WisDOT contract 20251111039 bid tabulation

STH 13 - Ecl; Little Black River Bridge B-60-0031 (CTH O, Taylor County STH 13 - Ecl). Let by Wisconsin DOT on November 11, 2025, Taylor. 6 bids received; low bid $663,990 by Janke General Contractors, Inc..

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
67
Data through
10 NOV 2026

5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Janke General Contractors, Inc.$663,990Low
2Sheet Piling Services LLC$670,567+1.0%
4Zenith Tech., Inc. - Waukesha$728,829+10%
5Larson Construction Co., Inc.$730,987+10%
6Lunda Construction Company$739,935+11%
WisDOT contract 20251111039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Janke General Contractors, Inc.2. Sheet Piling Services LLC3. Zenith Tech., Inc. - Waukesha4. Larson Construction Co., Inc.5. Lunda Construction Company
1Abatement of asbestos containing material (structure) 01. B-60-31 (203.0211.S)EACH1$7,500.00$7,000.00$8,880.00$8,880.00$7,000.00
2Removing structure over waterway minimal debris (structure) 01. B-60- 31 (203.0260)EACH1$100,000$190,000$65,000$119,490$200,000
3Removing asphaltic surface (204.0110)SY1,225$10.00$1.10$1.10$1.10$1.10
4Removing guardrail (204.0165)LF48$4.90$3.80$3.80$3.80$3.80
5Excavation common (205.0100)CY435$18.00$14.89$14.89$14.89$14.89
6Excavation for structures bridges (structure) 01. B-60-31 (206.1001)EACH1$35,146$30,000$10,000$5,500.00$35,000
7Borrow (208.0100)CY123$20.00$30.00$30.00$30.00$30.00
8Backfill structure type A (210.1500)TON500$35.00$21.85$21.85$21.85$21.85
9Finishing roadway (project) 01. 9547-03-70 (213.0100)EACH1$150.00$510.00$1,500.00$500.00$510.00
10Base aggregate dense 3/4-inch (305.0110)TON145$37.00$26.25$26.25$26.25$26.25
11Base aggregate dense 1 1/4-inch (305.0120)TON960$28.00$23.25$23.25$23.25$23.25
12Shaping shoulders (305.0500)STA2$150.00$510.00$510.00$510.00$510.00
13Tack coat (455.0605)GAL135$6.50$6.50$6.50$6.50$6.50
14Asphaltic surface (465.0105)TON428$134.72$134.72$134.72$134.72$134.72
15Concrete masonry bridges (502.0100)CY99$1,050.00$800.00$1,875.00$1,193.00$1,000.00
16Protective surface treatment (502.3200)SY397$4.50$3.50$4.00$3.50$3.00
17Adhesive anchors no. 4 bar (502.4204)EACH12$10.00$25.00$25.00$31.00$20.00
18Adhesive anchors no. 5 bar (502.4205)EACH194$10.00$25.00$30.00$31.00$25.00
19Bar steel reinforcement HS coated structures (505.0600)LB23,220$2.25$1.40$1.64$1.89$1.57
20Steel diaphragms (structure) 01. B- 60-31 (506.4000)EACH6$1,400.00$1,800.00$2,000.00$2,200.00$1,750.00
21Concrete surface repair (509.1500)SF15$365.00$225.00$260.00$94.00$250.00
22Railing tubular type M (513.4061)LF200$315.00$230.00$264.00$350.00$250.00
23Rubberized membrane waterproofing (516.0500)SY20$34.00$35.00$64.00$68.00$20.00
24Pipe underdrain wrapped 6-inch (612.0406)LF156$15.00$6.70$6.70$6.70$6.70
25Salvaged rail (614.0920)LF294$3.20$3.80$3.80$3.80$3.80
26MGS guardrail 3 (614.2300)LF153.13$28.60$22.85$22.85$22.85$22.85
27MGS guardrail 3 K (614.2330)LF6.25$37.00$39.25$39.25$39.25$39.25
28MGS guardrail short radius (614.2350)LF83$37.90$32.25$32.25$32.25$32.25
29MGS thrie beam transition (614.2500)LF157.60$92.00$90.30$90.30$90.30$90.30
30MGS guardrail terminal eat (614.2610)EACH3$3,835.00$3,422.00$3,422.00$3,422.00$3,422.00
31MGS guardrail short radius terminal (614.2630)EACH1$2,509.00$2,499.00$2,499.00$2,499.00$2,499.00
32Maintenance and repair of haul roads (project) 01. 9547-03-70 (618.0100)EACH1$150.00$0.01$1,500.00$2,500.00$0.01
33Mobilization (619.1000)EACH1$35,000$58,876$123,000$131,320$88,672
34Water (624.0100)MGAL23$14.50$0.50$0.50$0.50$0.50
35Salvaged topsoil (625.0500)SY3,320$6.00$1.74$1.74$1.74$1.74
36Silt fence (628.1504)LF1,175$2.17$2.25$2.25$2.25$2.25
37Silt fence maintenance (628.1520)LF1,175$0.01$0.01$0.01$0.01$0.01
38Mobilizations erosion control (628.1905)EACH5$275.00$300.00$300.00$300.00$300.00
39Mobilizations emergency erosion control (628.1910)EACH3$1.00$50.00$50.00$50.00$50.00
40Erosion mat urban class I type B (628.2008)SY3,740$2.12$1.70$1.70$1.70$1.70
41Erosion mat class III type D (628.2039)SY415$14.20$18.50$18.50$18.50$18.50
42Soil stabilizer type A (628.6505)ACRE0.09$2,250.00$7,250.00$7,250.00$7,250.00$7,250.00
43Fertilizer type A (629.0205)CWT3.20$110.00$161.00$161.00$161.00$161.00
44Seeding mixture no. 20 (630.0120)LB225$8.00$9.05$9.05$9.05$9.05
45Seeding temporary (630.0200)LB135$3.55$4.55$4.55$4.55$4.55
46Seed water (630.0500)MGAL109$1.00$0.01$0.01$0.01$0.01
47Posts wood 4X6-inch X 14-FT (634.0614)EACH4$95.00$90.00$90.00$90.00$90.00
48Signs type II reflective F (637.2230)SF12$25.00$29.60$29.60$29.60$29.60
49Removing signs type II (638.2602)EACH4$30.00$21.25$21.25$21.25$21.25
50Removing small sign supports (638.3000)EACH4$30.00$21.25$21.25$21.25$21.25
51Field office type B (642.5001)EACH1$2,200.00$1,000.00$7,000.00$3,000.00$3,000.00
52Traffic control barricades type III (643.0420)DAY1,190$0.35$0.35$0.35$0.35$0.35
53Traffic control warning lights type A (643.0705)DAY1,720$0.15$0.15$0.15$0.15$0.15
54Traffic control signs (643.0900)DAY7,730$0.45$0.45$0.45$0.45$0.45
55Traffic control covering signs type II (643.0920)EACH5$25.00$25.00$25.00$25.00$25.00
56Traffic control signs fixed message (643.1000)SF36$10.40$10.40$10.40$10.40$10.40
57Traffic control (643.5000)EACH1$1,413.00$1,413.00$1,413.00$1,413.00$1,413.00
58Geotextile type DF schedule A (645.0111)SY120$3.50$4.40$4.40$4.40$4.40
59Marking line epoxy 4-inch (646.1020)LF1,490$3.50$3.50$3.50$3.50$3.50
60Construction staking base (650.5000)LF614$0.01$0.01$0.01$0.01$2.00
61Construction staking resurfacing reference (650.8000)LF423$0.20$0.20$0.20$0.20$2.50
62Construction staking supplemental control (project) 01. 9547-03-70 (650.9911)EACH1$504.40$504.40$504.40$504.40$1,000.00
63Construction staking slope stakes (650.9920)LF614$1.49$1.49$1.49$1.49$1.25
64Sawing asphalt (690.0150)LF64$2.45$3.00$2.95$3.00$3.00
65Incentive strength concrete structures (715.0502)DOL594$1.00$1.00$1.00$1.00$1.00
66Installing and maintaining bird deterrent system (station) 01. sta 14+26 (999.2000.S)EACH1$2,500.00$0.01$6,500.00$1.00$0.01
67Special 01. foam void filling B-60- 31 (SPV.0060)EACH1$17,000$17,234$17,234$17,234$10,000
WisDOT contract 20251111039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy