WisDOT contract 20251111014 bid tabulation

Appleton - De Pere; French Rd Overpass (IH 041, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on November 11, 2025, Outagamie. 5 bids received; low bid $8,020,325 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
213
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$8,020,325Low
2Michels Road & Stone, Inc.$8,023,4650.0%
3Lunda Construction Company$8,407,251+5.0%
4Zenith Tech., Inc. - Waukesha$8,491,099+6.0%
5Zignego Company, Inc.$8,772,047+9.0%
WisDOT contract 20251111014: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company2. Michels Road & Stone, Inc.3. Lunda Construction Company4. Zenith Tech., Inc. - Waukesha5. Zignego Company, Inc.
1Clearing (201.0105)STA31$333.00$527.50$1,199.00$527.50$333.00
2Grubbing (201.0205)STA31$253.00$205.73$299.00$205.73$253.00
3Removing small pipe culverts (203.0100)EACH4$625.00$954.00$954.00$660.00$660.00
4Removing structure (structure) 0001. B-44-132 (203.0220)EACH1$675,000$675,000$675,000$400,000$675,000
5Removing concrete pavement (204.0100)SY3,459$1.25$1.20$1.20$1.20$6.20
6Removing asphaltic surface milling (204.0120)SY597$5.25$5.25$5.25$5.25$5.25
7Removing curb & gutter (204.0150)LF143$4.55$5.00$5.00$5.00$30.00
8Removing concrete sidewalk (204.0155)SY73$9.00$10.00$10.00$10.00$10.00
9Removing guardrail (204.0165)LF2,033$2.00$2.00$2.00$2.00$2.00
10Removing fence (204.0170)LF4,683$2.00$2.00$2.00$2.00$2.00
11Removing delineators and markers (204.0180)EACH18$25.00$25.00$25.00$25.00$25.00
12Removing inlets (204.0220)EACH4$322.00$390.00$390.00$500.00$500.00
13Removing storm sewer (size) 0002. 15-inch (204.0245)LF92$16.00$12.00$12.00$33.00$33.00
14Removing storm sewer (size) 0005. 36-inch (204.0245)LF134$46.00$27.00$27.00$33.00$33.00
15Sealing pipes (204.0280)EACH2$817.00$675.00$675.00$700.00$700.00
16Excavation common (205.0100)CY43,673$17.41$13.60$13.60$13.60$17.50
17Excavation for structures bridges (structure) 0001. B-44-329 (206.1001)EACH1$12,000$53,360$36,000$75,000$25,400
18Backfill structure type A (210.1500)TON1,320$33.55$34.00$34.00$34.00$39.00
19Prepare foundation for asphaltic shoulders (211.0400)STA19$165.00$165.00$165.00$165.00$165.00
20Base aggregate dense 3/4-inch (305.0110)TON370$30.82$56.00$56.00$56.00$30.00
21Base aggregate dense 1 1/4-inch (305.0120)TON9,040$13.85$14.80$14.80$14.80$15.25
22Base aggregate open-graded (310.0115)CY20$51.40$50.00$100.00$100.00$53.00
23Select crushed material (312.0110)TON22,551$13.05$12.30$12.30$12.30$14.75
24Coloring concrete wisdot red (405.0100)CY7$110.00$140.00$115.00$140.00$300.00
25Stamping colored concrete (405.1000)CY7$485.00$150.00$250.00$150.00$300.00
26Concrete pavement 8-inch (415.0080)SY5,428$60.14$61.68$61.68$61.68$89.00
27Concrete pavement 9-inch (415.0090)SY1,158$69.81$84.68$84.68$84.68$97.00
28Concrete pavement gaps (415.0210)EACH1$1,000.00$1,500.00$1,500.00$1,500.00$1,000.00
29Concrete pavement approach slab (415.0410)SY133$235.00$259.11$259.11$259.11$200.00
30Concrete pavement joint filling (415.4100)SY5,613$2.00$2.19$2.19$2.19$2.00
31Drilled tie bars (416.0610)EACH55$10.00$12.70$12.70$12.70$30.00
32Drilled dowel bars (416.0620)EACH20$16.50$15.03$15.03$15.03$30.00
33HMA cold weather paving (450.4000)TON416$8.25$8.25$8.25$8.25$8.25
34Tack coat (455.0605)GAL898$5.15$5.15$5.15$5.15$5.15
35Incentive density HMA pavement (460.2000)DOL1,390$1.00$1.00$1.00$1.00$1.00
36HMA pavement 4 LT 58-28 S (460.5224)TON228$219.50$237.35$237.35$237.35$219.50
37HMA pavement 3 MT 58-28 S (460.6223)TON52$175.00$192.85$192.85$192.85$175.00
38HMA pavement 4 MT 58-28 S (460.6224)TON42$195.00$212.85$212.85$212.85$195.00
39Asphaltic surface (465.0105)TON1,741$107.35$125.20$125.20$125.20$107.35
40Asphaltic surface driveways and field entrances (465.0120)TON20$225.00$242.85$242.85$242.85$225.00
41Asphaltic flumes (465.0315)SY16$65.00$65.00$65.00$65.00$65.00
42Asphaltic rumble strips, shoulder divided roadway (465.0510)LF1,326$1.85$1.85$1.85$1.85$1.85
43Ice hot weather concreting (501.1000.S)LB12,038$0.01$0.01$0.01$0.79$0.01
44Concrete masonry bridges (502.0100)CY535$550.00$550.00$550.00$700.00$550.00
45Expansion device (502.3101)LF117$300.00$300.00$300.00$325.00$300.00
46Protective surface treatment (502.3200)SY2,380$2.00$2.00$2.00$3.50$2.00
47Pigmented surface sealer (502.3210)SY1,070$5.00$5.00$5.00$8.00$5.00
48Prestressed girder type I 54W-inch (503.0155)LF2,922$250.00$250.00$250.00$260.00$250.00
49Bar steel reinforcement HS structures (505.0400)LB14,230$0.98$0.98$0.98$1.14$0.98
50Bar steel reinforcement HS coated structures (505.0600)LB305,980$1.07$1.07$1.07$1.27$1.07
51Bar steel reinforcement HS stainless structures (505.0800.S)LB2,000$3.78$3.78$3.78$3.97$3.78
52Bearing pads elastomeric non- laminated (506.2605)EACH32$150.00$150.00$150.00$135.00$150.00
53Bearing pads elastomeric laminated (506.2610)EACH16$3,000.00$3,000.00$3,000.00$3,100.00$3,000.00
54Steel diaphragms (structure) 0001. B-44-329 (506.4000)EACH42$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00
55Temporary shoring (structure) 0001. B-44-329 (511.1200)SF250$0.01$0.01$0.01$0.01$0.01
56Temporary shoring (location) 01. sta. 114'FN'+57 (511.1300)SF4,011$0.01$0.01$0.01$0.01$0.01
57Temporary shoring (location) 02. sta. 114'FN'+87 (511.1300)SF4,045$0.01$0.01$0.01$0.01$0.01
58Railing tubular screening (513.4091)LF821$207.20$207.20$207.20$205.00$207.20
59Rubberized membrane waterproofing (516.0500)SY32$25.00$25.00$25.00$60.00$25.00
60Concrete staining (structure) 1000. B-44-329 (517.1010.S)SF15,600$2.15$2.15$2.15$2.15$2.15
61Concrete collars for pipe (520.8000)EACH1$730.00$675.00$575.00$1,000.00$1,000.00
62Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH1$1,180.00$464.00$464.00$500.00$500.00
63Culvert pipe reinforced concrete class IV 54-inch (522.0454)LF175$481.10$676.00$676.00$760.00$760.00
64Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH9$1,382.00$1,315.00$1,315.00$1,250.00$1,250.00
65Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH4$5,809.00$3,276.00$3,276.00$3,050.00$3,050.00
66Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054)EACH2$8,512.00$4,274.00$4,274.00$5,040.00$5,040.00
67Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH2$1,906.00$1,809.00$1,809.00$1,650.00$1,650.00
68Concrete masonry ancillary structures type NS (531.1100)CY2$2,250.00$2,250.00$2,250.00$2,250.00$2,250.00
69Steel reinforcement HS ancillary structures type NS (531.1140)LB302$5.00$5.00$5.00$5.00$5.00
70Drilling shaft 24-inch (531.2024)LF17$125.00$125.00$125.00$125.00$125.00
71Drilling shaft 36-inch (531.2036)LF10$250.00$250.00$250.00$250.00$250.00
72Foundation camera pole 50-FT (531.4050)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00
73Anchor assemblies poles on structures (531.8990)EACH1$675.00$675.00$675.00$675.00$675.00
74Pile points (550.0500)EACH22$150.00$150.00$150.00$125.00$150.00
75Piling steel HP 12-inch X 53 LB (550.1120)LF9,720$48.90$48.90$48.90$63.00$48.90
76Concrete curb integral type D (601.0150)LF2,409$25.00$20.00$20.00$20.00$20.06
77Concrete curb & gutter 30-inch type A (601.0409)LF184$48.00$50.00$84.00$50.00$60.00
78Concrete sidewalk 4-inch (602.0405)SF21,730$6.25$6.48$6.45$6.48$8.38
79Concrete sidewalk 6-inch (602.0415)SF280$7.90$6.70$7.40$6.70$10.00
80Concrete driveway 6-inch (602.0810)SY37$69.50$60.30$66.60$60.30$100.00
81Concrete barrier type S42 (603.1142)LF210$305.00$269.72$269.72$269.72$350.00
82Concrete barrier temporary precast delivered (603.8000)LF5,514$9.00$9.00$9.00$13.00$9.00
83Concrete barrier temporary precast installed (603.8125)LF5,514$3.85$3.85$3.85$6.00$3.85
84Anchoring concrete barrier temporary precast (603.8500)LF2,818$0.01$0.01$0.01$6.00$0.01
85Slope paving select crushed material (604.0600)SY480$25.00$25.00$25.00$25.00$25.00
86Riprap medium (606.0200)CY366$88.79$115.00$115.00$95.00$95.00
87Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF61$97.60$86.00$86.00$91.00$91.00
88Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF822$84.10$85.00$85.00$91.00$91.00
89Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF112$82.60$72.00$72.00$91.00$91.00
90Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF205$88.60$84.00$84.00$99.00$99.00
91Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF83$165.50$113.00$113.00$188.00$188.00
92Storm sewer pipe reinforced concrete class IV 42-inch (608.0442)LF314$504.40$275.00$275.00$273.00$273.00
93Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419)LF145$163.25$184.00$184.00$188.00$188.00
94Manhole covers type J (611.0530)EACH2$516.00$560.00$560.00$750.00$750.00
95Manhole covers type J-special (611.0535)EACH3$483.00$583.00$583.00$775.00$775.00
96Inlet covers type H (611.0624)EACH23$728.00$823.00$823.00$990.00$990.00
97Inlet covers type MS (611.0642)EACH1$549.00$575.00$575.00$575.00$575.00
98Manholes 4-FT diameter (611.2004)EACH2$4,474.00$3,431.00$3,431.00$2,260.00$2,260.00
99Manholes 5-FT diameter (611.2005)EACH1$4,975.00$6,136.00$6,136.00$4,710.00$4,710.00
100Manholes 6-FT diameter (611.2006)EACH2$9,343.00$10,888$10,888$9,810.00$9,810.00
101Inlets 4-FT diameter (611.3004)EACH23$3,356.00$3,421.00$3,421.00$2,210.00$2,210.00
102Inlets median 1 grate (611.3901)EACH1$2,825.00$2,745.00$2,745.00$2,450.00$2,450.00
103Pipe underdrain 6-inch (612.0106)LF680$17.50$8.00$12.00$12.00$8.30
104Pipe underdrain wrapped 6-inch (612.0406)LF260$4.69$5.00$5.00$5.00$4.30
105Steel thrie beam bullnose terminal (614.0220)EACH2$15,000$15,000$15,000$15,000$15,000
106Steel thrie beam (614.0230)LF150$38.00$38.00$38.00$38.00$38.00
107Crash cushions temporary (614.0905)EACH8$3,723.33$8,245.00$4,895.00$7,500.00$3,723.33
108Fence woven wire (height) 0001. 4- FT (616.0100)LF277$13.00$13.00$13.00$13.00$13.00
109Fence chain link 6-FT (616.0206)LF3,058$25.50$25.50$25.50$25.50$25.50
110Fence chain link salvaged 6-FT (616.0406)LF464$36.90$36.90$36.90$36.90$36.90
111Fence safety (616.0700.S)LF1,000$3.00$3.00$3.00$3.00$3.00
112Maintenance and repair of haul roads (project) 0001. 1130-65-81 (618.0100)EACH1$0.01$1.00$1,500.00$1.00$1.00
113Mobilization (619.1000)EACH1$874,000$688,682$1,085,115$770,000$1,224,000
114Concrete median sloped nose (620.0300)SF39$14.00$17.00$16.00$17.00$20.00
115Dust control surface treatment (623.0200)SY22,950$0.01$0.01$0.01$0.01$0.01
116Water (624.0100)MGAL131$0.01$55.00$55.00$55.00$42.90
117Salvaged topsoil (625.0500)SY53,831$0.01$1.60$1.60$1.60$0.01
118Silt fence (628.1504)LF4,581$2.00$2.00$2.00$2.00$2.00
119Silt fence maintenance (628.1520)LF13,923$0.01$0.01$0.01$0.01$0.01
120Mobilizations erosion control (628.1905)EACH9$1.00$1.00$1.00$1.00$1.00
121Mobilizations emergency erosion control (628.1910)EACH6$1.00$1.00$1.00$1.00$1.00
122Erosion mat class I type B (628.2004)SY34,341$1.20$1.20$1.20$1.20$1.20
123Erosion mat urban class I type B (628.2008)SY6,701$2.00$2.00$2.00$2.00$2.00
124Inlet protection type A (628.7005)EACH30$1.00$1.00$1.00$1.00$1.00
125Inlet protection type C (628.7015)EACH31$150.00$150.00$150.00$150.00$150.00
126Temporary ditch checks (628.7504)LF325$6.00$6.00$6.00$6.00$6.00
127Culvert pipe checks (628.7555)EACH4$10.00$10.00$10.00$10.00$10.00
128Tracking pads (628.7560)EACH3$0.01$1,400.00$1,400.00$1,400.00$500.00
129Rock bags (628.7570)EACH87$10.00$10.00$10.00$10.00$10.00
130Fertilizer type B (629.0210)CWT17$125.00$125.00$125.00$125.00$125.00
131Seeding mixture no. 30 (630.0130)LB2,424$4.00$4.00$4.00$4.00$4.00
132Seed water (630.0500)MGAL1,211$0.01$0.01$0.01$0.01$0.01
133Posts wood 4X6-inch X 16-FT (634.0616)EACH21$140.00$140.00$140.00$140.00$140.00
134Posts wood 4X6-inch X 18-FT (634.0618)EACH2$150.00$150.00$150.00$150.00$150.00
135Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH8$300.00$300.00$300.00$300.00$300.00
136Sign supports structural steel HS (635.0200)LB1,050$7.00$7.00$7.00$7.00$7.00
137Signs type II reflective H (637.2210)SF45$26.00$26.00$26.00$26.00$26.00
138Signs type II reflective F (637.2230)SF20$30.00$30.00$30.00$30.00$30.00
139Moving signs type I (638.2101)EACH1$3,500.00$3,500.00$3,500.00$3,500.00$3,500.00
140Moving signs type II (638.2102)EACH19$100.00$100.00$100.00$100.00$100.00
141Removing signs type II (638.2602)EACH5$30.00$30.00$30.00$30.00$30.00
142Removing small sign supports (638.3000)EACH28$30.00$30.00$30.00$30.00$30.00
143Traffic control drums (643.0300)DAY52,999$0.22$0.17$0.17$0.17$0.22
144Traffic control barricades type III (643.0420)DAY6,923$0.44$0.65$0.65$0.65$0.44
145Traffic control warning lights type A (643.0705)DAY13,846$0.12$0.20$0.20$0.20$0.12
146Traffic control warning lights type C (643.0715)DAY5,962$0.14$0.20$0.20$0.20$0.14
147Traffic control connected arrow boards (643.0810)DAY1,227$8.40$7.95$7.95$7.95$8.40
148Traffic control signs (643.0900)DAY37,611$0.25$0.24$0.24$0.24$0.25
149Traffic control covering signs type I (643.0910)EACH9$86.01$275.00$275.00$275.00$86.01
150Traffic control signs fixed message (643.1000)SF207.50$24.13$22.15$22.15$22.15$24.13
151Traffic control signs PCMS (643.1050)DAY282$45.50$30.00$30.00$30.00$45.50
152Traffic control connected work zone start and end location markers (643.1220)DAY535$8.00$5.75$5.75$5.75$8.00
153Temporary marking line removable tape 6-inch (643.3180)LF479$2.79$2.50$2.50$2.50$2.79
154Traffic control (643.5000)EACH1$21,206$146,680$146,680$146,680$21,205
155Temporary pedestrian barricade (644.1810)LF60$6.79$10.00$10.00$10.00$6.79
156Geotextile type DF schedule A (645.0111)SY101$4.95$7.00$7.00$6.00$2.40
157Geotextile type HR (645.0120)SY732$3.00$6.00$6.00$3.20$3.20
158Geotextile type sas (645.0140)SY2,700$2.00$3.20$3.20$3.20$2.70
159Marking line epoxy 4-inch (646.1020)LF8,011$0.40$0.40$0.40$0.40$2.00
160Marking line epoxy 6-inch (646.2020)LF6,237$0.56$0.56$0.56$0.56$2.10
161Marking line epoxy 10-inch (646.4020)LF844$1.24$1.24$1.24$1.24$4.00
162Marking arrow epoxy (646.5020)EACH25$451.38$451.38$451.38$451.38$270.00
163Marking word epoxy (646.5120)EACH2$456.71$456.71$456.71$456.71$350.00
164Marking symbol epoxy (646.5220)EACH21$438.43$438.43$438.43$438.43$220.00
165Marking stop line epoxy 18-inch (646.6120)LF35$18.90$18.90$18.90$18.90$30.00
166Cold weather marking epoxy 4-inch (646.6464)LF1,321$0.40$0.40$0.40$0.40$0.80
167Cold weather marking epoxy 6-inch (646.6466)LF3,026$0.56$0.56$0.56$0.56$0.90
168Cold weather marking epoxy 8-inch (646.6468)LF150$1.09$1.09$1.09$1.09$1.00
169Marking diagonal epoxy 12-inch (646.7120)LF157$18.43$18.43$18.43$18.43$13.00
170Marking curb paint (646.8105)LF10$5.78$5.78$5.78$5.78$5.00
171Marking island nose paint (646.8205)EACH1$206.90$206.90$206.90$206.90$330.00
172Marking removal line 6-inch (646.9002)LF222$3.06$1.50$1.50$1.50$3.06
173Conduit rigid metallic 2-inch (652.0125)LF56$480.00$480.00$480.00$480.00$480.00
174Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,409$10.00$10.00$10.00$10.00$10.00
175Install conduit into existing item (652.0700.S)EACH1$275.00$275.00$275.00$275.00$275.00
176Pull boxes non-conductive 24X42- inch (653.0164)EACH2$1,950.00$1,950.00$1,950.00$1,950.00$1,950.00
177Junction boxes 18X12X6-inch (653.0222)EACH4$2,950.00$2,950.00$2,950.00$2,950.00$2,950.00
178Adjusting pull boxes (653.0900)EACH1$675.00$675.00$675.00$675.00$675.00
179Concrete bases type 6 (654.0106)EACH5$1,975.00$1,975.00$1,975.00$1,975.00$1,975.00
180Electrical wire lighting 12 AWG (655.0610)LF1,417$0.90$0.90$0.90$0.90$0.90
181Electrical wire lighting 6 AWG (655.0625)LF54$2.75$2.75$2.75$2.75$2.75
182Electrical service meter breaker pedestal (location) 0001. MB5-2 (656.0201)EACH1$1,950.00$1,950.00$1,950.00$1,950.00$1,950.00
183Electrical service breaker disconnect box (location) 0001. CB5-2 (656.0501)EACH1$800.00$800.00$800.00$800.00$800.00
184Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH6$615.00$615.00$615.00$615.00$615.00
185Poles type 6-aluminum (657.0327)EACH6$1,975.00$1,975.00$1,975.00$1,975.00$1,975.00
186Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH6$685.00$685.00$685.00$685.00$685.00
187Luminaires utility LED C (659.1125)EACH6$450.00$450.00$450.00$450.00$450.00
188Field system integrator (670.0101)EACH1$14,550$14,550$14,550$14,550$14,550
189ITS documentation (670.0201)EACH1$4,800.00$4,800.00$4,800.00$4,800.00$4,800.00
190Install pole mounted cabinet (673.1225.S)EACH1$2,650.00$2,650.00$2,650.00$2,650.00$2,650.00
191Install camera pole 50-FT (677.0150)EACH1$4,705.00$4,705.00$4,705.00$4,705.00$4,705.00
192Install camera assembly (677.0200)EACH1$2,650.00$2,650.00$2,650.00$2,650.00$2,650.00
193Communication system testing (678.0501)EACH1$4,800.00$4,800.00$4,800.00$4,800.00$4,800.00
194Install wireless antennas (678.0700)EACH1$2,975.00$2,975.00$2,975.00$2,975.00$2,975.00
195Sawing asphalt (690.0150)LF257$3.00$1.69$1.95$1.69$1.69
196Sawing concrete (690.0250)LF3,145$2.50$2.25$2.95$2.25$2.25
197Incentive strength concrete structures (715.0502)DOL3,210$1.00$1.00$1.00$1.00$1.00
198Incentive strength concrete barrier (715.0603)DOL105$1.00$1.00$1.00$1.00$1.00
199Incentive compressive strength concrete pavement (715.0720)DOL2,016$1.00$1.00$1.00$1.00$1.00
200On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
201On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,040$5.00$5.00$5.00$5.00$5.00
202Special 0800. HPC masonry structures (SPV.0035)CY1,068$550.00$550.00$550.00$750.00$550.00
203Special 0100. construction staking survey project 1130-65-81 (SPV.0060)EACH1$24,900$24,900$24,900$24,900$24,900
204Special 0165. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH12$0.01$1,210.00$1,210.00$3,500.00$2,500.00
205Special 0170. emergency response to traffic involving crash cushion temporary (SPV.0060)EACH12$0.01$360.00$360.00$1,500.00$1,637.00
206Special 0200. temporary water diversion (SPV.0060)EACH1$1,000.00$15,250$15,250$25,000$25,000
207Special 0205. cover plates left-in- place (SPV.0060)EACH2$494.00$350.00$350.00$1,000.00$1,000.00
208Special 1030. modify existing lighting controls (SPV.0060)EACH1$550.00$550.00$550.00$550.00$550.00
209Special 3000. decorative silhoutte (SPV.0060)EACH2$2,500.00$2,500.00$2,500.00$4,500.00$5,950.00
210Special 0100. street sweeping (SPV.0075)HRS61$0.01$225.00$125.00$180.00$300.00
211Special 0100. removal and salvage of high-tension cable guard and posts (SPV.0090)LF1,710$4.84$8.00$8.00$8.00$8.00
212Special 1020. tray cable for street lighting 6 AWG (SPV.0090)LF1,920$4.75$4.75$4.75$4.75$4.75
213Special 0800. longitudinal grooving bridge deck (SPV.0165)SF14,760$0.79$0.82$0.82$0.82$0.79
WisDOT contract 20251111014: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy