C Milwaukee 76th Street; Florist Ave to CTH Q (STH 181, Milwaukee County C Milwaukee 76th Street). Let by Wisconsin DOT on October 14, 2025, Milwaukee. 5 bids received; low bid $13,433,751 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
272
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$13,433,751Low
2Payne and Dolan, Inc$14,083,537+5.0%
3Zignego Company, Inc.$14,190,090+6.0%
4Rock Road Companies, Inc.$14,535,298+8.0%
5Stark Pavement Corporation$14,745,149+10%
WisDOT contract 20251014030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Payne and Dolan, Inc3. Zignego Company, Inc.4. Rock Road Companies, Inc.5. Stark Pavement Corporation
1Removing concrete pavement (204.0100)SY310$15.12$42.30$30.00$35.00$35.00
2Removing asphaltic surface (204.0110)SY1,030$12.40$24.55$30.00$35.00$35.00
3Removing asphaltic surface butt joints (204.0115)SY520$11.85$12.50$11.85$9.59$12.00
4Removing asphaltic surface milling (204.0120)SY208,740$3.15$3.40$3.15$1.50$4.48
5Removing curb & gutter (204.0150)LF3,550$10.62$15.90$12.00$15.50$16.00
6Removing concrete sidewalk (204.0155)SY3,290$13.84$17.51$12.00$11.50$12.00
7Removing guardrail (204.0165)LF1,140$3.00$2.95$2.95$2.95$2.95
8Removing concrete bases (204.0195)EACH178$300.00$1,200.00$800.00$400.00$300.00
9Removing inlets (204.0220)EACH2$780.00$500.00$780.00$500.00$500.00
10Removing storm sewer (size) 01. 12-inch (204.0245)LF45$35.00$50.00$35.00$50.00$50.00
11Removing (item description) 01. traffic signals STH 181 at florist ave (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
12Removing (item description) 02. traffic signals STH 181 at mill RD (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
13Removing (item description) 03. traffic signals STH 181 at acacia ST (204.9060.S)EACH1$10,688$10,688$10,688$10,688$10,688
14Removing (item description) 04. traffic signals STH 181 at green tree RD (204.9060.S)EACH1$10,688$10,688$10,688$10,688$10,688
15Removing (item description) 05. traffic signals STH 181 at good hope RD (204.9060.S)EACH1$10,688$10,688$10,688$10,688$10,688
16Removing (item description) 06. traffic signals STH 181 at calumet RD (204.9060.S)EACH1$10,688$10,688$10,688$10,688$10,688
17Removing (item description) 07. traffic signals STH 181 at bradley RD (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
18Removing (item description) 08. traffic signals STH 181 at tower RD (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
19Removing (item description) 09. traffic signals STH 181 at servite/dean RD (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
20Removing (item description) 10. traffic signals STH 181 at northridge DR (204.9060.S)EACH1$10,688$10,688$10,688$10,688$10,688
21Removing (item description) 11. traffic signals STH 181 at northridge lakes BLVD (204.9060.S)EACH1$8,016.00$8,016.00$8,016.00$8,016.00$8,016.00
22Removing (item description) 12. loop detector wire and lead-in cable STH 181 at florist ave (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
23Removing (item description) 13. loop detector wire and lead-in cable STH 181 at mill RD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
24Removing (item description) 14. loop detector wire and lead-in cable STH 181 at acacia ST (204.9060.S)EACH1$2,137.60$2,137.60$2,137.60$2,137.60$2,137.60
25Removing (item description) 15. loop detector wire and lead-in cable STH 181 at green tree RD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
26Removing (item description) 16. loop detector wire and lead-in cable STH 181 at good hope RD (204.9060.S)EACH1$3,206.40$3,206.40$3,206.40$3,206.40$3,206.40
27Removing (item description) 17. loop detector wire and lead-in cable STH 181 at calumet RD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
28Removing (item description) 18. loop detector wire and lead-in cable STH 181 at bradley RD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
29Removing (item description) 19. loop detector wire and lead-in cable STH 181 at tower ave (204.9060.S)EACH1$2,137.60$2,137.60$2,137.60$2,137.60$2,137.60
30Removing (item description) 20. loop detector wire and lead-in cable STH 181 at servite/dean RD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
31Removing (item description) 21. loop detector wire and lead-in cable STH 181 at northridge DR (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
32Removing (item description) 22. loop detector wire and lead-in cable STH 181 at northridge lakes BLVD (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
33Removing (item description) 23. loop detector wire and lead-in cable STH 181 at STH 100 (204.9060.S)EACH1$2,672.00$2,672.00$2,672.00$2,672.00$2,672.00
34Excavation common (205.0100)CY1,360$41.44$59.33$50.00$40.00$40.00
35Cofferdams (structure) 01. C-40- 0053 (206.5001)EACH1$19,078$19,078$19,078$19,078$19,078
36Borrow (208.0100)CY170$26.90$20.31$30.00$45.00$40.00
37Select borrow (208.1100)CY90$56.23$70.93$100.00$30.00$40.00
38Finishing roadway (project) 01. 2140-14-70 (213.0100)EACH1$3,680.00$2,500.00$1,000.00$10,210$9,500.00
39Base aggregate dense 1 1/4-inch (305.0120)TON1,422$28.23$53.19$32.50$23.92$40.00
40Base patching concrete shes (390.0405)CY85$436.55$733.90$650.00$560.00$560.00
41Drilled tie bars (416.0610)EACH350$17.55$9.33$30.00$14.00$14.00
42Drilled dowel bars (416.0620)EACH408$21.82$16.60$30.00$22.00$22.00
43Concrete pavement repair shes (416.1715)SY1,025$186.48$119.24$211.00$156.00$156.00
44HMA cold weather paving (450.4000)TON3,920$1.00$1.00$1.00$5.00$4.00
45Tack coat (455.0605)GAL29,300$2.30$2.30$2.30$3.48$3.00
46HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$1,200.00$1,100.00$1,200.00$3,500.00$3,500.00
47HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$8,000.00$8,000.00$8,000.00$3,500.00$3,500.00
48Incentive density PWL HMA pavement (460.2005)DOL50,230$1.00$1.00$1.00$1.00$1.00
49Incentive density HMA pavement longitudinal joints (460.2007)DOL16,380$1.00$1.00$1.00$1.00$1.00
50Incentive air voids HMA pavement (460.2010)DOL25,810$1.00$1.00$1.00$1.00$1.00
51HMA pavement 3 MT 58-28 S (460.6223)TON28,250$66.10$72.00$66.10$84.80$76.10
52HMA pavement 4 MT 58-28 S (460.6224)TON21,972$74.95$81.50$74.95$90.80$76.50
53Asphaltic surface patching (465.0110)TON717$200.00$300.00$200.00$174.25$265.00
54Concrete surface repair (509.1500)SF200$82.00$82.00$82.00$82.00$82.00
55Culvert pipe reinforced concrete class IV 12-inch (522.0412)LF44$95.00$180.00$95.00$180.00$180.00
56Concrete curb & gutter 18-inch type D (601.0407)LF610$45.77$37.67$60.00$48.00$48.00
57Concrete curb & gutter 30-inch type A (601.0409)LF147$51.74$58.89$60.00$58.00$58.00
58Concrete curb & gutter 30-inch type D (601.0411)LF2,143$48.98$55.59$60.00$46.00$46.00
59Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF640$48.98$55.12$60.00$58.00$58.00
60Concrete curb pedestrian (601.0600)LF467$46.32$48.75$100.00$45.00$45.00
61Concrete sidewalk 5-inch (602.0410)SF36,153$8.05$10.23$11.00$9.65$9.65
62Curb ramp detectable warning field yellow (602.0505)SF1,232$39.53$34.66$50.00$48.00$48.00
63Curb ramp detectable warning field radial yellow (602.0605)SF150$52.46$63.54$100.00$60.00$60.00
64Riprap light (606.0100)CY10$174.44$175.00$250.00$178.12$200.00
65Inlet covers type H (611.0624)EACH2$1,035.00$1,200.00$1,035.00$1,200.00$1,200.00
66Inlets 4-FT diameter (611.3004)EACH1$4,430.00$8,000.00$4,430.00$8,000.00$8,000.00
67Inlets 2X3-FT (611.3230)EACH1$1,910.00$6,000.00$1,910.00$6,000.00$6,000.00
68Adjusting manhole covers (611.8110)EACH232$1,240.21$900.00$750.00$900.00$1,800.00
69Adjusting inlet covers (611.8115)EACH8$947.20$1,100.00$750.00$1,100.00$1,100.00
70Cover plates temporary (611.8120.S)EACH417$405.00$450.00$375.00$450.00$450.00
71Salvaged inlet covers (611.9710)EACH2$330.00$800.00$330.00$800.00$800.00
72MGS guardrail 3 (614.2300)LF500$31.10$34.90$34.90$34.90$34.90
73MGS guardrail 3 K (614.2330)LF325$42.40$45.90$45.90$45.90$45.90
74MGS thrie beam transition (614.2500)LF4$95.80$200.00$200.00$200.00$200.00
75MGS guardrail terminal eat (614.2610)EACH3$4,200.00$4,600.00$4,600.00$4,600.00$4,600.00
76MGS guardrail terminal type 2 (614.2620)EACH1$4,200.00$5,000.00$5,000.00$5,000.00$5,000.00
77Fence chain link 4-FT (616.0204)LF72$185.99$187.87$185.99$189.00$185.99
78Mobilization (619.1000)EACH1$418,622$681,000$1,336,000$1,299,005$777,777
79Concrete median sloped nose (620.0300)SF154$22.47$17.73$20.00$28.00$15.00
80Topsoil (625.0100)SY4,437$6.80$10.25$10.00$0.01$10.25
81Silt fence (628.1504)LF3,260$2.18$1.89$1.89$1.89$1.89
82Silt fence maintenance (628.1520)LF3,260$0.01$0.02$0.02$0.02$0.02
83Mobilizations erosion control (628.1905)EACH11$100.00$250.00$250.00$250.00$250.00
84Mobilizations emergency erosion control (628.1910)EACH8$50.00$100.00$100.00$100.00$100.00
85Inlet protection type A (628.7005)EACH15$100.00$99.00$99.00$99.00$99.00
86Inlet protection type C (628.7015)EACH440$68.00$38.10$38.10$38.10$38.10
87Temporary ditch checks (628.7504)LF230$8.00$11.95$11.95$11.95$11.95
88Fertilizer type B (629.0210)CWT2.82$80.00$91.00$91.00$91.00$91.00
89Sod lawn (631.1000)SY4,437$7.00$12.75$12.75$12.75$12.75
90Posts wood 4X6-inch X 18-FT (634.0618)EACH500$148.00$95.00$95.00$95.00$95.00
91Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH4$200.00$200.00$200.00$200.00$200.00
92Signs type II reflective H (637.2210)SF4,458.20$21.80$18.90$18.90$18.90$18.90
93Signs type II reflective H folding (637.2215)SF731.08$30.00$21.00$21.00$21.00$21.00
94Signs type II reflective F (637.2230)SF1,152.25$23.80$17.50$17.50$17.50$17.50
95Moving signs type II (638.2102)EACH13$80.00$110.00$110.00$110.00$110.00
96Removing signs type II (638.2602)EACH627$12.00$17.00$17.00$17.00$17.00
97Removing small sign supports (638.3000)EACH418$15.00$16.00$16.00$16.00$16.00
98Traffic control drums (643.0300)DAY107,885$0.10$0.21$0.21$0.29$0.21
99Traffic control barricades type III (643.0420)DAY30,314$0.48$0.44$0.44$0.73$0.44
100Traffic control warning lights type A (643.0705)DAY60,628$0.05$0.14$0.14$0.17$0.14
101Traffic control warning lights type C (643.0715)DAY10,906$0.05$0.16$0.16$0.17$0.16
102Connected arrow board (643.0810.S)DAY754$12.00$14.19$14.19$11.00$14.19
103Traffic control signs (643.0900)DAY43,472$0.40$0.30$0.30$0.56$0.30
104Traffic control covering signs type II (643.0920)EACH1$100.00$155.92$155.92$200.00$155.92
105Traffic control cones 42-inch (643.1070)DAY137,971$0.07$0.17$0.17$0.20$0.17
106Connected work zone start and end location markers (643.1220.S)DAY76$65.00$10.80$10.80$7.60$10.80
107Temporary marking line paint 6- inch (643.3165)LF45,006$0.30$0.35$0.35$0.41$0.35
108Temporary marking line removable tape 6-inch (643.3180)LF62,551$1.70$1.88$1.88$1.77$1.88
109Temporary marking line removable contrast tape 6-inch (643.3185)LF2,303$2.20$5.84$5.84$2.47$5.84
110Temporary marking line paint 10- inch (643.3265)LF2,871$0.50$0.75$0.75$1.20$0.75
111Temporary marking line removable tape 10-inch (643.3280)LF11,869$2.75$3.46$3.46$4.38$3.46
112Traffic control (643.5000)EACH1$150,000$23,736$23,736$140,764$23,736
113Temporary pedestrian surface plate (644.1430)SF5,194$7.22$2.21$2.21$4.20$2.21
114Temporary pedestrian curb ramp (644.1601)DAY630$45.00$13.00$13.00$4.20$13.00
115Temporary pedestrian detectable warning field (644.1605)SF1,651$22.00$7.48$7.48$12.50$7.48
116Temporary pedestrian barricade (644.1810)LF13,146$4.50$6.18$6.18$4.70$6.18
117Temporary audible message devices (644.1900.S)DAY319$50.00$6.38$6.38$12.50$6.38
118Geotextile type R (645.0130)SY25$15.00$10.00$20.00$1.36$18.00
119Marking line grooved black epoxy 6-inch (646.2025)LF16,075$1.00$0.83$0.83$0.80$1.00
120Marking line grooved wet ref epoxy 6-inch (646.2040)LF111,264$1.60$1.35$1.35$1.30$1.60
121Marking line grooved black epoxy 10-inch (646.4025)LF1,969$2.10$1.83$1.83$2.00$2.10
122Marking line grooved wet ref epoxy 10-inch (646.4040)LF26,405$3.10$2.70$2.70$2.25$3.10
123Marking arrow epoxy (646.5020)EACH149$315.00$244.67$244.67$275.00$315.00
124Marking word epoxy (646.5120)EACH35$450.00$295.58$295.58$325.00$450.00
125Marking stop line epoxy 18-inch (646.6120)LF1,750$30.00$12.81$12.81$15.00$30.00
126Cold weather marking epoxy 6-inch (646.6466)LF27,816$0.65$0.45$0.45$0.90$0.65
127Cold weather marking epoxy 10- inch (646.6470)LF6,601$1.35$1.01$1.01$1.80$1.35
128Marking diagonal epoxy 12-inch (646.7120)LF6,593$12.00$13.58$13.58$12.00$12.00
129Marking chevron epoxy 24-inch (646.7220)LF178$13.00$24.84$24.84$18.00$13.00
130Marking crosswalk epoxy transverse line 6-inch (646.7420)LF6,288$13.75$12.03$12.03$11.50$13.75
131Marking curb epoxy (646.8120)LF2,022$8.00$7.25$7.25$8.00$8.00
132Marking island nose epoxy (646.8220)EACH81$380.00$271.92$271.92$325.00$380.00
133Construction staking storm sewer (650.4000)EACH2$500.00$500.00$300.00$500.00$500.00
134Construction staking curb gutter and curb & gutter (650.5500)LF3,510$1.40$1.40$5.00$1.40$1.40
135Construction staking resurfacing reference (650.8000)LF27,544$0.35$0.35$0.25$0.35$0.35
136Construction staking electrical installations (project) 01. 2140-14- 70 (650.8501)EACH1$6,000.00$6,000.00$12,000$6,000.00$6,000.00
137Construction staking curb ramps (650.9000)EACH134$135.00$135.00$250.00$135.00$135.00
138Construction staking sidewalk (project) 01. 2140-14-70 (650.9500)EACH1$5,000.00$5,000.00$6,500.00$5,000.00$5,000.00
139Construction staking supplemental control (project) 01. 2140-14-70 (650.9911)EACH1$7,500.00$7,500.00$2,500.00$7,500.00$7,500.00
140Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF7,000$7.40$7.40$7.40$7.40$7.40
141Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF6,205$8.94$8.94$8.94$8.94$8.94
142Conduit special 2-inch (652.0605)LF5,500$22.80$22.80$22.80$22.80$22.80
143Conduit special 3-inch (652.0615)LF8,515$30.29$30.29$30.29$30.29$30.29
144Conduit loop detector (652.0800)LF20,708$6.90$6.90$6.90$6.90$6.90
145Pull boxes steel 24X36-inch (653.0135)EACH51$1,030.00$1,030.00$1,030.00$1,030.00$1,030.00
146Pull boxes steel 24X42-inch (653.0140)EACH187$1,140.60$1,140.60$1,140.60$1,140.60$1,140.60
147Removing pull boxes (653.0905)EACH230$74.00$199.00$74.00$74.00$74.00
148Concrete bases type 1 (654.0101)EACH88$901.00$901.00$901.00$901.00$901.00
149Concrete bases type 2 (654.0102)EACH7$1,125.00$1,125.00$1,125.00$1,125.00$1,125.00
150Concrete bases type 10 (654.0110)EACH40$5,897.00$5,897.00$5,897.00$5,897.00$5,897.00
151Concrete bases type 10-special (654.0120)EACH22$7,849.00$7,849.00$7,849.00$7,849.00$7,849.00
152Concrete control cabinet bases type 9 special (654.0217)EACH11$2,590.00$2,590.00$2,590.00$2,590.00$2,590.00
153Cable traffic signal 5-14 AWG (655.0230)LF7,930$1.85$1.85$1.85$1.85$1.85
154Cable traffic signal 7-14 AWG (655.0240)LF12,905$2.26$2.26$2.26$2.26$2.26
155Cable traffic signal 12-14 AWG (655.0260)LF21,585$3.20$3.20$3.20$3.20$3.20
156Cable traffic signal 15-14 AWG (655.0270)LF8,890$4.17$4.17$4.17$4.17$4.17
157Cable type UF 2-12 AWG grounded (655.0305)LF9,790$1.81$1.81$1.81$1.81$1.81
158Electrical wire traffic signals 10 AWG (655.0515)LF27,195$1.29$1.29$1.29$1.29$1.29
159Electrical wire lighting 12 AWG (655.0610)LF11,010$1.00$1.00$1.00$1.00$1.00
160Loop detector lead in cable (655.0700)LF81,626$1.95$1.95$1.95$1.95$1.95
161Loop detector wire (655.0800)LF81,151$1.00$1.00$1.00$1.00$1.00
162Electrical service meter breaker pedestal (location) 01. STH 181 at florist ave (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
163Electrical service meter breaker pedestal (location) 02. STH 181 at mill RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
164Electrical service meter breaker pedestal (location) 03. STH 181 at acacia ST (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
165Electrical service meter breaker pedestal (location) 04. STH 181 at green tree RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
166Electrical service meter breaker pedestal (location) 05. STH 181 at good hope RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
167Electrical service meter breaker pedestal (location) 06. STH 181 at calumet RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
168Electrical service meter breaker pedestal (location) 07. STH 181 at bradley RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
169Electrical service meter breaker pedestal (location) 08. STH 181 at tower ave (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
170Electrical service meter breaker pedestal (location) 09. STH 181 at servite/dean RD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
171Electrical service meter breaker pedestal (location) 10. STH 181 at northridge DR (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
172Electrical service meter breaker pedestal (location) 11. STH 181 at northridge lake BLVD (656.0201)EACH1$1,460.00$1,460.00$1,460.00$1,460.00$1,460.00
173Pedestal bases (657.0100)EACH88$286.00$286.00$286.00$286.00$286.00
174Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH7$610.00$610.00$610.00$610.00$610.00
175Poles type 3 (657.0310)EACH7$3,521.00$3,521.00$3,521.00$3,521.00$3,521.00
176Traffic signal standards aluminum 3.5-FT (657.0405)EACH12$249.00$249.00$249.00$249.00$249.00
177Traffic signal standards aluminum 13-FT (657.0420)EACH20$539.00$539.00$539.00$539.00$539.00
178Traffic signal standards aluminum 15-FT (657.0425)EACH37$576.00$576.00$576.00$576.00$576.00
179Traffic signal standards aluminum 10-FT (657.0430)EACH19$490.00$490.00$490.00$490.00$490.00
180Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH9$270.00$270.00$270.00$270.00$270.00
181Traffic signal face 3S 12-inch (658.0173)EACH165$798.00$798.00$798.00$798.00$798.00
182Traffic signal face 4S 12-inch (658.0174)EACH81$1,079.00$1,079.00$1,079.00$1,079.00$1,079.00
183Pedestrian signal face 16-inch (658.0416)EACH92$558.00$558.00$558.00$558.00$558.00
184Pedestrian push buttons (658.0500)EACH119$402.00$402.00$402.00$402.00$402.00
185Signal mounting hardware (location) 01. STH 181 at florist ave (658.5070)EACH1$8,364.00$8,364.00$8,364.00$8,364.00$8,364.00
186Signal mounting hardware (location) 02. STH 181 at mill RD (658.5070)EACH1$9,151.00$9,151.00$9,151.00$9,151.00$9,151.00
187Signal mounting hardware (location) 03. STH 181 at acacia ST (658.5070)EACH1$7,105.00$7,105.00$7,105.00$7,105.00$7,105.00
188Signal mounting hardware (location) 04. STH 181 at green tree RD (658.5070)EACH1$7,842.00$7,842.00$7,842.00$7,842.00$7,842.00
189Signal mounting hardware (location) 05. STH 181 at good hope RD (658.5070)EACH1$10,218$10,218$10,218$10,218$10,218
190Signal mounting hardware (location) 06. STH 181 at calumet RD (658.5070)EACH1$7,413.00$7,413.00$7,413.00$7,413.00$7,413.00
191Signal mounting hardware (location) 07. STH 181 at bradley RD (658.5070)EACH1$6,214.00$6,214.00$6,214.00$6,214.00$6,214.00
192Signal mounting hardware (location) 08. STH 181 at tower ave (658.5070)EACH1$5,928.00$5,928.00$5,928.00$5,928.00$5,928.00
193Signal mounting hardware (location) 09. STH 181 at servite/dean RD (658.5070)EACH1$6,379.00$6,379.00$6,379.00$6,379.00$6,379.00
194Signal mounting hardware (location) 10. STH 181 at northridge DR (658.5070)EACH1$5,268.00$5,268.00$5,268.00$5,268.00$5,268.00
195Signal mounting hardware (location) 11. STH 181 at northridge lakes BLVD (658.5070)EACH1$7,699.00$7,699.00$7,699.00$7,699.00$7,699.00
196Signal mounting hardware (location) 12. STH 181 at STH 100 (658.5070)EACH1$1,056.00$1,056.00$1,056.00$1,056.00$1,056.00
197Luminaires utility LED C (659.1125)EACH85$314.80$314.80$314.80$314.80$314.80
198Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH361$3.25$3.25$3.25$3.25$3.25
199Temporary traffic signals for intersections (location) 01. STH 181 at florist ave (661.0201)EACH1$52,215$52,215$52,215$52,215$52,215
200Temporary traffic signals for intersections (location) 02. STH 181 at mill RD (661.0201)EACH1$62,430$62,430$62,430$62,430$62,430
201Temporary traffic signals for intersections (location) 03. STH 181 at acacia ST (661.0201)EACH1$52,215$52,215$52,215$52,215$52,215
202Temporary traffic signals for intersections (location) 04. STH 181 at green tree RD (661.0201)EACH1$52,215$52,215$52,215$52,215$52,215
203Temporary traffic signals for intersections (location) 05. STH 181 at good hope RD (661.0201)EACH1$64,107$64,107$64,107$64,107$64,107
204Temporary traffic signals for intersections (location) 06. STH 181 at calumet RD (661.0201)EACH1$55,331$55,331$55,331$55,331$55,331
205Temporary traffic signals for intersections (location) 07. STH 181 at bradley RD (661.0201)EACH1$58,663$58,663$58,663$58,663$58,663
206Temporary traffic signals for intersections (location) 09. STH 181 at servite/dean RD (661.0201)EACH1$52,157$52,157$52,157$52,157$52,157
207Temporary traffic signals for intersections (location) 10. STH 181 at northridge DR (661.0201)EACH1$56,983$56,983$56,983$56,983$56,983
208Temporary traffic signals for intersections (location) 11. STH 181 at northridge lakes BLVD (661.0201)EACH1$52,342$52,342$52,342$52,342$52,342
209Sawing asphalt (690.0150)LF20,148$1.75$1.39$1.39$1.39$1.39
210Sawing concrete (690.0250)LF4,805$2.55$2.15$2.15$2.15$2.15
211Incentive iri ride (740.0440)DOL47,720$1.00$1.00$1.00$1.00$1.00
212On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS8,400$5.00$5.00$5.00$5.00$5.00
213On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS17,280$5.00$5.00$5.00$5.00$5.00
214Special 01. utility line opening (ulo) (SPV.0060)EACH35$1,723.33$1,500.00$2,000.00$400.00$1,500.00
215Special 02. tuck point storm sewer structure (SPV.0060)EACH1$1,800.00$2,400.00$2,000.00$1,800.00$1,800.00
216Special 03. strapping C-40-0053 (SPV.0060)EACH2$2,800.00$2,800.00$2,800.00$2,800.00$2,800.00
217Special 04. install type 9 pole (SPV.0060)EACH5$1,060.00$1,060.00$1,060.00$1,060.00$1,060.00
218Special 05. install type 9 special pole (SPV.0060)EACH16$1,060.00$1,060.00$1,060.00$1,060.00$1,060.00
219Special 06. install type 10 pole (SPV.0060)EACH34$1,060.00$1,060.00$1,060.00$1,060.00$1,060.00
220Special 07. install type 10 special pole (SPV.0060)EACH7$1,060.00$1,060.00$1,060.00$1,060.00$1,060.00
221Special 08. install monotube arms 15-FT (SPV.0060)EACH18$2,044.00$2,044.00$2,044.00$2,044.00$2,044.00
222Special 09. install monotube arms 20-FT (SPV.0060)EACH4$2,204.00$2,204.00$2,204.00$2,204.00$2,204.00
223Special 10. install monotube arms 25-FT (SPV.0060)EACH2$2,284.00$2,284.00$2,284.00$2,284.00$2,284.00
224Special 11. install monotube arms 30-FT (SPV.0060)EACH16$2,364.00$2,364.00$2,364.00$2,364.00$2,364.00
225Special 12. install monotube arms 35-FT special (SPV.0060)EACH19$2,444.00$2,444.00$2,444.00$2,444.00$2,444.00
226Special 13. install monotube arms 40-FT (SPV.0060)EACH1$2,684.00$2,684.00$2,684.00$2,684.00$2,684.00
227Special 14. install monotube arms 45-FT special (SPV.0060)EACH2$3,004.00$3,004.00$3,004.00$3,004.00$3,004.00
228Special 15. install luminaire arms steel 15-FT (SPV.0060)EACH69$232.00$232.00$232.00$232.00$232.00
229Special 16. transport and install state furnished traffic signal cabinet florist ave (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
230Special 17. transport and install state furnished traffic signal cabinet mill RD (SPV.0060)EACH1$5,136.80$5,136.80$5,136.80$5,136.80$5,136.80
231Special 18. transport and install state furnished traffic signal cabinet acacia ST (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
232Special 19. transport and install state furnished traffic signal cabinet green tree RD (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
233Special 20. transport and install state furnished traffic signal cabinet good hope RD (SPV.0060)EACH1$6,128.80$6,128.80$6,128.80$6,128.80$6,128.80
234Special 21. transport and install state furnished traffic signal cabinet calumet RD (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
235Special 22. transport and install state furnished traffic signal cabinet bradley RD (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
236Special 23. transport and install state furnished traffic signal cabinet tower ave (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
237Special 24. transport and install state furnished traffic signal cabinet servite/dean RD (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
238Special 25. transport and install state furnished traffic signal cabinet northridge DR (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
239Special 26. TRNSPRT & install state FRNSHD TRFFC SGNL cabinet northridge lakes BLVD (SPV.0060)EACH1$4,144.80$4,144.80$4,144.80$4,144.80$4,144.80
240Special 27. transport traffic signal and lighting materials florist ave (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
241Special 28. transport traffic signal and lighting materials mill RD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
242Special 29. transport traffic signal and lighting materials acacia ST (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
243Special 30. transport traffic signal and lighting materials green tree RD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
244Special 31. transport traffic signal and lighting materials good hope RD (SPV.0060)EACH1$1,024.00$1,024.00$1,024.00$1,024.00$1,024.00
245Special 32. transport traffic signal and lighting materials calumet RD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
246Special 33. transport traffic signal and lighting materials bradley RD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
247Special 34. transport traffic signal and lighting materials tower ave (SPV.0060)EACH1$512.00$512.00$512.00$512.00$512.00
248Special 35. transport traffic signal and lighting materials servite/dean RD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
249Special 36. transport traffic signal and lighting materials northridge DR (SPV.0060)EACH1$384.00$384.00$384.00$384.00$384.00
250Special 37. transport traffic signal and lighting materials northridge lake BLVD (SPV.0060)EACH1$768.00$768.00$768.00$768.00$768.00
251Special 38. modify traffic signal STH 181 & STH 100 (SPV.0060)EACH1$3,071.20$3,071.20$3,071.20$3,071.20$3,071.20
252Special 39. inlet covers type H-D (SPV.0060)EACH1$1,050.00$1,050.00$1,050.00$1,050.00$1,050.00
253Special 40. cleaning storm sewer (SPV.0060)EACH2$5,462.50$2,000.00$2,850.00$2,500.00$1,500.00
254Special 41. adjusting water valve boxes (SPV.0060)EACH178$368.00$700.00$375.00$700.00$700.00
255Special 42. adjusting water manholes (SPV.0060)EACH5$1,284.24$1,500.00$750.00$1,500.00$2,400.00
256Special 43. adjusting sanitary manholes (SPV.0060)EACH103$2,063.86$1,050.00$750.00$1,050.00$2,000.00
257Special 44. internal manhole seals (SPV.0060)EACH4$925.00$800.00$750.00$800.00$800.00
258Special 45. manhole covers type MS-58A (SPV.0060)EACH4$1,695.00$1,100.00$1,695.00$1,100.00$1,100.00
259Special 46. adjusting cuc manhole cover (SPV.0060)EACH24$2,733.04$2,250.00$2,000.00$2,250.00$3,200.00
260Special 47. 4' diameter "doghouse" manhole type cuc (SPV.0060)EACH10$16,264$16,264$16,500$16,264$16,264
261Special 48. 5' diameter "doghouse" manhole type cuc (SPV.0060)EACH2$19,879$19,879$20,000$19,879$19,879
262Special 49. removing cuc manhole (SPV.0060)EACH12$6,137.00$6,137.00$6,200.00$6,137.00$6,137.00
263Special 50. section corner monuments (SPV.0060)EACH7$3,000.00$1,000.00$1,000.00$1,350.00$1,250.00
264Special 51. removing fence, R-40- 76 (SPV.0060)EACH1$1,200.00$10,101$10,000$4,200.00$10,000
265Special 52. field office facilities office space (SPV.0060)EACH1$28,180$30,000$60,000$32,500$42,000
266Special 01. street sweeping (SPV.0075)HRS100$229.00$180.00$300.00$185.00$195.00
267Special 01. concrete curb and gutter 6-inch slope 18-inch type J (SPV.0090)LF211$45.77$52.60$60.00$58.00$58.00
268Special 02. marking crosswalk epoxy block style 12-inch white (SPV.0090)LF6,358$25.00$12.42$12.42$14.00$25.00
269Special 01. excavation, hauling, and disposal of lead contaminated soil (SPV.0195)TON48$146.69$146.84$200.00$90.04$500.00
270Special 02. excavation, hauling, and disposal of pah contaminated soil (SPV.0195)TON2$311.22$291.46$1,000.00$90.04$2,000.00
271Special 03. excavation, hauling, and disposal of petroleum contaminated soil (SPV.0195)TON135$102.30$143.13$200.00$83.04$500.00
272Special 04. asphaltic repair (SPV.0195)TON4,667$144.30$160.00$144.30$135.00$151.00
WisDOT contract 20251014030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy