WisDOT contract 20251209036 bid tabulation
Whitehall - Strum; Elk Creek Bridge B-61-0293 (CTH D, Trempealeau County Whitehall - Strum). Let by Wisconsin DOT on December 9, 2025, Trempealeau. 5 bids received; low bid $826,726 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 72
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $826,726 | Low |
| 2 | Sheet Piling Services LLC | $883,686 | +7.0% |
| 3 | Lunda Construction Company | $898,947 | +9.0% |
| 4 | Pheifer Brothers Construction Co., Inc. | $967,124 | +17% |
| 5 | Zenith Tech., Inc. - Waukesha | $1,052,997 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Sheet Piling Services LLC | 3. Lunda Construction Company | 4. Pheifer Brothers Construction Co., Inc. | 5. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 4 | $400.00 | $400.00 | $400.00 | $400.00 | $1,165.67 |
| 2 | Grubbing (201.0205) | STA | 4 | $400.00 | $480.00 | $480.00 | $480.00 | $863.22 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-61- 0038 (203.0260) | EACH | 1 | $51,600 | $125,000 | $100,000 | $244,000 | $142,000 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 24 | $19.37 | $19.37 | $19.37 | $19.37 | $19.37 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 470 | $19.37 | $19.37 | $19.37 | $19.37 | $19.37 |
| 6 | Removing guardrail (204.0165) | LF | 164 | $4.90 | $4.90 | $4.90 | $4.90 | $3.50 |
| 7 | Excavation common (205.0100) | CY | 211 | $10.25 | $10.25 | $10.25 | $10.25 | $15.98 |
| 8 | Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S) | TON | 118 | $90.00 | $95.00 | $100.00 | $180.00 | $134.75 |
| 9 | Excavation for structures bridges (structure) 01. B-61-0293 (206.1001) | EACH | 1 | $15,872 | $75,000 | $50,000 | $130,300 | $7,237.87 |
| 10 | Borrow (208.0100) | CY | 823 | $20.20 | $20.20 | $20.20 | $20.20 | $30.65 |
| 11 | Backfill structure type A (210.1500) | TON | 346 | $17.25 | $17.25 | $17.25 | $17.25 | $42.25 |
| 12 | Prepare foundation for asphaltic paving (project) 01. 7146-00-76 (211.0101) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $2,500.00 |
| 13 | Finishing roadway (project) 01. 7146-00-76 (213.0100) | EACH | 1 | $720.00 | $720.00 | $720.00 | $720.00 | $2,600.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 120 | $35.00 | $35.00 | $35.00 | $35.00 | $55.35 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 420 | $26.90 | $26.90 | $26.90 | $26.90 | $27.34 |
| 16 | Tack coat (455.0605) | GAL | 64 | $11.17 | $11.17 | $11.17 | $11.17 | $11.17 |
| 17 | Asphaltic surface (465.0105) | TON | 180 | $150.58 | $150.58 | $150.58 | $150.58 | $150.58 |
| 18 | Concrete masonry bridges (502.0100) | CY | 187 | $788.00 | $850.00 | $1,000.00 | $600.00 | $1,100.00 |
| 19 | Protective surface treatment (502.3200) | SY | 276 | $4.00 | $3.00 | $5.00 | $4.70 | $4.00 |
| 20 | Pigmented surface sealer (502.3210) | SY | 116 | $10.00 | $4.00 | $8.00 | $12.00 | $12.50 |
| 21 | Prestressed girder type I 36W-inch (503.0137) | LF | 435 | $350.00 | $260.00 | $300.00 | $290.00 | $300.00 |
| 22 | Bar steel reinforcement HS structures (505.0400) | LB | 3,600 | $2.00 | $1.30 | $1.31 | $1.36 | $1.75 |
| 23 | Bar steel reinforcement HS coated structures (505.0600) | LB | 24,230 | $2.00 | $1.40 | $1.48 | $1.46 | $1.75 |
| 24 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 10 | $150.00 | $1,000.00 | $125.00 | $120.00 | $140.00 |
| 25 | Steel diaphragms (structure) 01. B- 61-0293 (506.4000) | EACH | 8 | $1,500.00 | $2,500.00 | $750.00 | $1,100.00 | $1,035.00 |
| 26 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $60.00 | $30.00 | $25.00 | $60.00 | $61.00 |
| 27 | Piling cip concrete 10 3/4 X 0.25- inch (550.2104) | LF | 1,300 | $54.00 | $48.00 | $45.00 | $19.00 | $70.00 |
| 28 | Riprap heavy (606.0300) | CY | 415 | $65.00 | $70.00 | $75.00 | $83.00 | $74.43 |
| 29 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 142 | $6.00 | $6.90 | $6.90 | $6.90 | $8.48 |
| 30 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $250.00 | $1,000.00 | $150.00 | $320.00 | $300.00 |
| 31 | MGS guardrail 3 (614.2300) | LF | 50 | $25.00 | $25.00 | $25.00 | $25.00 | $26.00 |
| 32 | MGS thrie beam transition (614.2500) | LF | 157.60 | $99.00 | $99.00 | $99.00 | $99.00 | $92.00 |
| 33 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,585.00 | $3,585.00 | $3,585.00 | $3,585.00 | $3,835.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 7146-00-76 (618.0100) | EACH | 1 | $1,500.00 | $0.01 | $0.01 | $1.00 | $3,800.00 |
| 35 | Mobilization (619.1000) | EACH | 1 | $111,135 | $74,069 | $113,654 | $43,853 | $150,000 |
| 36 | Water (624.0100) | MGAL | 10 | $45.00 | $45.00 | $45.00 | $45.00 | $37.07 |
| 37 | Salvaged topsoil (625.0500) | SY | 1,875 | $1.60 | $1.60 | $1.60 | $1.60 | $1.70 |
| 38 | Mulching (627.0200) | SY | 670 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 |
| 39 | Silt fence (628.1504) | LF | 755 | $2.00 | $2.00 | $2.00 | $2.00 | $2.20 |
| 40 | Silt fence maintenance (628.1520) | LF | 755 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 5 | $180.00 | $180.00 | $180.00 | $180.00 | $420.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 | $100.00 | $100.00 | $350.00 |
| 43 | Erosion mat urban class I type B (628.2008) | SY | 1,920 | $1.65 | $1.65 | $1.65 | $1.65 | $2.29 |
| 44 | Turbidity barriers (628.6005) | SY | 400 | $22.75 | $22.75 | $22.75 | $22.75 | $44.00 |
| 45 | Fertilizer type B (629.0210) | CWT | 1.70 | $150.00 | $150.00 | $150.00 | $150.00 | $110.00 |
| 46 | Seeding mixture no. 20 (630.0120) | LB | 57 | $8.75 | $8.75 | $8.75 | $8.75 | $8.75 |
| 47 | Seeding temporary (630.0200) | LB | 75 | $2.45 | $2.45 | $2.45 | $2.45 | $3.55 |
| 48 | Seed water (630.0500) | MGAL | 63 | $1.50 | $1.50 | $1.50 | $1.50 | $25.00 |
| 49 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $95.00 | $95.00 | $95.00 | $95.00 | $85.00 |
| 50 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $105.00 | $105.00 | $105.00 | $105.00 | $90.00 |
| 51 | Signs type II reflective H (637.2210) | SF | 6.50 | $17.50 | $17.50 | $17.50 | $17.50 | $26.00 |
| 52 | Signs type II reflective F (637.2230) | SF | 21 | $21.00 | $21.00 | $21.00 | $21.00 | $26.00 |
| 53 | Removing signs type II (638.2602) | EACH | 6 | $30.00 | $30.00 | $30.00 | $30.00 | $20.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 6 | $30.00 | $30.00 | $30.00 | $30.00 | $20.00 |
| 55 | Field office type B (642.5001) | EACH | 1 | $3,600.00 | $2,000.00 | $3,000.00 | $4,700.00 | $8,000.00 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 1,350 | $0.50 | $0.50 | $0.50 | $1.11 | $0.50 |
| 57 | Traffic control warning lights type A (643.0705) | DAY | 2,700 | $0.20 | $0.20 | $0.20 | $0.37 | $0.20 |
| 58 | Traffic control signs (643.0900) | DAY | 1,214 | $0.55 | $0.55 | $0.55 | $0.97 | $0.55 |
| 59 | Traffic control (643.5000) | EACH | 1 | $2,770.00 | $2,770.00 | $2,770.00 | $5,254.06 | $2,770.00 |
| 60 | Geotextile type DF schedule A (645.0111) | SY | 80 | $6.90 | $6.90 | $6.90 | $6.90 | $7.24 |
| 61 | Geotextile type HR (645.0120) | SY | 710 | $4.00 | $4.00 | $5.00 | $6.60 | $3.24 |
| 62 | Marking line epoxy 4-inch (646.1020) | LF | 1,768 | $3.45 | $3.40 | $3.75 | $3.75 | $3.75 |
| 63 | Construction staking subgrade (650.4500) | LF | 354 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 64 | Construction staking base (650.5000) | LF | 354 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 65 | Construction staking structure layout (structure) 01. B-61-0293 (650.6501) | EACH | 1 | $1,257.00 | $1,257.00 | $3,000.00 | $1,257.00 | $1,257.00 |
| 66 | Construction staking supplemental control (project) 01. 7146-00-76 (650.9911) | EACH | 1 | $369.00 | $369.00 | $1,000.00 | $369.00 | $369.00 |
| 67 | Construction staking slope stakes (650.9920) | LF | 354 | $0.98 | $0.98 | $1.00 | $0.98 | $0.98 |
| 68 | Sawing asphalt (690.0150) | LF | 284 | $1.95 | $1.95 | $1.95 | $1.95 | $1.95 |
| 69 | Incentive strength concrete structures (715.0502) | DOL | 1,218 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Installing and maintaining bird deterrent system (station) 01. sta. 10+00 (999.2000.S) | EACH | 1 | $4,000.00 | $0.01 | $0.01 | $5,000.00 | $4,500.00 |
| 71 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 72 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.