WisDOT contract 20251014030 bid tabulation
C Milwaukee 76th Street; Florist Ave to CTH Q (STH 181, Milwaukee County C Milwaukee 76th Street). Let by Wisconsin DOT on October 14, 2025, Milwaukee. 5 bids received; low bid $13,433,751 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 272
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $13,433,751 | Low |
| 2 | Payne and Dolan, Inc | $14,083,537 | +5.0% |
| 3 | Zignego Company, Inc. | $14,190,090 | +6.0% |
| 4 | Rock Road Companies, Inc. | $14,535,298 | +8.0% |
| 5 | Stark Pavement Corporation | $14,745,149 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Payne and Dolan, Inc | 3. Zignego Company, Inc. | 4. Rock Road Companies, Inc. | 5. Stark Pavement Corporation |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 310 | $15.12 | $42.30 | $30.00 | $35.00 | $35.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 1,030 | $12.40 | $24.55 | $30.00 | $35.00 | $35.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 520 | $11.85 | $12.50 | $11.85 | $9.59 | $12.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 208,740 | $3.15 | $3.40 | $3.15 | $1.50 | $4.48 |
| 5 | Removing curb & gutter (204.0150) | LF | 3,550 | $10.62 | $15.90 | $12.00 | $15.50 | $16.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 3,290 | $13.84 | $17.51 | $12.00 | $11.50 | $12.00 |
| 7 | Removing guardrail (204.0165) | LF | 1,140 | $3.00 | $2.95 | $2.95 | $2.95 | $2.95 |
| 8 | Removing concrete bases (204.0195) | EACH | 178 | $300.00 | $1,200.00 | $800.00 | $400.00 | $300.00 |
| 9 | Removing inlets (204.0220) | EACH | 2 | $780.00 | $500.00 | $780.00 | $500.00 | $500.00 |
| 10 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 45 | $35.00 | $50.00 | $35.00 | $50.00 | $50.00 |
| 11 | Removing (item description) 01. traffic signals STH 181 at florist ave (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 12 | Removing (item description) 02. traffic signals STH 181 at mill RD (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 13 | Removing (item description) 03. traffic signals STH 181 at acacia ST (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 | $10,688 | $10,688 |
| 14 | Removing (item description) 04. traffic signals STH 181 at green tree RD (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 | $10,688 | $10,688 |
| 15 | Removing (item description) 05. traffic signals STH 181 at good hope RD (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 | $10,688 | $10,688 |
| 16 | Removing (item description) 06. traffic signals STH 181 at calumet RD (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 | $10,688 | $10,688 |
| 17 | Removing (item description) 07. traffic signals STH 181 at bradley RD (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 18 | Removing (item description) 08. traffic signals STH 181 at tower RD (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 19 | Removing (item description) 09. traffic signals STH 181 at servite/dean RD (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 20 | Removing (item description) 10. traffic signals STH 181 at northridge DR (204.9060.S) | EACH | 1 | $10,688 | $10,688 | $10,688 | $10,688 | $10,688 |
| 21 | Removing (item description) 11. traffic signals STH 181 at northridge lakes BLVD (204.9060.S) | EACH | 1 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 | $8,016.00 |
| 22 | Removing (item description) 12. loop detector wire and lead-in cable STH 181 at florist ave (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 23 | Removing (item description) 13. loop detector wire and lead-in cable STH 181 at mill RD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 24 | Removing (item description) 14. loop detector wire and lead-in cable STH 181 at acacia ST (204.9060.S) | EACH | 1 | $2,137.60 | $2,137.60 | $2,137.60 | $2,137.60 | $2,137.60 |
| 25 | Removing (item description) 15. loop detector wire and lead-in cable STH 181 at green tree RD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 26 | Removing (item description) 16. loop detector wire and lead-in cable STH 181 at good hope RD (204.9060.S) | EACH | 1 | $3,206.40 | $3,206.40 | $3,206.40 | $3,206.40 | $3,206.40 |
| 27 | Removing (item description) 17. loop detector wire and lead-in cable STH 181 at calumet RD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 28 | Removing (item description) 18. loop detector wire and lead-in cable STH 181 at bradley RD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 29 | Removing (item description) 19. loop detector wire and lead-in cable STH 181 at tower ave (204.9060.S) | EACH | 1 | $2,137.60 | $2,137.60 | $2,137.60 | $2,137.60 | $2,137.60 |
| 30 | Removing (item description) 20. loop detector wire and lead-in cable STH 181 at servite/dean RD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 31 | Removing (item description) 21. loop detector wire and lead-in cable STH 181 at northridge DR (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 32 | Removing (item description) 22. loop detector wire and lead-in cable STH 181 at northridge lakes BLVD (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 33 | Removing (item description) 23. loop detector wire and lead-in cable STH 181 at STH 100 (204.9060.S) | EACH | 1 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 | $2,672.00 |
| 34 | Excavation common (205.0100) | CY | 1,360 | $41.44 | $59.33 | $50.00 | $40.00 | $40.00 |
| 35 | Cofferdams (structure) 01. C-40- 0053 (206.5001) | EACH | 1 | $19,078 | $19,078 | $19,078 | $19,078 | $19,078 |
| 36 | Borrow (208.0100) | CY | 170 | $26.90 | $20.31 | $30.00 | $45.00 | $40.00 |
| 37 | Select borrow (208.1100) | CY | 90 | $56.23 | $70.93 | $100.00 | $30.00 | $40.00 |
| 38 | Finishing roadway (project) 01. 2140-14-70 (213.0100) | EACH | 1 | $3,680.00 | $2,500.00 | $1,000.00 | $10,210 | $9,500.00 |
| 39 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,422 | $28.23 | $53.19 | $32.50 | $23.92 | $40.00 |
| 40 | Base patching concrete shes (390.0405) | CY | 85 | $436.55 | $733.90 | $650.00 | $560.00 | $560.00 |
| 41 | Drilled tie bars (416.0610) | EACH | 350 | $17.55 | $9.33 | $30.00 | $14.00 | $14.00 |
| 42 | Drilled dowel bars (416.0620) | EACH | 408 | $21.82 | $16.60 | $30.00 | $22.00 | $22.00 |
| 43 | Concrete pavement repair shes (416.1715) | SY | 1,025 | $186.48 | $119.24 | $211.00 | $156.00 | $156.00 |
| 44 | HMA cold weather paving (450.4000) | TON | 3,920 | $1.00 | $1.00 | $1.00 | $5.00 | $4.00 |
| 45 | Tack coat (455.0605) | GAL | 29,300 | $2.30 | $2.30 | $2.30 | $3.48 | $3.00 |
| 46 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $1,200.00 | $1,100.00 | $1,200.00 | $3,500.00 | $3,500.00 |
| 47 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $8,000.00 | $8,000.00 | $8,000.00 | $3,500.00 | $3,500.00 |
| 48 | Incentive density PWL HMA pavement (460.2005) | DOL | 50,230 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 16,380 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 50 | Incentive air voids HMA pavement (460.2010) | DOL | 25,810 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 51 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 28,250 | $66.10 | $72.00 | $66.10 | $84.80 | $76.10 |
| 52 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 21,972 | $74.95 | $81.50 | $74.95 | $90.80 | $76.50 |
| 53 | Asphaltic surface patching (465.0110) | TON | 717 | $200.00 | $300.00 | $200.00 | $174.25 | $265.00 |
| 54 | Concrete surface repair (509.1500) | SF | 200 | $82.00 | $82.00 | $82.00 | $82.00 | $82.00 |
| 55 | Culvert pipe reinforced concrete class IV 12-inch (522.0412) | LF | 44 | $95.00 | $180.00 | $95.00 | $180.00 | $180.00 |
| 56 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 610 | $45.77 | $37.67 | $60.00 | $48.00 | $48.00 |
| 57 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 147 | $51.74 | $58.89 | $60.00 | $58.00 | $58.00 |
| 58 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,143 | $48.98 | $55.59 | $60.00 | $46.00 | $46.00 |
| 59 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 640 | $48.98 | $55.12 | $60.00 | $58.00 | $58.00 |
| 60 | Concrete curb pedestrian (601.0600) | LF | 467 | $46.32 | $48.75 | $100.00 | $45.00 | $45.00 |
| 61 | Concrete sidewalk 5-inch (602.0410) | SF | 36,153 | $8.05 | $10.23 | $11.00 | $9.65 | $9.65 |
| 62 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,232 | $39.53 | $34.66 | $50.00 | $48.00 | $48.00 |
| 63 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 150 | $52.46 | $63.54 | $100.00 | $60.00 | $60.00 |
| 64 | Riprap light (606.0100) | CY | 10 | $174.44 | $175.00 | $250.00 | $178.12 | $200.00 |
| 65 | Inlet covers type H (611.0624) | EACH | 2 | $1,035.00 | $1,200.00 | $1,035.00 | $1,200.00 | $1,200.00 |
| 66 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $4,430.00 | $8,000.00 | $4,430.00 | $8,000.00 | $8,000.00 |
| 67 | Inlets 2X3-FT (611.3230) | EACH | 1 | $1,910.00 | $6,000.00 | $1,910.00 | $6,000.00 | $6,000.00 |
| 68 | Adjusting manhole covers (611.8110) | EACH | 232 | $1,240.21 | $900.00 | $750.00 | $900.00 | $1,800.00 |
| 69 | Adjusting inlet covers (611.8115) | EACH | 8 | $947.20 | $1,100.00 | $750.00 | $1,100.00 | $1,100.00 |
| 70 | Cover plates temporary (611.8120.S) | EACH | 417 | $405.00 | $450.00 | $375.00 | $450.00 | $450.00 |
| 71 | Salvaged inlet covers (611.9710) | EACH | 2 | $330.00 | $800.00 | $330.00 | $800.00 | $800.00 |
| 72 | MGS guardrail 3 (614.2300) | LF | 500 | $31.10 | $34.90 | $34.90 | $34.90 | $34.90 |
| 73 | MGS guardrail 3 K (614.2330) | LF | 325 | $42.40 | $45.90 | $45.90 | $45.90 | $45.90 |
| 74 | MGS thrie beam transition (614.2500) | LF | 4 | $95.80 | $200.00 | $200.00 | $200.00 | $200.00 |
| 75 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $4,200.00 | $4,600.00 | $4,600.00 | $4,600.00 | $4,600.00 |
| 76 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $4,200.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 77 | Fence chain link 4-FT (616.0204) | LF | 72 | $185.99 | $187.87 | $185.99 | $189.00 | $185.99 |
| 78 | Mobilization (619.1000) | EACH | 1 | $418,622 | $681,000 | $1,336,000 | $1,299,005 | $777,777 |
| 79 | Concrete median sloped nose (620.0300) | SF | 154 | $22.47 | $17.73 | $20.00 | $28.00 | $15.00 |
| 80 | Topsoil (625.0100) | SY | 4,437 | $6.80 | $10.25 | $10.00 | $0.01 | $10.25 |
| 81 | Silt fence (628.1504) | LF | 3,260 | $2.18 | $1.89 | $1.89 | $1.89 | $1.89 |
| 82 | Silt fence maintenance (628.1520) | LF | 3,260 | $0.01 | $0.02 | $0.02 | $0.02 | $0.02 |
| 83 | Mobilizations erosion control (628.1905) | EACH | 11 | $100.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 84 | Mobilizations emergency erosion control (628.1910) | EACH | 8 | $50.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 85 | Inlet protection type A (628.7005) | EACH | 15 | $100.00 | $99.00 | $99.00 | $99.00 | $99.00 |
| 86 | Inlet protection type C (628.7015) | EACH | 440 | $68.00 | $38.10 | $38.10 | $38.10 | $38.10 |
| 87 | Temporary ditch checks (628.7504) | LF | 230 | $8.00 | $11.95 | $11.95 | $11.95 | $11.95 |
| 88 | Fertilizer type B (629.0210) | CWT | 2.82 | $80.00 | $91.00 | $91.00 | $91.00 | $91.00 |
| 89 | Sod lawn (631.1000) | SY | 4,437 | $7.00 | $12.75 | $12.75 | $12.75 | $12.75 |
| 90 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 500 | $148.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 91 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 4 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 92 | Signs type II reflective H (637.2210) | SF | 4,458.20 | $21.80 | $18.90 | $18.90 | $18.90 | $18.90 |
| 93 | Signs type II reflective H folding (637.2215) | SF | 731.08 | $30.00 | $21.00 | $21.00 | $21.00 | $21.00 |
| 94 | Signs type II reflective F (637.2230) | SF | 1,152.25 | $23.80 | $17.50 | $17.50 | $17.50 | $17.50 |
| 95 | Moving signs type II (638.2102) | EACH | 13 | $80.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 96 | Removing signs type II (638.2602) | EACH | 627 | $12.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 97 | Removing small sign supports (638.3000) | EACH | 418 | $15.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 98 | Traffic control drums (643.0300) | DAY | 107,885 | $0.10 | $0.21 | $0.21 | $0.29 | $0.21 |
| 99 | Traffic control barricades type III (643.0420) | DAY | 30,314 | $0.48 | $0.44 | $0.44 | $0.73 | $0.44 |
| 100 | Traffic control warning lights type A (643.0705) | DAY | 60,628 | $0.05 | $0.14 | $0.14 | $0.17 | $0.14 |
| 101 | Traffic control warning lights type C (643.0715) | DAY | 10,906 | $0.05 | $0.16 | $0.16 | $0.17 | $0.16 |
| 102 | Connected arrow board (643.0810.S) | DAY | 754 | $12.00 | $14.19 | $14.19 | $11.00 | $14.19 |
| 103 | Traffic control signs (643.0900) | DAY | 43,472 | $0.40 | $0.30 | $0.30 | $0.56 | $0.30 |
| 104 | Traffic control covering signs type II (643.0920) | EACH | 1 | $100.00 | $155.92 | $155.92 | $200.00 | $155.92 |
| 105 | Traffic control cones 42-inch (643.1070) | DAY | 137,971 | $0.07 | $0.17 | $0.17 | $0.20 | $0.17 |
| 106 | Connected work zone start and end location markers (643.1220.S) | DAY | 76 | $65.00 | $10.80 | $10.80 | $7.60 | $10.80 |
| 107 | Temporary marking line paint 6- inch (643.3165) | LF | 45,006 | $0.30 | $0.35 | $0.35 | $0.41 | $0.35 |
| 108 | Temporary marking line removable tape 6-inch (643.3180) | LF | 62,551 | $1.70 | $1.88 | $1.88 | $1.77 | $1.88 |
| 109 | Temporary marking line removable contrast tape 6-inch (643.3185) | LF | 2,303 | $2.20 | $5.84 | $5.84 | $2.47 | $5.84 |
| 110 | Temporary marking line paint 10- inch (643.3265) | LF | 2,871 | $0.50 | $0.75 | $0.75 | $1.20 | $0.75 |
| 111 | Temporary marking line removable tape 10-inch (643.3280) | LF | 11,869 | $2.75 | $3.46 | $3.46 | $4.38 | $3.46 |
| 112 | Traffic control (643.5000) | EACH | 1 | $150,000 | $23,736 | $23,736 | $140,764 | $23,736 |
| 113 | Temporary pedestrian surface plate (644.1430) | SF | 5,194 | $7.22 | $2.21 | $2.21 | $4.20 | $2.21 |
| 114 | Temporary pedestrian curb ramp (644.1601) | DAY | 630 | $45.00 | $13.00 | $13.00 | $4.20 | $13.00 |
| 115 | Temporary pedestrian detectable warning field (644.1605) | SF | 1,651 | $22.00 | $7.48 | $7.48 | $12.50 | $7.48 |
| 116 | Temporary pedestrian barricade (644.1810) | LF | 13,146 | $4.50 | $6.18 | $6.18 | $4.70 | $6.18 |
| 117 | Temporary audible message devices (644.1900.S) | DAY | 319 | $50.00 | $6.38 | $6.38 | $12.50 | $6.38 |
| 118 | Geotextile type R (645.0130) | SY | 25 | $15.00 | $10.00 | $20.00 | $1.36 | $18.00 |
| 119 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 16,075 | $1.00 | $0.83 | $0.83 | $0.80 | $1.00 |
| 120 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 111,264 | $1.60 | $1.35 | $1.35 | $1.30 | $1.60 |
| 121 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 1,969 | $2.10 | $1.83 | $1.83 | $2.00 | $2.10 |
| 122 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 26,405 | $3.10 | $2.70 | $2.70 | $2.25 | $3.10 |
| 123 | Marking arrow epoxy (646.5020) | EACH | 149 | $315.00 | $244.67 | $244.67 | $275.00 | $315.00 |
| 124 | Marking word epoxy (646.5120) | EACH | 35 | $450.00 | $295.58 | $295.58 | $325.00 | $450.00 |
| 125 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,750 | $30.00 | $12.81 | $12.81 | $15.00 | $30.00 |
| 126 | Cold weather marking epoxy 6-inch (646.6466) | LF | 27,816 | $0.65 | $0.45 | $0.45 | $0.90 | $0.65 |
| 127 | Cold weather marking epoxy 10- inch (646.6470) | LF | 6,601 | $1.35 | $1.01 | $1.01 | $1.80 | $1.35 |
| 128 | Marking diagonal epoxy 12-inch (646.7120) | LF | 6,593 | $12.00 | $13.58 | $13.58 | $12.00 | $12.00 |
| 129 | Marking chevron epoxy 24-inch (646.7220) | LF | 178 | $13.00 | $24.84 | $24.84 | $18.00 | $13.00 |
| 130 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 6,288 | $13.75 | $12.03 | $12.03 | $11.50 | $13.75 |
| 131 | Marking curb epoxy (646.8120) | LF | 2,022 | $8.00 | $7.25 | $7.25 | $8.00 | $8.00 |
| 132 | Marking island nose epoxy (646.8220) | EACH | 81 | $380.00 | $271.92 | $271.92 | $325.00 | $380.00 |
| 133 | Construction staking storm sewer (650.4000) | EACH | 2 | $500.00 | $500.00 | $300.00 | $500.00 | $500.00 |
| 134 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,510 | $1.40 | $1.40 | $5.00 | $1.40 | $1.40 |
| 135 | Construction staking resurfacing reference (650.8000) | LF | 27,544 | $0.35 | $0.35 | $0.25 | $0.35 | $0.35 |
| 136 | Construction staking electrical installations (project) 01. 2140-14- 70 (650.8501) | EACH | 1 | $6,000.00 | $6,000.00 | $12,000 | $6,000.00 | $6,000.00 |
| 137 | Construction staking curb ramps (650.9000) | EACH | 134 | $135.00 | $135.00 | $250.00 | $135.00 | $135.00 |
| 138 | Construction staking sidewalk (project) 01. 2140-14-70 (650.9500) | EACH | 1 | $5,000.00 | $5,000.00 | $6,500.00 | $5,000.00 | $5,000.00 |
| 139 | Construction staking supplemental control (project) 01. 2140-14-70 (650.9911) | EACH | 1 | $7,500.00 | $7,500.00 | $2,500.00 | $7,500.00 | $7,500.00 |
| 140 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 7,000 | $7.40 | $7.40 | $7.40 | $7.40 | $7.40 |
| 141 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 6,205 | $8.94 | $8.94 | $8.94 | $8.94 | $8.94 |
| 142 | Conduit special 2-inch (652.0605) | LF | 5,500 | $22.80 | $22.80 | $22.80 | $22.80 | $22.80 |
| 143 | Conduit special 3-inch (652.0615) | LF | 8,515 | $30.29 | $30.29 | $30.29 | $30.29 | $30.29 |
| 144 | Conduit loop detector (652.0800) | LF | 20,708 | $6.90 | $6.90 | $6.90 | $6.90 | $6.90 |
| 145 | Pull boxes steel 24X36-inch (653.0135) | EACH | 51 | $1,030.00 | $1,030.00 | $1,030.00 | $1,030.00 | $1,030.00 |
| 146 | Pull boxes steel 24X42-inch (653.0140) | EACH | 187 | $1,140.60 | $1,140.60 | $1,140.60 | $1,140.60 | $1,140.60 |
| 147 | Removing pull boxes (653.0905) | EACH | 230 | $74.00 | $199.00 | $74.00 | $74.00 | $74.00 |
| 148 | Concrete bases type 1 (654.0101) | EACH | 88 | $901.00 | $901.00 | $901.00 | $901.00 | $901.00 |
| 149 | Concrete bases type 2 (654.0102) | EACH | 7 | $1,125.00 | $1,125.00 | $1,125.00 | $1,125.00 | $1,125.00 |
| 150 | Concrete bases type 10 (654.0110) | EACH | 40 | $5,897.00 | $5,897.00 | $5,897.00 | $5,897.00 | $5,897.00 |
| 151 | Concrete bases type 10-special (654.0120) | EACH | 22 | $7,849.00 | $7,849.00 | $7,849.00 | $7,849.00 | $7,849.00 |
| 152 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 11 | $2,590.00 | $2,590.00 | $2,590.00 | $2,590.00 | $2,590.00 |
| 153 | Cable traffic signal 5-14 AWG (655.0230) | LF | 7,930 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 154 | Cable traffic signal 7-14 AWG (655.0240) | LF | 12,905 | $2.26 | $2.26 | $2.26 | $2.26 | $2.26 |
| 155 | Cable traffic signal 12-14 AWG (655.0260) | LF | 21,585 | $3.20 | $3.20 | $3.20 | $3.20 | $3.20 |
| 156 | Cable traffic signal 15-14 AWG (655.0270) | LF | 8,890 | $4.17 | $4.17 | $4.17 | $4.17 | $4.17 |
| 157 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 9,790 | $1.81 | $1.81 | $1.81 | $1.81 | $1.81 |
| 158 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 27,195 | $1.29 | $1.29 | $1.29 | $1.29 | $1.29 |
| 159 | Electrical wire lighting 12 AWG (655.0610) | LF | 11,010 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 160 | Loop detector lead in cable (655.0700) | LF | 81,626 | $1.95 | $1.95 | $1.95 | $1.95 | $1.95 |
| 161 | Loop detector wire (655.0800) | LF | 81,151 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 162 | Electrical service meter breaker pedestal (location) 01. STH 181 at florist ave (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 163 | Electrical service meter breaker pedestal (location) 02. STH 181 at mill RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 164 | Electrical service meter breaker pedestal (location) 03. STH 181 at acacia ST (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 165 | Electrical service meter breaker pedestal (location) 04. STH 181 at green tree RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 166 | Electrical service meter breaker pedestal (location) 05. STH 181 at good hope RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 167 | Electrical service meter breaker pedestal (location) 06. STH 181 at calumet RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 168 | Electrical service meter breaker pedestal (location) 07. STH 181 at bradley RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 169 | Electrical service meter breaker pedestal (location) 08. STH 181 at tower ave (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 170 | Electrical service meter breaker pedestal (location) 09. STH 181 at servite/dean RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 171 | Electrical service meter breaker pedestal (location) 10. STH 181 at northridge DR (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 172 | Electrical service meter breaker pedestal (location) 11. STH 181 at northridge lake BLVD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 | $1,460.00 |
| 173 | Pedestal bases (657.0100) | EACH | 88 | $286.00 | $286.00 | $286.00 | $286.00 | $286.00 |
| 174 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 7 | $610.00 | $610.00 | $610.00 | $610.00 | $610.00 |
| 175 | Poles type 3 (657.0310) | EACH | 7 | $3,521.00 | $3,521.00 | $3,521.00 | $3,521.00 | $3,521.00 |
| 176 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 12 | $249.00 | $249.00 | $249.00 | $249.00 | $249.00 |
| 177 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 20 | $539.00 | $539.00 | $539.00 | $539.00 | $539.00 |
| 178 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 37 | $576.00 | $576.00 | $576.00 | $576.00 | $576.00 |
| 179 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 19 | $490.00 | $490.00 | $490.00 | $490.00 | $490.00 |
| 180 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 9 | $270.00 | $270.00 | $270.00 | $270.00 | $270.00 |
| 181 | Traffic signal face 3S 12-inch (658.0173) | EACH | 165 | $798.00 | $798.00 | $798.00 | $798.00 | $798.00 |
| 182 | Traffic signal face 4S 12-inch (658.0174) | EACH | 81 | $1,079.00 | $1,079.00 | $1,079.00 | $1,079.00 | $1,079.00 |
| 183 | Pedestrian signal face 16-inch (658.0416) | EACH | 92 | $558.00 | $558.00 | $558.00 | $558.00 | $558.00 |
| 184 | Pedestrian push buttons (658.0500) | EACH | 119 | $402.00 | $402.00 | $402.00 | $402.00 | $402.00 |
| 185 | Signal mounting hardware (location) 01. STH 181 at florist ave (658.5070) | EACH | 1 | $8,364.00 | $8,364.00 | $8,364.00 | $8,364.00 | $8,364.00 |
| 186 | Signal mounting hardware (location) 02. STH 181 at mill RD (658.5070) | EACH | 1 | $9,151.00 | $9,151.00 | $9,151.00 | $9,151.00 | $9,151.00 |
| 187 | Signal mounting hardware (location) 03. STH 181 at acacia ST (658.5070) | EACH | 1 | $7,105.00 | $7,105.00 | $7,105.00 | $7,105.00 | $7,105.00 |
| 188 | Signal mounting hardware (location) 04. STH 181 at green tree RD (658.5070) | EACH | 1 | $7,842.00 | $7,842.00 | $7,842.00 | $7,842.00 | $7,842.00 |
| 189 | Signal mounting hardware (location) 05. STH 181 at good hope RD (658.5070) | EACH | 1 | $10,218 | $10,218 | $10,218 | $10,218 | $10,218 |
| 190 | Signal mounting hardware (location) 06. STH 181 at calumet RD (658.5070) | EACH | 1 | $7,413.00 | $7,413.00 | $7,413.00 | $7,413.00 | $7,413.00 |
| 191 | Signal mounting hardware (location) 07. STH 181 at bradley RD (658.5070) | EACH | 1 | $6,214.00 | $6,214.00 | $6,214.00 | $6,214.00 | $6,214.00 |
| 192 | Signal mounting hardware (location) 08. STH 181 at tower ave (658.5070) | EACH | 1 | $5,928.00 | $5,928.00 | $5,928.00 | $5,928.00 | $5,928.00 |
| 193 | Signal mounting hardware (location) 09. STH 181 at servite/dean RD (658.5070) | EACH | 1 | $6,379.00 | $6,379.00 | $6,379.00 | $6,379.00 | $6,379.00 |
| 194 | Signal mounting hardware (location) 10. STH 181 at northridge DR (658.5070) | EACH | 1 | $5,268.00 | $5,268.00 | $5,268.00 | $5,268.00 | $5,268.00 |
| 195 | Signal mounting hardware (location) 11. STH 181 at northridge lakes BLVD (658.5070) | EACH | 1 | $7,699.00 | $7,699.00 | $7,699.00 | $7,699.00 | $7,699.00 |
| 196 | Signal mounting hardware (location) 12. STH 181 at STH 100 (658.5070) | EACH | 1 | $1,056.00 | $1,056.00 | $1,056.00 | $1,056.00 | $1,056.00 |
| 197 | Luminaires utility LED C (659.1125) | EACH | 85 | $314.80 | $314.80 | $314.80 | $314.80 | $314.80 |
| 198 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 361 | $3.25 | $3.25 | $3.25 | $3.25 | $3.25 |
| 199 | Temporary traffic signals for intersections (location) 01. STH 181 at florist ave (661.0201) | EACH | 1 | $52,215 | $52,215 | $52,215 | $52,215 | $52,215 |
| 200 | Temporary traffic signals for intersections (location) 02. STH 181 at mill RD (661.0201) | EACH | 1 | $62,430 | $62,430 | $62,430 | $62,430 | $62,430 |
| 201 | Temporary traffic signals for intersections (location) 03. STH 181 at acacia ST (661.0201) | EACH | 1 | $52,215 | $52,215 | $52,215 | $52,215 | $52,215 |
| 202 | Temporary traffic signals for intersections (location) 04. STH 181 at green tree RD (661.0201) | EACH | 1 | $52,215 | $52,215 | $52,215 | $52,215 | $52,215 |
| 203 | Temporary traffic signals for intersections (location) 05. STH 181 at good hope RD (661.0201) | EACH | 1 | $64,107 | $64,107 | $64,107 | $64,107 | $64,107 |
| 204 | Temporary traffic signals for intersections (location) 06. STH 181 at calumet RD (661.0201) | EACH | 1 | $55,331 | $55,331 | $55,331 | $55,331 | $55,331 |
| 205 | Temporary traffic signals for intersections (location) 07. STH 181 at bradley RD (661.0201) | EACH | 1 | $58,663 | $58,663 | $58,663 | $58,663 | $58,663 |
| 206 | Temporary traffic signals for intersections (location) 09. STH 181 at servite/dean RD (661.0201) | EACH | 1 | $52,157 | $52,157 | $52,157 | $52,157 | $52,157 |
| 207 | Temporary traffic signals for intersections (location) 10. STH 181 at northridge DR (661.0201) | EACH | 1 | $56,983 | $56,983 | $56,983 | $56,983 | $56,983 |
| 208 | Temporary traffic signals for intersections (location) 11. STH 181 at northridge lakes BLVD (661.0201) | EACH | 1 | $52,342 | $52,342 | $52,342 | $52,342 | $52,342 |
| 209 | Sawing asphalt (690.0150) | LF | 20,148 | $1.75 | $1.39 | $1.39 | $1.39 | $1.39 |
| 210 | Sawing concrete (690.0250) | LF | 4,805 | $2.55 | $2.15 | $2.15 | $2.15 | $2.15 |
| 211 | Incentive iri ride (740.0440) | DOL | 47,720 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 212 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 8,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 213 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 17,280 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 214 | Special 01. utility line opening (ulo) (SPV.0060) | EACH | 35 | $1,723.33 | $1,500.00 | $2,000.00 | $400.00 | $1,500.00 |
| 215 | Special 02. tuck point storm sewer structure (SPV.0060) | EACH | 1 | $1,800.00 | $2,400.00 | $2,000.00 | $1,800.00 | $1,800.00 |
| 216 | Special 03. strapping C-40-0053 (SPV.0060) | EACH | 2 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 217 | Special 04. install type 9 pole (SPV.0060) | EACH | 5 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 |
| 218 | Special 05. install type 9 special pole (SPV.0060) | EACH | 16 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 |
| 219 | Special 06. install type 10 pole (SPV.0060) | EACH | 34 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 |
| 220 | Special 07. install type 10 special pole (SPV.0060) | EACH | 7 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 | $1,060.00 |
| 221 | Special 08. install monotube arms 15-FT (SPV.0060) | EACH | 18 | $2,044.00 | $2,044.00 | $2,044.00 | $2,044.00 | $2,044.00 |
| 222 | Special 09. install monotube arms 20-FT (SPV.0060) | EACH | 4 | $2,204.00 | $2,204.00 | $2,204.00 | $2,204.00 | $2,204.00 |
| 223 | Special 10. install monotube arms 25-FT (SPV.0060) | EACH | 2 | $2,284.00 | $2,284.00 | $2,284.00 | $2,284.00 | $2,284.00 |
| 224 | Special 11. install monotube arms 30-FT (SPV.0060) | EACH | 16 | $2,364.00 | $2,364.00 | $2,364.00 | $2,364.00 | $2,364.00 |
| 225 | Special 12. install monotube arms 35-FT special (SPV.0060) | EACH | 19 | $2,444.00 | $2,444.00 | $2,444.00 | $2,444.00 | $2,444.00 |
| 226 | Special 13. install monotube arms 40-FT (SPV.0060) | EACH | 1 | $2,684.00 | $2,684.00 | $2,684.00 | $2,684.00 | $2,684.00 |
| 227 | Special 14. install monotube arms 45-FT special (SPV.0060) | EACH | 2 | $3,004.00 | $3,004.00 | $3,004.00 | $3,004.00 | $3,004.00 |
| 228 | Special 15. install luminaire arms steel 15-FT (SPV.0060) | EACH | 69 | $232.00 | $232.00 | $232.00 | $232.00 | $232.00 |
| 229 | Special 16. transport and install state furnished traffic signal cabinet florist ave (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 230 | Special 17. transport and install state furnished traffic signal cabinet mill RD (SPV.0060) | EACH | 1 | $5,136.80 | $5,136.80 | $5,136.80 | $5,136.80 | $5,136.80 |
| 231 | Special 18. transport and install state furnished traffic signal cabinet acacia ST (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 232 | Special 19. transport and install state furnished traffic signal cabinet green tree RD (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 233 | Special 20. transport and install state furnished traffic signal cabinet good hope RD (SPV.0060) | EACH | 1 | $6,128.80 | $6,128.80 | $6,128.80 | $6,128.80 | $6,128.80 |
| 234 | Special 21. transport and install state furnished traffic signal cabinet calumet RD (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 235 | Special 22. transport and install state furnished traffic signal cabinet bradley RD (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 236 | Special 23. transport and install state furnished traffic signal cabinet tower ave (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 237 | Special 24. transport and install state furnished traffic signal cabinet servite/dean RD (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 238 | Special 25. transport and install state furnished traffic signal cabinet northridge DR (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 239 | Special 26. TRNSPRT & install state FRNSHD TRFFC SGNL cabinet northridge lakes BLVD (SPV.0060) | EACH | 1 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 | $4,144.80 |
| 240 | Special 27. transport traffic signal and lighting materials florist ave (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 241 | Special 28. transport traffic signal and lighting materials mill RD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 242 | Special 29. transport traffic signal and lighting materials acacia ST (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 243 | Special 30. transport traffic signal and lighting materials green tree RD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 244 | Special 31. transport traffic signal and lighting materials good hope RD (SPV.0060) | EACH | 1 | $1,024.00 | $1,024.00 | $1,024.00 | $1,024.00 | $1,024.00 |
| 245 | Special 32. transport traffic signal and lighting materials calumet RD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 246 | Special 33. transport traffic signal and lighting materials bradley RD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 247 | Special 34. transport traffic signal and lighting materials tower ave (SPV.0060) | EACH | 1 | $512.00 | $512.00 | $512.00 | $512.00 | $512.00 |
| 248 | Special 35. transport traffic signal and lighting materials servite/dean RD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 249 | Special 36. transport traffic signal and lighting materials northridge DR (SPV.0060) | EACH | 1 | $384.00 | $384.00 | $384.00 | $384.00 | $384.00 |
| 250 | Special 37. transport traffic signal and lighting materials northridge lake BLVD (SPV.0060) | EACH | 1 | $768.00 | $768.00 | $768.00 | $768.00 | $768.00 |
| 251 | Special 38. modify traffic signal STH 181 & STH 100 (SPV.0060) | EACH | 1 | $3,071.20 | $3,071.20 | $3,071.20 | $3,071.20 | $3,071.20 |
| 252 | Special 39. inlet covers type H-D (SPV.0060) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 | $1,050.00 |
| 253 | Special 40. cleaning storm sewer (SPV.0060) | EACH | 2 | $5,462.50 | $2,000.00 | $2,850.00 | $2,500.00 | $1,500.00 |
| 254 | Special 41. adjusting water valve boxes (SPV.0060) | EACH | 178 | $368.00 | $700.00 | $375.00 | $700.00 | $700.00 |
| 255 | Special 42. adjusting water manholes (SPV.0060) | EACH | 5 | $1,284.24 | $1,500.00 | $750.00 | $1,500.00 | $2,400.00 |
| 256 | Special 43. adjusting sanitary manholes (SPV.0060) | EACH | 103 | $2,063.86 | $1,050.00 | $750.00 | $1,050.00 | $2,000.00 |
| 257 | Special 44. internal manhole seals (SPV.0060) | EACH | 4 | $925.00 | $800.00 | $750.00 | $800.00 | $800.00 |
| 258 | Special 45. manhole covers type MS-58A (SPV.0060) | EACH | 4 | $1,695.00 | $1,100.00 | $1,695.00 | $1,100.00 | $1,100.00 |
| 259 | Special 46. adjusting cuc manhole cover (SPV.0060) | EACH | 24 | $2,733.04 | $2,250.00 | $2,000.00 | $2,250.00 | $3,200.00 |
| 260 | Special 47. 4' diameter "doghouse" manhole type cuc (SPV.0060) | EACH | 10 | $16,264 | $16,264 | $16,500 | $16,264 | $16,264 |
| 261 | Special 48. 5' diameter "doghouse" manhole type cuc (SPV.0060) | EACH | 2 | $19,879 | $19,879 | $20,000 | $19,879 | $19,879 |
| 262 | Special 49. removing cuc manhole (SPV.0060) | EACH | 12 | $6,137.00 | $6,137.00 | $6,200.00 | $6,137.00 | $6,137.00 |
| 263 | Special 50. section corner monuments (SPV.0060) | EACH | 7 | $3,000.00 | $1,000.00 | $1,000.00 | $1,350.00 | $1,250.00 |
| 264 | Special 51. removing fence, R-40- 76 (SPV.0060) | EACH | 1 | $1,200.00 | $10,101 | $10,000 | $4,200.00 | $10,000 |
| 265 | Special 52. field office facilities office space (SPV.0060) | EACH | 1 | $28,180 | $30,000 | $60,000 | $32,500 | $42,000 |
| 266 | Special 01. street sweeping (SPV.0075) | HRS | 100 | $229.00 | $180.00 | $300.00 | $185.00 | $195.00 |
| 267 | Special 01. concrete curb and gutter 6-inch slope 18-inch type J (SPV.0090) | LF | 211 | $45.77 | $52.60 | $60.00 | $58.00 | $58.00 |
| 268 | Special 02. marking crosswalk epoxy block style 12-inch white (SPV.0090) | LF | 6,358 | $25.00 | $12.42 | $12.42 | $14.00 | $25.00 |
| 269 | Special 01. excavation, hauling, and disposal of lead contaminated soil (SPV.0195) | TON | 48 | $146.69 | $146.84 | $200.00 | $90.04 | $500.00 |
| 270 | Special 02. excavation, hauling, and disposal of pah contaminated soil (SPV.0195) | TON | 2 | $311.22 | $291.46 | $1,000.00 | $90.04 | $2,000.00 |
| 271 | Special 03. excavation, hauling, and disposal of petroleum contaminated soil (SPV.0195) | TON | 135 | $102.30 | $143.13 | $200.00 | $83.04 | $500.00 |
| 272 | Special 04. asphaltic repair (SPV.0195) | TON | 4,667 | $144.30 | $160.00 | $144.30 | $135.00 | $151.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.