WisDOT contract 20250408003 bid tabulation
T Medina - T York (CTH Tt); Maunesha River Bridge B-13-0913 (CTH TT, Dane County T Medina - T York (CTH TT)). Let by Wisconsin DOT on April 8, 2025, Dane. 6 bids received; low bid $842,663 by Radtke Contractors Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 79
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Radtke Contractors Inc. | $842,663 | Low |
| 2 | Concrete Structures, Inc. | $862,741 | +2.0% |
| 3 | Pheifer Brothers Construction Co., Inc. | $883,574 | +5.0% |
| 4 | R.G. Huston Company, Inc. | $919,900 | +9.0% |
| 5 | Janke General Contractors, Inc. | $935,177 | +11% |
| 6 | Lunda Construction Company | $942,760 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Radtke Contractors Inc. | 2. Concrete Structures, Inc. | 3. Pheifer Brothers Construction Co., Inc. | 4. R.G. Huston Company, Inc. | 5. Janke General Contractors, Inc. | 6. Lunda Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 1 | $10.00 | $10.00 | $10.00 | $2,600.00 | $4,620.00 | $10.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $275.00 | $275.00 | $275.00 | $1,500.00 | $1,495.00 | $275.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-13- 0207 (203.0260) | EACH | 1 | $47,794 | $88,450 | $277,600 | $44,000 | $28,000 | $80,000 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 10 | $66.00 | $66.00 | $66.00 | $66.67 | $66.00 | $66.00 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 283 | $19.10 | $19.10 | $19.10 | $19.29 | $19.10 | $19.10 |
| 6 | Removing guardrail (204.0165) | LF | 230 | $4.50 | $4.50 | $5.00 | $5.00 | $4.50 | $4.50 |
| 7 | Excavation common (205.0100) | CY | 544 | $14.00 | $14.00 | $14.00 | $17.00 | $28.00 | $14.00 |
| 8 | Excavation for structures bridges (structure) 01. B-13-0913 (206.1001) | EACH | 1 | $45,293 | $25,000 | $42,500 | $17,000 | $34,000 | $20,000 |
| 9 | Cofferdams (structure) 01. B-13- 0913 (206.5001) | EACH | 1 | $54,148 | $32,000 | $34,200 | $56,000 | $23,000 | $85,000 |
| 10 | Backfill structure type A (210.1500) | TON | 520 | $33.87 | $26.25 | $26.25 | $37.00 | $32.00 | $26.25 |
| 11 | Finishing roadway (project) 01. 3682-00-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 | $1,300.00 | $375.00 | $500.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 100 | $24.00 | $24.00 | $24.00 | $30.00 | $50.00 | $24.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,085 | $18.50 | $18.50 | $18.50 | $20.00 | $26.00 | $18.50 |
| 14 | Concrete pavement approach slab (415.0410) | SY | 92 | $285.00 | $285.00 | $285.00 | $257.58 | $320.00 | $285.00 |
| 15 | Tack coat (455.0605) | GAL | 80 | $3.00 | $3.00 | $3.00 | $3.03 | $3.00 | $3.00 |
| 16 | Incentive density HMA pavement (460.2000) | DOL | 210 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 310 | $96.70 | $96.70 | $96.70 | $97.68 | $96.70 | $96.70 |
| 18 | Concrete masonry bridges (502.0100) | CY | 285 | $681.21 | $975.00 | $520.00 | $1,040.00 | $900.00 | $905.00 |
| 19 | Protective surface treatment (502.3200) | SY | 394 | $3.73 | $7.00 | $4.70 | $7.15 | $4.35 | $4.00 |
| 20 | Underwater substructure inspection (structure) 01. B-13-0913 (502.9000.S) | EACH | 1 | $500.00 | $1.00 | $5,100.00 | $5,000.00 | $4,400.00 | $7,500.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 6,890 | $1.29 | $1.20 | $0.97 | $1.20 | $1.70 | $1.10 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 36,530 | $1.35 | $1.40 | $1.09 | $1.30 | $1.85 | $1.20 |
| 23 | Railing tubular type M (513.4061) | LF | 169 | $315.44 | $293.00 | $280.00 | $330.00 | $383.00 | $280.00 |
| 24 | Rubberized membrane waterproofing (516.0500) | SY | 22 | $75.07 | $37.00 | $60.00 | $56.00 | $36.00 | $25.00 |
| 25 | Apron endwalls for culvert pipe 15- inch (520.1015) | EACH | 2 | $325.00 | $325.00 | $325.00 | $365.00 | $1,550.00 | $325.00 |
| 26 | Culvert pipe class III-A 15-inch (520.3315) | LF | 32 | $55.00 | $55.00 | $55.00 | $38.00 | $125.00 | $55.00 |
| 27 | Piling cip concrete 12 3/4 X 0.25- inch (550.2124) | LF | 1,130 | $43.08 | $55.00 | $14.00 | $73.00 | $84.00 | $45.00 |
| 28 | Riprap medium (606.0200) | CY | 2 | $100.00 | $100.00 | $100.00 | $200.00 | $130.00 | $100.00 |
| 29 | Riprap heavy (606.0300) | CY | 185 | $125.27 | $75.00 | $100.27 | $79.00 | $110.00 | $75.00 |
| 30 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 226 | $4.29 | $9.00 | $9.00 | $4.60 | $12.00 | $9.00 |
| 31 | MGS guardrail 3 (614.2300) | LF | 50 | $30.00 | $30.00 | $32.00 | $32.00 | $30.00 | $30.00 |
| 32 | MGS guardrail short radius (614.2350) | LF | 58 | $44.00 | $44.00 | $38.00 | $38.00 | $44.00 | $44.00 |
| 33 | MGS thrie beam transition (614.2500) | LF | 157.60 | $92.00 | $92.00 | $98.00 | $98.00 | $92.00 | $92.00 |
| 34 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $3,835.00 | $3,835.00 | $3,600.00 | $3,600.00 | $3,835.00 | $3,835.00 |
| 35 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,509.00 | $2,509.00 | $2,300.00 | $2,300.00 | $2,509.00 | $2,509.00 |
| 36 | Maintenance and repair of haul roads (project) 01. 3682-00-70 (618.0100) | EACH | 1 | $250.00 | $250.00 | $1.00 | $100.00 | $375.00 | $1.00 |
| 37 | Mobilization (619.1000) | EACH | 1 | $97,234 | $34,365 | $23,431 | $55,097 | $64,255 | $106,162 |
| 38 | Water (624.0100) | MGAL | 20 | $0.01 | $0.01 | $0.01 | $77.00 | $16.50 | $0.01 |
| 39 | Topsoil (625.0100) | SY | 830 | $2.75 | $2.75 | $2.75 | $7.30 | $9.50 | $2.75 |
| 40 | Silt fence (628.1504) | LF | 985 | $2.55 | $2.55 | $2.50 | $2.50 | $2.55 | $2.55 |
| 41 | Silt fence maintenance (628.1520) | LF | 985 | $0.08 | $0.08 | $0.25 | $0.25 | $0.08 | $0.08 |
| 42 | Mobilizations erosion control (628.1905) | EACH | 6 | $420.00 | $420.00 | $250.00 | $250.00 | $420.00 | $420.00 |
| 43 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $250.00 | $250.00 | $300.00 | $300.00 | $250.00 | $250.00 |
| 44 | Erosion mat urban class I type B (628.2008) | SY | 1,250 | $2.40 | $2.40 | $1.80 | $1.80 | $2.40 | $2.40 |
| 45 | Turbidity barriers (628.6005) | SY | 150 | $45.00 | $45.00 | $62.50 | $62.50 | $45.00 | $45.00 |
| 46 | Culvert pipe checks (628.7555) | EACH | 1 | $23.50 | $23.50 | $100.00 | $100.00 | $23.50 | $23.50 |
| 47 | Fertilizer type B (629.0210) | CWT | 1 | $96.00 | $96.00 | $200.00 | $200.00 | $96.00 | $96.00 |
| 48 | Seeding mixture no. 75 (630.0175) | LB | 11 | $110.00 | $110.00 | $100.00 | $100.00 | $110.00 | $110.00 |
| 49 | Seeding temporary (630.0200) | LB | 22 | $3.55 | $3.55 | $10.00 | $10.00 | $3.55 | $3.55 |
| 50 | Seed water (630.0500) | MGAL | 9 | $29.00 | $29.00 | $100.00 | $100.00 | $29.00 | $29.00 |
| 51 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $95.00 | $95.00 | $75.00 | $75.00 | $95.00 | $95.00 |
| 52 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 2 | $98.00 | $98.00 | $100.00 | $100.00 | $98.00 | $98.00 |
| 53 | Signs type II reflective F (637.2230) | SF | 12 | $29.00 | $29.00 | $35.00 | $35.00 | $29.00 | $29.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 6 | $34.30 | $34.30 | $35.00 | $35.00 | $34.30 | $34.30 |
| 55 | Field office type B (642.5001) | EACH | 1 | $2,589.56 | $1,500.00 | $5,300.00 | $1,000.00 | $8,000.00 | $4,500.00 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 1,200 | $0.53 | $0.53 | $0.53 | $0.51 | $0.53 | $0.53 |
| 57 | Traffic control warning lights type A (643.0705) | DAY | 1,680 | $0.15 | $0.15 | $0.15 | $0.10 | $0.15 | $0.15 |
| 58 | Traffic control signs (643.0900) | DAY | 3,900 | $0.19 | $0.19 | $0.19 | $0.30 | $0.19 | $0.19 |
| 59 | Traffic control covering signs type II (643.0920) | EACH | 7 | $95.00 | $95.00 | $95.00 | $50.51 | $95.00 | $95.00 |
| 60 | Traffic control signs PCMS (643.1050) | DAY | 14 | $55.00 | $55.00 | $55.00 | $35.35 | $55.00 | $55.00 |
| 61 | Traffic control (643.5000) | EACH | 1 | $7,290.00 | $7,290.00 | $7,290.00 | $8,080.81 | $7,290.00 | $7,290.00 |
| 62 | Geotextile type DF schedule A (645.0111) | SY | 150 | $5.17 | $8.00 | $8.00 | $2.25 | $2.65 | $8.00 |
| 63 | Geotextile type HR (645.0120) | SY | 442 | $5.39 | $6.00 | $6.00 | $4.25 | $3.67 | $6.00 |
| 64 | Marking line paint 6-inch (646.2005) | LF | 1,864 | $1.85 | $1.85 | $2.85 | $1.85 | $1.85 | $2.85 |
| 65 | Construction staking subgrade (650.4500) | LF | 385 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 66 | Construction staking base (650.5000) | LF | 385 | $0.01 | $0.01 | $0.01 | $0.01 | $1.50 | $1.50 |
| 67 | Construction staking pipe culverts (650.6000) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $150.00 | $150.00 |
| 68 | Construction staking structure layout (structure) 01. B-13-0913 (650.6501) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $3,500.00 | $3,500.00 |
| 69 | Construction staking concrete pavement (650.7000) | LF | 28 | $15.00 | $15.00 | $15.00 | $15.00 | $20.00 | $20.00 |
| 70 | Construction staking supplemental control (project) 01. 3682-00-70 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $900.00 | $900.00 |
| 71 | Construction staking slope stakes (650.9920) | LF | 385 | $0.01 | $0.01 | $0.01 | $0.01 | $1.50 | $1.50 |
| 72 | Sawing asphalt (690.0150) | LF | 289 | $1.95 | $2.00 | $2.00 | $1.95 | $1.95 | $2.00 |
| 73 | Incentive strength concrete structures (715.0502) | DOL | 1,710 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 74 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 75 | Maintaining bird deterrent system (station) 01. 13+00 (999.2005.S) | EACH | 1 | $1.00 | $500.00 | $0.01 | $100.00 | $4,200.00 | $0.01 |
| 76 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 77 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 78 | Special 01. flashing stainless steel (SPV.0090) | LF | 78 | $86.98 | $105.00 | $78.00 | $120.00 | $55.00 | $75.00 |
| 79 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 78 | $44.22 | $55.00 | $54.00 | $59.00 | $57.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.