WisDOT contract 20251014010 bid tabulation

1053-07-86. Let by Wisconsin DOT on October 14, 2025, Marathon. 8 bids received; low bid $20,568,560 by James Peterson Sons, Inc..

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
157
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1James Peterson Sons, Inc.$20,568,560Low
2Trierweiler Construction & Supply Company, Inc.$20,763,016+1.0%
3Hoffman Construction Company$21,696,981+5.0%
4Mashuda Contractors, Inc.$22,049,706+7.0%
5Integrity Grading and Excavating, Inc.$22,405,866+9.0%
6Michels Road & Stone, Inc.$22,566,625+10%
7Haas Sons, Inc.$23,181,387+13%
8Zignego Company, Inc.$23,298,626+13%
WisDOT contract 20251014010: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. James Peterson Sons, Inc.2. Trierweiler Construction & Supply Company, Inc.3. Hoffman Construction Company4. Mashuda Contractors, Inc.5. Integrity Grading and Excavating, Inc.6. Michels Road & Stone, Inc.
1Removing small pipe culverts (203.0100)EACH7$450.00$450.00$1,250.00$400.00$226.00$650.00
2Removing concrete pavement (204.0100)SY143,893$0.50$0.65$15.00$0.76$0.65$0.65
3Removing asphaltic surface (204.0110)SY19,210$1.20$1.20$1.50$2.75$2.23$2.60
4Removing curb & gutter (204.0150)LF870$2.00$2.00$5.00$4.00$4.55$5.00
5Removing guardrail (204.0165)LF2,040$1.85$2.75$1.85$1.85$1.85$1.85
6Removing delineators and markers (204.0180)EACH207$15.00$18.00$15.00$15.00$15.00$15.00
7Removing inlets (204.0220)EACH14$500.00$500.00$325.00$500.00$1,146.00$500.00
8Removing storm sewer (size) 01. 12-inch (204.0245)LF45$20.00$20.00$9.00$30.00$27.80$30.00
9Removing storm sewer (size) 01. 24-inch (204.0245)LF9$100.00$100.00$9.00$75.00$26.30$35.00
10Abandoning culvert pipes (204.0270)EACH9$450.00$450.00$1,500.00$1,500.00$723.50$850.00
11Removing (item description) 01. apron endwalls (204.9060.S)EACH14$450.00$450.00$400.00$400.00$291.00$750.00
12Removing (item description) 01. buried concrete pavement (204.9180.S)SY10,700$0.40$0.40$5.00$6.25$0.65$4.50
13Excavation common (205.0100)CY236,945$8.61$8.61$20.00$8.03$7.05$10.40
14Excavation for structures bridges (structure) 01. B-37-288 (206.1001)EACH1$2,500.00$4,500.00$30,000$8,800.00$1,521.00$2,500.00
15Borrow (208.0100)CY734$13.84$13.84$0.01$0.01$0.01$10.00
16Backfill structure type A (210.1500)TON182$23.50$23.50$32.00$47.65$26.30$30.00
17Finishing roadway (project) 01. 1053-07-86 (213.0100)EACH1$1,500.00$500.00$100.00$725.00$500.00$2,500.00
18Finishing roadway (project) 02. 1053-07-87 (213.0100)EACH1$1,000.00$500.00$100.00$352.00$500.00$2,500.00
19Base aggregate dense 3/4-inch (305.0110)TON28,307$16.79$16.79$0.01$19.95$18.30$19.70
20Base aggregate dense 1 1/4-inch (305.0120)TON168,310$10.20$10.43$0.01$14.28$12.25$11.80
21Select crushed material (312.0110)TON170,825$11.74$11.74$0.01$14.05$15.30$13.70
22Removing pavement for base patching (390.0100)CY348$259.97$259.97$175.08$259.97$24.40$175.08
23Base patching concrete hes (390.0305)CY348$259.97$259.97$303.16$259.97$259.97$303.16
24Concrete pavement approach slab (415.0410)SY312$180.22$180.22$236.77$180.22$180.22$236.77
25Rout and seal (415.6000.S)LF123,530$0.87$0.87$0.87$0.87$0.87$0.87
26Drilled tie bars (416.0610)EACH220$13.13$13.13$14.28$13.13$13.13$14.28
27Drilled dowel bars (416.0620)EACH98$16.59$16.59$18.33$16.59$16.59$18.33
28HMA cold weather paving (450.4000)TON600$3.00$3.00$3.00$3.00$3.00$3.00
29Tack coat (455.0605)GAL4,268$7.25$7.25$7.25$7.25$7.25$7.25
30Incentive density HMA pavement (460.2000)DOL14,230$1.00$1.00$1.00$1.00$1.00$1.00
31HMA pavement 4 MT 58-28 S (460.6224)TON17,319$108.10$108.10$108.10$108.10$108.10$108.10
32HMA pavement 5 MT 58-28 S (460.6225)TON2,334$112.95$112.95$112.95$112.95$112.95$112.95
33HMA pavement 3 HT 58-28 S (460.7223)TON3,093$117.00$117.00$117.00$117.00$117.00$117.00
34HMA pavement 4 HT 58-28 H (460.7424)TON1,728$125.15$125.15$125.15$125.15$125.15$125.15
35Asphaltic surface driveways and field entrances (465.0120)TON90$225.00$225.00$225.00$225.00$225.00$225.00
36Asphaltic surface temporary (465.0125)TON700$105.40$105.40$105.40$105.40$105.40$105.40
37Asphaltic flumes (465.0315)SY224$84.75$84.75$84.75$84.75$84.75$84.75
38Asphaltic rumble strips, shoulder divided roadway (465.0510)LF46,950$0.13$0.24$0.40$0.13$0.40$0.40
39Concrete masonry bridges (502.0100)CY10$2,000.00$1,952.00$1,952.00$1,952.00$2,000.00$2,000.00
40Protective surface treatment (502.3200)SY17$3.00$16.00$16.00$16.00$3.00$3.00
41Adhesive anchors no. 5 bar (502.4205)EACH112$20.00$48.00$48.00$48.00$20.00$20.00
42Bar steel reinforcement HS coated structures (505.0600)LB1,180$6.50$5.00$5.00$5.00$6.50$6.50
43Rubberized membrane waterproofing (516.0500)SY4$25.00$70.00$75.00$75.00$25.00$25.00
44Apron endwalls for culvert pipe 12- inch (520.1012)EACH4$210.00$210.00$650.00$745.00$676.00$1,500.00
45Apron endwalls for culvert pipe 18- inch (520.1018)EACH7$262.00$262.00$700.00$600.00$750.00$1,750.00
46Culvert pipe temporary 12-inch (520.2012)LF834$52.35$52.35$32.00$51.50$35.25$70.00
47Culvert pipe class III-A 18-inch (520.3318)LF167$51.50$51.50$42.00$57.75$62.60$81.00
48Concrete collars for pipe (520.8000)EACH3$800.00$800.00$1,200.00$1,000.00$723.40$850.00
49Apron endwalls for culvert pipe steel 12-inch (521.1012)EACH4$233.00$233.00$525.00$410.00$676.30$307.00
50Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH1$365.00$365.00$635.00$494.00$760.75$810.00
51Apron endwalls for culvert pipe steel 36-inch (521.1036)EACH1$888.00$888.00$1,170.00$967.00$1,754.75$1,310.00
52Culvert pipe corrugated steel 24- inch (521.3124)LF8$143.00$143.00$138.00$168.50$189.00$165.00
53Culvert pipe corrugated steel 36- inch (521.3136)LF8$172.00$172.00$172.00$197.50$226.00$210.00
54Apron endwalls for culvert pipe salvaged 18-inch (524.0618)EACH1$1,500.00$1,500.00$400.00$1,238.00$1,313.00$950.00
55Culvert pipe corrugated polyethylene 12-inch (530.0112)LF330$66.00$66.00$32.00$51.25$55.00$75.00
56Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF529$36.58$36.58$53.96$36.58$36.58$53.96
57Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF871$37.66$37.66$53.96$37.66$37.66$53.96
58Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF236$37.66$37.66$53.96$37.66$37.66$53.96
59Concrete rumble strips, shoulder divided roadway (602.3210)LF41,860$0.45$0.84$0.45$1.00$0.45$0.45
60Riprap light (606.0100)CY267$80.00$80.00$70.00$80.00$96.00$156.00
61Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF207$93.00$93.00$80.00$95.75$107.00$110.00
62Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF200$97.00$97.00$86.00$113.50$115.00$118.00
63Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF37$203.00$203.00$136.00$226.75$153.00$191.00
64Inlet covers type MS (611.0642)EACH9$665.00$665.00$1,000.00$600.00$695.00$558.00
65Inlet covers type V (611.0654)EACH4$815.00$815.00$1,100.00$870.00$857.00$746.00
66Inlets 3-FT diameter (611.3003)EACH4$2,650.00$2,650.00$2,100.00$3,324.00$3,313.00$4,550.00
67Inlets median 1 grate (611.3901)EACH3$3,725.00$3,725.00$4,250.00$4,534.00$4,340.00$5,900.00
68Inlets median 2 grate (611.3902)EACH3$6,775.00$6,775.00$7,250.00$6,938.00$6,300.00$9,500.00
69Pipe underdrain wrapped 6-inch (612.0406)LF720$3.00$3.00$9.50$15.00$11.00$6.50
70Steel thrie beam bullnose terminal (614.0220)EACH4$15,250$14,400$15,250$15,250$15,250$15,250
71Steel thrie beam (614.0230)LF300$34.00$39.00$34.00$34.00$34.00$34.00
72Guardrail mow strip emulsified asphalt (614.0397)SY837$13.00$10.76$13.00$13.00$13.00$13.00
73MGS guardrail 3 (614.2300)LF375$27.00$25.00$27.00$27.00$27.00$27.00
74MGS thrie beam transition (614.2500)LF394$98.00$89.00$98.00$98.00$98.00$98.00
75MGS guardrail terminal eat (614.2610)EACH10$3,613.00$3,650.00$3,613.00$3,613.00$3,613.00$3,613.00
76Maintenance and repair of haul roads (project) 01. 1053-07-86 (618.0100)EACH1$1,500.00$0.01$100.00$100.00$500.00$0.01
77Maintenance and repair of haul roads (project) 02. 1053-07-87 (618.0100)EACH1$1,500.00$0.01$100.00$100.00$500.00$0.01
78Mobilization (619.1000)EACH1$1,071,681$1,105,104$995,255$1,033,077$2,059,000$1,005,293
79Water (624.0100)MGAL5,305$5.00$5.00$0.01$27.50$44.50$45.00
80Topsoil (625.0100)SY38,825$0.87$0.87$2.00$1.15$1.80$2.30
81Silt fence (628.1504)LF4,831$1.85$2.10$1.85$1.85$1.85$1.85
82Silt fence maintenance (628.1520)LF9,531$0.03$0.02$0.03$0.03$0.03$0.03
83Mobilizations erosion control (628.1905)EACH25$50.00$200.00$50.00$50.00$50.00$50.00
84Mobilizations emergency erosion control (628.1910)EACH10$105.00$50.00$105.00$105.00$105.00$105.00
85Erosion mat class I type B (628.2004)SY37,165$0.95$1.07$0.95$0.95$0.95$0.95
86Erosion mat urban class I type B (628.2008)SY1,650$2.35$2.10$2.35$2.35$2.35$2.35
87Inlet protection type A (628.7005)EACH27$101.00$106.00$101.00$101.00$101.00$101.00
88Temporary ditch checks (628.7504)LF2,440$5.25$7.00$5.25$5.25$5.25$5.25
89Culvert pipe checks (628.7555)EACH310$18.00$13.00$18.00$18.00$18.00$18.00
90Tracking pads (628.7560)EACH9$300.00$300.00$500.00$3,000.00$1,000.00$1,800.00
91Rock bags (628.7570)EACH50$12.50$13.00$12.50$12.50$12.50$12.50
92Fertilizer type B (629.0210)CWT219.90$101.00$100.00$101.00$101.00$101.00$101.00
93Seeding mixture no. 30 (630.0130)LB7,978$6.85$7.00$6.85$6.85$6.85$6.85
94Seeding borrow pit (630.0300)LB1,078$5.95$8.00$5.95$5.95$5.95$5.95
95Seed water (630.0500)MGAL4,018$1.00$1.00$1.00$1.00$1.00$1.00
96Delineator posts steel (633.0100)EACH266$35.00$32.00$35.00$35.00$35.00$35.00
97Delineator reflectors (633.0500)EACH306$19.00$9.00$19.00$19.00$19.00$19.00
98Delineators temporary (633.1100)EACH183$16.00$16.00$35.00$35.00$16.00$35.00
99Markers culvert end (633.5200)EACH12$85.00$65.00$85.00$85.00$85.00$85.00
100Markers permanent flexible (633.5350)EACH157$31.50$31.50$55.00$55.00$31.50$31.50
101Posts wood 4X6-inch X 14-FT (634.0614)EACH1$175.00$100.00$175.00$175.00$175.00$175.00
102Signs type II reflective H (637.2210)SF5.20$75.00$26.00$75.00$75.00$75.00$75.00
103Moving signs type II (638.2102)EACH20$175.00$155.00$175.00$175.00$175.00$175.00
104Removing signs type II (638.2602)EACH5$30.00$20.00$30.00$30.00$30.00$30.00
105Removing small sign supports (638.3000)EACH5$30.00$20.00$30.00$30.00$30.00$30.00
106Field office type D (642.5401)EACH1$6,600.00$19,526$20,000$15,000$28,000$33,000
107Traffic control drums (643.0300)DAY178,116$0.10$0.10$0.10$0.10$0.10$0.10
108Traffic control barricades type III (643.0420)DAY35,746$0.35$0.35$0.35$0.35$0.35$0.35
109Traffic control flexible tubular marker posts (643.0500)EACH1,447$24.00$24.00$24.00$24.00$24.00$24.00
110Traffic control flexible tubular marker bases (643.0600)EACH1,447$6.20$6.20$6.20$6.20$6.20$6.20
111Traffic control warning lights type A (643.0705)DAY44,832$0.05$0.05$0.05$0.05$0.05$0.05
112Traffic control warning lights type C (643.0715)DAY44,792$0.05$0.05$0.05$0.05$0.05$0.05
113Traffic control signs (643.0900)DAY78,123$0.30$0.30$0.30$0.30$0.30$0.30
114Traffic control covering signs type I (643.0910)EACH7$425.00$425.00$425.00$425.00$425.00$425.00
115Traffic control covering signs type II (643.0920)EACH78$20.00$20.00$20.00$20.00$20.00$20.00
116Traffic control signs fixed message (643.1000)SF363$10.50$10.50$10.50$10.50$10.50$10.50
117Temporary marking line epoxy 6- inch (643.3170)LF108,460$0.39$0.45$0.39$0.45$0.39$0.39
118Temporary marking line removable tape 6-inch (643.3180)LF85,415$1.65$1.65$1.65$1.65$1.65$1.65
119Temporary marking line removable tape 10-inch (643.3280)LF630$3.40$3.40$3.40$3.40$3.40$3.40
120Temporary marking stop line removable tape 18-inch (643.3850)LF72$5.00$5.00$5.00$5.00$5.00$5.00
121Traffic control (643.5000)EACH1$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00$6,500.00
122Geotextile type R (645.0130)SY1,103$3.00$3.00$3.50$5.00$1.39$4.00
123Geotextile type sas (645.0140)SY197,330$0.90$0.90$2.25$1.25$0.81$1.75
124Marking line epoxy 6-inch (646.2020)LF132,960$0.43$0.60$0.43$0.60$0.43$0.43
125Marking line grooved wet ref epoxy 6-inch (646.2040)LF147,662$1.30$1.48$1.30$1.48$1.30$1.30
126Marking line epoxy 10-inch (646.4020)LF4,629$0.97$1.05$0.97$1.05$0.97$0.97
127Marking line grooved wet ref epoxy 10-inch (646.4040)LF6,340$2.60$2.75$2.60$2.75$2.60$2.60
128Marking aerial enforcement bar epoxy (646.5420)EACH10$350.27$195.00$350.27$195.00$350.27$350.27
129Marking outfall epoxy (646.5520)EACH132$45.89$100.00$45.89$100.00$45.89$45.89
130Marking stop line epoxy 18-inch (646.6120)LF486$14.77$19.75$14.77$19.75$14.77$14.77
131Cold weather marking epoxy 6-inch (646.6466)LF15,520$0.43$0.53$0.43$0.53$0.43$0.43
132Cold weather marking epoxy 10- inch (646.6470)LF6,340$0.97$0.90$0.97$0.90$0.97$0.97
133Marking chevron epoxy 24-inch (646.7220)LF326$24.24$15.50$24.24$15.50$24.24$24.24
134Marking removal line water blasting 4-inch (646.9010)LF6,665$0.99$0.99$0.99$1.50$0.99$0.99
135Marking removal line water blasting wide (646.9210)LF20$20.97$20.97$20.97$8.25$20.97$20.97
136Construction staking storm sewer (650.4000)EACH10$100.00$100.00$100.00$100.00$100.00$100.00
137Construction staking subgrade (650.4500)LF59,748$0.01$0.01$0.01$0.01$0.01$0.01
138Construction staking base (650.5000)LF16,084$0.60$0.60$0.60$0.60$0.01$0.60
139Construction staking curb gutter and curb & gutter (650.5500)LF871$0.75$0.75$0.75$0.75$0.75$0.75
140Construction staking pipe culverts (650.6000)EACH6$120.00$120.00$120.00$120.00$120.00$120.00
141Construction staking concrete pavement (650.7000)LF65,599$0.36$0.36$0.36$0.36$0.36$0.36
142Construction staking supplemental control (project) 01. 1053-07-86 (650.9911)EACH1$10.00$10.00$10.00$10.00$10.00$10.00
143Construction staking supplemental control (project) 02. 1053-07-87 (650.9911)EACH1$10.00$10.00$10.00$10.00$10.00$10.00
144Construction staking slope stakes (650.9920)LF61,871$0.65$0.65$0.01$0.65$0.65$0.65
145Sawing asphalt (690.0150)LF13,599$1.75$1.75$1.75$1.75$1.75$1.69
146Sawing concrete (690.0250)LF772$2.55$2.55$2.55$2.55$2.55$2.95
147Incentive flexural strength concrete pavement (715.0715)DOL57,085$1.00$1.00$1.00$1.00$1.00$1.00
148Incentive iri ride (740.0440)DOL41,609$1.00$1.00$1.00$1.00$1.00$1.00
149On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00$5.00
150On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,980$5.00$5.00$5.00$5.00$5.00$5.00
151Special 01. connected work zone notification system (SPV.0045)DAY688$33.00$33.00$33.00$33.00$33.00$33.00
152Special 01. reestablish section corner monuments (SPV.0060)EACH7$500.00$500.00$500.00$500.00$500.00$500.00
153Special 02. locate and clean existing underdrain outfalls (SPV.0060)EACH132$214.00$214.00$90.00$150.00$201.00$100.00
154Special 03. coring of existing concrete pavement (SPV.0060)EACH60$150.00$150.00$150.00$250.00$150.00$50.00
155Special 01. unbonded concrete overlay 7-inch (SPV.0180)SY41,650$31.91$31.91$33.65$31.91$31.91$33.65
156Special 02. HP concrete pavement 8-inch (SPV.0180)SY16,490$54.51$54.51$55.86$54.51$54.51$55.86
157Special 03. HP concrete pavement 10-inch (SPV.0180)SY131,830$44.18$44.18$45.43$44.18$44.18$45.43
WisDOT contract 20251014010: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy