WisDOT contract 20250708002 bid tabulation
1030-43-71. Let by Wisconsin DOT on July 8, 2025, Milwaukee. 3 bids received; low bid $31,241,590 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 JUL 2025
- Pay items
- 215
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $31,241,590 | Low |
| 2 | Payne and Dolan, Inc | $35,157,847 | +13% |
| 3 | Zignego Company, Inc. | $35,211,169 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Payne and Dolan, Inc | 3. Zignego Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 2 | $0.01 | $1.00 | $1,000.00 |
| 2 | Clearing (201.0120) | ID | 24 | $45.00 | $153.00 | $150.00 |
| 3 | Grubbing (201.0205) | STA | 5 | $700.00 | $688.50 | $675.00 |
| 4 | Grubbing (201.0220) | ID | 24 | $25.00 | $100.98 | $99.00 |
| 5 | Removing structure (structure) 01. R-40-398 (203.0220) | EACH | 1 | $5,000.00 | $25,500 | $35,000 |
| 6 | Removing concrete pavement (204.0100) | SY | 50 | $25.00 | $51.00 | $100.00 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 13,709 | $12.80 | $0.01 | $12.80 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 598,800 | $3.00 | $5.50 | $3.00 |
| 9 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 85,300 | $1.08 | $5.57 | $1.08 |
| 10 | Removing curb & gutter (204.0150) | LF | 552 | $10.00 | $15.30 | $20.00 |
| 11 | Removing concrete sidewalk (204.0155) | SY | 392 | $10.00 | $15.30 | $20.00 |
| 12 | Removing concrete barrier (204.0157) | LF | 804 | $22.00 | $56.10 | $80.00 |
| 13 | Removing (item description) 01. removing porcelain ceramic tile facing (204.9165.S) | SF | 9,505 | $14.56 | $17.85 | $25.00 |
| 14 | Excavation common (205.0100) | CY | 1,799 | $35.60 | $40.80 | $60.00 |
| 15 | Backfill controlled low strength (209.0200.S) | CY | 2 | $350.00 | $1,500.00 | $1,000.00 |
| 16 | Backfill structure type A (210.1500) | TON | 4 | $90.00 | $510.00 | $350.00 |
| 17 | Finishing roadway (project) 01. 1030-43-71 (213.0100) | EACH | 1 | $5,165.67 | $150.00 | $1,000.00 |
| 18 | Finishing roadway (project) 02. 1030-43-72 (213.0100) | EACH | 1 | $5,165.67 | $150.00 | $1,000.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 370 | $55.00 | $40.80 | $50.00 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 20 | $40.00 | $45.90 | $100.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0125) | CY | 2 | $70.00 | $1,000.00 | $200.00 |
| 22 | Removing pavement for base patching (390.0100) | CY | 5,880 | $140.00 | $102.00 | $50.00 |
| 23 | Base patching concrete shes (390.0405) | CY | 5,880 | $301.00 | $224.40 | $295.00 |
| 24 | Drilled tie bars (416.0610) | EACH | 3,817 | $8.00 | $17.34 | $15.00 |
| 25 | Drilled dowel bars (416.0620) | EACH | 19,031 | $12.80 | $27.54 | $1.00 |
| 26 | Concrete pavement repair shes (416.1715) | SY | 17 | $185.00 | $193.80 | $450.00 |
| 27 | Concrete pavement replacement shes (416.1725) | SY | 855 | $148.99 | $193.80 | $200.00 |
| 28 | Tack coat (455.0605) | GAL | 83,432 | $3.74 | $2.25 | $3.74 |
| 29 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $5,000.00 | $1,415.75 | $5,000.00 |
| 30 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $5,000.00 | $11,653 | $5,000.00 |
| 31 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 2 | $3,500.00 | $1,415.75 | $3,500.00 |
| 32 | HMA pavement test strip density (460.0120.S) | EACH | 2 | $3,500.00 | $10,177 | $3,500.00 |
| 33 | Incentive density HMA pavement (460.2000) | DOL | 35,985 | $1.00 | $1.00 | $1.00 |
| 34 | Incentive density PWL HMA pavement (460.2005) | DOL | 34,810 | $1.00 | $1.00 | $1.00 |
| 35 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 37,550 | $1.00 | $1.00 | $1.00 |
| 36 | Incentive air voids HMA pavement (460.2010) | DOL | 58,699 | $1.00 | $1.00 | $1.00 |
| 37 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,475 | $88.64 | $74.04 | $88.64 |
| 38 | HMA pavement 4 HT 58-28 V (460.7624) | TON | 65,385 | $98.14 | $120.41 | $98.14 |
| 39 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 65,588 | $117.02 | $122.10 | $117.02 |
| 40 | Material transfer vehicle (460.9000.S) | EACH | 1 | $0.01 | $1.02 | $0.01 |
| 41 | Asphaltic surface patching (465.0110) | TON | 200 | $194.97 | $483.95 | $194.97 |
| 42 | Cold patch (495.1000.S) | TON | 20 | $700.00 | $1,250.18 | $1.00 |
| 43 | Pigmented surface sealer (502.3210) | SY | 2 | $600.00 | $612.00 | $30.00 |
| 44 | Protective surface treatment reseal (502.3215) | SY | 1,058 | $25.00 | $20.40 | $23.00 |
| 45 | Adhesive anchors no. 4 bar (502.4204) | EACH | 3 | $200.00 | $112.20 | $50.00 |
| 46 | Concrete masonry retaining walls (504.0500) | CY | 1 | $3,500.00 | $7,650.00 | $7,500.00 |
| 47 | Bar steel reinforcement HS coated structures (505.0600) | LB | 70 | $3.00 | $10.20 | $12.00 |
| 48 | Concrete surface repair (509.1500) | SF | 169 | $205.00 | $408.00 | $260.00 |
| 49 | Epoxy crack sealing (509.9020.S) | LF | 35 | $20.00 | $51.00 | $45.00 |
| 50 | Railing pipe (513.2001) | LF | 11 | $240.00 | $1,020.00 | $1,200.00 |
| 51 | Drilling shaft 36-inch (531.2036) | LF | 10 | $221.28 | $225.71 | $221.28 |
| 52 | Foundation camera pole 50-FT (531.4050) | EACH | 1 | $8,384.32 | $8,552.01 | $8,384.32 |
| 53 | Concrete curb & gutter 31-inch (601.0331) | LF | 552 | $42.00 | $56.10 | $30.00 |
| 54 | Concrete sidewalk 5-inch (602.0410) | SF | 2,862 | $12.50 | $14.28 | $11.00 |
| 55 | Curb ramp detectable warning field natural patina (602.0515) | SF | 134 | $45.00 | $56.10 | $48.00 |
| 56 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 41 | $55.00 | $76.50 | $58.00 |
| 57 | Concrete surface drains (602.3010) | CY | 265 | $840.00 | $1,377.00 | $1.00 |
| 58 | Concrete barrier type S42 (603.1142) | LF | 306 | $110.00 | $408.00 | $110.00 |
| 59 | Concrete barrier type S56 (603.1156) | LF | 407 | $125.00 | $408.00 | $125.00 |
| 60 | Concrete barrier temporary precast delivered (603.8000) | LF | 3,606 | $18.18 | $30.60 | $11.00 |
| 61 | Concrete barrier temporary precast installed (603.8125) | LF | 3,606 | $5.99 | $15.30 | $7.00 |
| 62 | Anchoring concrete barrier temporary precast (603.8500) | LF | 104 | $15.25 | $51.00 | $25.00 |
| 63 | Riprap extra-light (606.0050) | CY | 300 | $125.25 | $153.00 | $150.00 |
| 64 | Riprap light (606.0100) | CY | 130 | $125.25 | $163.20 | $200.00 |
| 65 | Riprap medium (606.0200) | CY | 2.72 | $175.00 | $239.70 | $1,000.00 |
| 66 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 100 | $155.00 | $142.80 | $200.00 |
| 67 | Reconstructing inlets (611.0430) | EACH | 2 | $3,500.00 | $2,244.00 | $2,000.00 |
| 68 | Inlet covers type V (611.0654) | EACH | 2 | $2,500.00 | $765.00 | $1,000.00 |
| 69 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $3,200.00 | $5,304.00 | $7,000.00 |
| 70 | Adjusting inlet covers (611.8115) | EACH | 52 | $2,800.00 | $510.00 | $1,000.00 |
| 71 | Pipe underdrain 6-inch (612.0106) | LF | 404 | $30.00 | $31.62 | $50.00 |
| 72 | Crash cushions temporary (614.0905) | EACH | 8 | $4,000.00 | $4,080.00 | $4,000.00 |
| 73 | Fence chain link 6-FT (616.0206) | LF | 887 | $39.00 | $39.78 | $39.00 |
| 74 | Gates chain link (width) 01. 10-FT (616.0329) | EACH | 2 | $2,443.00 | $2,491.86 | $2,443.00 |
| 75 | Gates chain link (width) 02. 12-FT (616.0329) | EACH | 1 | $2,726.00 | $2,780.52 | $2,726.00 |
| 76 | Gates chain link (width) 03. 22-FT (616.0329) | EACH | 3 | $2,858.00 | $2,915.16 | $2,858.00 |
| 77 | Fence chain link salvaged 10-FT (616.0410) | LF | 390 | $83.00 | $84.66 | $83.00 |
| 78 | Maintenance and repair of haul roads (project) 01. 1030-43-71 (618.0100) | EACH | 1 | $0.01 | $150.00 | $1.00 |
| 79 | Maintenance and repair of haul roads (project) 02. 1030-43-72 (618.0100) | EACH | 1 | $0.01 | $150.00 | $1.00 |
| 80 | Mobilization (619.1000) | EACH | 1 | $3,388,383 | $3,054,260 | $6,924,000 |
| 81 | Water (624.0100) | MGAL | 5 | $50.00 | $1.00 | $500.00 |
| 82 | Topsoil (625.0100) | SY | 4,814 | $7.00 | $9.18 | $6.00 |
| 83 | Topsoil (625.0105) | CY | 100 | $30.00 | $40.80 | $75.00 |
| 84 | Silt fence (628.1504) | LF | 750 | $3.10 | $2.55 | $2.95 |
| 85 | Silt fence maintenance (628.1520) | LF | 1,125 | $0.10 | $0.26 | $0.01 |
| 86 | Mobilizations erosion control (628.1905) | EACH | 10 | $150.00 | $255.00 | $150.00 |
| 87 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $200.00 | $306.00 | $150.00 |
| 88 | Erosion mat urban class I type A (628.2006) | SY | 675 | $1.89 | $1.99 | $1.95 |
| 89 | Erosion mat class II type B (628.2023) | SY | 9,588 | $1.71 | $1.79 | $2.05 |
| 90 | Inlet protection type A (628.7005) | EACH | 10 | $95.00 | $153.00 | $105.00 |
| 91 | Inlet protection type B (628.7010) | EACH | 590 | $41.10 | $51.00 | $50.00 |
| 92 | Inlet protection type D (628.7020) | EACH | 160 | $89.00 | $117.30 | $95.00 |
| 93 | Seeding mixture no. 20 (630.0120) | LB | 216 | $9.00 | $7.45 | $8.95 |
| 94 | Seeding mixture no. 40 (630.0140) | LB | 31 | $12.90 | $12.24 | $15.00 |
| 95 | Seeding temporary (630.0200) | LB | 230 | $6.10 | $5.10 | $3.45 |
| 96 | Seed water (630.0500) | MGAL | 35.34 | $75.00 | $81.60 | $40.00 |
| 97 | Sod water (631.0300) | MGAL | 6.42 | $100.00 | $81.60 | $100.00 |
| 98 | Sod lawn (631.1000) | SY | 285 | $15.10 | $13.01 | $12.00 |
| 99 | Delineator reflectors (633.0500) | EACH | 20 | $79.50 | $4.59 | $15.00 |
| 100 | Delineators barrier wall (633.1000) | EACH | 20 | $39.90 | $35.70 | $55.00 |
| 101 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 24 | $110.00 | $122.40 | $135.00 |
| 102 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 6 | $120.00 | $255.00 | $215.00 |
| 103 | Posts tubular steel 2X2-inch X 8.5- FT (634.0885) | EACH | 2 | $110.00 | $357.00 | $215.00 |
| 104 | Sign supports replacing base connection bolts (635.0300) | EACH | 1 | $975.00 | $204.00 | $500.00 |
| 105 | Signs type I reflective SH (637.1220) | SF | 260 | $37.90 | $28.56 | $28.00 |
| 106 | Signs type II reflective H (637.2210) | SF | 216.71 | $36.90 | $28.56 | $25.00 |
| 107 | Signs type II reflective F (637.2230) | SF | 80 | $26.90 | $24.48 | $24.00 |
| 108 | Moving signs type II (638.2102) | EACH | 6 | $110.90 | $76.50 | $110.00 |
| 109 | Removing signs type II (638.2602) | EACH | 25 | $28.10 | $35.70 | $30.00 |
| 110 | Removing small sign supports (638.3000) | EACH | 24 | $28.10 | $35.70 | $30.00 |
| 111 | Traffic control drums (643.0300) | DAY | 213,429 | $0.14 | $0.14 | $0.14 |
| 112 | Traffic control barricades type III (643.0420) | DAY | 20,553 | $0.65 | $0.66 | $0.65 |
| 113 | Traffic control warning lights type A (643.0705) | DAY | 41,105 | $0.10 | $0.10 | $0.10 |
| 114 | Traffic control warning lights type C (643.0715) | DAY | 45,802 | $0.10 | $0.10 | $0.10 |
| 115 | Connected arrow board (643.0810.S) | DAY | 2,023 | $18.00 | $18.36 | $18.00 |
| 116 | Traffic control signs (643.0900) | DAY | 67,334 | $0.40 | $0.41 | $0.40 |
| 117 | Traffic control covering signs type I (643.0910) | EACH | 125 | $250.00 | $255.00 | $250.00 |
| 118 | Traffic control covering signs type II (643.0920) | EACH | 550 | $20.00 | $20.40 | $20.00 |
| 119 | Traffic control signs fixed message (643.1000) | SF | 806 | $12.00 | $12.24 | $12.00 |
| 120 | Traffic control signs PCMS (643.1050) | DAY | 1,394 | $25.00 | $25.50 | $25.00 |
| 121 | Basic traffic queue warning system (643.1205.S) | DAY | 262 | $125.00 | $127.50 | $125.00 |
| 122 | Connected work zone start and end location markers (643.1220.S) | DAY | 385 | $18.00 | $18.36 | $18.00 |
| 123 | Temporary marking line epoxy 4- inch (643.3120) | LF | 200 | $1.00 | $2.04 | $1.00 |
| 124 | Temporary marking line epoxy 6- inch (643.3170) | LF | 553,250 | $0.72 | $0.77 | $0.72 |
| 125 | Temporary marking line epoxy 10- inch (643.3270) | LF | 117,360 | $1.05 | $1.04 | $1.05 |
| 126 | Traffic control interim lane closure (643.4100) | EACH | 655 | $300.00 | $306.00 | $300.00 |
| 127 | Traffic control (643.5000) | EACH | 1 | $763,749 | $779,024 | $763,749 |
| 128 | Temporary pedestrian surface plate (644.1430) | SF | 640 | $22.00 | $22.44 | $10.00 |
| 129 | Temporary pedestrian curb ramp (644.1601) | DAY | 44 | $6.00 | $6.12 | $30.00 |
| 130 | Temporary pedestrian detectable warning field (644.1605) | SF | 24 | $6.00 | $6.12 | $100.00 |
| 131 | Temporary pedestrian barricade (644.1810) | LF | 542 | $4.00 | $4.08 | $4.00 |
| 132 | Temporary audible message devices (644.1900.S) | DAY | 286 | $3.50 | $3.57 | $3.50 |
| 133 | Geotextile type R (645.0130) | SY | 3,491 | $4.60 | $14.64 | $6.00 |
| 134 | Marking line grooved permanent tape 4-inch (646.1050) | LF | 100 | $6.00 | $8.16 | $8.00 |
| 135 | Marking line epoxy 6-inch (646.2020) | LF | 68,916 | $0.74 | $0.61 | $0.60 |
| 136 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 42,037 | $0.75 | $0.77 | $0.75 |
| 137 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 165,434 | $1.31 | $1.79 | $1.75 |
| 138 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 42,179 | $8.20 | $9.18 | $9.00 |
| 139 | Marking line epoxy 8-inch (646.3020) | LF | 152 | $0.95 | $1.22 | $1.20 |
| 140 | Marking line epoxy 10-inch (646.4020) | LF | 7,044 | $1.25 | $1.33 | $1.30 |
| 141 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 5,800 | $1.25 | $1.17 | $1.15 |
| 142 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 42,342 | $2.15 | $2.24 | $2.20 |
| 143 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 7,238 | $14.00 | $15.81 | $15.50 |
| 144 | Marking arrow epoxy (646.5020) | EACH | 83 | $250.00 | $285.60 | $280.00 |
| 145 | Marking word epoxy (646.5120) | EACH | 44 | $300.00 | $306.00 | $300.00 |
| 146 | Marking symbol epoxy (646.5220) | EACH | 8 | $350.00 | $331.50 | $325.00 |
| 147 | Marking stop line epoxy 18-inch (646.6120) | LF | 739 | $14.00 | $14.28 | $14.00 |
| 148 | Marking yield line epoxy 18-inch (646.6220) | EACH | 9 | $13.00 | $178.50 | $175.00 |
| 149 | Cold weather marking epoxy 4-inch (646.6464) | LF | 100 | $0.52 | $3.57 | $3.50 |
| 150 | Cold weather marking epoxy 6-inch (646.6466) | LF | 64,006 | $0.70 | $0.82 | $0.80 |
| 151 | Cold weather marking epoxy 10- inch (646.6470) | LF | 12,896 | $1.30 | $1.22 | $1.20 |
| 152 | Marking diagonal epoxy 12-inch (646.7120) | LF | 20,858 | $10.00 | $5.61 | $5.50 |
| 153 | Marking chevron epoxy 24-inch (646.7220) | LF | 8,113 | $15.00 | $7.14 | $7.00 |
| 154 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,685 | $9.00 | $12.24 | $12.00 |
| 155 | Marking curb epoxy (646.8120) | LF | 20 | $10.00 | $17.34 | $17.00 |
| 156 | Marking island nose epoxy (646.8220) | EACH | 2 | $300.00 | $326.40 | $320.00 |
| 157 | Marking parking stall epoxy (646.8320) | LF | 9,466 | $3.00 | $4.08 | $4.00 |
| 158 | Marking removal line grooved contrast permanent tape 10-inch (646.9165) | LF | 511 | $5.00 | $5.10 | $3.00 |
| 159 | Marking removal line wide (646.9200) | LF | 340 | $3.00 | $3.06 | $3.00 |
| 160 | Conduit rigid metallic 1-inch (652.0110) | LF | 35 | $60.68 | $61.89 | $60.68 |
| 161 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 35 | $28.23 | $28.79 | $28.23 |
| 162 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 62 | $28.86 | $29.44 | $28.86 |
| 163 | Install conduit into existing item (652.0700.S) | EACH | 2 | $1,255.21 | $1,280.32 | $1,255.21 |
| 164 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 55 | $1.36 | $1.39 | $1.36 |
| 165 | Field system integrator (670.0101) | EACH | 1 | $22,301 | $22,747 | $22,301 |
| 166 | ITS documentation (670.0201) | EACH | 1 | $6,700.92 | $6,834.94 | $6,700.92 |
| 167 | Install camera pole 50-FT (677.0150) | EACH | 1 | $4,390.86 | $4,478.68 | $4,390.86 |
| 168 | Install camera assembly (677.0200) | EACH | 2 | $3,208.53 | $3,272.70 | $3,208.53 |
| 169 | Sawing asphalt (690.0150) | LF | 1,000 | $2.00 | $7.14 | $1.55 |
| 170 | Sawing concrete (690.0250) | LF | 49,271 | $2.55 | $7.14 | $2.55 |
| 171 | Incentive strength concrete barrier (715.0603) | DOL | 426.50 | $1.00 | $1.00 | $1.00 |
| 172 | Incentive iri ride (740.0440) | DOL | 116,000 | $1.00 | $1.00 | $1.00 |
| 173 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 7,000 | $5.00 | $5.00 | $5.00 |
| 174 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 17,280 | $5.00 | $5.00 | $5.00 |
| 175 | Special 01. fertilizer type B, special (SPV.0030) | CWT | 3.47 | $140.00 | $91.80 | $125.00 |
| 176 | Special 01. gabions (SPV.0035) | CY | 11 | $900.00 | $1,224.00 | $1,000.00 |
| 177 | Special 05. mobilizations emergency pavement repair (SPV.0060) | EACH | 8 | $3,500.00 | $3,019.47 | $1,200.00 |
| 178 | Special 06. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 386 | $200.00 | $204.00 | $200.00 |
| 179 | Special 07. traffic control close- open freeway to freeway system ramp (SPV.0060) | EACH | 198 | $850.00 | $867.00 | $850.00 |
| 180 | Special 08. traffic control full freeway closure (SPV.0060) | EACH | 121 | $850.00 | $867.00 | $850.00 |
| 181 | Special 10. traffic control local road lane closures (SPV.0060) | EACH | 10 | $250.00 | $255.00 | $250.00 |
| 182 | Special 11. survey project 1030-43- 71 (SPV.0060) | EACH | 1 | $71,618 | $73,050 | $71,618 |
| 183 | Special 13. survey project 1030-43- 72 (SPV.0060) | EACH | 1 | $71,620 | $73,051 | $71,620 |
| 184 | Special 21. remove ground mount DMS (SPV.0060) | EACH | 1 | $4,583.33 | $4,675.00 | $4,583.33 |
| 185 | Special 22. install ground mount DMS (SPV.0060) | EACH | 1 | $8,332.69 | $8,499.34 | $8,332.69 |
| 186 | Special 23. ground rod (SPV.0060) | EACH | 1 | $298.82 | $304.80 | $298.82 |
| 187 | Special 24. emergency response to traffic involving crash cushion (SPV.0060) | EACH | 10 | $1,200.00 | $1,224.00 | $1,200.00 |
| 188 | Special 25. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 10 | $2,500.00 | $1,224.00 | $1,200.00 |
| 189 | Special 41. anchor slab repair at inlet (SPV.0060) | EACH | 11 | $900.00 | $1,632.00 | $7,500.00 |
| 190 | Special 42. precast concrete wall panel repair R-40-382 (SPV.0060) | EACH | 1 | $4,000.00 | $7,650.00 | $5,000.00 |
| 191 | Special 43. precast concrete wall panel repair R-40-417 (SPV.0060) | EACH | 1 | $8,000.00 | $7,650.00 | $5,000.00 |
| 192 | Special 44. precast concrete wall panel repair R-40-439 (SPV.0060) | EACH | 1 | $4,000.00 | $7,650.00 | $5,000.00 |
| 193 | Special 01. pavement cleanup (SPV.0075) | HRS | 200 | $175.00 | $255.00 | $300.00 |
| 194 | Special 01. foam-jacking (SPV.0085) | LB | 18,477 | $4.90 | $5.10 | $5.00 |
| 195 | Special 02. sealing cracks and joints with hot applied sealant (SPV.0085) | LB | 1,667 | $6.00 | $14.15 | $10.00 |
| 196 | Special 01. marking line permanent tape 6-inch (SPV.0090) | LF | 96 | $7.50 | $15.30 | $15.00 |
| 197 | Special 02. sealing parapet joint (SPV.0090) | LF | 173 | $9.00 | $17.34 | $95.00 |
| 198 | Special 05. marking line wet reflective epoxy 10-inch (SPV.0090) | LF | 4,545 | $2.00 | $2.04 | $1.98 |
| 199 | Special 06. clean and reseal joint (SPV.0090) | LF | 1,403 | $9.00 | $9.18 | $9.00 |
| 200 | Special 07. linear delineation system (SPV.0090) | LF | 65 | $45.00 | $35.70 | $200.00 |
| 201 | Special 08. concrete barrier dual pan 32-inch (SPV.0090) | LF | 75 | $200.00 | $408.00 | $200.00 |
| 202 | Special 09. concrete barrier 42-inch vertical back (SPV.0090) | LF | 65 | $180.00 | $408.00 | $180.00 |
| 203 | Special 10. concrete curb and gutter 4-inch sloped 60-inch type A (SPV.0090) | LF | 16 | $75.00 | $255.00 | $100.00 |
| 204 | Special 41. sealing precast concrete wall facing unit joint (SPV.0090) | LF | 460 | $20.00 | $17.34 | $45.00 |
| 205 | Special 01. field office (SPV.0135) | MON | 18 | $3,500.00 | $3,071.10 | $6,000.00 |
| 206 | Special 01. tied concrete block mat with doubled layered underlayment (SPV.0165) | SF | 1,700 | $15.00 | $23.46 | $0.75 |
| 207 | Special 41. anchor slab surface repair (SPV.0165) | SF | 84 | $41.00 | $306.00 | $160.00 |
| 208 | Special 42. concrete restaining (SPV.0165) | SF | 2,233 | $2.94 | $3.06 | $15.00 |
| 209 | Special 01. resin binder high friction surface treatment (SPV.0180) | SY | 73,478 | $20.00 | $20.61 | $20.00 |
| 210 | Special 02. expansion joint repair rapid set (SPV.0180) | SY | 786 | $264.00 | $408.00 | $750.00 |
| 211 | Special 03. concrete pavement approach slab repair rapid set (SPV.0180) | SY | 838 | $269.63 | $408.00 | $1,000.00 |
| 212 | Special 04. removing high friction surface treatment (SPV.0180) | SY | 2,190 | $5.87 | $9.97 | $9.77 |
| 213 | Special 05. asphalt wedge (SPV.0180) | SY | 209 | $252.86 | $256.75 | $252.86 |
| 214 | Special 07. concrete pavement repair rapid set (SPV.0180) | SY | 98 | $264.00 | $408.00 | $1,000.00 |
| 215 | Special 01. joint and crack repair (SPV.0195) | TON | 800 | $340.36 | $238.27 | $340.36 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 8, 2025. Compiled by Mirage Metrics.