WisDOT contract 20250708006 bid tabulation
W Wisconsin Ave, T of Grand Chute; Casaloma Drive - N Badger Avenue (STH 096, Outagamie County W Wisconsin Ave, T Grand Chute). Let by Wisconsin DOT on July 8, 2025, Outagamie. 3 bids received; low bid $7,375,054 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 JUL 2025
- Pay items
- 257
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $7,375,054 | Low |
| 2 | Vinton Construction Company | $7,691,225 | +4.0% |
| 3 | Michels Road & Stone, Inc. | $7,862,896 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Vinton Construction Company | 3. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 2 | $1,000.00 | $440.00 | $500.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 1,960 | $18.00 | $0.01 | $9.81 |
| 3 | Removing concrete pavement butt joints (204.0105) | SY | 177 | $17.25 | $17.25 | $17.25 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 147 | $17.25 | $17.25 | $17.25 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 540 | $3.90 | $3.90 | $3.90 |
| 6 | Removing curb & gutter (204.0150) | LF | 2,995 | $10.00 | $14.85 | $25.68 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 1,066 | $10.00 | $18.00 | $16.60 |
| 8 | Removing guardrail (204.0165) | LF | 210 | $6.00 | $6.00 | $6.00 |
| 9 | Removing fence (204.0170) | LF | 8 | $25.00 | $25.00 | $40.00 |
| 10 | Removing surface drains (204.0190) | EACH | 1 | $1,000.00 | $500.00 | $500.00 |
| 11 | Removing concrete bases (204.0195) | EACH | 12 | $300.00 | $200.00 | $200.00 |
| 12 | Removing manholes (204.0210) | EACH | 1 | $1,000.00 | $590.00 | $950.00 |
| 13 | Removing inlets (204.0220) | EACH | 14 | $850.00 | $401.43 | $500.00 |
| 14 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 411 | $30.00 | $13.48 | $10.00 |
| 15 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 101 | $30.00 | $13.51 | $10.00 |
| 16 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 32 | $45.00 | $21.09 | $20.00 |
| 17 | Removing storm sewer (size) 05. 36-inch (204.0245) | LF | 16 | $55.00 | $28.91 | $30.00 |
| 18 | Removing storm sewer (size) 06. 19X30-inch (204.0245) | LF | 169 | $35.00 | $30.47 | $10.00 |
| 19 | Removing ancillary structure (structure) 01. S-44-1 (204.0246) | EACH | 1 | $15,000 | $12,000 | $10,500 |
| 20 | Removing (item description) 01. removing buisness sign sta 205+00 (204.9060.S) | EACH | 1 | $7,200.00 | $2,500.00 | $2,500.00 |
| 21 | Removing (item description) 02. removing buisness light pole (204.9060.S) | EACH | 2 | $1,750.00 | $1,750.00 | $1,750.00 |
| 22 | Removing (item description) 03. removing business sign sta 201+90 (204.9060.S) | EACH | 1 | $7,200.00 | $3,500.00 | $3,500.00 |
| 23 | Excavation common (205.0100) | CY | 2,343 | $36.00 | $40.00 | $41.96 |
| 24 | Backfill granular grade 1 (209.1500) | TON | 2 | $100.00 | $150.00 | $500.00 |
| 25 | Prepare foundation for asphaltic paving (project) 01. 4075-40-71 (211.0101) | EACH | 1 | $18,500 | $18,500 | $18,500 |
| 26 | Finishing roadway (project) 01. 4075-40-71 (213.0100) | EACH | 1 | $1,000.00 | $5,000.00 | $5,000.00 |
| 27 | Obliterating old road (214.0100) | STA | 1 | $1,000.00 | $3,000.00 | $1,100.00 |
| 28 | Base aggregate dense 3/4-inch (305.0110) | TON | 900 | $30.00 | $37.00 | $51.33 |
| 29 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 645 | $30.00 | $25.50 | $45.42 |
| 30 | Shaping shoulders (305.0500) | STA | 16 | $200.00 | $150.00 | $125.00 |
| 31 | Base aggregate open-graded (310.0110) | TON | 69 | $75.00 | $38.60 | $55.00 |
| 32 | Breaker run (311.0110) | TON | 67 | $75.00 | $33.41 | $104.57 |
| 33 | Select crushed material (312.0110) | TON | 334 | $30.00 | $21.50 | $51.33 |
| 34 | Concrete base 8 1/2-inch (320.0150) | SY | 80 | $160.00 | $96.98 | $142.77 |
| 35 | Removing pavement for base patching (390.0100) | CY | 2,805 | $50.00 | $0.01 | $114.65 |
| 36 | Base patching concrete shes (390.0405) | CY | 2,805 | $375.00 | $520.48 | $310.88 |
| 37 | Concrete pavement 9-inch (415.0090) | SY | 4 | $160.00 | $125.00 | $1,006.66 |
| 38 | Drilled tie bars (416.0610) | EACH | 2,198 | $15.00 | $10.00 | $24.24 |
| 39 | Drilled dowel bars (416.0620) | EACH | 12,178 | $15.00 | $17.80 | $15.71 |
| 40 | Concrete pavement repair shes (416.1715) | SY | 618 | $160.00 | $146.00 | $130.58 |
| 41 | Concrete pavement replacement shes (416.1725) | SY | 519 | $160.00 | $149.00 | $152.22 |
| 42 | HMA cold weather paving (450.4000) | TON | 2,648 | $3.90 | $3.90 | $3.90 |
| 43 | Tack coat (455.0605) | GAL | 9,926 | $3.25 | $3.25 | $3.25 |
| 44 | Incentive density HMA pavement (460.2000) | DOL | 1,470 | $1.00 | $1.00 | $1.00 |
| 45 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 10,780 | $98.15 | $98.15 | $98.15 |
| 46 | Asphaltic surface (465.0105) | TON | 95 | $225.00 | $225.00 | $225.00 |
| 47 | Asphaltic surface driveways and field entrances (465.0120) | TON | 126 | $225.00 | $225.00 | $225.00 |
| 48 | Asphaltic surface temporary (465.0125) | TON | 442 | $185.00 | $185.00 | $185.00 |
| 49 | Structure repainting recycled abrasive (structure) 01. B-44-0157 (517.1801.S) | EACH | 1 | $240,000 | $230,000 | $286,860 |
| 50 | Structure repainting recycled abrasive (structure) 02. B-44-0158 (517.1801.S) | EACH | 1 | $240,000 | $230,000 | $286,860 |
| 51 | Negative pressure containment and collection of waste materials (structure) 01. B-44-0157 (517.4501.S) | EACH | 1 | $160,000 | $150,000 | $122,940 |
| 52 | Negative pressure containment and collection of waste materials (structure) 02. B-44-0158 (517.4501.S) | EACH | 1 | $160,000 | $150,000 | $122,940 |
| 53 | Portable decontamination facility (517.6001.S) | EACH | 2 | $1,000.00 | $1,000.00 | $500.00 |
| 54 | Concrete collars for pipe (520.8000) | EACH | 43 | $500.00 | $1,302.33 | $850.00 |
| 55 | Apron endwalls for culvert pipe steel 15-inch (521.1015) | EACH | 1 | $1,000.00 | $472.00 | $420.00 |
| 56 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 1 | $1,000.00 | $1,069.00 | $800.00 |
| 57 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $1,200.00 | $1,373.00 | $1,860.00 |
| 58 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $2,000.00 | $1,985.00 | $2,330.00 |
| 59 | Concrete curb type A (601.0105) | LF | 38 | $60.00 | $60.00 | $60.00 |
| 60 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 508 | $60.00 | $59.50 | $62.50 |
| 61 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 90 | $60.00 | $58.00 | $62.00 |
| 62 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 2,414 | $60.00 | $60.00 | $65.00 |
| 63 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 393 | $60.00 | $59.00 | $65.00 |
| 64 | Concrete curb pedestrian (601.0600) | LF | 171 | $70.00 | $45.00 | $45.00 |
| 65 | Concrete sidewalk 4-inch (602.0405) | SF | 35,865 | $8.33 | $7.35 | $7.25 |
| 66 | Concrete sidewalk 6-inch (602.0415) | SF | 7,930 | $9.33 | $9.30 | $9.50 |
| 67 | Curb ramp detectable warning field natural patina (602.0515) | SF | 460 | $35.00 | $35.00 | $35.00 |
| 68 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 402 | $35.00 | $55.00 | $55.00 |
| 69 | Concrete driveway 8-inch (602.0820) | SY | 437 | $100.00 | $87.80 | $90.00 |
| 70 | Concrete driveway hes 8-inch (602.0870) | SY | 100 | $120.00 | $93.10 | $95.50 |
| 71 | Concrete barrier temporary precast delivered (603.8000) | LF | 1,100 | $20.00 | $18.65 | $22.00 |
| 72 | Concrete barrier temporary precast installed (603.8125) | LF | 1,425 | $5.00 | $3.00 | $5.00 |
| 73 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 244 | $140.00 | $117.01 | $133.50 |
| 74 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 101 | $140.00 | $159.92 | $164.00 |
| 75 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 40 | $150.00 | $241.86 | $218.50 |
| 76 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 16 | $225.00 | $385.66 | $410.50 |
| 77 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 309 | $135.00 | $117.12 | $143.00 |
| 78 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 169 | $400.00 | $244.23 | $311.50 |
| 79 | Storm sewer pipe composite 12- inch (608.6012) | LF | 4 | $250.00 | $159.00 | $114.00 |
| 80 | Storm sewer pipe composite 15- inch (608.6015) | LF | 15 | $200.00 | $80.83 | $126.00 |
| 81 | Reconstructing manholes (611.0420) | EACH | 1 | $2,750.00 | $2,900.00 | $2,250.00 |
| 82 | Reconstructing inlets (611.0430) | EACH | 12 | $1,750.00 | $675.00 | $2,250.00 |
| 83 | Manhole covers type J (611.0530) | EACH | 1 | $1,000.00 | $517.00 | $735.00 |
| 84 | Inlet covers type C (611.0612) | EACH | 1 | $1,000.00 | $540.00 | $759.00 |
| 85 | Inlet covers type H (611.0624) | EACH | 2 | $1,000.00 | $742.00 | $969.00 |
| 86 | Inlet covers type H-S (611.0639) | EACH | 16 | $1,000.00 | $742.00 | $969.00 |
| 87 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $5,500.00 | $4,855.00 | $3,875.00 |
| 88 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $9,000.00 | $8,367.50 | $7,655.00 |
| 89 | Inlets 2X3-FT (611.3230) | EACH | 17 | $3,450.00 | $4,025.18 | $2,600.00 |
| 90 | Adjusting manhole covers (611.8110) | EACH | 18 | $1,000.00 | $547.22 | $1,050.00 |
| 91 | Adjusting inlet covers (611.8115) | EACH | 35 | $900.00 | $544.29 | $1,050.00 |
| 92 | Pipe underdrain 6-inch (612.0106) | LF | 10 | $200.00 | $36.75 | $65.00 |
| 93 | Crash cushions temporary (614.0905) | EACH | 2 | $5,200.00 | $5,200.00 | $5,500.00 |
| 94 | Fence chain link 5-FT (616.0205) | LF | 8 | $300.00 | $300.00 | $160.00 |
| 95 | Maintenance and repair of haul roads (project) 01. 4075-40-71 (618.0100) | EACH | 1 | $1.00 | $0.01 | $1.00 |
| 96 | Mobilization (619.1000) | EACH | 1 | $720,000 | $1,105,000 | $1,022,123 |
| 97 | Concrete median sloped nose (620.0300) | SF | 131 | $20.00 | $14.00 | $14.00 |
| 98 | Water (624.0100) | MGAL | 8.59 | $200.00 | $30.00 | $85.00 |
| 99 | Salvaged topsoil (625.0500) | SY | 8,900 | $6.00 | $1.50 | $10.00 |
| 100 | Mulching (627.0200) | SY | 2,170 | $0.50 | $0.50 | $2.25 |
| 101 | Silt fence (628.1504) | LF | 1,530 | $2.00 | $2.00 | $3.00 |
| 102 | Silt fence maintenance (628.1520) | LF | 1,530 | $0.01 | $0.01 | $0.01 |
| 103 | Mobilizations erosion control (628.1905) | EACH | 2 | $250.00 | $250.00 | $1.00 |
| 104 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $200.00 | $1.00 |
| 105 | Erosion mat class I type B (628.2004) | SY | 2,900 | $1.45 | $1.45 | $2.25 |
| 106 | Erosion mat urban class I type A (628.2006) | SY | 3,830 | $2.10 | $2.10 | $3.50 |
| 107 | Inlet protection type B (628.7010) | EACH | 4 | $70.00 | $70.00 | $55.00 |
| 108 | Inlet protection type C (628.7015) | EACH | 121 | $70.00 | $70.00 | $55.00 |
| 109 | Inlet protection type D (628.7020) | EACH | 69 | $130.00 | $130.00 | $125.00 |
| 110 | Temporary ditch checks (628.7504) | LF | 115 | $8.75 | $8.75 | $8.00 |
| 111 | Culvert pipe checks (628.7555) | EACH | 10 | $12.00 | $12.00 | $16.00 |
| 112 | Rock bags (628.7570) | EACH | 90 | $12.00 | $12.00 | $8.00 |
| 113 | Fertilizer type B (629.0210) | CWT | 5.59 | $110.00 | $110.00 | $150.00 |
| 114 | Seeding mixture no. 30 (630.0130) | LB | 130 | $8.00 | $8.00 | $9.00 |
| 115 | Seeding mixture no. 40 (630.0140) | LB | 272 | $8.00 | $8.00 | $9.00 |
| 116 | Seed water (630.0500) | MGAL | 1,383 | $5.00 | $5.00 | $0.01 |
| 117 | Markers culvert end (633.5200) | EACH | 5 | $65.00 | $65.00 | $85.00 |
| 118 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $88.00 | $88.00 | $125.00 |
| 119 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 20 | $88.00 | $88.00 | $130.00 |
| 120 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $90.00 | $90.00 | $135.00 |
| 121 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 5 | $96.00 | $96.00 | $140.00 |
| 122 | Signs type II reflective H (637.2210) | SF | 20 | $25.00 | $25.00 | $40.00 |
| 123 | Moving signs type II (638.2102) | EACH | 46 | $75.00 | $75.00 | $125.00 |
| 124 | Removing signs type II (638.2602) | EACH | 3 | $35.00 | $35.00 | $100.00 |
| 125 | Removing small sign supports (638.3000) | EACH | 32 | $35.00 | $35.00 | $50.00 |
| 126 | Traffic control drums (643.0300) | DAY | 141,330 | $0.14 | $0.14 | $0.20 |
| 127 | Traffic control barricades type III (643.0420) | DAY | 5,272 | $0.40 | $0.40 | $0.75 |
| 128 | Traffic control warning lights type A (643.0705) | DAY | 8,265 | $0.13 | $0.13 | $0.15 |
| 129 | Traffic control warning lights type C (643.0715) | DAY | 10,270 | $0.13 | $0.13 | $0.15 |
| 130 | Traffic control arrow boards (643.0800) | DAY | 215 | $10.00 | $10.00 | $20.00 |
| 131 | Connected arrow board (643.0810.S) | DAY | 530 | $20.00 | $20.00 | $25.00 |
| 132 | Traffic control signs (643.0900) | DAY | 20,520 | $0.45 | $0.45 | $0.35 |
| 133 | Traffic control covering signs type I (643.0910) | EACH | 2 | $250.00 | $250.00 | $500.00 |
| 134 | Traffic control covering signs type II (643.0920) | EACH | 23 | $25.00 | $25.00 | $50.00 |
| 135 | Traffic control signs fixed message (643.1000) | SF | 98 | $23.00 | $23.00 | $24.00 |
| 136 | Traffic control signs PCMS (643.1050) | DAY | 193 | $50.00 | $50.00 | $50.00 |
| 137 | Traffic control cones 42-inch (643.1070) | DAY | 4,680 | $0.25 | $0.25 | $1.00 |
| 138 | Connected work zone start and end location markers (643.1220.S) | DAY | 1,065 | $11.75 | $11.75 | $15.00 |
| 139 | Temporary marking line paint 6- inch (643.3165) | LF | 240 | $0.85 | $0.85 | $3.00 |
| 140 | Temporary marking line paint 10- inch (643.3265) | LF | 1,000 | $0.99 | $0.99 | $7.00 |
| 141 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 942 | $0.85 | $0.85 | $8.00 |
| 142 | Traffic control (643.5000) | EACH | 1 | $82,000 | $82,000 | $75,000 |
| 143 | Temporary pedestrian surface asphalt (644.1410) | SF | 920 | $10.00 | $10.00 | $10.00 |
| 144 | Temporary pedestrian surface plate (644.1430) | SF | 600 | $10.00 | $10.00 | $10.00 |
| 145 | Temporary pedestrian curb ramp (644.1601) | DAY | 301 | $1.00 | $6.00 | $20.00 |
| 146 | Temporary pedestrian detectable warning field (644.1605) | SF | 410 | $10.00 | $25.00 | $15.00 |
| 147 | Temporary pedestrian barricade (644.1810) | LF | 1,866 | $4.00 | $4.00 | $5.00 |
| 148 | Geotextile type DF schedule B (645.0112) | SY | 6 | $50.00 | $5.00 | $50.00 |
| 149 | Marking line epoxy 6-inch (646.2020) | LF | 395 | $0.85 | $0.85 | $0.85 |
| 150 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 24,850 | $0.90 | $0.90 | $0.90 |
| 151 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 50,480 | $1.40 | $1.40 | $1.40 |
| 152 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,920 | $2.60 | $2.60 | $2.60 |
| 153 | Marking line same day paint 6- inch (646.4705) | LF | 14,620 | $1.00 | $1.00 | $1.00 |
| 154 | Marking line same day paint 10- inch (646.4805) | LF | 8,294 | $2.00 | $2.00 | $2.00 |
| 155 | Marking arrow epoxy (646.5020) | EACH | 65 | $250.00 | $250.00 | $250.00 |
| 156 | Marking word epoxy (646.5120) | EACH | 15 | $350.00 | $350.00 | $350.00 |
| 157 | Marking railroad crossing epoxy (646.5320) | EACH | 5 | $1,500.00 | $1,500.00 | $1,500.00 |
| 158 | Marking stop line epoxy 18-inch (646.6120) | LF | 405 | $25.00 | $25.00 | $25.00 |
| 159 | Cold weather marking epoxy 6-inch (646.6466) | LF | 50,870 | $0.70 | $0.01 | $0.70 |
| 160 | Cold weather marking epoxy 10- inch (646.6470) | LF | 1,920 | $1.20 | $0.01 | $1.20 |
| 161 | Marking diagonal epoxy 12-inch (646.7120) | LF | 30 | $18.00 | $18.00 | $18.00 |
| 162 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,690 | $13.00 | $13.00 | $13.00 |
| 163 | Marking curb epoxy (646.8120) | LF | 160 | $14.00 | $14.00 | $14.00 |
| 164 | Marking island nose epoxy (646.8220) | EACH | 18 | $250.00 | $250.00 | $250.00 |
| 165 | Marking removal line 4-inch (646.9000) | LF | 210 | $2.00 | $2.00 | $0.65 |
| 166 | Marking removal line 6-inch (646.9002) | LF | 700 | $3.00 | $3.00 | $0.70 |
| 167 | Marking removal line 8-inch (646.9100) | LF | 625 | $4.00 | $4.00 | $0.75 |
| 168 | Marking removal line 10-inch (646.9102) | LF | 1,000 | $4.00 | $4.00 | $0.85 |
| 169 | Marking removal special marking (646.9300) | EACH | 5 | $150.00 | $150.00 | $50.00 |
| 170 | Construction staking storm sewer (650.4000) | EACH | 23 | $150.00 | $48.00 | $48.00 |
| 171 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 520 | $2.00 | $2.00 | $2.00 |
| 172 | Construction staking resurfacing reference (650.8000) | LF | 10,524 | $0.12 | $0.27 | $0.27 |
| 173 | Construction staking electrical installations (project) 01. 4075-40- 71 (650.8501) | EACH | 1 | $3,500.00 | $1,687.35 | $1,687.35 |
| 174 | Construction staking curb ramps (650.9000) | EACH | 48 | $300.00 | $165.00 | $165.00 |
| 175 | Construction staking sidewalk (project) 01. 4075-40-71 (650.9500) | EACH | 1 | $5,500.00 | $8,779.00 | $8,779.00 |
| 176 | Construction staking supplemental control (project) 01. 4075-40-71 (650.9911) | EACH | 1 | $10.00 | $433.96 | $433.96 |
| 177 | Construction staking slope stakes (650.9920) | LF | 6,800 | $0.85 | $0.94 | $0.94 |
| 178 | Conduit rigid nonmetallic schedule 40 1-inch (652.0210) | LF | 35 | $10.00 | $10.00 | $10.00 |
| 179 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 310 | $12.00 | $12.00 | $12.00 |
| 180 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 435 | $14.00 | $14.00 | $14.00 |
| 181 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 100 | $16.00 | $16.00 | $16.00 |
| 182 | Conduit special 2-inch (652.0605) | LF | 75 | $30.00 | $30.00 | $30.00 |
| 183 | Conduit special 3-inch (652.0615) | LF | 835 | $42.00 | $42.00 | $42.00 |
| 184 | Conduit loop detector (652.0800) | LF | 334 | $6.00 | $6.00 | $6.00 |
| 185 | Pull boxes steel 24X36-inch (653.0135) | EACH | 2 | $2,575.00 | $2,575.00 | $2,575.00 |
| 186 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 10 | $2,400.00 | $2,400.00 | $2,400.00 |
| 187 | Adjusting pull boxes (653.0900) | EACH | 5 | $875.00 | $875.00 | $875.00 |
| 188 | Removing pull boxes (653.0905) | EACH | 3 | $75.00 | $75.00 | $75.00 |
| 189 | Concrete bases type 1 (654.0101) | EACH | 12 | $1,750.00 | $1,750.00 | $1,750.00 |
| 190 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,400.00 | $2,400.00 | $2,400.00 |
| 191 | Cable traffic signal 5-14 AWG (655.0230) | LF | 3,436 | $2.25 | $2.25 | $2.25 |
| 192 | Cable traffic signal 7-14 AWG (655.0240) | LF | 62 | $2.50 | $2.50 | $2.50 |
| 193 | Cable traffic signal 12-14 AWG (655.0260) | LF | 2,050 | $4.75 | $4.75 | $4.75 |
| 194 | Loop detector lead in cable (655.0700) | LF | 1,264 | $1.50 | $1.50 | $1.50 |
| 195 | Loop detector wire (655.0800) | LF | 1,566 | $0.90 | $0.90 | $0.90 |
| 196 | Traffic signal evp detector cable (655.0900) | LF | 856 | $2.00 | $2.00 | $2.00 |
| 197 | Electrical service meter breaker pedestal (location) 01. IH 41 NB & STH 96 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 |
| 198 | Pedestal bases (657.0100) | EACH | 12 | $325.00 | $325.00 | $325.00 |
| 199 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $590.00 | $590.00 | $590.00 |
| 200 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 10 | $510.00 | $510.00 | $510.00 |
| 201 | Traffic signal face 3S 12-inch (658.0173) | EACH | 2 | $640.00 | $640.00 | $640.00 |
| 202 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $785.00 | $785.00 | $785.00 |
| 203 | Pedestrian signal face 16-inch (658.0416) | EACH | 14 | $500.00 | $500.00 | $500.00 |
| 204 | Pedestrian push buttons (658.0500) | EACH | 11 | $500.00 | $500.00 | $500.00 |
| 205 | Signal mounting hardware (location) 01. IH 41 NB & STH 96 (658.5070) | EACH | 1 | $550.00 | $550.00 | $550.00 |
| 206 | Signal mounting hardware (location) 02. STH 96 & bluemound (658.5070) | EACH | 1 | $675.00 | $675.00 | $675.00 |
| 207 | Signal mounting hardware (location) 03. STH 96 & lyndale (658.5070) | EACH | 1 | $1,450.00 | $1,450.00 | $1,450.00 |
| 208 | Signal mounting hardware (location) 04. STH 96 & perkins (658.5070) | EACH | 1 | $1,005.00 | $1,005.00 | $1,005.00 |
| 209 | Signal mounting hardware (location) 05. STH 96 & westhill (658.5070) | EACH | 1 | $1,275.00 | $1,275.00 | $1,275.00 |
| 210 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 11 | $75.00 | $75.00 | $75.00 |
| 211 | Sawing asphalt (690.0150) | LF | 1,835 | $1.75 | $1.75 | $1.75 |
| 212 | Sawing concrete (690.0250) | LF | 42,170 | $2.35 | $2.35 | $2.35 |
| 213 | Incentive iri ride (740.0440) | DOL | 12,178 | $1.00 | $1.00 | $1.00 |
| 214 | Installing and maintaining bird deterrent system (station) 01. sta 127+10 (999.2000.S) | EACH | 1 | $1.00 | $15,570 | $15,250 |
| 215 | Installing and maintaining bird deterrent system (station) 02. sta 127+75 (999.2000.S) | EACH | 1 | $1.00 | $15,570 | $15,250 |
| 216 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 |
| 217 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 | $5.00 |
| 218 | Special 02. removing, pulling back, and RE-installing cables (SPV.0060) | EACH | 1 | $4,750.00 | $4,750.00 | $4,750.00 |
| 219 | Special 04. abandon sanitary manhole (SPV.0060) | EACH | 4 | $2,000.00 | $2,470.00 | $700.00 |
| 220 | Special 05. manhole cover riser (SPV.0060) | EACH | 31 | $600.00 | $497.58 | $570.00 |
| 221 | Special 06. water valve riser (SPV.0060) | EACH | 7 | $500.00 | $237.50 | $733.00 |
| 222 | Special 07. inlet cover type H-S riser (SPV.0060) | EACH | 44 | $600.00 | $323.86 | $733.00 |
| 223 | Special 08. inlet cover type H riser (SPV.0060) | EACH | 12 | $600.00 | $337.50 | $700.00 |
| 224 | Special 09. inlet cover type A-S riser (SPV.0060) | EACH | 6 | $600.00 | $337.50 | $700.00 |
| 225 | Special 10. inlet cover tpye 19.5"X16.5" riser (SPV.0060) | EACH | 2 | $600.00 | $337.50 | $700.00 |
| 226 | Special 11. adjusting water valves (SPV.0060) | EACH | 8 | $1,250.00 | $375.00 | $950.00 |
| 227 | Special 12. cipp joint repair 72- inch (SPV.0060) | EACH | 2 | $32,000 | $32,000 | $45,000 |
| 228 | Special 13. manhole crack and joint repair (SPV.0060) | EACH | 1 | $15,000 | $15,000 | $25,000 |
| 229 | Special 14. PVC pipe elbow 45 degree 15-inch (SPV.0060) | EACH | 1 | $1,500.00 | $911.00 | $1,500.00 |
| 230 | Special 15. PVC pipe elbow 45 degree 30-inch (SPV.0060) | EACH | 1 | $6,000.00 | $5,072.00 | $5,050.00 |
| 231 | Special 16. pipe end grate 15-inch (SPV.0060) | EACH | 1 | $2,500.00 | $1,100.00 | $2,250.00 |
| 232 | Special 17. pipe end grate 30-inch (SPV.0060) | EACH | 1 | $3,000.00 | $1,800.00 | $2,650.00 |
| 233 | Special 18. cleaing existing manhole (SPV.0060) | EACH | 1 | $5,000.00 | $1,425.00 | $1,500.00 |
| 234 | Special 19. inlet cover special (SPV.0060) | EACH | 1 | $1,500.00 | $650.00 | $950.00 |
| 235 | Special 20. reconditioning inlets (SPV.0060) | EACH | 1 | $2,200.00 | $625.00 | $3,200.00 |
| 236 | Special 21. remove traffic signal IH 41 NB & STH 96 (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 |
| 237 | Special 22. remove traffic signal STH 96 & bluemound (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 |
| 238 | Special 23. remove traffic signal STH 96 & lyndale (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 |
| 239 | Special 25. remove traffic signal STH 96 & westhill (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 |
| 240 | Special 26. cold weather marking railroad crossing epoxy (SPV.0060) | EACH | 5 | $1,500.00 | $0.01 | $1,500.00 |
| 241 | Special 27. cold weather marking island nose epoxy (SPV.0060) | EACH | 17 | $250.00 | $0.01 | $250.00 |
| 242 | Special 28. cold weather marking arrow epoxy (SPV.0060) | EACH | 65 | $250.00 | $0.01 | $250.00 |
| 243 | Special 29. cold weather marking word epoxy (SPV.0060) | EACH | 15 | $350.00 | $0.01 | $350.00 |
| 244 | Special 02. PVC pipe 27-inch (SPV.0090) | LF | 3 | $1,500.00 | $556.05 | $875.00 |
| 245 | Special 03. PVC pipe 30-inch (SPV.0090) | LF | 45 | $400.00 | $244.91 | $300.00 |
| 246 | Special 04 . concrete joint and crack cleaning and repair (SPV.0090) | LF | 3,380 | $7.50 | $7.50 | $7.50 |
| 247 | Special 05. pedestrian overhead protection (SPV.0090) | LF | 288 | $168.00 | $203.00 | $198.72 |
| 248 | Special 06. concrete curb and gutter 30-inch type A hes (SPV.0090) | LF | 38 | $100.00 | $65.00 | $65.00 |
| 249 | Special 07. cold weather marking crosswalk epoxy transverse line 6-inch (SPV.0090) | LF | 3,651 | $15.00 | $0.01 | $15.00 |
| 250 | Special 08. cold weather marking curb epoxy (SPV.0090) | LF | 160 | $13.00 | $0.01 | $13.00 |
| 251 | Special 09. cold weather marking stop line epoxy 18-inch (SPV.0090) | LF | 405 | $25.00 | $0.01 | $25.00 |
| 252 | Special 10. cold weather marking diagonal epoxy 12-inch (SPV.0090) | LF | 30 | $18.00 | $0.01 | $18.00 |
| 253 | Special 11. concrete curb and gutter 24-inch type D (SPV.0090) | LF | 37 | $100.00 | $58.50 | $64.00 |
| 254 | Special 12. concrete curb and gutter 18-inch type D hes modified (SPV.0090) | LF | 73 | $100.00 | $63.50 | $63.50 |
| 255 | Special 13. concrete curb and gutter 30-inch type D hes modified (SPV.0090) | LF | 70 | $100.00 | $65.00 | $65.00 |
| 256 | Special 01. concrete sidewalk 6- inch hes (SPV.0165) | SF | 100 | $20.00 | $11.80 | $12.00 |
| 257 | Special 01. removing surface milling special (SPV.0180) | SY | 64,900 | $3.90 | $3.90 | $3.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 8, 2025. Compiled by Mirage Metrics.