RankBidderTotal bidAgainst the low bid
1Iverson Construction, A Div. of Mathy Co$7,969,694Low
WisDOT contract 20250812004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Iverson Construction, A Div. of Mathy Co
1Removing small pipe culverts (203.0100)EACH32$477.77
2Removing concrete pavement (204.0100)SY1,998$6.48
3Removing concrete surface partial depth (204.0109.S)SF89,846$0.61
4Removing asphaltic surface (204.0110)SY261$4.99
5Removing asphaltic surface butt joints (204.0115)SY690$18.74
6Removing asphaltic surface milling (204.0120)SY764$18.12
7Removing curb & gutter (204.0150)LF1,375$2.14
8Removing concrete sidewalk (204.0155)SY689$4.26
9Removing guardrail (204.0165)LF14,279$2.10
10Removing surface drains (204.0190)EACH1$575.00
11Removing inlets (204.0220)EACH11$311.49
12Abandoning culvert pipes (204.0270)EACH1$1,259.02
13Excavation common (205.0100)CY3,286$12.46
14Excavation rock (205.0200)CY354$44.82
15Borrow (208.0100)CY1,310$16.90
16Prepare foundation for asphaltic paving (project) 01. 5790-02-72 (211.0101)EACH1$126,060
17Base aggregate dense 3/4-inch (305.0110)TON5,531$22.25
18Base aggregate dense 1 1/4-inch (305.0120)TON13,743$13.49
19Breaker run (311.0110)TON2,201$13.99
20Mill and relay (330.0100)SY170,564$2.86
21QMP mill and relay compaction (374.1010.S)SY170,439$0.09
22Removing pavement for base patching (390.0100)CY199$103.91
23Base patching concrete hes (390.0305)CY199$435.15
24Drilled tie bars (416.0610)EACH671$10.22
25Drilled dowel bars (416.0620)EACH1,295$16.23
26Tack coat (455.0605)GAL10,022$3.60
27HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$3,600.00
28HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$2,620.00
29HMA pavement interlayer (460.4210.S)TON571$120.66
30HMA pavement 4 LT 58-28 S (460.5224)TON32,843$89.88
31HMA pavement 5 MT 58-28 S (460.6225)TON910$106.68
32Asphaltic surface (465.0105)TON254$150.00
33Asphaltic surface driveways and field entrances (465.0120)TON217$150.00
34Asphaltic surface temporary (465.0125)TON173$150.00
35Asphaltic rumble strips, centerline (465.0560)LF48,830$0.17
36Polymer overlay (509.5100.S)SY858$43.98
37Removing polymer overlay (structure) 01. B-12-137 (509.9015.S)SY858$7.75
38Concrete collars for pipe (520.8000)EACH4$1,026.11
39Cleaning culvert pipes (520.8700)EACH3$750.00
40Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$357.31
41Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH1$458.55
42Culvert pipe corrugated steel 18- inch (521.3118)LF26$125.62
43Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF20$164.98
44Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF130$162.92
45Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,038.59
46Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH1$1,099.95
47Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH7$1,188.98
48Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH30$1,360.34
49Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH3$2,025.13
50Concrete curb & gutter 30-inch type A (601.0409)LF656$32.36
51Concrete curb & gutter 30-inch type D (601.0411)LF779$25.77
52Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF25$81.09
53Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576)LF20,786$19.95
54Concrete curb pedestrian (601.0600)LF101$75.25
55Concrete sidewalk 4-inch (602.0405)SF7,752$7.55
56Concrete sidewalk 6-inch (602.0415)SF420$8.54
57Curb ramp detectable warning field natural patina (602.0515)SF547.50$50.26
58Concrete driveway 6-inch (602.0810)SY24$67.01
59Concrete surface drains (602.3010)CY24$1,197.75
60Riprap medium (606.0200)CY48$100.81
61Riprap heavy (606.0300)CY398$81.97
62Storm sewer rock excavation (608.0005)CY48$72.31
63Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF587$57.78
64Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF35$112.07
65Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF289$131.44
66Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF943$192.23
67Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF122$265.74
68Inlet covers type C (611.0612)EACH1$771.34
69Inlet covers type H (611.0624)EACH4$2,930.78
70Inlet covers type HM-GJ (611.0630)EACH5$931.85
71Inlet covers type HM-GJ-S (611.0633)EACH2$1,008.46
72Inlet covers type H-S (611.0639)EACH3$1,007.18
73Inlet covers type MS (611.0642)EACH51$734.94
74Inlet covers type MS-A (611.0645)EACH2$936.85
75Manholes 5-FT diameter (611.2005)EACH1$4,549.98
76Inlets 4-FT diameter (611.3004)EACH1$2,826.22
77Inlets 2X3-FT (611.3230)EACH13$2,332.82
78Inlets median 1 grate (611.3901)EACH5$3,464.94
79Inlets median 2 grate (611.3902)EACH24$4,246.00
80Cover plates temporary (611.8120.S)EACH11$426.17
81Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY9$103.99
82Guardrail mow strip emulsified asphalt (614.0397)SY1,627$7.25
83MGS guardrail 3 (614.2300)LF9,974.50$23.05
84MGS guardrail 3 K (614.2330)LF3,712.50$40.15
85MGS guardrail short radius (614.2350)LF152$27.00
86MGS thrie beam transition (614.2500)LF79$100.00
87MGS guardrail terminal eat (614.2610)EACH16$3,500.00
88Maintenance and repair of haul roads (project) 01. 5790-02-72 (618.0100)EACH1$500.00
89Mobilization (619.1000)EACH1$622,690
90Water (624.0100)MGAL1,104$37.00
91Salvaged topsoil (625.0500)SY6,208$2.48
92Mulching (627.0200)SY1,374$0.50
93Silt fence (628.1504)LF19,497$2.05
94Silt fence maintenance (628.1520)LF38,993$0.01
95Mobilizations erosion control (628.1905)EACH3$200.00
96Mobilizations emergency erosion control (628.1910)EACH4$200.00
97Erosion mat class I type B (628.2004)SY4,834$0.94
98Inlet protection type A (628.7005)EACH52$75.00
99Inlet protection type B (628.7010)EACH4$41.00
100Inlet protection type C (628.7015)EACH17$45.00
101Temporary ditch checks (628.7504)LF200$5.90
102Culvert pipe checks (628.7555)EACH24$20.00
103Fertilizer type B (629.0210)CWT4$105.00
104Seeding mixture no. 20 (630.0120)LB88$10.00
105Seeding mixture no. 40 (630.0140)LB27$20.00
106Seeding temporary (630.0200)LB170$3.00
107Seed water (630.0500)MGAL143$1.00
108Posts wood 4X6-inch X 12-FT (634.0612)EACH21$75.00
109Posts wood 4X6-inch X 14-FT (634.0614)EACH23$80.00
110Posts wood 4X6-inch X 16-FT (634.0616)EACH3$85.00
111Posts wood 4X6-inch X 18-FT (634.0618)EACH14$90.00
112Signs type II reflective F (637.2230)SF77.25$19.00
113Moving signs type II (638.2102)EACH53$70.00
114Removing small sign supports (638.3000)EACH54$20.00
115Field office type B (642.5001)EACH1$19,830
116Traffic control drums (643.0300)DAY2,478$0.75
117Traffic control barricades type III (643.0420)DAY1,003$1.25
118Traffic control flexible tubular marker posts (643.0500)EACH30$10.81
119Traffic control flexible tubular marker bases (643.0600)EACH30$18.22
120Traffic control warning lights type A (643.0705)DAY1,564$0.50
121Traffic control warning lights type C (643.0715)DAY222$0.69
122Traffic control signs (643.0900)DAY17,853$0.62
123Traffic control covering signs type II (643.0920)EACH34$80.00
124Traffic control signs PCMS (643.1050)DAY56$60.00
125Traffic control cones 42-inch (643.1070)DAY1,270$0.75
126Temporary marking line paint 6- inch (643.3165)LF373,634$0.20
127Traffic control (643.5000)EACH1$24,750
128Temporary pedestrian surface asphalt (644.1410)SF118$27.29
129Temporary pedestrian surface plate (644.1430)SF50$15.33
130Temporary pedestrian curb ramp (644.1601)DAY8$95.20
131Temporary pedestrian barricade (644.1810)LF645$7.86
132Geotextile type R (645.0130)SY288$3.10
133Marking line epoxy 6-inch (646.2020)LF854$0.65
134Marking line grooved wet ref epoxy 6-inch (646.2040)LF233,519$1.24
135Marking stop line epoxy 18-inch (646.6120)LF38$28.00
136Marking crosswalk epoxy transverse line 6-inch (646.7420)LF2,012$12.00
137Locating no-passing zones (648.0100)MI11.66$365.00
138Construction staking storm sewer (650.4000)EACH80$125.00
139Construction staking subgrade (650.4500)LF502$0.10
140Construction staking base (650.5000)LF650$0.75
141Construction staking curb gutter and curb & gutter (650.5500)LF1,736$1.00
142Construction staking pipe culverts (650.6000)EACH1$125.00
143Construction staking resurfacing reference (650.8000)LF61,830$0.10
144Construction staking curb ramps (650.9000)EACH52$135.00
145Construction staking sidewalk (project) 01. 5790-02-72 (650.9500)EACH1$2,500.00
146Construction staking supplemental control (project) 01. 5790-02-72 (650.9911)EACH1$1,000.00
147Sawing asphalt (690.0150)LF2,575$1.75
148Sawing concrete (690.0250)LF3,507$2.75
149Incentive iri ride (740.0440)DOL23,400$1.00
150Special 01. HMA pavement PWL QMP, core only project; incentive density PWL HMA pavement (SPV.0055)DOL33,540$1.00
151Special 02. incentive air voids HMA pavement (SPV.0055)DOL33,540$1.00
152Special 03. incentive density HMA pavement longitudinal joints (SPV.0055)DOL24,930$1.00
153Special 01. inlet covers flat temporary (SPV.0060)EACH3$1,907.90
154Special 02. adjusting sanitary manhole covers (SPV.0060)EACH11$652.01
155Special 03. adjust water valve box (SPV.0060)EACH18$588.42
156Special 01. grading, shaping, and finishing for concrete curb and gutter (SPV.0090)LF19,309$8.09
157Special 02. transverse joint and crack plunge milling and patching (SPV.0090)LF624$112.29
WisDOT contract 20250812004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy