| 1 | Removing small pipe culverts (203.0100) | EACH | 2 | $500.00 | $662.50 |
| 2 | Removing concrete pavement (204.0100) | SY | 645 | $10.00 | $5.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 8 | $75.00 | $20.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 28 | $93.20 | $93.20 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 39,710 | $3.90 | $3.90 |
| 6 | Removing curb (204.0130) | LF | 230 | $10.00 | $15.00 |
| 7 | Removing curb & gutter (204.0150) | LF | 825 | $10.00 | $15.00 |
| 8 | Removing concrete bases (204.0195) | EACH | 9 | $200.00 | $200.00 |
| 9 | Removing inlets (204.0220) | EACH | 24 | $1,425.50 | $437.00 |
| 10 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 288 | $17.50 | $19.50 |
| 11 | Removing (item description) 01. business sign (204.9060.S) | EACH | 1 | $1,500.00 | $1,500.00 |
| 12 | Excavation common (205.0100) | CY | 1,252 | $28.00 | $54.31 |
| 13 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 80 | $75.00 | $90.00 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 1490-40-71 (211.0101) | EACH | 1 | $37,860 | $37,860 |
| 15 | Finishing roadway (project) 01. 1490-40-71 (213.0100) | EACH | 1 | $1,500.00 | $4,000.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 105 | $35.00 | $69.27 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,020 | $22.00 | $25.47 |
| 18 | Shaping shoulders (305.0500) | STA | 20 | $420.00 | $100.00 |
| 19 | Coloring concrete wisdot red (405.0100) | CY | 18 | $110.00 | $110.00 |
| 20 | Drilled tie bars (416.0610) | EACH | 145 | $10.00 | $10.00 |
| 21 | HMA cold weather paving (450.4000) | TON | 3,255 | $3.10 | $3.10 |
| 22 | Tack coat (455.0605) | GAL | 2,900 | $3.20 | $3.20 |
| 23 | Incentive density HMA pavement (460.2000) | DOL | 3,160 | $1.00 | $1.00 |
| 24 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 5,000 | $89.60 | $89.60 |
| 25 | Asphaltic surface (465.0105) | TON | 65 | $198.00 | $198.00 |
| 26 | Asphaltic surface driveways and field entrances (465.0120) | TON | 1 | $587.00 | $587.00 |
| 27 | Asphaltic flumes (465.0315) | SY | 130 | $78.10 | $78.10 |
| 28 | Concrete collars for pipe (520.8000) | EACH | 2 | $950.00 | $800.00 |
| 29 | Cleaning culvert pipes (520.8700) | EACH | 3 | $1,500.00 | $1,185.00 |
| 30 | Apron endwalls for pipe arch steel 42X29-inch (521.1242) | EACH | 1 | $860.00 | $1,685.00 |
| 31 | Pipe arch corrugated steel 42X29- inch (521.3742) | LF | 16 | $133.50 | $177.50 |
| 32 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 94 | $175.00 | $142.75 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $2,221.00 | $1,998.00 |
| 34 | Apron endwalls for culvert pipe salvaged 30-inch (524.0630) | EACH | 1 | $2,150.00 | $1,070.00 |
| 35 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 20 | $70.00 | $70.00 |
| 36 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 275 | $70.00 | $70.00 |
| 37 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 145 | $65.00 | $65.00 |
| 38 | Concrete driveway 6-inch (602.0810) | SY | 60 | $110.00 | $110.00 |
| 39 | Maintenance and repair of haul roads (project) 01. 1490-40-71 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 40 | Mobilization (619.1000) | EACH | 1 | $364,870 | $410,000 |
| 41 | Water (624.0100) | MGAL | 21 | $50.00 | $50.00 |
| 42 | Salvaged topsoil (625.0500) | SY | 2,470 | $5.00 | $8.85 |
| 43 | Mulching (627.0200) | SY | 415 | $1.00 | $1.00 |
| 44 | Silt fence (628.1504) | LF | 775 | $2.50 | $2.50 |
| 45 | Silt fence maintenance (628.1520) | LF | 775 | $0.01 | $0.01 |
| 46 | Mobilizations erosion control (628.1905) | EACH | 6 | $400.00 | $400.00 |
| 47 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $200.00 | $200.00 |
| 48 | Erosion mat urban class I type B (628.2008) | SY | 2,470 | $2.10 | $2.10 |
| 49 | Inlet protection type C (628.7015) | EACH | 15 | $70.00 | $70.00 |
| 50 | Temporary ditch checks (628.7504) | LF | 275 | $7.95 | $7.95 |
| 51 | Culvert pipe checks (628.7555) | EACH | 15 | $14.00 | $14.00 |
| 52 | Rock bags (628.7570) | EACH | 140 | $14.00 | $14.00 |
| 53 | Fertilizer type B (629.0210) | CWT | 1.50 | $150.00 | $150.00 |
| 54 | Seeding mixture no. 30 (630.0130) | LB | 38 | $8.75 | $8.75 |
| 55 | Seeding mixture no. 60 (630.0160) | LB | 3 | $100.00 | $100.00 |
| 56 | Seeding temporary (630.0200) | LB | 12 | $5.00 | $5.00 |
| 57 | Seed water (630.0500) | MGAL | 57 | $5.00 | $5.00 |
| 58 | Sod water (631.0300) | MGAL | 6.50 | $5.00 | $5.00 |
| 59 | Sod erosion control (631.1100) | SY | 206 | $18.00 | $18.00 |
| 60 | Markers culvert end (633.5200) | EACH | 9 | $68.00 | $68.00 |
| 61 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 43 | $84.00 | $84.00 |
| 62 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 16 | $88.00 | $88.00 |
| 63 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 5 | $92.00 | $92.00 |
| 64 | Signs type II reflective H (637.2210) | SF | 442.80 | $21.70 | $21.70 |
| 65 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $29.15 | $29.15 |
| 66 | Signs type II reflective F (637.2230) | SF | 59.70 | $22.95 | $22.95 |
| 67 | Removing signs type II (638.2602) | EACH | 53 | $35.00 | $35.00 |
| 68 | Removing small sign supports (638.3000) | EACH | 52 | $35.00 | $35.00 |
| 69 | Field office type B (642.5001) | EACH | 1 | $11,870 | $9,500.00 |
| 70 | Traffic control drums (643.0300) | DAY | 15,091 | $0.35 | $0.75 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 1,228 | $0.65 | $2.50 |
| 72 | Traffic control flexible tubular marker posts (643.0500) | EACH | 18 | $30.00 | $35.00 |
| 73 | Traffic control flexible tubular marker bases (643.0600) | EACH | 18 | $8.00 | $15.00 |
| 74 | Traffic control warning lights type A (643.0705) | DAY | 1,784 | $0.20 | $0.75 |
| 75 | Traffic control warning lights type C (643.0715) | DAY | 992 | $0.20 | $1.00 |
| 76 | Traffic control signs (643.0900) | DAY | 3,188 | $0.89 | $1.25 |
| 77 | Traffic control covering signs type II (643.0920) | EACH | 18 | $85.00 | $99.46 |
| 78 | Traffic control signs fixed message (643.1000) | SF | 158 | $23.00 | $22.00 |
| 79 | Traffic control signs PCMS (643.1050) | DAY | 56 | $85.00 | $30.00 |
| 80 | Temporary marking line paint 6- inch (643.3165) | LF | 22,245 | $0.25 | $0.25 |
| 81 | Temporary marking line removable tape 6-inch (643.3180) | LF | 26,715 | $2.65 | $1.95 |
| 82 | Temporary marking line removable tape 10-inch (643.3280) | LF | 40 | $10.00 | $3.55 |
| 83 | Temporary marking stop line paint 18-inch (643.3805) | LF | 11 | $5.50 | $5.50 |
| 84 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 11 | $15.00 | $6.50 |
| 85 | Traffic control (643.5000) | EACH | 1 | $19,500 | $47,350 |
| 86 | Geotextile type sas (645.0140) | SY | 150 | $7.00 | $5.00 |
| 87 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 35,210 | $1.75 | $1.75 |
| 88 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 990 | $3.60 | $3.60 |
| 89 | Marking arrow epoxy (646.5020) | EACH | 40 | $346.87 | $346.87 |
| 90 | Marking word epoxy (646.5120) | EACH | 2 | $398.54 | $398.54 |
| 91 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $3,377.27 | $3,377.27 |
| 92 | Marking stop line epoxy 18-inch (646.6120) | LF | 120 | $14.76 | $14.76 |
| 93 | Cold weather marking epoxy 6-inch (646.6466) | LF | 35,210 | $0.29 | $0.29 |
| 94 | Cold weather marking epoxy 10- inch (646.6470) | LF | 990 | $0.63 | $0.63 |
| 95 | Marking diagonal epoxy 12-inch (646.7120) | LF | 310 | $14.17 | $14.17 |
| 96 | Marking curb epoxy (646.8120) | LF | 90 | $7.00 | $7.00 |
| 97 | Marking island nose epoxy (646.8220) | EACH | 2 | $273.47 | $273.47 |
| 98 | Marking removal line 4-inch (646.9000) | LF | 4,030 | $0.50 | $0.50 |
| 99 | Marking removal line wide (646.9200) | LF | 95 | $2.50 | $2.50 |
| 100 | Marking removal special marking (646.9300) | EACH | 1 | $75.00 | $75.00 |
| 101 | Construction staking subgrade (650.4500) | LF | 880 | $0.01 | $0.01 |
| 102 | Construction staking base (650.5000) | LF | 880 | $1.21 | $1.21 |
| 103 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,065 | $0.72 | $0.72 |
| 104 | Construction staking pipe culverts (650.6000) | EACH | 3 | $106.09 | $106.09 |
| 105 | Construction staking resurfacing reference (650.8000) | LF | 7,630 | $0.24 | $0.24 |
| 106 | Construction staking electrical installations (project) 01. 1490-40- 71 (650.8501) | EACH | 1 | $1,357.49 | $1,357.49 |
| 107 | Construction staking supplemental control (project) 01. 1490-40-71 (650.9911) | EACH | 1 | $422.81 | $422.81 |
| 108 | Construction staking slope stakes (650.9920) | LF | 770 | $0.84 | $0.84 |
| 109 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 390 | $10.00 | $10.00 |
| 110 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 195 | $14.00 | $14.00 |
| 111 | Conduit special 2-inch (652.0605) | LF | 270 | $28.00 | $28.00 |
| 112 | Conduit special 3-inch (652.0615) | LF | 630 | $32.00 | $32.00 |
| 113 | Conduit loop detector (652.0800) | LF | 966 | $6.00 | $6.00 |
| 114 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 10 | $2,250.00 | $2,250.00 |
| 115 | Removing pull boxes (653.0905) | EACH | 12 | $75.00 | $75.00 |
| 116 | Concrete bases type 1 (654.0101) | EACH | 4 | $1,575.00 | $1,575.00 |
| 117 | Concrete bases type 10 (654.0110) | EACH | 2 | $7,500.00 | $7,500.00 |
| 118 | Concrete bases type 10-special (654.0120) | EACH | 2 | $13,750 | $13,750 |
| 119 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,200.00 | $2,200.00 |
| 120 | Cable traffic signal 5-14 AWG (655.0230) | LF | 831 | $2.55 | $2.55 |
| 121 | Cable traffic signal 7-14 AWG (655.0240) | LF | 214 | $2.85 | $2.85 |
| 122 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,003 | $4.75 | $4.75 |
| 123 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 938 | $0.90 | $0.90 |
| 124 | Loop detector lead in cable (655.0700) | LF | 1,774 | $2.00 | $2.00 |
| 125 | Loop detector wire (655.0800) | LF | 2,630 | $0.80 | $0.80 |
| 126 | Electrical service meter breaker pedestal (location) 01. S38-0492 temporary (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 |
| 127 | Pedestal bases (657.0100) | EACH | 4 | $260.00 | $260.00 |
| 128 | Poles type 9 (657.0345) | EACH | 2 | $8,405.00 | $8,405.00 |
| 129 | Poles type 9-special (657.0347) | EACH | 2 | $11,280 | $11,280 |
| 130 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $545.00 | $545.00 |
| 131 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $580.00 | $580.00 |
| 132 | Monotube arms 25-FT (657.0525) | EACH | 1 | $4,736.00 | $4,736.00 |
| 133 | Monotube arms 30-FT (657.0530) | EACH | 1 | $5,788.00 | $5,788.00 |
| 134 | Monotube arms 40-FT-special (657.0541) | EACH | 2 | $5,634.00 | $5,634.00 |
| 135 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $690.00 | $690.00 |
| 136 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $870.00 | $870.00 |
| 137 | Signal mounting hardware (location) 01. S38-0492 temporary (658.5070) | EACH | 1 | $2,500.00 | $2,500.00 |
| 138 | Signal mounting hardware (location) 02. S38-0492 future (658.5070) | EACH | 1 | $3,500.00 | $3,500.00 |
| 139 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 36 | $75.00 | $75.00 |
| 140 | Sawing asphalt (690.0150) | LF | 1,605 | $1.95 | $1.85 |
| 141 | Sawing concrete (690.0250) | LF | 610 | $2.95 | $2.95 |
| 142 | Incentive iri ride (740.0440) | DOL | 16,900 | $1.00 | $1.00 |
| 143 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 |
| 144 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 |
| 145 | Special 01. inlet adjustment ring replacement (SPV.0060) | EACH | 2 | $1,550.00 | $817.50 |
| 146 | Special 02. remove traffic signal (ush 141 & CTH W) (SPV.0060) | EACH | 1 | $8,500.00 | $8,500.00 |
| 147 | Special 03. utility line opening (ulo) (SPV.0060) | EACH | 5 | $1,500.00 | $826.50 |
| 148 | Special 04. temporary traffic signal (ush 141 & CTH W) (SPV.0060) | EACH | 1 | $9,500.00 | $9,500.00 |
| 149 | Special 01. concrete curb & gutter shes 30-inch type D (SPV.0090) | LF | 900 | $62.00 | $62.00 |
| 150 | Special 01. concrete median sloped nose shes (SPV.0165) | SF | 320 | $25.00 | $25.00 |
| 151 | Special 01. concrete truck apron shes 12-inch (SPV.0180) | SY | 57 | $280.00 | $280.00 |