0301) | SY | 275 | $140.00 | $125.00 |
| 85 | Preparation decks type 2 (509.0302) | SY | 138 | $160.00 | $150.00 |
| 86 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 2,360 | $14.00 | $15.00 |
| 87 | Joint repair (509.1000) | SY | 76 | $1,200.00 | $1,200.00 |
| 88 | Concrete surface repair (509.1500) | SF | 651 | $195.00 | $150.00 |
| 89 | Full-depth deck repair (509.2000) | SY | 8 | $850.00 | $500.00 |
| 90 | Concrete masonry overlay decks (509.2500) | CY | 339 | $860.00 | $1,625.00 |
| 91 | Removing concrete masonry deck overlay (structure) 01. B-3-14 (509.9005.S) | SY | 615 | $25.00 | $38.81 |
| 92 | Removing concrete masonry deck overlay (structure) 02. B-3-26 (509.9005.S) | SY | 671 | $20.00 | $38.81 |
| 93 | Removing concrete masonry deck overlay (structure) 03. B-3-37 (509.9005.S) | SY | 1,074 | $20.00 | $38.81 |
| 94 | Epoxy crack sealing (509.9020.S) | LF | 66 | $25.00 | $100.00 |
| 95 | Cleaning parapets (509.9050.S) | LF | 1,066 | $5.00 | $10.00 |
| 96 | Temporary shoring (structure) 01. B-3-20 (511.1200) | SF | 720 | $55.00 | $35.00 |
| 97 | Temporary shoring (structure) 02. B-3-218 (511.1200) | SF | 1,020 | $35.00 | $35.00 |
| 98 | Temporary shoring (structure) 03. B-3-30 (511.1200) | SF | 264 | $65.00 | $35.00 |
| 99 | Floor drains type WF (514.0450) | EACH | 3 | $5,200.00 | $5,000.00 |
| 100 | Downspout 8-inch (514.2608) | LF | 113 | $320.00 | $325.00 |
| 101 | Rubberized membrane waterproofing (516.0500) | SY | 114 | $45.00 | $20.00 |
| 102 | Preparation and coating of top flanges (structure) 01. B-3-18 (517.0901.S) | EACH | 1 | $25,516 | $25,516 |
| 103 | Structure overcoating cleaning and priming (structure) 01. B-3-18 (517.3001.S) | EACH | 1 | $21,667 | $21,667 |
| 104 | Structure overcoating cleaning and priming (structure) 02. B-3-37 (517.3001.S) | EACH | 1 | $14,347 | $14,347 |
| 105 | Containment and collection of waste materials (structure) 01. B-3- 18 (517.4001.S) | EACH | 1 | $1,000.00 | $1,000.00 |
| 106 | Containment and collection of waste materials (structure) 02. B-3- 37 (517.4001.S) | EACH | 1 | $1,000.00 | $1,000.00 |
| 107 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 7 | $460.00 | $460.00 |
| 108 | Culvert pipe corrugated polyethylene 18-inch (530.0118) | LF | 378 | $43.85 | $43.85 |
| 109 | Pre-boring unconsolidated materials (550.0010) | LF | 618 | $125.00 | $175.00 |
| 110 | Pre-boring rock or consolidated materials (550.0020) | LF | 135 | $220.00 | $175.00 |
| 111 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 753 | $50.00 | $40.00 |
| 112 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 28 | $85.90 | $85.90 |
| 113 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 112 | $62.98 | $62.98 |
| 114 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 202 | $47.88 | $47.88 |
| 115 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 94 | $71.24 | $71.24 |
| 116 | Concrete surface drains (602.3010) | CY | 12 | $750.80 | $750.80 |
| 117 | Concrete barrier temporary precast delivered (603.8000) | LF | 8,315 | $11.98 | $11.98 |
| 118 | Concrete barrier temporary precast installed (603.8125) | LF | 15,480 | $3.91 | $3.91 |
| 119 | Anchoring concrete barrier temporary precast (603.8500) | LF | 8,995 | $5.00 | $8.25 |
| 120 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 2,235 | $8.00 | $12.25 |
| 121 | Slope paving crushed aggregate (604.0500) | SY | 365 | $47.15 | $47.15 |
| 122 | Riprap light (606.0100) | CY | 4 | $150.00 | $150.00 |
| 123 | Riprap medium (606.0200) | CY | 64 | $86.20 | $86.20 |
| 124 | Inlet covers type F (611.0615) | EACH | 4 | $2,460.00 | $2,460.00 |
| 125 | Inlet covers type V (611.0654) | EACH | 3 | $995.00 | $995.00 |
| 126 | Inlets 2X2.5-FT (611.3225) | EACH | 3 | $2,325.00 | $2,325.00 |
| 127 | Inlets 2.5X3-FT (611.3253) | EACH | 4 | $3,715.00 | $3,715.00 |
| 128 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 370 | $8.00 | $8.00 |
| 129 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 17 | $400.00 | $150.00 |
| 130 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $17,700 | $17,700 |
| 131 | Steel thrie beam (614.0230) | LF | 400 | $36.80 | $36.80 |
| 132 | Guardrail mow strip asphalt (614.0396) | SY | 460 | $43.10 | $43.10 |
| 133 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 3,750 | $6.25 | $6.25 |
| 134 | Adjusting steel plate beam guard (614.0400) | LF | 2,410 | $6.10 | $6.10 |
| 135 | Crash cushions temporary (614.0905) | EACH | 17 | $4,500.00 | $4,500.00 |
| 136 | MGS guardrail 3 (614.2300) | LF | 6,889 | $20.70 | $20.70 |
| 137 | MGS thrie beam transition (614.2500) | LF | 640 | $88.25 | $88.25 |
| 138 | MGS guardrail terminal eat (614.2610) | EACH | 16 | $3,472.00 | $3,472.00 |
| 139 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,195.00 | $3,195.00 |
| 140 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 1,610 | $18.55 | $18.55 |
| 141 | Maintenance and repair of haul roads (project) 01. 1196-04-77 (618.0100) | EACH | 1 | $3,096.02 | $0.01 |
| 142 | Mobilization (619.1000) | EACH | 1 | $1,260,000 | $2,319,670 |
| 143 | Water (624.0100) | MGAL | 52 | $75.00 | $75.00 |
| 144 | Salvaged topsoil (625.0500) | SY | 4,730 | $3.10 | $3.10 |
| 145 | Silt fence (628.1504) | LF | 3,960 | $1.92 | $1.92 |
| 146 | Silt fence maintenance (628.1520) | LF | 3,960 | $0.01 | $0.01 |
| 147 | Mobilizations erosion control (628.1905) | EACH | 9 | $431.00 | $431.00 |
| 148 | Mobilizations emergency erosion control (628.1910) | EACH | 9 | $1.00 | $1.00 |
| 149 | Erosion mat class I type B (628.2004) | SY | 4,730 | $1.20 | $1.20 |
| 150 | Inlet protection type A (628.7005) | EACH | 11 | $175.00 | $175.00 |
| 151 | Inlet protection type B (628.7010) | EACH | 13 | $35.00 | $35.00 |
| 152 | Temporary ditch checks (628.7504) | LF | 220 | $8.00 | $8.00 |
| 153 | Fertilizer type B (629.0210) | CWT | 3 | $210.00 | $210.00 |
| 154 | Seeding mixture no. 20 (630.0120) | LB | 214 | $25.00 | $25.00 |
| 155 | Seeding temporary (630.0200) | LB | 127 | $3.35 | $3.35 |
| 156 | Seed water (630.0500) | MGAL | 105 | $1.00 | $1.00 |
| 157 | Markers culvert end (633.5200) | EACH | 7 | $36.00 | $59.00 |
| 158 | Field office type C (642.5201) | EACH | 1 | $22,000 | $15,000 |
| 159 | Traffic control drums (643.0300) | DAY | 166,447 | $0.30 | $0.30 |
| 160 | Traffic control barricades type III (643.0420) | DAY | 14,402 | $0.50 | $0.50 |
| 161 | Traffic control warning lights type A (643.0705) | DAY | 28,292 | $0.10 | $0.10 |
| 162 | Traffic control warning lights type C (643.0715) | DAY | 39,565 | $0.10 | $0.10 |
| 163 | Traffic control arrow boards (643.0800) | DAY | 1,216 | $20.00 | $20.00 |
| 164 | Traffic control signs (643.0900) | DAY | 79,607 | $0.55 | $0.55 |
| 165 | Traffic control covering signs type II (643.0920) | EACH | 15 | $35.00 | $35.00 |
| 166 | Traffic control signs PCMS (643.1050) | DAY | 289 | $40.00 | $40.00 |
| 167 | Temporary marking line epoxy 6- inch (643.3170) | LF | 52,858 | $0.60 | $0.60 |
| 168 | Temporary marking line removable tape 6-inch (643.3180) | LF | 6,575 | $1.65 | $1.65 |
| 169 | Temporary marking line epoxy 10- inch (643.3270) | LF | 1,255 | $1.20 | $1.20 |
| 170 | Traffic control (643.5000) | EACH | 1 | $6,000.00 | $6,000.00 |
| 171 | Geotextile type DF schedule A (645.0111) | SY | 78 | $4.30 | $4.30 |
| 172 | Geotextile type HR (645.0120) | SY | 149 | $5.00 | $5.00 |
| 173 | Marking line epoxy 6-inch (646.2020) | LF | 36,006 | $0.85 | $0.85 |
| 174 | Marking line epoxy 10-inch (646.4020) | LF | 2,360 | $1.55 | $1.55 |
| 175 | Marking removal line 4-inch (646.9000) | LF | 20,119 | $0.45 | $0.45 |
| 176 | Marking removal line 8-inch (646.9100) | LF | 1,320 | $0.90 | $0.90 |
| 177 | Construction staking storm sewer (650.4000) | EACH | 14 | $200.00 | $200.00 |
| 178 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 350 | $2.00 | $2.00 |
| 179 | Construction staking structure layout (structure) 01. B-3-16 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 |
| 180 | Construction staking structure layout (structure) 02. B-3-18 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 |
| 181 | Construction staking structure layout (structure) 03. B-3-20 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 |
| 182 | Construction staking structure layout (structure) 04. B-3-218 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 |
| 183 | Construction staking structure layout (structure) 05. B-3-30 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 |
| 184 | Construction staking concrete pavement (650.7000) | LF | 415 | $2.00 | $2.00 |
| 185 | Construction staking resurfacing reference (650.8000) | LF | 15,779 | $0.08 | $0.08 |
| 186 | Construction staking supplemental control (project) 01. 1196-04-77 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 |
| 187 | Construction staking slope stakes (650.9920) | LF | 770 | $0.50 | $0.50 |
| 188 | Sawing asphalt (690.0150) | LF | 19,104 | $1.75 | $1.75 |
| 189 | Sawing concrete (690.0250) | LF | 1,360 | $2.75 | $2.75 |
| 190 | Incentive strength concrete structures (715.0502) | DOL | 13,266 | $1.00 | $1.00 |
| 191 | Incentive compressive strength concrete pavement (715.0720) | DOL | 548 | $1.00 | $1.00 |
| 192 | Incentive iri ride (740.0440) | DOL | 2,315 | $1.00 | $1.00 |
| 193 | Maintaining bird deterrent system (station) 01. 68+00 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 194 | Maintaining bird deterrent system (station) 02. 221+50 SB (999.2005.S) | EACH | 1 | $5,000.00 | $10.00 |
| 195 | Maintaining bird deterrent system (station) 03. 365+00 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 196 | Maintaining bird deterrent system (station) 04. 429+00 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 197 | Maintaining bird deterrent system (station) 05. 492+00 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 198 | Maintaining bird deterrent system (station) 06. 797+50 SB (999.2005.S) | EACH | 1 | $5,000.00 | $10.00 |
| 199 | Maintaining bird deterrent system (station) 07. 415+50 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 200 | Maintaining bird deterrent system (station) 08. 871+00 SB (999.2005.S) | EACH | 1 | $1.00 | $10.00 |
| 201 | Special 01. cleaning and painting bearings (SPV.0060) | EACH | 21 | $863.00 | $863.00 |
| 202 | Special 02. embedded galvanic anodes (SPV.0060) | EACH | 495 | $30.00 | $40.00 |
| 203 | Special 03. temporary support B-3- 16 (SPV.0060) | EACH | 1 | $10,000 | $5,000.00 |
| 204 | Special 04. temporary support B-3- 18 (SPV.0060) | EACH | 1 | $20,000 | $8,000.00 |
| 205 | Special 05. temporary support B-3- 218 (existing deck) (SPV.0060) | EACH | 1 | $12,000 | $5,000.00 |
| 206 | Special 06. temporary support B-3- 30 (SPV.0060) | EACH | 1 | $80,000 | $5,000.00 |
| 207 | Special 07. temporary support B-3- 218 (new deck) (SPV.0060) | EACH | 1 | $12,000 | $1,500.00 |
| 208 | Special 08. temporary pier support B-3-218 (SPV.0060) | EACH | 1 | $60,000 | $15,000 |
| 209 | Special 09. inlet covers type DW (SPV.0060) | EACH | 4 | $1,230.00 | $1,230.00 |
| 210 | Special 10. salvage and reinstall eat terminal (SPV.0060) | EACH | 8 | $750.00 | $750.00 |
| 211 | Special 01. PVC waterstop (SPV.0090) | LF | 34 | $30.00 | $60.00 |
| 212 | Special 02. concrete curb & gutter 30-inch type DW (SPV.0090) | LF | 36 | $87.57 | $87.57 |
| 213 | Special 03. profile curb cut (SPV.0090) | LF | 880 | $30.00 | $30.00 |
| 214 | Special 01. fiber wrap reinforcing non-structural (SPV.0165) | SF | 900 | $47.34 | $45.00 |
| 215 | Special 01. abutment seat cleaning and sealing (SPV.0180) | SY | 141 | $100.00 | $75.00 |
| 216 | Special 02. epoxy sealer (SPV.0180) | SY | 29 | $220.00 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.