WisDOT contract 20251209032 bid tabulation
V Marathon City, Main Street; CTH B to North Street (STH 107, Marathon County V Marathon City, Main Street; CTH B to North Street). Let by Wisconsin DOT on December 9, 2025, Marathon. 2 bids received; low bid $1,299,972 by American Asphalt of Wisconsin.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 135
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Asphalt of Wisconsin | $1,299,972 | Low |
| 2 | Earth, Inc. | $1,397,532 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Asphalt of Wisconsin | 2. Earth, Inc. |
|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $500.00 | $1,200.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 39 | $15.00 | $20.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 835 | $12.36 | $22.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 17,062 | $4.10 | $4.90 |
| 5 | Removing curb & gutter (204.0150) | LF | 1,270 | $9.85 | $16.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 996 | $12.00 | $30.00 |
| 7 | Removing masonry (204.0185) | CY | 1.20 | $75.00 | $1,000.00 |
| 8 | Removing concrete bases (204.0195) | EACH | 3 | $300.00 | $600.00 |
| 9 | Removing catch basins (204.0215) | EACH | 3 | $450.00 | $750.00 |
| 10 | Removing inlets (204.0220) | EACH | 1 | $450.00 | $750.00 |
| 11 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 16 | $12.00 | $50.00 |
| 12 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 38 | $12.00 | $58.00 |
| 13 | Excavation common (205.0100) | CY | 760 | $21.35 | $40.00 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 6360-05-75 (211.0101) | EACH | 1 | $27,490 | $4,000.00 |
| 15 | Finishing roadway (project) 01. 6360-05-75 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 167 | $29.60 | $44.00 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 495 | $19.35 | $40.00 |
| 18 | Shaping shoulders (305.0500) | STA | 22 | $96.74 | $150.00 |
| 19 | Base aggregate open-graded (310.0110) | TON | 247 | $31.20 | $45.00 |
| 20 | Select crushed material (312.0110) | TON | 414 | $19.35 | $42.00 |
| 21 | Drilled tie bars (416.0610) | EACH | 128 | $16.03 | $7.00 |
| 22 | Tack coat (455.0605) | GAL | 1,310 | $6.33 | $6.50 |
| 23 | Incentive density HMA pavement (460.2000) | DOL | 1,140 | $1.00 | $1.00 |
| 24 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 1,774 | $116.12 | $119.00 |
| 25 | Asphaltic surface (465.0105) | TON | 267 | $258.19 | $270.00 |
| 26 | Asphaltic surface patching (465.0110) | TON | 189 | $183.71 | $190.00 |
| 27 | Concrete collars for pipe (520.8000) | EACH | 6 | $950.00 | $1,600.00 |
| 28 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 56 | $244.00 | $280.00 |
| 29 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $1,620.00 | $2,000.00 |
| 30 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,327 | $76.23 | $45.00 |
| 31 | Concrete curb pedestrian (601.0600) | LF | 201 | $45.70 | $50.00 |
| 32 | Concrete sidewalk 4-inch (602.0405) | SF | 9,349 | $15.75 | $9.00 |
| 33 | Curb ramp detectable warning field white (602.0510) | SF | 380 | $62.51 | $60.00 |
| 34 | Curb ramp detectable warning field radial white (602.0610) | SF | 182 | $67.84 | $70.00 |
| 35 | Concrete driveway 6-inch (602.0810) | SY | 2 | $719.69 | $80.00 |
| 36 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 61 | $132.00 | $125.00 |
| 37 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 8 | $206.00 | $180.00 |
| 38 | Reconstructing catch basins (611.0410) | EACH | 4 | $1,800.00 | $2,000.00 |
| 39 | Reconstructing manholes (611.0420) | EACH | 5 | $2,000.00 | $2,800.00 |
| 40 | Manhole covers type J (611.0530) | EACH | 1 | $770.00 | $1,100.00 |
| 41 | Inlet covers type MS (611.0642) | EACH | 1 | $850.00 | $1,200.00 |
| 42 | Catch basins 2X3-FT (611.1230) | EACH | 3 | $3,380.00 | $3,800.00 |
| 43 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,800.00 | $4,000.00 |
| 44 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,590.00 | $3,200.00 |
| 45 | Adjusting inlet covers (611.8115) | EACH | 3 | $450.00 | $990.00 |
| 46 | Salvaged inlet covers (611.9710) | EACH | 2 | $450.00 | $750.00 |
| 47 | Pipe underdrain 6-inch (612.0106) | LF | 246 | $8.00 | $18.00 |
| 48 | Maintenance and repair of haul roads (project) 01. 6360-05-75 (618.0100) | EACH | 1 | $5,000.00 | $100.00 |
| 49 | Mobilization (619.1000) | EACH | 1 | $124,120 | $150,000 |
| 50 | Concrete median sloped nose (620.0300) | SF | 70 | $16.85 | $15.00 |
| 51 | Water (624.0100) | MGAL | 34 | $1.00 | $40.00 |
| 52 | Topsoil (625.0100) | SY | 485 | $10.00 | $12.00 |
| 53 | Mobilizations erosion control (628.1905) | EACH | 4 | $133.00 | $350.00 |
| 54 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $333.00 | $400.00 |
| 55 | Erosion mat urban class I type A (628.2006) | SY | 245 | $5.00 | $3.00 |
| 56 | Erosion mat class II type C (628.2027) | SY | 242 | $10.00 | $6.00 |
| 57 | Inlet protection type A (628.7005) | EACH | 4 | $150.00 | $200.00 |
| 58 | Inlet protection type B (628.7010) | EACH | 1 | $100.00 | $100.00 |
| 59 | Inlet protection type C (628.7015) | EACH | 27 | $75.00 | $125.00 |
| 60 | Temporary ditch checks (628.7504) | LF | 132 | $9.00 | $10.00 |
| 61 | Culvert pipe checks (628.7555) | EACH | 6 | $50.00 | $15.00 |
| 62 | Rock bags (628.7570) | EACH | 4 | $25.00 | $20.00 |
| 63 | Seeding mixture no. 40 (630.0140) | LB | 24 | $20.00 | $10.00 |
| 64 | Seeding temporary (630.0200) | LB | 15 | $10.00 | $6.00 |
| 65 | Seed water (630.0500) | MGAL | 13 | $100.00 | $11.00 |
| 66 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 6 | $150.00 | $175.00 |
| 67 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 1 | $150.00 | $200.00 |
| 68 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 14 | $300.00 | $300.00 |
| 69 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 1 | $325.00 | $350.00 |
| 70 | Signs type II reflective H (637.2210) | SF | 34.92 | $50.00 | $35.00 |
| 71 | Moving signs type II (638.2102) | EACH | 16 | $180.00 | $100.00 |
| 72 | Removing small sign supports (638.3000) | EACH | 16 | $50.00 | $100.00 |
| 73 | Field office type B (642.5001) | EACH | 1 | $12,000 | $8,000.00 |
| 74 | Traffic control drums (643.0300) | DAY | 16,701 | $0.50 | $0.52 |
| 75 | Traffic control barricades type III (643.0420) | DAY | 2,112 | $0.50 | $0.52 |
| 76 | Traffic control warning lights type A (643.0705) | DAY | 2,368 | $0.10 | $0.11 |
| 77 | Traffic control signs (643.0900) | DAY | 7,818 | $0.50 | $0.52 |
| 78 | Traffic control covering signs type II (643.0920) | EACH | 4 | $30.00 | $30.00 |
| 79 | Traffic control signs fixed message (643.1000) | SF | 36 | $9.80 | $10.00 |
| 80 | Temporary marking line paint 6- inch (643.3165) | LF | 1,152 | $0.40 | $0.40 |
| 81 | Temporary marking line epoxy 6- inch (643.3170) | LF | 13,580 | $0.80 | $0.85 |
| 82 | Temporary marking line removable tape 6-inch (643.3180) | LF | 5,692 | $1.69 | $1.75 |
| 83 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 3,301 | $1.69 | $1.75 |
| 84 | Traffic control (643.5000) | EACH | 1 | $2,000.00 | $10,000 |
| 85 | Temporary pedestrian surface plate (644.1430) | SF | 646 | $11.41 | $10.00 |
| 86 | Temporary pedestrian surface matting (644.1440) | SF | 143 | $4.00 | $4.00 |
| 87 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,027 | $5.00 | $5.10 |
| 88 | Temporary pedestrian detectable warning field (644.1605) | SF | 376 | $4.50 | $5.00 |
| 89 | Temporary pedestrian barricade (644.1810) | LF | 2,966 | $4.70 | $4.25 |
| 90 | Geotextile type DF schedule B (645.0112) | SY | 110 | $4.50 | $8.00 |
| 91 | Marking line epoxy 6-inch (646.2020) | LF | 175 | $1.25 | $1.25 |
| 92 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 9,940 | $2.20 | $2.25 |
| 93 | Marking line epoxy 8-inch (646.3020) | LF | 10 | $1.90 | $2.00 |
| 94 | Marking stop line epoxy 18-inch (646.6120) | LF | 92 | $35.00 | $40.00 |
| 95 | Marking diagonal epoxy 6-inch (646.7020) | LF | 110 | $15.00 | $16.00 |
| 96 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,546 | $14.10 | $15.00 |
| 97 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 66 | $50.00 | $52.00 |
| 98 | Marking parking stall epoxy (646.8320) | LF | 207 | $12.50 | $13.00 |
| 99 | Marking removal line 6-inch (646.9002) | LF | 2,811 | $0.90 | $1.00 |
| 100 | Construction staking storm sewer (650.4000) | EACH | 5 | $120.00 | $150.00 |
| 101 | Construction staking subgrade (650.4500) | LF | 222 | $8.35 | $2.00 |
| 102 | Construction staking base (650.5000) | LF | 222 | $1.36 | $1.00 |
| 103 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,327 | $0.73 | $1.55 |
| 104 | Construction staking pipe culverts (650.6000) | EACH | 1 | $119.41 | $300.00 |
| 105 | Construction staking resurfacing reference (650.8000) | LF | 1,097 | $0.30 | $0.60 |
| 106 | Construction staking electrical installations (project) 01. 6360-05- 75 (650.8501) | EACH | 1 | $316.14 | $1,000.00 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 52 | $115.39 | $280.00 |
| 108 | Construction staking sidewalk (project) 01. 6360-05-75 (650.9500) | EACH | 1 | $1,364.95 | $1,550.00 |
| 109 | Construction staking supplemental control (project) 01. 6360-05-75 (650.9911) | EACH | 1 | $474.20 | $6,000.00 |
| 110 | Construction staking slope stakes (650.9920) | LF | 372 | $0.96 | $3.00 |
| 111 | Conduit rigid nonmetallic schedule 40 3/4-inch (652.0205) | LF | 5 | $9.52 | $10.00 |
| 112 | Conduit rigid nonmetallic schedule 40 1 1/2-inch (652.0220) | LF | 110 | $10.55 | $11.00 |
| 113 | Adjusting pull boxes (653.0900) | EACH | 3 | $630.00 | $650.00 |
| 114 | Concrete bases type 5 (654.0105) | EACH | 3 | $1,875.00 | $2,000.00 |
| 115 | Electrical wire lighting 12 AWG (655.0610) | LF | 480 | $1.20 | $1.25 |
| 116 | Electrical wire lighting 8 AWG (655.0620) | LF | 1,600 | $1.47 | $1.55 |
| 117 | Electrical wire lighting 6 AWG (655.0625) | LF | 1,030 | $2.27 | $2.50 |
| 118 | Sawing asphalt (690.0150) | LF | 2,031 | $3.80 | $3.50 |
| 119 | Sawing concrete (690.0250) | LF | 837 | $4.86 | $6.00 |
| 120 | Incentive iri ride (740.0440) | DOL | 2,900 | $1.00 | $1.00 |
| 121 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 122 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 123 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 0.50 | $500.00 | $200.00 |
| 124 | Special 01. research and locate existing land parcel monuments (SPV.0060) | EACH | 64 | $56.28 | $30.00 |
| 125 | Special 02. verify and replace existing land parcel monuments (SPV.0060) | EACH | 64 | $58.54 | $32.00 |
| 126 | Special 03. storm sewer structure repair (SPV.0060) | EACH | 27 | $650.00 | $2,000.00 |
| 127 | Special 05. inlet covers type H- special (SPV.0060) | EACH | 3 | $995.00 | $1,300.00 |
| 128 | Special 06. salvage and reinstall decorative pole with twin luminaires (SPV.0060) | EACH | 1 | $2,430.00 | $2,500.00 |
| 129 | Special 07. salvage and reinstall flashing beacon unit (SPV.0060) | EACH | 1 | $2,460.00 | $2,500.00 |
| 130 | Special 01. salvage concrete pavers (SPV.0165) | SF | 324 | $5.00 | $15.00 |
| 131 | Special 02. reinstall salvaged concrete pavers (SPV.0165) | SF | 258 | $10.00 | $20.00 |
| 132 | Special 01. preparing topsoil for lawn type turf (SPV.0180) | SY | 485 | $2.00 | $10.00 |
| 133 | Special 02. removing distressed asphaltic surface milling (SPV.0180) | SY | 896 | $13.01 | $26.00 |
| 134 | Special 01. excavation, hauling, and disposal of lead contaminated soil (SPV.0195) | TON | 17 | $120.00 | $260.00 |
| 135 | Special 02. excavation, hauling, and disposal of voc contaminated soil (SPV.0195) | TON | 34 | $135.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.