WisDOT contract 20251111023 bid tabulation

T Stockton, Standing Rocks Road; Custer Road to Town Line Road (LOC STR, Portage County T Stockton, Standing Rocks Road). Let by Wisconsin DOT on November 11, 2025, Portage. 4 bids received; low bid $1,326,236 by Gerke Excavating Inc.

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
63
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerke Excavating Inc$1,326,236Low
2Earth, Inc.$1,454,209+10%
3Integrity Grading and Excavating, Inc.$1,480,804+12%
4A-1 Excavating LLC$1,509,509+14%
WisDOT contract 20251111023: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerke Excavating Inc2. Earth, Inc.3. Integrity Grading and Excavating, Inc.4. A-1 Excavating LLC
1Clearing (201.0105)STA70$842.83$800.00$842.83$300.00
2Grubbing (201.0205)STA70$322.27$300.00$322.27$1,000.00
3Removing small pipe culverts (203.0100)EACH5$619.26$500.00$1,275.00$770.00
4Removing asphaltic surface butt joints (204.0115)SY130$8.03$15.00$5.00$10.00
5Excavation common (205.0100)CY7,797$7.68$21.00$16.60$17.00
6Excavation rock (205.0200)CY10$94.49$400.00$494.00$300.00
7Prepare foundation for asphaltic paving (project) 01. 6808-02-70 (211.0101)EACH1$28,500$30,000$500.00$29,000
8Finishing roadway (project) 01. 6808-02-70 (213.0100)EACH1$4,018.81$7,800.00$500.00$500.00
9Base aggregate dense 3/4-inch (305.0110)TON2,300$20.54$21.00$23.50$26.00
10Base aggregate dense 1 1/4-inch (305.0120)TON8,530$16.21$16.00$13.00$19.00
11Pulverize and relay (325.0100)SY21,550$0.31$1.65$2.00$1.50
12QMP pulverize and relay compaction (374.1020.S)SY28,900$0.16$0.50$0.16$0.50
13Incentive density HMA pavement (460.2000)DOL3,520$1.00$1.00$1.00$1.00
14HMA pavement 4 LT 58-28 S (460.5224)TON5,500$87.38$88.00$87.38$93.00
15Asphaltic surface driveways and field entrances (465.0120)TON55$215.66$225.00$215.66$260.00
16Apron endwalls for culvert pipe 12- inch (520.1012)EACH6$483.87$350.00$730.00$600.00
17Culvert pipe class III-A 12-inch (520.3312)LF78$45.86$50.00$90.00$50.00
18Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF148$91.86$120.00$264.00$100.00
19Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,151.20$1,080.00$1,683.00$1,500.00
20Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH10$1,404.45$1,200.00$1,848.00$1,900.00
21Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF350$40.98$43.00$40.98$47.00
22Riprap medium (606.0200)CY160$117.03$75.00$125.00$125.00
23Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF38$78.16$92.00$100.00$110.00
24Inlet covers type HM-S (611.0636)EACH1$1,289.05$1,500.00$970.00$1,600.00
25Inlets 2X3-FT (611.3230)EACH1$2,848.30$2,500.00$3,800.00$3,000.00
26Mobilization (619.1000)EACH1$178,784$88,000$178,190$99,403
27Water (624.0100)MGAL440$37.00$20.00$49.00$13.00
28Salvaged topsoil (625.0500)SY35,150$1.76$2.40$2.45$2.00
29Mulching (627.0200)SY31,150$0.29$0.40$0.29$0.30
30Silt fence (628.1504)LF500$2.40$3.00$2.40$2.50
31Silt fence maintenance (628.1520)LF250$0.01$0.01$0.01$0.02
32Mobilizations erosion control (628.1905)EACH8$400.00$100.00$400.00$424.00
33Mobilizations emergency erosion control (628.1910)EACH2$200.00$100.00$200.00$212.00
34Erosion mat class I type B (628.2004)SY2,500$1.23$1.50$1.23$1.30
35Erosion mat urban class I type B (628.2008)SY1,500$1.78$2.00$1.78$1.90
36Temporary ditch checks (628.7504)LF400$6.95$9.00$6.95$7.40
37Culvert pipe checks (628.7555)EACH75$16.65$20.00$16.65$17.50
38Fertilizer type B (629.0210)CWT22$99.45$90.00$99.45$104.00
39Seeding mixture no. 30 (630.0130)LB630$8.95$9.00$8.95$9.50
40Seeding temporary (630.0200)LB475$3.85$4.00$3.85$4.00
41Seed water (630.0500)MGAL880$0.01$10.00$0.01$0.01
42Markers culvert end (633.5200)EACH10$74.75$70.00$74.75$79.00
43Posts wood 4X6-inch X 12-FT (634.0612)EACH16$85.25$90.00$85.25$90.00
44Moving signs type II (638.2102)EACH16$87.25$180.00$87.25$92.00
45Field office type B (642.5001)EACH1$7,531.35$7,000.00$13,200$8,500.00
46Traffic control drums (643.0300)DAY3,000$0.50$0.55$0.50$0.55
47Traffic control barricades type III (643.0420)DAY930$1.25$1.30$1.25$1.35
48Traffic control signs (643.0900)DAY930$1.50$1.50$1.50$1.60
49Traffic control signs fixed message (643.1000)SF72$10.50$11.00$10.40$11.00
50Traffic control (643.5000)EACH1$1,850.00$8,500.00$1,850.00$8,000.00
51Geotextile type HR (645.0120)SY480$3.87$6.00$1.85$5.00
52Construction staking storm sewer (650.4000)EACH2$100.00$110.00$175.00$184.00
53Construction staking subgrade (650.4500)LF3,120$0.65$0.75$0.01$0.01
54Construction staking base (650.5000)LF16,155$0.75$0.85$0.77$0.80
55Construction staking curb gutter and curb & gutter (650.5500)LF350$2.00$2.00$1.00$1.10
56Construction staking pipe culverts (650.6000)EACH8$125.00$150.00$175.00$184.00
57Construction staking supplemental control (project) 01. 6808-02-70 (650.9911)EACH1$2,000.00$3,000.00$900.00$954.00
58Construction staking slope stakes (650.9920)LF16,155$0.80$0.90$0.77$0.80
59Sawing asphalt (690.0150)LF100$2.95$6.00$2.95$4.00
60Incentive iri ride (740.0440)DOL12,176$1.00$1.00$1.00$1.00
61On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00
62On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
63Special 01. pulverize, salvage, and relay (SPV.0180)SY7,350$2.28$6.65$5.70$10.00
WisDOT contract 20251111023: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy