WisDOT contract 20251111023 bid tabulation
T Stockton, Standing Rocks Road; Custer Road to Town Line Road (LOC STR, Portage County T Stockton, Standing Rocks Road). Let by Wisconsin DOT on November 11, 2025, Portage. 4 bids received; low bid $1,326,236 by Gerke Excavating Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 NOV 2025
- Pay items
- 63
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerke Excavating Inc | $1,326,236 | Low |
| 2 | Earth, Inc. | $1,454,209 | +10% |
| 3 | Integrity Grading and Excavating, Inc. | $1,480,804 | +12% |
| 4 | A-1 Excavating LLC | $1,509,509 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerke Excavating Inc | 2. Earth, Inc. | 3. Integrity Grading and Excavating, Inc. | 4. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 70 | $842.83 | $800.00 | $842.83 | $300.00 |
| 2 | Grubbing (201.0205) | STA | 70 | $322.27 | $300.00 | $322.27 | $1,000.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 5 | $619.26 | $500.00 | $1,275.00 | $770.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 130 | $8.03 | $15.00 | $5.00 | $10.00 |
| 5 | Excavation common (205.0100) | CY | 7,797 | $7.68 | $21.00 | $16.60 | $17.00 |
| 6 | Excavation rock (205.0200) | CY | 10 | $94.49 | $400.00 | $494.00 | $300.00 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 6808-02-70 (211.0101) | EACH | 1 | $28,500 | $30,000 | $500.00 | $29,000 |
| 8 | Finishing roadway (project) 01. 6808-02-70 (213.0100) | EACH | 1 | $4,018.81 | $7,800.00 | $500.00 | $500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,300 | $20.54 | $21.00 | $23.50 | $26.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 8,530 | $16.21 | $16.00 | $13.00 | $19.00 |
| 11 | Pulverize and relay (325.0100) | SY | 21,550 | $0.31 | $1.65 | $2.00 | $1.50 |
| 12 | QMP pulverize and relay compaction (374.1020.S) | SY | 28,900 | $0.16 | $0.50 | $0.16 | $0.50 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 3,520 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 5,500 | $87.38 | $88.00 | $87.38 | $93.00 |
| 15 | Asphaltic surface driveways and field entrances (465.0120) | TON | 55 | $215.66 | $225.00 | $215.66 | $260.00 |
| 16 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 6 | $483.87 | $350.00 | $730.00 | $600.00 |
| 17 | Culvert pipe class III-A 12-inch (520.3312) | LF | 78 | $45.86 | $50.00 | $90.00 | $50.00 |
| 18 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 148 | $91.86 | $120.00 | $264.00 | $100.00 |
| 19 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,151.20 | $1,080.00 | $1,683.00 | $1,500.00 |
| 20 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 10 | $1,404.45 | $1,200.00 | $1,848.00 | $1,900.00 |
| 21 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 350 | $40.98 | $43.00 | $40.98 | $47.00 |
| 22 | Riprap medium (606.0200) | CY | 160 | $117.03 | $75.00 | $125.00 | $125.00 |
| 23 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 38 | $78.16 | $92.00 | $100.00 | $110.00 |
| 24 | Inlet covers type HM-S (611.0636) | EACH | 1 | $1,289.05 | $1,500.00 | $970.00 | $1,600.00 |
| 25 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,848.30 | $2,500.00 | $3,800.00 | $3,000.00 |
| 26 | Mobilization (619.1000) | EACH | 1 | $178,784 | $88,000 | $178,190 | $99,403 |
| 27 | Water (624.0100) | MGAL | 440 | $37.00 | $20.00 | $49.00 | $13.00 |
| 28 | Salvaged topsoil (625.0500) | SY | 35,150 | $1.76 | $2.40 | $2.45 | $2.00 |
| 29 | Mulching (627.0200) | SY | 31,150 | $0.29 | $0.40 | $0.29 | $0.30 |
| 30 | Silt fence (628.1504) | LF | 500 | $2.40 | $3.00 | $2.40 | $2.50 |
| 31 | Silt fence maintenance (628.1520) | LF | 250 | $0.01 | $0.01 | $0.01 | $0.02 |
| 32 | Mobilizations erosion control (628.1905) | EACH | 8 | $400.00 | $100.00 | $400.00 | $424.00 |
| 33 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $100.00 | $200.00 | $212.00 |
| 34 | Erosion mat class I type B (628.2004) | SY | 2,500 | $1.23 | $1.50 | $1.23 | $1.30 |
| 35 | Erosion mat urban class I type B (628.2008) | SY | 1,500 | $1.78 | $2.00 | $1.78 | $1.90 |
| 36 | Temporary ditch checks (628.7504) | LF | 400 | $6.95 | $9.00 | $6.95 | $7.40 |
| 37 | Culvert pipe checks (628.7555) | EACH | 75 | $16.65 | $20.00 | $16.65 | $17.50 |
| 38 | Fertilizer type B (629.0210) | CWT | 22 | $99.45 | $90.00 | $99.45 | $104.00 |
| 39 | Seeding mixture no. 30 (630.0130) | LB | 630 | $8.95 | $9.00 | $8.95 | $9.50 |
| 40 | Seeding temporary (630.0200) | LB | 475 | $3.85 | $4.00 | $3.85 | $4.00 |
| 41 | Seed water (630.0500) | MGAL | 880 | $0.01 | $10.00 | $0.01 | $0.01 |
| 42 | Markers culvert end (633.5200) | EACH | 10 | $74.75 | $70.00 | $74.75 | $79.00 |
| 43 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 16 | $85.25 | $90.00 | $85.25 | $90.00 |
| 44 | Moving signs type II (638.2102) | EACH | 16 | $87.25 | $180.00 | $87.25 | $92.00 |
| 45 | Field office type B (642.5001) | EACH | 1 | $7,531.35 | $7,000.00 | $13,200 | $8,500.00 |
| 46 | Traffic control drums (643.0300) | DAY | 3,000 | $0.50 | $0.55 | $0.50 | $0.55 |
| 47 | Traffic control barricades type III (643.0420) | DAY | 930 | $1.25 | $1.30 | $1.25 | $1.35 |
| 48 | Traffic control signs (643.0900) | DAY | 930 | $1.50 | $1.50 | $1.50 | $1.60 |
| 49 | Traffic control signs fixed message (643.1000) | SF | 72 | $10.50 | $11.00 | $10.40 | $11.00 |
| 50 | Traffic control (643.5000) | EACH | 1 | $1,850.00 | $8,500.00 | $1,850.00 | $8,000.00 |
| 51 | Geotextile type HR (645.0120) | SY | 480 | $3.87 | $6.00 | $1.85 | $5.00 |
| 52 | Construction staking storm sewer (650.4000) | EACH | 2 | $100.00 | $110.00 | $175.00 | $184.00 |
| 53 | Construction staking subgrade (650.4500) | LF | 3,120 | $0.65 | $0.75 | $0.01 | $0.01 |
| 54 | Construction staking base (650.5000) | LF | 16,155 | $0.75 | $0.85 | $0.77 | $0.80 |
| 55 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 350 | $2.00 | $2.00 | $1.00 | $1.10 |
| 56 | Construction staking pipe culverts (650.6000) | EACH | 8 | $125.00 | $150.00 | $175.00 | $184.00 |
| 57 | Construction staking supplemental control (project) 01. 6808-02-70 (650.9911) | EACH | 1 | $2,000.00 | $3,000.00 | $900.00 | $954.00 |
| 58 | Construction staking slope stakes (650.9920) | LF | 16,155 | $0.80 | $0.90 | $0.77 | $0.80 |
| 59 | Sawing asphalt (690.0150) | LF | 100 | $2.95 | $6.00 | $2.95 | $4.00 |
| 60 | Incentive iri ride (740.0440) | DOL | 12,176 | $1.00 | $1.00 | $1.00 | $1.00 |
| 61 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 62 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 63 | Special 01. pulverize, salvage, and relay (SPV.0180) | SY | 7,350 | $2.28 | $6.65 | $5.70 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.