WisDOT contract 20251111014 bid tabulation
Appleton - De Pere; French Rd Overpass (IH 041, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on November 11, 2025, Outagamie. 5 bids received; low bid $8,020,325 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 213
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $8,020,325 | Low |
| 2 | Michels Road & Stone, Inc. | $8,023,465 | 0.0% |
| 3 | Lunda Construction Company | $8,407,251 | +5.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $8,491,099 | +6.0% |
| 5 | Zignego Company, Inc. | $8,772,047 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Michels Road & Stone, Inc. | 3. Lunda Construction Company | 4. Zenith Tech., Inc. - Waukesha | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 31 | $333.00 | $527.50 | $1,199.00 | $527.50 | $333.00 |
| 2 | Grubbing (201.0205) | STA | 31 | $253.00 | $205.73 | $299.00 | $205.73 | $253.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 4 | $625.00 | $954.00 | $954.00 | $660.00 | $660.00 |
| 4 | Removing structure (structure) 0001. B-44-132 (203.0220) | EACH | 1 | $675,000 | $675,000 | $675,000 | $400,000 | $675,000 |
| 5 | Removing concrete pavement (204.0100) | SY | 3,459 | $1.25 | $1.20 | $1.20 | $1.20 | $6.20 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 597 | $5.25 | $5.25 | $5.25 | $5.25 | $5.25 |
| 7 | Removing curb & gutter (204.0150) | LF | 143 | $4.55 | $5.00 | $5.00 | $5.00 | $30.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 73 | $9.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 9 | Removing guardrail (204.0165) | LF | 2,033 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 10 | Removing fence (204.0170) | LF | 4,683 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 11 | Removing delineators and markers (204.0180) | EACH | 18 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 12 | Removing inlets (204.0220) | EACH | 4 | $322.00 | $390.00 | $390.00 | $500.00 | $500.00 |
| 13 | Removing storm sewer (size) 0002. 15-inch (204.0245) | LF | 92 | $16.00 | $12.00 | $12.00 | $33.00 | $33.00 |
| 14 | Removing storm sewer (size) 0005. 36-inch (204.0245) | LF | 134 | $46.00 | $27.00 | $27.00 | $33.00 | $33.00 |
| 15 | Sealing pipes (204.0280) | EACH | 2 | $817.00 | $675.00 | $675.00 | $700.00 | $700.00 |
| 16 | Excavation common (205.0100) | CY | 43,673 | $17.41 | $13.60 | $13.60 | $13.60 | $17.50 |
| 17 | Excavation for structures bridges (structure) 0001. B-44-329 (206.1001) | EACH | 1 | $12,000 | $53,360 | $36,000 | $75,000 | $25,400 |
| 18 | Backfill structure type A (210.1500) | TON | 1,320 | $33.55 | $34.00 | $34.00 | $34.00 | $39.00 |
| 19 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 19 | $165.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 370 | $30.82 | $56.00 | $56.00 | $56.00 | $30.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 9,040 | $13.85 | $14.80 | $14.80 | $14.80 | $15.25 |
| 22 | Base aggregate open-graded (310.0115) | CY | 20 | $51.40 | $50.00 | $100.00 | $100.00 | $53.00 |
| 23 | Select crushed material (312.0110) | TON | 22,551 | $13.05 | $12.30 | $12.30 | $12.30 | $14.75 |
| 24 | Coloring concrete wisdot red (405.0100) | CY | 7 | $110.00 | $140.00 | $115.00 | $140.00 | $300.00 |
| 25 | Stamping colored concrete (405.1000) | CY | 7 | $485.00 | $150.00 | $250.00 | $150.00 | $300.00 |
| 26 | Concrete pavement 8-inch (415.0080) | SY | 5,428 | $60.14 | $61.68 | $61.68 | $61.68 | $89.00 |
| 27 | Concrete pavement 9-inch (415.0090) | SY | 1,158 | $69.81 | $84.68 | $84.68 | $84.68 | $97.00 |
| 28 | Concrete pavement gaps (415.0210) | EACH | 1 | $1,000.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,000.00 |
| 29 | Concrete pavement approach slab (415.0410) | SY | 133 | $235.00 | $259.11 | $259.11 | $259.11 | $200.00 |
| 30 | Concrete pavement joint filling (415.4100) | SY | 5,613 | $2.00 | $2.19 | $2.19 | $2.19 | $2.00 |
| 31 | Drilled tie bars (416.0610) | EACH | 55 | $10.00 | $12.70 | $12.70 | $12.70 | $30.00 |
| 32 | Drilled dowel bars (416.0620) | EACH | 20 | $16.50 | $15.03 | $15.03 | $15.03 | $30.00 |
| 33 | HMA cold weather paving (450.4000) | TON | 416 | $8.25 | $8.25 | $8.25 | $8.25 | $8.25 |
| 34 | Tack coat (455.0605) | GAL | 898 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 |
| 35 | Incentive density HMA pavement (460.2000) | DOL | 1,390 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 228 | $219.50 | $237.35 | $237.35 | $237.35 | $219.50 |
| 37 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 52 | $175.00 | $192.85 | $192.85 | $192.85 | $175.00 |
| 38 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 42 | $195.00 | $212.85 | $212.85 | $212.85 | $195.00 |
| 39 | Asphaltic surface (465.0105) | TON | 1,741 | $107.35 | $125.20 | $125.20 | $125.20 | $107.35 |
| 40 | Asphaltic surface driveways and field entrances (465.0120) | TON | 20 | $225.00 | $242.85 | $242.85 | $242.85 | $225.00 |
| 41 | Asphaltic flumes (465.0315) | SY | 16 | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 42 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 1,326 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 43 | Ice hot weather concreting (501.1000.S) | LB | 12,038 | $0.01 | $0.01 | $0.01 | $0.79 | $0.01 |
| 44 | Concrete masonry bridges (502.0100) | CY | 535 | $550.00 | $550.00 | $550.00 | $700.00 | $550.00 |
| 45 | Expansion device (502.3101) | LF | 117 | $300.00 | $300.00 | $300.00 | $325.00 | $300.00 |
| 46 | Protective surface treatment (502.3200) | SY | 2,380 | $2.00 | $2.00 | $2.00 | $3.50 | $2.00 |
| 47 | Pigmented surface sealer (502.3210) | SY | 1,070 | $5.00 | $5.00 | $5.00 | $8.00 | $5.00 |
| 48 | Prestressed girder type I 54W-inch (503.0155) | LF | 2,922 | $250.00 | $250.00 | $250.00 | $260.00 | $250.00 |
| 49 | Bar steel reinforcement HS structures (505.0400) | LB | 14,230 | $0.98 | $0.98 | $0.98 | $1.14 | $0.98 |
| 50 | Bar steel reinforcement HS coated structures (505.0600) | LB | 305,980 | $1.07 | $1.07 | $1.07 | $1.27 | $1.07 |
| 51 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 2,000 | $3.78 | $3.78 | $3.78 | $3.97 | $3.78 |
| 52 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 32 | $150.00 | $150.00 | $150.00 | $135.00 | $150.00 |
| 53 | Bearing pads elastomeric laminated (506.2610) | EACH | 16 | $3,000.00 | $3,000.00 | $3,000.00 | $3,100.00 | $3,000.00 |
| 54 | Steel diaphragms (structure) 0001. B-44-329 (506.4000) | EACH | 42 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 55 | Temporary shoring (structure) 0001. B-44-329 (511.1200) | SF | 250 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 56 | Temporary shoring (location) 01. sta. 114'FN'+57 (511.1300) | SF | 4,011 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 57 | Temporary shoring (location) 02. sta. 114'FN'+87 (511.1300) | SF | 4,045 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 58 | Railing tubular screening (513.4091) | LF | 821 | $207.20 | $207.20 | $207.20 | $205.00 | $207.20 |
| 59 | Rubberized membrane waterproofing (516.0500) | SY | 32 | $25.00 | $25.00 | $25.00 | $60.00 | $25.00 |
| 60 | Concrete staining (structure) 1000. B-44-329 (517.1010.S) | SF | 15,600 | $2.15 | $2.15 | $2.15 | $2.15 | $2.15 |
| 61 | Concrete collars for pipe (520.8000) | EACH | 1 | $730.00 | $675.00 | $575.00 | $1,000.00 | $1,000.00 |
| 62 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 1 | $1,180.00 | $464.00 | $464.00 | $500.00 | $500.00 |
| 63 | Culvert pipe reinforced concrete class IV 54-inch (522.0454) | LF | 175 | $481.10 | $676.00 | $676.00 | $760.00 | $760.00 |
| 64 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 9 | $1,382.00 | $1,315.00 | $1,315.00 | $1,250.00 | $1,250.00 |
| 65 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 4 | $5,809.00 | $3,276.00 | $3,276.00 | $3,050.00 | $3,050.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 2 | $8,512.00 | $4,274.00 | $4,274.00 | $5,040.00 | $5,040.00 |
| 67 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,906.00 | $1,809.00 | $1,809.00 | $1,650.00 | $1,650.00 |
| 68 | Concrete masonry ancillary structures type NS (531.1100) | CY | 2 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,250.00 |
| 69 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 302 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 70 | Drilling shaft 24-inch (531.2024) | LF | 17 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 71 | Drilling shaft 36-inch (531.2036) | LF | 10 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 72 | Foundation camera pole 50-FT (531.4050) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 73 | Anchor assemblies poles on structures (531.8990) | EACH | 1 | $675.00 | $675.00 | $675.00 | $675.00 | $675.00 |
| 74 | Pile points (550.0500) | EACH | 22 | $150.00 | $150.00 | $150.00 | $125.00 | $150.00 |
| 75 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 9,720 | $48.90 | $48.90 | $48.90 | $63.00 | $48.90 |
| 76 | Concrete curb integral type D (601.0150) | LF | 2,409 | $25.00 | $20.00 | $20.00 | $20.00 | $20.06 |
| 77 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 184 | $48.00 | $50.00 | $84.00 | $50.00 | $60.00 |
| 78 | Concrete sidewalk 4-inch (602.0405) | SF | 21,730 | $6.25 | $6.48 | $6.45 | $6.48 | $8.38 |
| 79 | Concrete sidewalk 6-inch (602.0415) | SF | 280 | $7.90 | $6.70 | $7.40 | $6.70 | $10.00 |
| 80 | Concrete driveway 6-inch (602.0810) | SY | 37 | $69.50 | $60.30 | $66.60 | $60.30 | $100.00 |
| 81 | Concrete barrier type S42 (603.1142) | LF | 210 | $305.00 | $269.72 | $269.72 | $269.72 | $350.00 |
| 82 | Concrete barrier temporary precast delivered (603.8000) | LF | 5,514 | $9.00 | $9.00 | $9.00 | $13.00 | $9.00 |
| 83 | Concrete barrier temporary precast installed (603.8125) | LF | 5,514 | $3.85 | $3.85 | $3.85 | $6.00 | $3.85 |
| 84 | Anchoring concrete barrier temporary precast (603.8500) | LF | 2,818 | $0.01 | $0.01 | $0.01 | $6.00 | $0.01 |
| 85 | Slope paving select crushed material (604.0600) | SY | 480 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 86 | Riprap medium (606.0200) | CY | 366 | $88.79 | $115.00 | $115.00 | $95.00 | $95.00 |
| 87 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 61 | $97.60 | $86.00 | $86.00 | $91.00 | $91.00 |
| 88 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 822 | $84.10 | $85.00 | $85.00 | $91.00 | $91.00 |
| 89 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 112 | $82.60 | $72.00 | $72.00 | $91.00 | $91.00 |
| 90 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 205 | $88.60 | $84.00 | $84.00 | $99.00 | $99.00 |
| 91 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 83 | $165.50 | $113.00 | $113.00 | $188.00 | $188.00 |
| 92 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 314 | $504.40 | $275.00 | $275.00 | $273.00 | $273.00 |
| 93 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 145 | $163.25 | $184.00 | $184.00 | $188.00 | $188.00 |
| 94 | Manhole covers type J (611.0530) | EACH | 2 | $516.00 | $560.00 | $560.00 | $750.00 | $750.00 |
| 95 | Manhole covers type J-special (611.0535) | EACH | 3 | $483.00 | $583.00 | $583.00 | $775.00 | $775.00 |
| 96 | Inlet covers type H (611.0624) | EACH | 23 | $728.00 | $823.00 | $823.00 | $990.00 | $990.00 |
| 97 | Inlet covers type MS (611.0642) | EACH | 1 | $549.00 | $575.00 | $575.00 | $575.00 | $575.00 |
| 98 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $4,474.00 | $3,431.00 | $3,431.00 | $2,260.00 | $2,260.00 |
| 99 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $4,975.00 | $6,136.00 | $6,136.00 | $4,710.00 | $4,710.00 |
| 100 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $9,343.00 | $10,888 | $10,888 | $9,810.00 | $9,810.00 |
| 101 | Inlets 4-FT diameter (611.3004) | EACH | 23 | $3,356.00 | $3,421.00 | $3,421.00 | $2,210.00 | $2,210.00 |
| 102 | Inlets median 1 grate (611.3901) | EACH | 1 | $2,825.00 | $2,745.00 | $2,745.00 | $2,450.00 | $2,450.00 |
| 103 | Pipe underdrain 6-inch (612.0106) | LF | 680 | $17.50 | $8.00 | $12.00 | $12.00 | $8.30 |
| 104 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 260 | $4.69 | $5.00 | $5.00 | $5.00 | $4.30 |
| 105 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $15,000 | $15,000 | $15,000 | $15,000 | $15,000 |
| 106 | Steel thrie beam (614.0230) | LF | 150 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 107 | Crash cushions temporary (614.0905) | EACH | 8 | $3,723.33 | $8,245.00 | $4,895.00 | $7,500.00 | $3,723.33 |
| 108 | Fence woven wire (height) 0001. 4- FT (616.0100) | LF | 277 | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 109 | Fence chain link 6-FT (616.0206) | LF | 3,058 | $25.50 | $25.50 | $25.50 | $25.50 | $25.50 |
| 110 | Fence chain link salvaged 6-FT (616.0406) | LF | 464 | $36.90 | $36.90 | $36.90 | $36.90 | $36.90 |
| 111 | Fence safety (616.0700.S) | LF | 1,000 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 112 | Maintenance and repair of haul roads (project) 0001. 1130-65-81 (618.0100) | EACH | 1 | $0.01 | $1.00 | $1,500.00 | $1.00 | $1.00 |
| 113 | Mobilization (619.1000) | EACH | 1 | $874,000 | $688,682 | $1,085,115 | $770,000 | $1,224,000 |
| 114 | Concrete median sloped nose (620.0300) | SF | 39 | $14.00 | $17.00 | $16.00 | $17.00 | $20.00 |
| 115 | Dust control surface treatment (623.0200) | SY | 22,950 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 116 | Water (624.0100) | MGAL | 131 | $0.01 | $55.00 | $55.00 | $55.00 | $42.90 |
| 117 | Salvaged topsoil (625.0500) | SY | 53,831 | $0.01 | $1.60 | $1.60 | $1.60 | $0.01 |
| 118 | Silt fence (628.1504) | LF | 4,581 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 119 | Silt fence maintenance (628.1520) | LF | 13,923 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 120 | Mobilizations erosion control (628.1905) | EACH | 9 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 121 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | Erosion mat class I type B (628.2004) | SY | 34,341 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 123 | Erosion mat urban class I type B (628.2008) | SY | 6,701 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 124 | Inlet protection type A (628.7005) | EACH | 30 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 125 | Inlet protection type C (628.7015) | EACH | 31 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 126 | Temporary ditch checks (628.7504) | LF | 325 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 127 | Culvert pipe checks (628.7555) | EACH | 4 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 128 | Tracking pads (628.7560) | EACH | 3 | $0.01 | $1,400.00 | $1,400.00 | $1,400.00 | $500.00 |
| 129 | Rock bags (628.7570) | EACH | 87 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 130 | Fertilizer type B (629.0210) | CWT | 17 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 131 | Seeding mixture no. 30 (630.0130) | LB | 2,424 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 132 | Seed water (630.0500) | MGAL | 1,211 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 133 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 21 | $140.00 | $140.00 | $140.00 | $140.00 | $140.00 |
| 134 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 135 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 8 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 136 | Sign supports structural steel HS (635.0200) | LB | 1,050 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 137 | Signs type II reflective H (637.2210) | SF | 45 | $26.00 | $26.00 | $26.00 | $26.00 | $26.00 |
| 138 | Signs type II reflective F (637.2230) | SF | 20 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 139 | Moving signs type I (638.2101) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 140 | Moving signs type II (638.2102) | EACH | 19 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 141 | Removing signs type II (638.2602) | EACH | 5 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 142 | Removing small sign supports (638.3000) | EACH | 28 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 143 | Traffic control drums (643.0300) | DAY | 52,999 | $0.22 | $0.17 | $0.17 | $0.17 | $0.22 |
| 144 | Traffic control barricades type III (643.0420) | DAY | 6,923 | $0.44 | $0.65 | $0.65 | $0.65 | $0.44 |
| 145 | Traffic control warning lights type A (643.0705) | DAY | 13,846 | $0.12 | $0.20 | $0.20 | $0.20 | $0.12 |
| 146 | Traffic control warning lights type C (643.0715) | DAY | 5,962 | $0.14 | $0.20 | $0.20 | $0.20 | $0.14 |
| 147 | Traffic control connected arrow boards (643.0810) | DAY | 1,227 | $8.40 | $7.95 | $7.95 | $7.95 | $8.40 |
| 148 | Traffic control signs (643.0900) | DAY | 37,611 | $0.25 | $0.24 | $0.24 | $0.24 | $0.25 |
| 149 | Traffic control covering signs type I (643.0910) | EACH | 9 | $86.01 | $275.00 | $275.00 | $275.00 | $86.01 |
| 150 | Traffic control signs fixed message (643.1000) | SF | 207.50 | $24.13 | $22.15 | $22.15 | $22.15 | $24.13 |
| 151 | Traffic control signs PCMS (643.1050) | DAY | 282 | $45.50 | $30.00 | $30.00 | $30.00 | $45.50 |
| 152 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 535 | $8.00 | $5.75 | $5.75 | $5.75 | $8.00 |
| 153 | Temporary marking line removable tape 6-inch (643.3180) | LF | 479 | $2.79 | $2.50 | $2.50 | $2.50 | $2.79 |
| 154 | Traffic control (643.5000) | EACH | 1 | $21,206 | $146,680 | $146,680 | $146,680 | $21,205 |
| 155 | Temporary pedestrian barricade (644.1810) | LF | 60 | $6.79 | $10.00 | $10.00 | $10.00 | $6.79 |
| 156 | Geotextile type DF schedule A (645.0111) | SY | 101 | $4.95 | $7.00 | $7.00 | $6.00 | $2.40 |
| 157 | Geotextile type HR (645.0120) | SY | 732 | $3.00 | $6.00 | $6.00 | $3.20 | $3.20 |
| 158 | Geotextile type sas (645.0140) | SY | 2,700 | $2.00 | $3.20 | $3.20 | $3.20 | $2.70 |
| 159 | Marking line epoxy 4-inch (646.1020) | LF | 8,011 | $0.40 | $0.40 | $0.40 | $0.40 | $2.00 |
| 160 | Marking line epoxy 6-inch (646.2020) | LF | 6,237 | $0.56 | $0.56 | $0.56 | $0.56 | $2.10 |
| 161 | Marking line epoxy 10-inch (646.4020) | LF | 844 | $1.24 | $1.24 | $1.24 | $1.24 | $4.00 |
| 162 | Marking arrow epoxy (646.5020) | EACH | 25 | $451.38 | $451.38 | $451.38 | $451.38 | $270.00 |
| 163 | Marking word epoxy (646.5120) | EACH | 2 | $456.71 | $456.71 | $456.71 | $456.71 | $350.00 |
| 164 | Marking symbol epoxy (646.5220) | EACH | 21 | $438.43 | $438.43 | $438.43 | $438.43 | $220.00 |
| 165 | Marking stop line epoxy 18-inch (646.6120) | LF | 35 | $18.90 | $18.90 | $18.90 | $18.90 | $30.00 |
| 166 | Cold weather marking epoxy 4-inch (646.6464) | LF | 1,321 | $0.40 | $0.40 | $0.40 | $0.40 | $0.80 |
| 167 | Cold weather marking epoxy 6-inch (646.6466) | LF | 3,026 | $0.56 | $0.56 | $0.56 | $0.56 | $0.90 |
| 168 | Cold weather marking epoxy 8-inch (646.6468) | LF | 150 | $1.09 | $1.09 | $1.09 | $1.09 | $1.00 |
| 169 | Marking diagonal epoxy 12-inch (646.7120) | LF | 157 | $18.43 | $18.43 | $18.43 | $18.43 | $13.00 |
| 170 | Marking curb paint (646.8105) | LF | 10 | $5.78 | $5.78 | $5.78 | $5.78 | $5.00 |
| 171 | Marking island nose paint (646.8205) | EACH | 1 | $206.90 | $206.90 | $206.90 | $206.90 | $330.00 |
| 172 | Marking removal line 6-inch (646.9002) | LF | 222 | $3.06 | $1.50 | $1.50 | $1.50 | $3.06 |
| 173 | Conduit rigid metallic 2-inch (652.0125) | LF | 56 | $480.00 | $480.00 | $480.00 | $480.00 | $480.00 |
| 174 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,409 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 175 | Install conduit into existing item (652.0700.S) | EACH | 1 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 |
| 176 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 2 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 177 | Junction boxes 18X12X6-inch (653.0222) | EACH | 4 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 |
| 178 | Adjusting pull boxes (653.0900) | EACH | 1 | $675.00 | $675.00 | $675.00 | $675.00 | $675.00 |
| 179 | Concrete bases type 6 (654.0106) | EACH | 5 | $1,975.00 | $1,975.00 | $1,975.00 | $1,975.00 | $1,975.00 |
| 180 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,417 | $0.90 | $0.90 | $0.90 | $0.90 | $0.90 |
| 181 | Electrical wire lighting 6 AWG (655.0625) | LF | 54 | $2.75 | $2.75 | $2.75 | $2.75 | $2.75 |
| 182 | Electrical service meter breaker pedestal (location) 0001. MB5-2 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 183 | Electrical service breaker disconnect box (location) 0001. CB5-2 (656.0501) | EACH | 1 | $800.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 184 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 6 | $615.00 | $615.00 | $615.00 | $615.00 | $615.00 |
| 185 | Poles type 6-aluminum (657.0327) | EACH | 6 | $1,975.00 | $1,975.00 | $1,975.00 | $1,975.00 | $1,975.00 |
| 186 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 6 | $685.00 | $685.00 | $685.00 | $685.00 | $685.00 |
| 187 | Luminaires utility LED C (659.1125) | EACH | 6 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 |
| 188 | Field system integrator (670.0101) | EACH | 1 | $14,550 | $14,550 | $14,550 | $14,550 | $14,550 |
| 189 | ITS documentation (670.0201) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 190 | Install pole mounted cabinet (673.1225.S) | EACH | 1 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 |
| 191 | Install camera pole 50-FT (677.0150) | EACH | 1 | $4,705.00 | $4,705.00 | $4,705.00 | $4,705.00 | $4,705.00 |
| 192 | Install camera assembly (677.0200) | EACH | 1 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 | $2,650.00 |
| 193 | Communication system testing (678.0501) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 |
| 194 | Install wireless antennas (678.0700) | EACH | 1 | $2,975.00 | $2,975.00 | $2,975.00 | $2,975.00 | $2,975.00 |
| 195 | Sawing asphalt (690.0150) | LF | 257 | $3.00 | $1.69 | $1.95 | $1.69 | $1.69 |
| 196 | Sawing concrete (690.0250) | LF | 3,145 | $2.50 | $2.25 | $2.95 | $2.25 | $2.25 |
| 197 | Incentive strength concrete structures (715.0502) | DOL | 3,210 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 198 | Incentive strength concrete barrier (715.0603) | DOL | 105 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 199 | Incentive compressive strength concrete pavement (715.0720) | DOL | 2,016 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 200 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 201 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,040 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 202 | Special 0800. HPC masonry structures (SPV.0035) | CY | 1,068 | $550.00 | $550.00 | $550.00 | $750.00 | $550.00 |
| 203 | Special 0100. construction staking survey project 1130-65-81 (SPV.0060) | EACH | 1 | $24,900 | $24,900 | $24,900 | $24,900 | $24,900 |
| 204 | Special 0165. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 12 | $0.01 | $1,210.00 | $1,210.00 | $3,500.00 | $2,500.00 |
| 205 | Special 0170. emergency response to traffic involving crash cushion temporary (SPV.0060) | EACH | 12 | $0.01 | $360.00 | $360.00 | $1,500.00 | $1,637.00 |
| 206 | Special 0200. temporary water diversion (SPV.0060) | EACH | 1 | $1,000.00 | $15,250 | $15,250 | $25,000 | $25,000 |
| 207 | Special 0205. cover plates left-in- place (SPV.0060) | EACH | 2 | $494.00 | $350.00 | $350.00 | $1,000.00 | $1,000.00 |
| 208 | Special 1030. modify existing lighting controls (SPV.0060) | EACH | 1 | $550.00 | $550.00 | $550.00 | $550.00 | $550.00 |
| 209 | Special 3000. decorative silhoutte (SPV.0060) | EACH | 2 | $2,500.00 | $2,500.00 | $2,500.00 | $4,500.00 | $5,950.00 |
| 210 | Special 0100. street sweeping (SPV.0075) | HRS | 61 | $0.01 | $225.00 | $125.00 | $180.00 | $300.00 |
| 211 | Special 0100. removal and salvage of high-tension cable guard and posts (SPV.0090) | LF | 1,710 | $4.84 | $8.00 | $8.00 | $8.00 | $8.00 |
| 212 | Special 1020. tray cable for street lighting 6 AWG (SPV.0090) | LF | 1,920 | $4.75 | $4.75 | $4.75 | $4.75 | $4.75 |
| 213 | Special 0800. longitudinal grooving bridge deck (SPV.0165) | SF | 14,760 | $0.79 | $0.82 | $0.82 | $0.82 | $0.79 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.