WisDOT contract 20260113047 bid tabulation
Wcl - Menomonie; Irving Creek Bridge B-17-0238 (CTH P, Dunn County WCL - Menomonie). Let by Wisconsin DOT on January 13, 2026, Dunn. 6 bids received; low bid $547,773 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 52
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $547,773 | Low |
| 2 | Tri-City Contractors, Inc | $549,991 | 0.0% |
| 3 | Haas Sons, Inc. | $552,824 | +1.0% |
| 4 | Larson Construction Co., Inc. | $565,723 | +3.0% |
| 5 | Lunda Construction Company | $631,793 | +15% |
| 6 | Stout Construction, Inc. | $644,217 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Tri-City Contractors, Inc | 3. Haas Sons, Inc. | 4. Larson Construction Co., Inc. | 5. Lunda Construction Company | 6. Stout Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 2 | $100.00 | $3,000.00 | $1,000.00 | $100.00 | $100.00 | $2,200.00 |
| 2 | Grubbing (201.0205) | STA | 2 | $100.00 | $1,500.00 | $1,000.00 | $100.00 | $100.00 | $1,650.00 |
| 3 | Removing structure (structure) 01. P-17-0915 (203.0220) | EACH | 1 | $108,390 | $15,000 | $25,000 | $8,390.00 | $84,390 | $9,500.00 |
| 4 | Excavation common (205.0100) | CY | 896 | $20.55 | $12.00 | $19.00 | $20.55 | $20.55 | $33.10 |
| 5 | Excavation for structures culverts (structure) 01. B-17-0238 (206.2001) | EACH | 1 | $17,745 | $18,000 | $25,000 | $42,750 | $17,745 | $19,250 |
| 6 | Backfill structure type B (210.2500) | TON | 1,050 | $10.60 | $25.40 | $25.00 | $10.60 | $10.60 | $31.75 |
| 7 | Finishing roadway (project) 01. 7878-03-70 (213.0100) | EACH | 1 | $750.00 | $1,500.00 | $1.00 | $750.00 | $750.00 | $3,500.00 |
| 8 | Base aggregate dense 3/4-inch (305.0110) | TON | 58 | $37.00 | $44.10 | $45.00 | $37.00 | $37.00 | $59.35 |
| 9 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 815 | $24.40 | $22.10 | $23.00 | $24.40 | $24.40 | $23.60 |
| 10 | Breaker run (311.0115) | CY | 110 | $51.80 | $26.10 | $69.00 | $51.80 | $51.80 | $75.80 |
| 11 | Select crushed material (312.0110) | TON | 1,022 | $24.40 | $23.50 | $22.00 | $24.40 | $24.40 | $23.20 |
| 12 | Tack coat (455.0605) | GAL | 45 | $14.38 | $15.00 | $14.38 | $14.38 | $14.38 | $15.10 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 140 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 111 | $165.10 | $175.00 | $165.10 | $165.10 | $165.10 | $173.35 |
| 15 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 94 | $172.17 | $185.00 | $172.17 | $172.17 | $172.17 | $180.80 |
| 16 | Concrete masonry culverts (504.0100) | CY | 200 | $1,000.00 | $970.00 | $1,300.00 | $857.00 | $750.00 | $1,000.00 |
| 17 | Bar steel reinforcement HS structures (505.0400) | LB | 32,340 | $1.30 | $1.75 | $0.01 | $1.64 | $1.30 | $1.45 |
| 18 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,980 | $1.40 | $1.90 | $0.01 | $2.53 | $2.10 | $2.55 |
| 19 | Rubberized membrane waterproofing (516.0500) | SY | 14 | $25.00 | $75.00 | $0.01 | $90.00 | $25.00 | $68.25 |
| 20 | Riprap heavy (606.0300) | CY | 55 | $73.15 | $101.00 | $150.00 | $73.15 | $73.15 | $108.00 |
| 21 | Maintenance and repair of haul roads (project) 01. 7878-03-70 (618.0100) | EACH | 1 | $0.01 | $500.00 | $500.00 | $2,500.00 | $500.00 | $2,900.00 |
| 22 | Mobilization (619.1000) | EACH | 1 | $19,495 | $60,000 | $38,000 | $78,311 | $97,988 | $44,300 |
| 23 | Water (624.0100) | MGAL | 10 | $47.00 | $40.00 | $40.00 | $47.00 | $47.00 | $220.00 |
| 24 | Salvaged topsoil (625.0500) | SY | 710 | $1.50 | $4.00 | $6.25 | $1.50 | $1.50 | $22.75 |
| 25 | Silt fence (628.1504) | LF | 663 | $2.65 | $3.50 | $2.65 | $2.65 | $2.65 | $4.05 |
| 26 | Silt fence maintenance (628.1520) | LF | 663 | $0.25 | $0.01 | $0.25 | $0.25 | $0.25 | $2.00 |
| 27 | Mobilizations erosion control (628.1905) | EACH | 3 | $200.00 | $500.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 28 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $500.00 | $100.00 | $100.00 | $100.00 | $300.00 |
| 29 | Erosion mat class II type C (628.2027) | SY | 521 | $4.50 | $6.00 | $4.50 | $4.50 | $4.50 | $6.30 |
| 30 | Turbidity barriers (628.6005) | SY | 30 | $40.00 | $80.00 | $40.00 | $40.00 | $40.00 | $96.00 |
| 31 | Seeding mixture no. 20 (630.0120) | LB | 14 | $14.70 | $60.00 | $14.70 | $14.70 | $14.70 | $26.50 |
| 32 | Seeding temporary (630.0200) | LB | 14 | $9.60 | $56.00 | $9.60 | $9.60 | $9.60 | $25.50 |
| 33 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $100.00 | $270.00 | $100.00 | $100.00 | $100.00 | $200.00 |
| 34 | Signs type II reflective F (637.2230) | SF | 12 | $30.00 | $65.00 | $30.00 | $30.00 | $30.00 | $61.25 |
| 35 | Removing signs type II (638.2602) | EACH | 4 | $23.00 | $30.00 | $23.00 | $23.00 | $23.00 | $165.00 |
| 36 | Removing small sign supports (638.3000) | EACH | 4 | $23.00 | $30.00 | $23.00 | $23.00 | $23.00 | $165.00 |
| 37 | Field office type B (642.5001) | EACH | 1 | $1,250.00 | $8,500.00 | $15,000 | $4,000.00 | $4,500.00 | $3,675.00 |
| 38 | Traffic control barricades type III (643.0420) | DAY | 1,278 | $0.40 | $0.45 | $0.40 | $0.40 | $0.77 | $0.45 |
| 39 | Traffic control warning lights type A (643.0705) | DAY | 1,988 | $0.10 | $0.10 | $0.10 | $0.10 | $0.23 | $0.10 |
| 40 | Traffic control signs (643.0900) | DAY | 994 | $0.40 | $0.45 | $0.40 | $0.40 | $1.04 | $0.45 |
| 41 | Traffic control (643.5000) | EACH | 1 | $2,565.00 | $4,000.00 | $2,565.00 | $2,565.00 | $1,588.53 | $2,700.00 |
| 42 | Geotextile type C (645.0105) | SY | 329 | $3.15 | $6.50 | $2.00 | $3.15 | $3.15 | $3.50 |
| 43 | Geotextile type HR (645.0120) | SY | 120 | $3.75 | $7.00 | $7.00 | $3.75 | $3.75 | $6.80 |
| 44 | Marking line epoxy 6-inch (646.2020) | LF | 660 | $7.00 | $7.70 | $7.00 | $7.00 | $7.00 | $7.35 |
| 45 | Construction staking subgrade (650.4500) | LF | 330 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 46 | Construction staking base (650.5000) | LF | 330 | $1.00 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 47 | Construction staking structure layout (structure) 01. B-17-0238 (650.6501) | EACH | 1 | $3,000.00 | $1,500.00 | $2,000.00 | $1,331.00 | $2,000.00 | $2,100.00 |
| 48 | Construction staking supplemental control (project) 01. 7878-03-70 (650.9911) | EACH | 1 | $1,000.00 | $360.00 | $1,150.00 | $329.00 | $1,000.00 | $1,200.00 |
| 49 | Construction staking slope stakes (650.9920) | LF | 330 | $1.00 | $1.00 | $0.01 | $0.98 | $1.00 | $0.01 |
| 50 | Sawing asphalt (690.0150) | LF | 44 | $5.00 | $6.00 | $2.95 | $5.00 | $5.00 | $15.00 |
| 51 | Incentive strength concrete structures (715.0502) | DOL | 1,260 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 52 | Special 01. temporary water diversions twin-cell box culvert (P- 17-0915) (SPV.0060) | EACH | 1 | $8,040.00 | $19,700 | $20,000 | $54,050 | $83,040 | $90,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.