WisDOT contract 20250708005 bid tabulation
4050-27-71. Let by Wisconsin DOT on July 8, 2025, Calumet. 2 bids received; low bid $4,210,940 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 08 JUL 2025
- Pay items
- 168
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $4,210,940 | Low |
| 2 | Vinton Construction Company | $4,502,861 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Vinton Construction Company |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 17 | $1,500.00 | $500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 3 | $500.00 | $435.00 |
| 3 | Removing structure (structure) 01. C-08-0065 (203.0220) | EACH | 1 | $65,000 | $5,000.00 |
| 4 | Removing structure (structure) 02. C-08-3302 (203.0220) | EACH | 1 | $68,000 | $18,000 |
| 5 | Removing structure (structure) 03. C-08-3993 (203.0220) | EACH | 1 | $30,000 | $19,500 |
| 6 | Removing structure (structure) 04. C-08-3271 (203.0220) | EACH | 1 | $30,000 | $19,500 |
| 7 | Removing structure (structure) 05. C-08-3997 (203.0220) | EACH | 1 | $27,000 | $19,500 |
| 8 | Removing structure (structure) 06. C-08-3267 (203.0220) | EACH | 1 | $27,000 | $12,000 |
| 9 | Removing structure (structure) 07. 8'X2.5' 3-sided rigid frame sta 523+32 (203.0220) | EACH | 1 | $7,500.00 | $16,000 |
| 10 | Removing structure (structure) 08. 3'X2.5' box culvert sta 520+44 (203.0220) | EACH | 1 | $6,500.00 | $10,400 |
| 11 | Removing concrete pavement (204.0100) | SY | 1,905 | $9.00 | $3.00 |
| 12 | Removing curb & gutter (204.0150) | LF | 430 | $6.00 | $6.50 |
| 13 | Removing concrete sidewalk (204.0155) | SY | 265 | $6.00 | $10.06 |
| 14 | Removing guardrail (204.0165) | LF | 2,495 | $3.00 | $2.00 |
| 15 | Excavation common (205.0100) | CY | 5,563 | $17.00 | $29.12 |
| 16 | Excavation for structures bridges (structure) 01. B-08-121 (206.1001) | EACH | 1 | $25,750 | $40,500 |
| 17 | Excavation for structures culverts (structure) 01. C-08-0089 (206.2001) | EACH | 1 | $60,850 | $193,000 |
| 18 | Excavation for structures culverts (structure) 02. C-08-83 (206.2001) | EACH | 1 | $36,756 | $58,000 |
| 19 | Excavation for structures culverts (structure) 03. C-08-84 (206.2001) | EACH | 1 | $40,644 | $61,000 |
| 20 | Excavation for structures culverts (structure) 04. C-08-85 (206.2001) | EACH | 1 | $50,783 | $53,000 |
| 21 | Excavation for structures culverts (structure) 05. C-08-86 (206.2001) | EACH | 1 | $42,850 | $106,000 |
| 22 | Excavation for structures culverts (structure) 06. C-08-87 (206.2001) | EACH | 1 | $60,000 | $68,000 |
| 23 | Borrow (208.0100) | CY | 766 | $15.00 | $0.01 |
| 24 | Backfill structure type A (210.1500) | TON | 340 | $28.00 | $30.92 |
| 25 | Backfill structure type B (210.2500) | TON | 8,588 | $26.00 | $27.55 |
| 26 | Finishing roadway (project) 01. 4050-28-71 (213.0100) | EACH | 1 | $1,500.00 | $4,000.00 |
| 27 | Finishing roadway (project) 02. 4050-27-71 (213.0100) | EACH | 1 | $1,500.00 | $4,000.00 |
| 28 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,201 | $32.00 | $59.00 |
| 29 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,070 | $22.00 | $22.75 |
| 30 | Breaker run (311.0110) | TON | 1,136 | $26.00 | $21.75 |
| 31 | Concrete pavement approach slab (415.0410) | SY | 134 | $205.00 | $205.00 |
| 32 | Drilled tie bars (416.0610) | EACH | 39 | $10.00 | $10.00 |
| 33 | HMA cold weather paving (450.4000) | TON | 455 | $5.00 | $5.00 |
| 34 | Tack coat (455.0605) | GAL | 225 | $5.00 | $5.00 |
| 35 | Incentive density HMA pavement (460.2000) | DOL | 1,400 | $1.00 | $1.00 |
| 36 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 990 | $155.00 | $155.00 |
| 37 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 410 | $174.00 | $174.00 |
| 38 | Asphaltic surface driveways and field entrances (465.0120) | TON | 41 | $211.00 | $211.00 |
| 39 | Asphaltic flumes (465.0315) | SY | 7 | $150.00 | $150.00 |
| 40 | Asphaltic rumble strips, shoulder (465.0520) | LF | 848 | $3.00 | $3.00 |
| 41 | Asphaltic rumble strips, centerline (465.0560) | LF | 193 | $3.00 | $3.00 |
| 42 | Concrete masonry bridges (502.0100) | CY | 211 | $1,055.00 | $1,200.00 |
| 43 | Protective surface treatment (502.3200) | SY | 210 | $2.00 | $5.10 |
| 44 | Pigmented surface sealer (502.3210) | SY | 28 | $5.00 | $17.00 |
| 45 | Concrete masonry culverts (504.0100) | CY | 964 | $1,055.00 | $799.00 |
| 46 | Bar steel reinforcement HS structures (505.0400) | LB | 113,070 | $1.14 | $1.17 |
| 47 | Bar steel reinforcement HS coated structures (505.0600) | LB | 84,360 | $1.14 | $1.17 |
| 48 | Temporary shoring (structure) 01. C-08-87 (511.1200) | SF | 1,062 | $30.00 | $49.00 |
| 49 | Railing tubular screening (513.4091) | LF | 102 | $345.75 | $487.00 |
| 50 | Railing steel type C6 (513.7031) | LF | 68 | $225.00 | $390.00 |
| 51 | Rubberized membrane waterproofing (516.0500) | SY | 187 | $25.00 | $62.00 |
| 52 | Sheet membrane waterproofing for buried structures (516.0610.S) | SY | 233 | $25.00 | $60.50 |
| 53 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 3 | $395.00 | $551.67 |
| 54 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 1 | $540.00 | $717.00 |
| 55 | Culvert pipe temporary 18-inch (520.2018) | LF | 42 | $75.00 | $85.06 |
| 56 | Culvert pipe class III-A 18-inch (520.3318) | LF | 76 | $70.00 | $79.40 |
| 57 | Culvert pipe class III-A 24-inch (520.3324) | LF | 120 | $90.00 | $87.85 |
| 58 | Concrete collars for pipe (520.8000) | EACH | 3 | $950.00 | $700.00 |
| 59 | Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524) | EACH | 1 | $2,350.00 | $2,236.50 |
| 60 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $1,500.00 | $1,606.00 |
| 61 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 90 | $236.00 | $218.87 |
| 62 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $3,250.00 | $2,385.00 |
| 63 | Pre-boring rock or consolidated materials (550.0020) | LF | 26 | $250.00 | $86.00 |
| 64 | Pile points (550.0500) | EACH | 22 | $150.00 | $110.00 |
| 65 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 660 | $42.15 | $23.00 |
| 66 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 60 | $60.00 | $60.00 |
| 67 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 387 | $60.00 | $60.00 |
| 68 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 64 | $62.00 | $62.00 |
| 69 | Concrete sidewalk 4-inch (602.0405) | SF | 2,400 | $9.70 | $10.20 |
| 70 | Concrete driveway 6-inch (602.0810) | SY | 59 | $96.00 | $98.00 |
| 71 | Concrete driveway 8-inch (602.0820) | SY | 53 | $103.65 | $106.00 |
| 72 | Riprap medium (606.0200) | CY | 1,190 | $95.00 | $87.70 |
| 73 | Riprap heavy (606.0300) | CY | 516 | $95.00 | $93.70 |
| 74 | Riprap extra-heavy (606.0400) | CY | 194 | $95.00 | $102.00 |
| 75 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 238 | $108.00 | $136.62 |
| 76 | Manhole covers type J (611.0530) | EACH | 2 | $800.00 | $517.00 |
| 77 | Inlet covers type H (611.0624) | EACH | 4 | $1,000.00 | $742.00 |
| 78 | Inlet covers type H-S (611.0639) | EACH | 4 | $1,000.00 | $742.00 |
| 79 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $3,000.00 | $4,409.00 |
| 80 | Inlets 2X3-FT (611.3230) | EACH | 6 | $2,500.00 | $2,914.83 |
| 81 | Pipe grates (size) 01. 18-inch (611.9850.S) | EACH | 2 | $1,600.00 | $1,150.00 |
| 82 | Pipe grates (size) 02. 24X38-inch (611.9850.S) | EACH | 2 | $2,900.00 | $2,250.00 |
| 83 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 36 | $14.00 | $23.75 |
| 84 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 210 | $15.00 | $21.74 |
| 85 | Drain tile exploration (612.0700) | LF | 60 | $10.00 | $15.83 |
| 86 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 170 | $45.00 | $23.65 |
| 87 | MGS guardrail 3 (614.2300) | LF | 1,742.50 | $29.00 | $29.00 |
| 88 | MGS guardrail short radius (614.2350) | LF | 12.50 | $50.00 | $35.00 |
| 89 | MGS guardrail terminal eat (614.2610) | EACH | 7 | $4,800.00 | $3,950.00 |
| 90 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $3,200.00 | $2,500.00 |
| 91 | Maintenance and repair of haul roads (project) 01. 4050-28-71 (618.0100) | EACH | 1 | $500.00 | $0.01 |
| 92 | Maintenance and repair of haul roads (project) 02. 4050-27-71 (618.0100) | EACH | 1 | $500.00 | $0.01 |
| 93 | Mobilization (619.1000) | EACH | 1 | $365,355 | $645,000 |
| 94 | Water (624.0100) | MGAL | 73 | $50.00 | $50.00 |
| 95 | Topsoil (625.0100) | SY | 11,560 | $6.00 | $7.25 |
| 96 | Mulching (627.0200) | SY | 1,445 | $1.00 | $0.45 |
| 97 | Silt fence (628.1504) | LF | 3,230 | $2.50 | $2.00 |
| 98 | Silt fence maintenance (628.1520) | LF | 5,660 | $0.01 | $0.01 |
| 99 | Mobilizations erosion control (628.1905) | EACH | 26 | $1.00 | $1.00 |
| 100 | Mobilizations emergency erosion control (628.1910) | EACH | 13 | $1.00 | $1.00 |
| 101 | Erosion mat urban class I type B (628.2008) | SY | 11,290 | $1.95 | $1.75 |
| 102 | Erosion mat class II type C (628.2027) | SY | 270 | $7.00 | $3.95 |
| 103 | Turbidity barriers (628.6005) | SY | 340 | $60.00 | $52.00 |
| 104 | Inlet protection type C (628.7015) | EACH | 10 | $100.00 | $65.00 |
| 105 | Temporary ditch checks (628.7504) | LF | 165 | $10.00 | $9.25 |
| 106 | Culvert pipe checks (628.7555) | EACH | 18 | $15.00 | $17.00 |
| 107 | Rock bags (628.7570) | EACH | 1,030 | $15.00 | $17.00 |
| 108 | Fertilizer type B (629.0210) | CWT | 4.10 | $150.00 | $90.00 |
| 109 | Seeding mixture no. 30 (630.0130) | LB | 579 | $8.00 | $8.15 |
| 110 | Seeding mixture no. 40 (630.0140) | LB | 64 | $10.00 | $14.00 |
| 111 | Seeding temporary (630.0200) | LB | 39 | $8.00 | $5.00 |
| 112 | Seed water (630.0500) | MGAL | 326 | $10.00 | $10.00 |
| 113 | Markers culvert end (633.5200) | EACH | 10 | $85.00 | $65.00 |
| 114 | Moving signs type II (638.2102) | EACH | 8 | $200.00 | $175.00 |
| 115 | Moving small sign supports (638.4000) | EACH | 9 | $50.00 | $150.00 |
| 116 | Field office type B (642.5001) | EACH | 1 | $5,000.00 | $15,000 |
| 117 | Traffic control drums (643.0300) | DAY | 4,440 | $0.67 | $0.67 |
| 118 | Traffic control barricades type III (643.0420) | DAY | 7,412 | $0.68 | $0.68 |
| 119 | Traffic control warning lights type A (643.0705) | DAY | 13,284 | $0.20 | $0.20 |
| 120 | Traffic control signs (643.0900) | DAY | 37,814 | $0.26 | $0.26 |
| 121 | Traffic control covering signs type II (643.0920) | EACH | 18 | $92.52 | $92.52 |
| 122 | Traffic control signs fixed message (643.1000) | SF | 127 | $25.00 | $25.00 |
| 123 | Traffic control signs PCMS (643.1050) | DAY | 42 | $74.07 | $74.07 |
| 124 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 311 | $3.29 | $3.29 |
| 125 | Traffic control (643.5000) | EACH | 1 | $12,000 | $12,000 |
| 126 | Temporary pedestrian surface asphalt (644.1410) | SF | 513 | $17.50 | $10.00 |
| 127 | Temporary pedestrian surface plate (644.1430) | SF | 85 | $20.55 | $10.00 |
| 128 | Temporary pedestrian curb ramp (644.1601) | DAY | 240 | $16.38 | $16.38 |
| 129 | Temporary pedestrian detectable warning field (644.1605) | SF | 64 | $26.29 | $26.29 |
| 130 | Temporary pedestrian barricade (644.1810) | LF | 1,758 | $5.00 | $5.00 |
| 131 | Geotextile type C (645.0105) | SY | 1,944 | $6.00 | $3.50 |
| 132 | Geotextile type DF schedule A (645.0111) | SY | 162 | $6.00 | $5.00 |
| 133 | Geotextile type HR (645.0120) | SY | 4,209 | $6.00 | $3.50 |
| 134 | Marking line epoxy 4-inch (646.1020) | LF | 3,498 | $3.00 | $1.60 |
| 135 | Marking line epoxy 6-inch (646.2020) | LF | 557 | $3.25 | $3.50 |
| 136 | Marking stop line epoxy 18-inch (646.6120) | LF | 12 | $60.00 | $55.00 |
| 137 | Cold weather marking epoxy 4-inch (646.6464) | LF | 3,498 | $1.50 | $1.60 |
| 138 | Cold weather marking epoxy 6-inch (646.6466) | LF | 557 | $1.60 | $3.50 |
| 139 | Construction staking storm sewer (650.4000) | EACH | 11 | $42.55 | $42.55 |
| 140 | Construction staking subgrade (650.4500) | LF | 785 | $0.01 | $0.01 |
| 141 | Construction staking base (650.5000) | LF | 785 | $1.29 | $1.29 |
| 142 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 451 | $1.20 | $1.20 |
| 143 | Construction staking pipe culverts (650.6000) | EACH | 1 | $149.27 | $149.27 |
| 144 | Construction staking structure layout (structure) 01. C-08-0089 (650.6501) | EACH | 1 | $2,750.00 | $2,750.00 |
| 145 | Construction staking structure layout (structure) 02. B-08-121 (650.6501) | EACH | 1 | $4,800.00 | $4,800.00 |
| 146 | Construction staking structure layout (structure) 03. C-08-83 (650.6501) | EACH | 1 | $2,750.00 | $2,750.00 |
| 147 | Construction staking structure layout (structure) 04. C-08-84 (650.6501) | EACH | 1 | $2,750.00 | $2,750.00 |
| 148 | Construction staking structure layout (structure) 05. C-08-85 (650.6501) | EACH | 1 | $2,750.00 | $2,750.00 |
| 149 | Construction staking structure layout (structure) 06. C-08-86 (650.6501) | EACH | 1 | $2,750.00 | $2,750.00 |
| 150 | Construction staking structure layout (structure) 07. C-08-87 (650.6501) | EACH | 1 | $4,250.00 | $4,250.00 |
| 151 | Construction staking sidewalk (project) 01. 4050-27-71 (650.9500) | EACH | 1 | $576.00 | $576.00 |
| 152 | Construction staking supplemental control (project) 01. 4050-28-71 (650.9911) | EACH | 1 | $733.96 | $733.96 |
| 153 | Construction staking supplemental control (project) 02. 4050-27-71 (650.9911) | EACH | 1 | $733.96 | $733.96 |
| 154 | Construction staking slope stakes (650.9920) | LF | 3,041 | $0.87 | $0.87 |
| 155 | Sawing asphalt (690.0150) | LF | 1,446 | $1.75 | $1.75 |
| 156 | Sawing concrete (690.0250) | LF | 486 | $2.35 | $2.35 |
| 157 | Incentive strength concrete structures (715.0502) | DOL | 7,056 | $1.00 | $1.00 |
| 158 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 159 | Seismograph (project) 01. 4050-27- 71 (999.1001.S) | EACH | 1 | $4,850.00 | $4,000.00 |
| 160 | Crack and damage survey (999.1501.S) | EACH | 1 | $1,200.00 | $1,350.00 |
| 161 | Installing and maintaining bird deterrent system (station) 01. station 479+71 (999.2000.S) | EACH | 1 | $500.00 | $1,700.00 |
| 162 | Installing and maintaining bird deterrent system (station) 02. station 501+47 (999.2000.S) | EACH | 1 | $500.00 | $2,300.00 |
| 163 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,320 | $5.00 | $5.00 |
| 164 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 |
| 165 | Special 01. pipe underdrain cleanout (SPV.0060) | EACH | 1 | $1,250.00 | $585.00 |
| 166 | Special 01. storm sewer pipe PVC 4-inch (SPV.0090) | LF | 65 | $40.00 | $30.73 |
| 167 | Special 01. corrugated surface treatment (SPV.0165) | SF | 708 | $3.50 | $6.00 |
| 168 | Special 01. excavation, hauling, and disposal of lead contaminated soil (SPV.0195) | TON | 246 | $80.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 8, 2025. Compiled by Mirage Metrics.