WisDOT contract 20260113054 bid tabulation

C. Gillett, Main & Mckenzie Strts; S Cpl - N Cpl (STH 022, Oconto County C. Gillett, Main & Mckenzie Strts). Let by Wisconsin DOT on January 13, 2026, Oconto. 5 bids received; low bid $6,641,827 by Peters Concrete Company.

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
206
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Peters Concrete Company$6,641,827Low
2Zignego Company, Inc.$6,745,439+2.0%
3Relyco Plus, LLC$6,849,703+3.0%
4James Peterson Sons, Inc.$7,513,811+13%
5Dorner Inc.$7,553,696+14%
WisDOT contract 20260113054: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Peters Concrete Company2. Zignego Company, Inc.3. Relyco Plus, LLC4. James Peterson Sons, Inc.5. Dorner Inc.
1Clearing (201.0105)STA15$10.00$10.00$10.00$10.00$10.60
2Clearing (201.0120)ID15$5.00$5.00$5.00$5.00$5.30
3Grubbing (201.0205)STA15$1,000.00$1,000.00$1,000.00$1,000.00$1,055.80
4Grubbing (201.0220)ID15$50.00$50.00$50.00$50.00$52.80
5Removing small pipe culverts (203.0100)EACH8$425.00$425.00$435.00$550.00$195.00
6Removing structure (structure) 01. C-42-25 (203.0220)EACH1$27,500$12,950$8,545.00$12,950$13,672
7Removing concrete pavement (204.0100)SY1,369$4.00$4.00$10.74$5.33$6.10
8Removing curb & gutter (204.0150)LF10,284$2.86$2.86$0.01$5.25$2.40
9Removing concrete sidewalk (204.0155)SY4,817$6.63$6.63$4.30$6.92$8.90
10Removing guardrail (204.0165)LF105$3.40$5.00$3.40$5.00$3.60
11Removing surface drains (204.0190)EACH3$250.00$250.00$250.00$500.00$158.00
12Removing concrete bases (204.0195)EACH1$314.00$500.00$250.00$5,000.00$332.00
13Removing manholes (204.0210)EACH21$350.00$350.00$460.00$700.00$585.00
14Removing inlets (204.0220)EACH45$150.00$150.00$313.00$600.00$300.00
15Removing storm sewer (size) 01. 8- inch (204.0245)LF1,104$25.65$25.65$12.85$38.00$14.70
16Removing storm sewer (size) 02. 10-inch (204.0245)LF89$25.65$25.65$12.85$38.34$17.00
17Removing storm sewer (size) 03. 12-inch (204.0245)LF727$25.65$25.65$14.75$40.21$22.30
18Removing storm sewer (size) 04. 18-inch (204.0245)LF1,584$3.50$3.50$14.75$29.72$25.20
19Removing storm sewer (size) 05. 24-inch (204.0245)LF516$3.50$3.50$16.00$48.00$28.20
20Removing storm sewer (size) 06. 30-inch (204.0245)LF1,636$3.50$3.50$16.00$27.86$33.00
21Removing storm sewer (size) 07. 36-inch (204.0245)LF61$3.50$3.50$19.00$15.00$57.50
22Removing storm sewer (size) 08. 38-inch X 60-inch (204.0245)LF47$3.50$3.50$24.00$15.00$77.80
23Removing (item description) 01. removing retaining walls (204.9090.S)LF251$13.00$13.00$10.00$20.00$10.60
24Excavation common (205.0100)CY34,992$12.22$12.22$17.44$18.20$18.80
25Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON80$75.00$75.00$133.48$136.00$92.00
26Excavation for structures culverts (structure) 01. C-42-25 (206.2001)EACH1$6,165.00$9,497.00$7,500.00$9,497.00$10,026
27Backfill structure type B (210.2500)TON558$25.00$22.50$26.30$22.50$23.80
28Finishing roadway (project) 01. 9180-35-71 (213.0100)EACH1$5,000.00$1,000.00$5,000.00$7,500.00$4,329.00
29Base aggregate dense 3/4-inch (305.0110)TON651$24.25$24.25$32.65$27.00$28.10
30Base aggregate dense 1 1/4-inch (305.0120)TON16,127$13.50$13.50$9.19$15.25$16.60
31Select crushed material (312.0110)TON28,447$14.23$14.23$14.45$16.00$17.50
32Concrete pavement 8-inch (415.0080)SY25,240$62.05$62.05$63.30$65.65$65.50
33Concrete pavement gaps (415.0210)EACH21$1.00$1.00$1,000.00$569.95$1.00
34Concrete pavement joint filling (415.4100)SY27,760$1.50$1.50$2.00$1.20$1.60
35Drilled tie bars (416.0610)EACH62$30.00$30.00$10.00$9.69$31.70
36Drilled dowel bars (416.0620)EACH39$71.00$30.00$16.50$13.73$31.70
37HMA cold weather paving (450.4000)TON668$4.65$4.65$0.01$4.65$4.90
38HMA pavement 4 MT 58-28 S (450.6224)TON668$134.70$134.70$134.70$134.70$182.60
39Tack coat (455.0605)GAL204$8.40$8.40$8.40$8.40$8.90
40Asphaltic surface driveways and field entrances (465.0120)TON206$246.00$246.00$246.00$246.00$300.10
41Asphaltic flumes (465.0315)SY13$86.40$86.40$86.40$86.40$91.20
42Adhesive anchors no. 5 bar (502.4205)EACH64$26.00$26.00$26.00$26.00$27.40
43Concrete masonry culverts (504.0100)CY44$889.00$889.00$889.00$889.00$938.60
44Bar steel reinforcement HS structures (505.0400)LB4,770$1.37$1.37$1.37$1.37$1.40
45Bar steel reinforcement HS coated structures (505.0600)LB790$1.50$1.50$1.50$1.50$1.60
46Temporary shoring (structure) 01. C-42-25 (511.1200)SF375$45.00$45.00$45.00$45.00$47.50
47Railing pipe (513.2001)LF6$200.00$850.00$950.00$950.00$1,090.50
48Rubberized membrane waterproofing (516.0500)SY18$50.00$50.00$50.00$50.00$52.80
49Apron endwalls for pipe arch sloped cross drains steel 35X24- inch 4 to 1 (521.0535)EACH2$4,800.00$4,800.00$4,668.00$5,148.00$4,650.00
50Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH4$175.00$175.00$430.00$364.00$445.00
51Apron endwalls for culvert pipe steel 30-inch (521.1030)EACH4$450.00$450.00$800.00$700.00$730.00
52Culvert pipe corrugated steel 18- inch (521.3118)LF76$81.00$81.00$74.65$62.25$82.00
53Culvert pipe corrugated steel 30- inch (521.3130)LF63$111.00$111.00$113.25$81.00$109.00
54Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF61$163.00$163.00$163.70$165.50$149.00
55Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH1$1,275.00$1,275.00$1,045.00$1,392.00$1,635.00
56Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$2,025.00$2,025.00$1,522.00$1,592.00$1,925.00
57Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH3$2,325.00$2,325.00$1,925.00$1,815.00$2,290.00
58Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF71$220.00$220.00$222.00$255.00$189.00
59Concrete curb & gutter 18-inch type A (601.0405)LF420$33.00$33.00$35.75$34.49$34.80
60Concrete curb & gutter 18-inch type D (601.0407)LF20$79.00$79.00$50.00$70.99$83.40
61Concrete curb & gutter 30-inch type A (601.0409)LF221$29.00$29.00$25.00$22.13$30.60
62Concrete curb & gutter integral 30- inch type D (601.0452)LF7,895$23.12$23.12$25.00$13.35$24.40
63Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF140$35.00$35.00$28.00$42.26$37.00
64Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF20$79.00$79.00$55.00$65.95$83.40
65Concrete curb pedestrian (601.0600)LF451$79.00$79.00$45.00$79.80$83.40
66Concrete sidewalk 5-inch (602.0410)SF41,947$7.00$7.00$7.20$5.76$7.40
67Curb ramp detectable warning field yellow (602.0505)SF460$38.00$38.00$35.00$53.63$40.10
68Curb ramp detectable warning field radial yellow (602.0605)SF123$68.00$68.00$55.00$76.23$71.80
69Concrete driveway 6-inch (602.0810)SY2,190$74.00$74.00$72.20$65.95$78.10
70Concrete steps (602.1500)SF79$125.00$125.00$85.00$83.23$132.00
71Concrete surface drains (602.3010)CY3$1,500.00$1,500.00$900.00$1,197.43$1,583.60
72Riprap medium (606.0200)CY63$65.00$65.00$75.00$130.00$93.30
73Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF87$98.90$98.90$74.70$129.00$76.00
74Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF46$158.55$158.55$83.00$163.50$95.00
75Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF1,433$91.25$91.25$74.60$132.25$81.00
76Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF283$102.60$102.60$80.75$140.00$90.00
77Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF104$90.65$90.65$82.00$105.75$93.00
78Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF2,187$121.05$121.05$117.50$135.07$141.00
79Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF94$173.00$173.00$152.40$187.70$185.00
80Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF911$236.45$236.45$211.00$233.25$256.00
81Storm sewer pipe reinforced concrete class IV 42-inch (608.0442)LF511$259.10$259.10$250.30$276.00$311.00
82Storm sewer pipe reinforced concrete class IV 48-inch (608.0448)LF333$366.00$366.00$316.00$395.13$402.00
83Storm sewer pipe composite 8-inch (608.6008)LF9$80.00$80.00$60.00$116.00$133.00
84Storm sewer pipe composite 12- inch (608.6012)LF15$84.00$84.00$73.00$216.25$147.00
85Manhole covers type J-special (611.0535)EACH43$445.00$445.00$508.00$1,269.80$530.00
86Manhole covers type L (611.0545)EACH1$425.00$425.00$367.00$1,083.00$385.00
87Inlet covers type C (611.0612)EACH2$445.00$445.00$512.00$1,284.00$535.00
88Inlet covers type H (611.0624)EACH63$680.00$680.00$725.00$1,672.00$750.00
89Inlet covers type MS (611.0642)EACH1$480.00$480.00$500.00$605.00$520.00
90Inlet covers type Z (611.0666)EACH3$635.00$635.00$739.00$1,696.00$765.00
91Manholes 4-FT diameter (611.2004)EACH16$3,200.00$3,200.00$4,012.00$2,741.75$3,915.00
92Manholes 5-FT diameter (611.2005)EACH10$5,025.00$5,025.00$6,117.00$4,661.50$6,620.00
93Manholes 6-FT diameter (611.2006)EACH5$7,670.00$7,670.00$8,112.00$7,562.00$8,945.00
94Manholes 7-FT diameter (611.2007)EACH5$9,150.00$9,150.00$10,171$9,817.50$11,020
95Manholes 8-FT diameter (611.2008)EACH7$13,575$13,575$14,356$13,508$14,545
96Manholes 10-FT diameter (611.2010)EACH1$37,120$37,120$34,461$38,583$32,800
97Inlets 3-FT diameter (611.3003)EACH4$2,130.00$2,130.00$2,444.00$1,682.00$2,805.00
98Inlets 4-FT diameter (611.3004)EACH33$2,865.00$2,865.00$3,675.00$2,293.00$3,685.00
99Inlets 2X3-FT (611.3230)EACH37$2,060.00$2,060.00$2,481.00$1,801.00$2,535.00
100Inlets median 1 grate (611.3901)EACH1$3,075.00$3,075.00$3,286.00$2,735.00$3,275.00
101Pipe underdrain unperforated 4- inch (612.0204)LF50$25.30$25.30$19.90$10.00$24.00
102Pipe underdrain wrapped 6-inch (612.0406)LF880$17.90$17.90$20.70$17.30$29.00
103Drain tile exploration (612.0700)LF50$27.50$27.50$30.00$20.00$35.00
104Mobilization (619.1000)EACH1$372,500$410,000$468,500$550,550$350,000
105Concrete median sloped nose (620.0300)SF95$15.00$15.00$15.00$13.46$15.80
106Water (624.0100)MGAL330$40.00$40.00$0.01$65.00$47.50
107Topsoil (625.0100)SY15,970$9.75$9.75$6.40$5.34$9.10
108Mulching (627.0200)SY25,632$0.40$0.40$0.40$0.40$0.30
109Erosion bales (628.1104)EACH50$25.00$25.00$25.00$25.00$16.90
110Silt fence (628.1504)LF1,280$2.00$2.00$2.00$2.00$2.60
111Silt fence maintenance (628.1520)LF650$0.01$0.01$0.01$0.01$0.01
112Mobilizations erosion control (628.1905)EACH10$350.00$350.00$350.00$350.00$317.00
113Mobilizations emergency erosion control (628.1910)EACH8$1.00$1.00$1.00$1.00$211.00
114Erosion mat urban class I type A (628.2006)SY12,240$2.00$2.00$2.00$2.00$1.70
115Erosion mat urban class I type B (628.2008)SY780$2.00$2.00$2.00$2.00$2.00
116Inlet protection type A (628.7005)EACH87$50.00$50.00$50.00$50.00$10.60
117Inlet protection type B (628.7010)EACH2$125.00$125.00$125.00$125.00$79.20
118Inlet protection type D (628.7020)EACH88$125.00$125.00$125.00$125.00$142.50
119Temporary ditch checks (628.7504)LF102$10.00$10.00$10.00$10.00$9.00
120Culvert pipe checks (628.7555)EACH42$10.00$10.00$10.00$10.00$17.90
121Tracking pads (628.7560)EACH5$700.00$700.00$0.01$3,000.00$1,500.00
122Rock bags (628.7570)EACH45$10.00$10.00$10.00$10.00$17.90
123Fertilizer type B (629.0210)CWT26.60$150.00$150.00$150.00$150.00$103.50
124Seeding mixture no. 40 (630.0140)LB781$10.00$10.00$10.00$10.00$8.30
125Seeding mixture no. 70 (630.0170)LB13$250.00$250.00$250.00$250.00$211.20
126Seeding temporary (630.0200)LB274$5.00$5.00$5.00$5.00$4.20
127Seeding borrow pit (630.0300)LB450$7.00$7.00$7.00$7.00$8.60
128Seed water (630.0500)MGAL744$0.01$0.01$0.01$0.01$10.60
129Markers culvert end (633.5200)EACH9$85.00$85.00$85.00$85.00$73.90
130Posts wood 4X6-inch X 14-FT (634.0614)EACH43$150.00$150.00$150.00$150.00$86.60
131Posts wood 4X6-inch X 16-FT (634.0616)EACH21$165.00$165.00$165.00$165.00$88.70
132Signs type II reflective H (637.2210)SF69.96$35.00$35.00$35.00$35.00$25.90
133Signs type II reflective F (637.2230)SF17.50$35.00$35.00$35.00$35.00$28.40
134Moving signs type II (638.2102)EACH49$45.00$45.00$45.00$45.00$79.20
135Removing signs type II (638.2602)EACH3$50.00$50.00$50.00$50.00$42.20
136Removing small sign supports (638.3000)EACH50$100.00$100.00$100.00$100.00$42.20
137Field office type C (642.5201)EACH1$9,500.00$20,000$10,000$35,000$12,100
138Traffic control drums (643.0300)DAY10,000$0.25$0.25$0.25$0.25$0.40
139Traffic control barricades type III (643.0420)DAY12,330$0.50$0.50$0.50$0.50$0.60
140Traffic control warning lights type A (643.0705)DAY24,660$0.10$0.10$0.10$0.10$0.10
141Traffic control signs (643.0900)DAY44,560$0.25$0.25$0.25$0.25$0.30
142Traffic control covering signs type II (643.0920)EACH8$25.00$25.00$25.00$25.00$73.90
143Traffic control signs fixed message (643.1000)SF78$0.99$0.99$0.99$0.99$27.80
144Traffic control signs PCMS (643.1050)DAY21$45.00$45.00$45.00$45.00$72.80
145Temporary marking crosswalk removable tape 6-inch (643.3350)LF4,120$1.00$1.00$1.00$1.00$3.00
146Traffic control (643.5000)EACH1$10,000$10,000$10,000$10,000$8,689.00
147Temporary pedestrian surface asphalt (644.1410)SF3,365$3.85$10.00$8.50$12.00$4.20
148Temporary pedestrian curb ramp (644.1601)DAY1,995$8.00$8.00$8.00$8.00$10.20
149Temporary pedestrian detectable warning field (644.1605)SF550$9.00$9.00$9.00$9.00$16.90
150Temporary pedestrian barricade (644.1810)LF9,200$3.99$3.99$3.99$4.00$5.20
151Temporary audible message devices (644.1900.S)DAY2,330$3.00$3.00$3.00$3.00$2.70
152Geotextile type C (645.0105)SY107$2.00$4.00$4.00$6.00$4.20
153Geotextile type HR (645.0120)SY269$3.00$3.00$5.00$5.00$5.30
154Geotextile type R (645.0130)SY27$3.00$3.00$5.00$15.00$3.20
155Geotextile type sas (645.0140)SY4,740$1.56$1.56$1.75$3.00$1.60
156Marking line grooved wet ref epoxy 6-inch (646.2040)LF15,650$1.55$2.40$1.55$2.40$1.60
157Marking line grooved wet ref epoxy 10-inch (646.4040)LF430$3.10$4.40$3.10$4.40$3.30
158Marking arrow epoxy (646.5020)EACH11$416.65$295.00$416.65$295.00$439.80
159Marking word epoxy (646.5120)EACH3$421.55$355.00$421.55$355.00$445.10
160Marking stop line epoxy 18-inch (646.6120)LF113$17.45$25.00$17.45$25.00$18.40
161Marking diagonal epoxy 12-inch (646.7120)LF37$17.20$18.00$17.20$18.00$18.20
162Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,611$16.65$15.00$16.65$15.00$17.60
163Marking curb epoxy (646.8120)LF59$8.45$12.00$8.45$12.00$8.90
164Marking island nose epoxy (646.8220)EACH2$315.00$350.00$315.00$350.00$332.60
165Locating no-passing zones (648.0100)MI1.38$576.00$1,500.00$576.00$1,500.00$608.10
166Construction staking storm sewer (650.4000)EACH123$43.83$85.00$43.83$43.83$46.00
167Construction staking subgrade (650.4500)LF7,185$0.01$0.01$0.01$0.01$0.01
168Construction staking base (650.5000)LF823$1.28$0.55$1.28$1.28$1.40
169Construction staking curb gutter and curb & gutter (650.5500)LF906$0.69$0.75$0.69$0.69$0.70
170Construction staking pipe culverts (650.6000)EACH2$112.55$100.00$112.55$112.55$119.00
171Construction staking structure layout (structure) 01. C-42-25 (650.6501)EACH1$2,244.70$3,500.00$2,244.70$2,244.70$2,370.00
172Construction staking concrete pavement (650.7000)LF5,764$1.29$0.80$1.29$1.29$1.40
173Construction staking curb ramps (650.9000)EACH42$93.05$150.00$93.05$93.05$98.20
174Construction staking sidewalk (project) 01. 9180-35-71 (650.9500)EACH1$10,541$7,000.00$10,541$10,541$11,128
175Construction staking supplemental control (project) 01. 9180-35-71 (650.9911)EACH1$447.00$10.00$446.98$446.98$472.00
176Construction staking slope stakes (650.9920)LF7,424$0.90$0.80$0.90$0.90$1.00
177Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF67$10.30$10.30$10.30$10.30$10.90
178Install conduit into existing item (652.0700.S)EACH1$720.00$720.00$720.00$720.00$760.00
179Concrete bases type 5 (654.0105)EACH1$2,256.00$2,256.00$2,256.00$2,256.00$2,382.00
180Electrical wire lighting 12 AWG (655.0610)LF246$1.27$1.27$1.27$1.27$1.30
181Electrical wire lighting 10 AWG (655.0615)LF67$1.52$1.52$1.52$1.52$1.60
182Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH1$754.00$754.00$754.00$754.00$796.00
183Poles type 5-aluminum (657.0322)EACH1$3,260.00$3,260.00$3,260.00$3,260.00$3,442.00
184Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH2$517.00$517.00$517.00$517.00$546.00
185Luminaires utility LED C (659.1125)EACH2$369.00$369.00$369.00$369.00$390.00
186Remove cable (674.0300)LF72$1.00$1.00$1.00$1.00$1.10
187Sawing asphalt (690.0150)LF1,590$1.74$1.74$1.74$1.74$1.80
188Sawing concrete (690.0250)LF956$2.29$2.29$2.29$2.29$2.40
189Incentive compressive strength concrete pavement (706.0020)DOL7,520$1.00$1.00$1.00$1.00$1.00
190Incentive strength concrete structures (706.0025)DOL500$1.00$1.00$1.00$1.00$1.00
191Incentive iri ride (729.0440)DOL8,720$1.00$1.00$1.00$1.00$1.00
192Seismograph (project) 01. 9180-35- 71 (999.1001.S)EACH1$5,000.00$10,000$5,000.00$6,710.00$12,880
193Crack and damage survey (999.1501.S)EACH1$1,000.00$4,500.00$4,500.00$4,500.00$4,751.00
194Installing and maintaining turtle exclusion fence (999.2100.S)LF330$8.50$8.50$8.50$8.50$8.40
195On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,100$5.00$5.00$5.00$5.00$5.00
196On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,400$5.00$5.00$5.00$5.00$5.00
197Special 01. foundation backfill (SPV.0035)CY374$31.25$100.00$36.66$50.00$42.20
198Special 01. inlet covers type H-D (SPV.0060)EACH6$745.00$745.00$731.00$1,699.00$755.00
199Special 02. cleaning box culvert C- 42-25 (SPV.0060)EACH1$5,700.00$6,551.00$3,945.00$6,551.00$5,701.00
200Special 03. removing light pole assembly (SPV.0060)EACH1$888.00$888.00$888.00$888.00$938.00
201Special 04. reconnect storm sewer lateral (SPV.0060)EACH4$430.00$430.00$660.00$186.00$600.00
202Special 05. adjusting sanitary manhole covers (SPV.0060)EACH20$545.00$715.00$465.00$713.25$555.00
203Special 06. sanitary sewer manhole seals (SPV.0060)EACH20$545.00$420.00$450.00$420.00$500.00
204Special 01. concrete curb & gutter 24- inch type A (SPV.0090)LF1,420$29.00$29.00$25.00$39.49$30.60
205Special 02. concrete curb & gutter 24- inch type D (SPV.0090)LF810$29.00$29.00$34.25$41.24$30.60
206Special 03. storm sewer pipe reinforced conc horiz elliptical class HE-IV 38X60-inch (SPV.0090)LF362$373.00$373.00$364.10$386.50$468.00
WisDOT contract 20260113054: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy