WisDOT contract 20260210015 bid tabulation
2415-02-71. Let by Wisconsin DOT on February 10, 2026, Milwaukee. 4 bids received; low bid $3,359,756 by Wandel Contractors Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 190
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wandel Contractors Inc | $3,359,756 | Low |
| 2 | Lalonde Contractors Incorporated | $3,365,073 | 0.0% |
| 3 | Zenith Tech., Inc. - Waukesha | $3,478,929 | +4.0% |
| 4 | Zignego Company, Inc. | $3,671,464 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wandel Contractors Inc | 2. Lalonde Contractors Incorporated | 3. Zenith Tech., Inc. - Waukesha | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 2,257 | $14.13 | $14.08 | $20.00 | $25.00 |
| 2 | Removing curb & gutter (204.0150) | LF | 11 | $30.00 | $15.43 | $28.00 | $100.00 |
| 3 | Removing concrete sidewalk (204.0155) | SY | 860 | $4.86 | $12.53 | $14.00 | $15.00 |
| 4 | Removing concrete bases (204.0195) | EACH | 19 | $350.00 | $324.82 | $500.00 | $100.00 |
| 5 | Abandoning catch basins (204.0255) | EACH | 8 | $550.00 | $550.00 | $550.00 | $500.00 |
| 6 | Abandoning culvert pipes (204.0270) | EACH | 8 | $550.00 | $550.00 | $550.00 | $500.00 |
| 7 | Removing (item description) 01. poles (204.9060.S) | EACH | 24 | $843.62 | $843.62 | $843.62 | $843.62 |
| 8 | Removing (item description) 02. aerial cable (204.9090.S) | LF | 4,225 | $6.02 | $6.02 | $6.02 | $6.02 |
| 9 | Excavation common (205.0100) | CY | 345 | $46.09 | $59.73 | $65.00 | $100.00 |
| 10 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 25 | $350.00 | $123.07 | $125.00 | $200.00 |
| 11 | Finishing roadway (project) 01. 2415-02-71 (213.0100) | EACH | 1 | $5,000.00 | $1,740.00 | $2,080.90 | $1,000.00 |
| 12 | Finishing roadway (project) 02. 2984-01-79 (213.0100) | EACH | 1 | $5,000.00 | $1,740.00 | $2,080.90 | $1,000.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 593 | $30.00 | $33.97 | $46.00 | $50.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 434 | $25.00 | $30.50 | $46.00 | $50.00 |
| 15 | Concrete base 8-inch (320.0145) | SY | 745 | $67.55 | $75.44 | $90.92 | $115.10 |
| 16 | Concrete pavement 8-inch (415.0080) | SY | 457 | $95.05 | $93.58 | $105.59 | $115.10 |
| 17 | Concrete pavement 11-inch (415.0110) | SY | 159 | $147.25 | $133.51 | $162.59 | $134.64 |
| 18 | Drilled tie bars (416.0610) | EACH | 1,540 | $10.00 | $17.70 | $6.56 | $15.00 |
| 19 | Drilled dowel bars (416.0620) | EACH | 294 | $25.00 | $22.78 | $16.74 | $30.00 |
| 20 | Tack coat (455.0605) | GAL | 55 | $2.25 | $10.00 | $2.25 | $10.00 |
| 21 | Asphaltic surface (465.0105) | TON | 175 | $278.00 | $150.00 | $278.00 | $150.00 |
| 22 | Concrete curb & gutter 19-inch (601.0319) | LF | 188 | $42.35 | $52.02 | $48.74 | $41.82 |
| 23 | Concrete curb & gutter 31-inch (601.0331) | LF | 1,387 | $65.79 | $56.16 | $55.46 | $36.93 |
| 24 | Concrete curb pedestrian (601.0600) | LF | 98 | $38.00 | $53.59 | $53.58 | $100.00 |
| 25 | Concrete sidewalk 5-inch (602.0410) | SF | 9,690 | $10.20 | $10.49 | $16.55 | $12.94 |
| 26 | Concrete sidewalk 7-inch (602.0420) | SF | 70 | $15.00 | $11.47 | $14.61 | $30.00 |
| 27 | Curb ramp detectable warning field natural patina (602.0515) | SF | 385 | $52.00 | $42.98 | $31.44 | $60.00 |
| 28 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 29 | $75.00 | $62.54 | $49.00 | $150.00 |
| 29 | Concrete driveway 7-inch (602.0815) | SY | 62 | $110.00 | $104.14 | $94.61 | $100.00 |
| 30 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 214 | $85.00 | $85.00 | $85.00 | $170.00 |
| 31 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $5,500.00 |
| 32 | Salvaged inlet covers (611.9710) | EACH | 3 | $625.00 | $625.00 | $625.00 | $750.00 |
| 33 | Mobilization (619.1000) | EACH | 1 | $35,000 | $47,180 | $50,090 | $221,000 |
| 34 | Concrete median sloped nose (620.0300) | SF | 20 | $70.00 | $38.41 | $33.54 | $100.00 |
| 35 | Water (624.0100) | MGAL | 16 | $225.00 | $56.20 | $50.42 | $0.01 |
| 36 | Topsoil (625.0100) | SY | 660 | $5.95 | $5.95 | $8.36 | $5.95 |
| 37 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 | $252.53 | $100.00 |
| 38 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $353.54 | $100.00 |
| 39 | Inlet protection type C (628.7015) | EACH | 37 | $55.00 | $55.00 | $72.22 | $55.00 |
| 40 | Inlet protection type D (628.7020) | EACH | 9 | $90.00 | $90.00 | $94.44 | $90.00 |
| 41 | Sod water (631.0300) | MGAL | 17 | $75.00 | $75.00 | $50.79 | $75.00 |
| 42 | Sod lawn (631.1000) | SY | 660 | $8.95 | $8.95 | $8.59 | $8.95 |
| 43 | Signs type II reflective SH (637.2220) | SF | 259.50 | $25.00 | $25.00 | $30.25 | $25.00 |
| 44 | Removing signs type II (638.2602) | EACH | 45 | $30.00 | $30.00 | $36.65 | $30.00 |
| 45 | Field office type C (642.5201) | EACH | 1 | $15,000 | $16,864 | $14,155 | $20,000 |
| 46 | Traffic control drums (643.0300) | DAY | 35,066 | $0.13 | $0.13 | $0.13 | $0.21 |
| 47 | Traffic control barricades type III (643.0420) | DAY | 4,334 | $0.48 | $0.48 | $0.48 | $0.65 |
| 48 | Traffic control warning lights type A (643.0705) | DAY | 4,898 | $0.05 | $0.05 | $0.05 | $0.13 |
| 49 | Traffic control warning lights type C (643.0715) | DAY | 5,798 | $0.04 | $0.04 | $0.04 | $0.13 |
| 50 | Traffic control connected arrow boards (643.0810) | DAY | 1,196 | $8.00 | $8.00 | $8.00 | $8.14 |
| 51 | Traffic control signs (643.0900) | DAY | 17,496 | $0.39 | $0.39 | $0.39 | $0.52 |
| 52 | Traffic control signs PCMS (643.1050) | DAY | 130 | $58.00 | $58.00 | $58.00 | $43.50 |
| 53 | Temporary marking line removable tape 4-inch (643.3150) | LF | 400 | $1.50 | $1.50 | $1.50 | $1.47 |
| 54 | Temporary marking arrow removable tape (643.3550) | EACH | 16 | $65.00 | $65.00 | $65.00 | $150.90 |
| 55 | Traffic control (643.5000) | EACH | 1 | $19,250 | $19,250 | $19,250 | $12,960 |
| 56 | Temporary audible message devices (644.1900.S) | DAY | 5,763 | $2.00 | $2.00 | $2.00 | $1.75 |
| 57 | Marking line epoxy 4-inch (646.1020) | LF | 5,638 | $0.40 | $2.25 | $0.40 | $0.40 |
| 58 | Marking line epoxy 8-inch (646.3020) | LF | 1,157 | $1.05 | $4.50 | $1.06 | $1.05 |
| 59 | Marking arrow epoxy (646.5020) | EACH | 24 | $410.65 | $275.00 | $414.80 | $410.65 |
| 60 | Marking symbol epoxy (646.5220) | EACH | 3 | $398.30 | $375.00 | $402.32 | $398.30 |
| 61 | Marking curb epoxy (646.8120) | LF | 27 | $8.24 | $9.00 | $8.32 | $8.24 |
| 62 | Marking island nose epoxy (646.8220) | EACH | 2 | $310.29 | $300.00 | $313.43 | $310.29 |
| 63 | Marking removal line 4-inch (646.9000) | LF | 5,693 | $0.45 | $0.45 | $0.45 | $0.52 |
| 64 | Marking removal line 8-inch (646.9100) | LF | 432 | $1.00 | $1.00 | $1.00 | $0.74 |
| 65 | Marking removal line wide (646.9200) | LF | 2,046 | $1.00 | $1.00 | $1.00 | $1.82 |
| 66 | Marking removal special marking (646.9300) | EACH | 18 | $65.00 | $65.00 | $65.00 | $79.00 |
| 67 | Construction staking storm sewer (650.4000) | EACH | 10 | $125.00 | $125.00 | $125.00 | $125.00 |
| 68 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,387 | $1.50 | $1.50 | $1.50 | $1.50 |
| 69 | Construction staking electrical installations (project) 01. 2415-02- 71 (650.8501) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 70 | Construction staking electrical installations (project) 02. 2984-01- 79 (650.8501) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 71 | Construction staking curb ramps (650.9000) | EACH | 36 | $150.00 | $150.00 | $150.00 | $150.00 |
| 72 | Construction staking sidewalk (project) 01. 2415-02-71 (650.9500) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 73 | Construction staking sidewalk (project) 02. 2984-01-79 (650.9500) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 74 | Construction staking supplemental control (project) 01. 2415-02-71 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 75 | Construction staking supplemental control (project) 02. 2984-01-79 (650.9911) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 76 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 80 | $11.28 | $11.28 | $11.28 | $11.28 |
| 77 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 2,290 | $12.19 | $12.19 | $12.19 | $12.19 |
| 78 | Conduit special 3-inch (652.0615) | LF | 2,440 | $44.52 | $44.52 | $44.52 | $44.52 |
| 79 | Removing pull boxes (653.0905) | EACH | 11 | $227.34 | $227.34 | $227.34 | $227.34 |
| 80 | Concrete bases type 1 (654.0101) | EACH | 14 | $1,164.33 | $1,164.33 | $1,164.33 | $1,164.33 |
| 81 | Concrete bases type 10 (654.0110) | EACH | 9 | $7,449.48 | $7,449.48 | $7,449.48 | $7,449.48 |
| 82 | Concrete bases type 13 (654.0113) | EACH | 2 | $14,017 | $14,017 | $14,017 | $14,017 |
| 83 | Concrete bases type 10-special (654.0120) | EACH | 5 | $12,238 | $12,238 | $12,238 | $12,238 |
| 84 | Cable traffic signal 5-14 AWG (655.0230) | LF | 3,545 | $2.34 | $2.34 | $2.34 | $2.34 |
| 85 | Cable traffic signal 9-14 AWG (655.0250) | LF | 585 | $4.25 | $4.25 | $4.25 | $4.25 |
| 86 | Cable traffic signal 12-14 AWG (655.0260) | LF | 35 | $4.30 | $4.30 | $4.30 | $4.30 |
| 87 | Cable traffic signal 15-14 AWG (655.0270) | LF | 625 | $5.74 | $5.74 | $5.74 | $5.74 |
| 88 | Cable traffic signal 19-14 AWG (655.0280) | LF | 2,160 | $7.05 | $7.05 | $7.05 | $7.05 |
| 89 | Cable traffic signal 21-14 AWG (655.0290) | LF | 1,535 | $7.37 | $7.37 | $7.37 | $7.37 |
| 90 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 5,160 | $1.71 | $1.71 | $1.71 | $1.71 |
| 91 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,785 | $2.38 | $2.38 | $2.38 | $2.38 |
| 92 | Traffic signal evp detector cable (655.0900) | LF | 2,860 | $1.89 | $1.89 | $1.89 | $1.89 |
| 93 | Pedestal bases (657.0100) | EACH | 15 | $401.01 | $401.01 | $401.01 | $401.01 |
| 94 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 23 | $741.90 | $741.90 | $741.90 | $741.90 |
| 95 | Poles type 10 (657.0350) | EACH | 9 | $10,763 | $10,763 | $10,763 | $10,763 |
| 96 | Poles type 10-special (657.0352) | EACH | 5 | $13,148 | $13,148 | $13,148 | $13,148 |
| 97 | Poles type 13 (657.0360) | EACH | 2 | $18,238 | $18,238 | $18,238 | $18,238 |
| 98 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 7 | $499.84 | $499.84 | $499.84 | $499.84 |
| 99 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 8 | $929.39 | $929.39 | $929.39 | $929.39 |
| 100 | Monotube arms 20-FT (657.0520) | EACH | 4 | $5,379.18 | $5,379.18 | $5,379.18 | $5,379.18 |
| 101 | Monotube arms 25-FT (657.0525) | EACH | 2 | $5,564.98 | $5,564.98 | $5,564.98 | $5,564.98 |
| 102 | Monotube arms 30-FT (657.0530) | EACH | 3 | $6,724.21 | $6,724.21 | $6,724.21 | $6,724.21 |
| 103 | Monotube arms 35-FT-special (657.0536) | EACH | 2 | $6,374.80 | $6,374.80 | $6,374.80 | $6,374.80 |
| 104 | Monotube arms 40-FT-special (657.0541) | EACH | 1 | $6,496.34 | $6,496.34 | $6,496.34 | $6,496.34 |
| 105 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $6,603.85 | $6,603.85 | $6,603.85 | $6,603.85 |
| 106 | Monotube arms 50-FT (657.0550) | EACH | 1 | $14,127 | $14,127 | $14,127 | $14,127 |
| 107 | Monotube arms 55-FT (657.0555) | EACH | 1 | $15,883 | $15,883 | $15,883 | $15,883 |
| 108 | Traffic signal face 3S 12-inch (658.0173) | EACH | 73 | $949.56 | $949.56 | $949.56 | $949.56 |
| 109 | Pedestrian signal face 12-inch (658.0412) | EACH | 34 | $545.92 | $545.92 | $545.92 | $545.92 |
| 110 | Programmable traffic signal face 3S 12-inch (658.1133) | EACH | 2 | $11,982 | $11,982 | $11,982 | $11,982 |
| 111 | Signal mounting hardware (location) 01. W burleigh ST (658.5070) | EACH | 1 | $7,748.00 | $7,748.00 | $7,748.00 | $7,748.00 |
| 112 | Signal mounting hardware (location) 02. W keefe ave (658.5070) | EACH | 1 | $5,729.87 | $5,729.87 | $5,729.87 | $5,729.87 |
| 113 | Signal mounting hardware (location) 03. W center ST (658.5070) | EACH | 1 | $5,563.94 | $5,563.94 | $5,563.94 | $5,563.94 |
| 114 | Signal mounting hardware (location) 04. W burleigh ST (658.5070) | EACH | 1 | $6,310.65 | $6,310.65 | $6,310.65 | $6,310.65 |
| 115 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 60 | $19.77 | $19.77 | $19.77 | $19.77 |
| 116 | Temporary traffic signals for intersections (location) 01. W burleigh ST (661.0201) | EACH | 1 | $102,978 | $102,978 | $102,978 | $102,978 |
| 117 | Temporary traffic signals for intersections (location) 02. W keefe ave (661.0201) | EACH | 1 | $86,749 | $86,749 | $86,749 | $86,749 |
| 118 | Temporary traffic signals for intersections (location) 03. W center ST (661.0201) | EACH | 1 | $78,067 | $78,067 | $78,067 | $78,067 |
| 119 | Temporary traffic signals for intersections (location) 04. W burleigh ST (661.0201) | EACH | 1 | $75,243 | $75,243 | $75,243 | $75,243 |
| 120 | Sawing asphalt (690.0150) | LF | 159 | $2.50 | $1.25 | $1.25 | $1.25 |
| 121 | Sawing concrete (690.0250) | LF | 2,253 | $2.50 | $2.25 | $2.25 | $2.25 |
| 122 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 900 | $5.00 | $5.00 | $5.00 | $5.00 |
| 124 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 125 | Special 001. utility line opening (SPV.0060) | EACH | 4 | $1,200.00 | $1,553.03 | $1,220.00 | $0.01 |
| 126 | Special 002. section corner monuments (SPV.0060) | EACH | 6 | $500.00 | $1,546.25 | $1,730.90 | $1,000.00 |
| 127 | Special 003. adjusting water valve boxes (SPV.0060) | EACH | 6 | $700.00 | $393.00 | $700.00 | $500.00 |
| 128 | Special 102. inlet covers type MS 57 (SPV.0060) | EACH | 9 | $900.00 | $900.00 | $900.00 | $1,800.00 |
| 129 | Special 103. manhole covers type MS 58-A (SPV.0060) | EACH | 3 | $950.00 | $950.00 | $950.00 | $1,800.00 |
| 130 | Special 110. catch basin type 44A (SPV.0060) | EACH | 3 | $7,000.00 | $7,000.00 | $7,000.00 | $6,500.00 |
| 131 | Special 112. storm inlet type 45A (SPV.0060) | EACH | 6 | $5,000.00 | $5,000.00 | $5,000.00 | $6,500.00 |
| 132 | Special 115. pipe connection to existing structure (SPV.0060) | EACH | 6 | $600.00 | $600.00 | $600.00 | $2,000.00 |
| 133 | Special 201. install city precast controller base (SPV.0060) | EACH | 4 | $866.99 | $866.99 | $866.99 | $866.99 |
| 134 | Special 205. atc controller and cabinet installed (SPV.0060) | EACH | 4 | $35,739 | $35,739 | $35,739 | $35,739 |
| 135 | Special 212. fiber optic patch panel (SPV.0060) | EACH | 4 | $4,777.52 | $4,777.52 | $4,777.52 | $4,777.52 |
| 136 | Special 213. ethernet switch (SPV.0060) | EACH | 4 | $5,829.05 | $5,829.05 | $5,829.05 | $5,829.05 |
| 137 | Special 215. electrical service pedestal (SPV.0060) | EACH | 4 | $840.40 | $840.40 | $840.40 | $840.40 |
| 138 | Special 218. evp 1 direction detector (SPV.0060) | EACH | 14 | $1,310.32 | $1,310.32 | $1,310.32 | $1,310.32 |
| 139 | Special 221. evp phase selector card 4 channel (SPV.0060) | EACH | 4 | $4,724.74 | $4,724.74 | $4,724.74 | $4,724.74 |
| 140 | Special 223. evp confirmation light (SPV.0060) | EACH | 14 | $645.41 | $645.41 | $645.41 | $645.41 |
| 141 | Special 225. vehicular video detection system-2 cameras (SPV.0060) | EACH | 2 | $3,941.82 | $3,941.82 | $3,941.82 | $3,941.82 |
| 142 | Special 228. electrical riser (SPV.0060) | EACH | 2 | $1,888.73 | $1,888.73 | $1,888.73 | $1,888.73 |
| 143 | Special 243. remove traffic signals (W burleigh ST) (SPV.0060) | EACH | 1 | $8,109.28 | $8,109.28 | $8,109.28 | $8,109.28 |
| 144 | Special 244. remove traffic signals (W keefe ave) (SPV.0060) | EACH | 1 | $8,109.28 | $8,109.28 | $8,109.28 | $8,109.28 |
| 145 | Special 245. remove traffic signals (W center ST) (SPV.0060) | EACH | 1 | $8,109.28 | $8,109.28 | $8,109.28 | $8,109.28 |
| 146 | Special 246. remove traffic signals (W burleigh ST) (SPV.0060) | EACH | 1 | $8,109.28 | $8,109.28 | $8,109.28 | $8,109.28 |
| 147 | Special 267. pedestrian countdown signal face 12-inch (SPV.0060) | EACH | 34 | $545.92 | $545.92 | $545.92 | $545.92 |
| 148 | Special 268. voice instruction audible pushbutton (SPV.0060) | EACH | 35 | $997.17 | $997.17 | $997.17 | $997.17 |
| 149 | Special 269. voice instruction audible control unit (SPV.0060) | EACH | 4 | $3,350.16 | $3,350.16 | $3,350.16 | $3,350.16 |
| 150 | Special 281. round aluminum sign post system in soft surface 10-FT. (SPV.0060) | EACH | 3 | $250.00 | $250.00 | $362.76 | $250.00 |
| 151 | Special 284. round aluminum sign post system in concrete surface 7- FT. (SPV.0060) | EACH | 10 | $250.00 | $250.00 | $192.00 | $250.00 |
| 152 | Special 285. round aluminum sign post system in concrete surface 10-FT. (SPV.0060) | EACH | 6 | $250.00 | $250.00 | $240.99 | $250.00 |
| 153 | Special 288. sign mounting hardware on existing pole (SPV.0060) | EACH | 16 | $50.00 | $50.00 | $58.75 | $50.00 |
| 154 | Special 290. street name sign mounting hardware on existing pole (SPV.0060) | EACH | 4 | $50.00 | $50.00 | $147.08 | $50.00 |
| 155 | Special 291. street name sign mounting hardware on mast arm (SPV.0060) | EACH | 14 | $50.00 | $50.00 | $96.61 | $50.00 |
| 156 | Special 292. sign mounting hardware on round aluminum sign post (SPV.0060) | EACH | 23 | $50.00 | $50.00 | $80.52 | $50.00 |
| 157 | Special 293. removing sign post assembly and type II signage (SPV.0060) | EACH | 5 | $80.00 | $80.00 | $94.22 | $80.00 |
| 158 | Special 302. pull boxes 13X24X24- inch (SPV.0060) | EACH | 40 | $1,781.15 | $1,781.15 | $1,781.15 | $1,781.15 |
| 159 | Special 303. pull boxes 17X30X24- inch (SPV.0060) | EACH | 34 | $1,938.41 | $1,938.41 | $1,938.41 | $1,938.41 |
| 160 | Special 321. poles type 30-AL-BD (SPV.0060) | EACH | 23 | $2,358.56 | $2,358.56 | $2,358.56 | $2,358.56 |
| 161 | Special 324. 40-FT. wood pole (SPV.0060) | EACH | 34 | $1,943.52 | $1,943.52 | $1,943.52 | $1,943.52 |
| 162 | Special 334. inline 5A fast acting fuse with holder (SPV.0060) | EACH | 48 | $107.85 | $107.85 | $107.85 | $107.85 |
| 163 | Special 339. primary or secondary riser (SPV.0060) | EACH | 28 | $1,493.37 | $1,493.37 | $1,493.37 | $1,493.37 |
| 164 | Special 345. luminaire arms single member 6-FT. (SPV.0060) | EACH | 35 | $629.07 | $629.07 | $629.07 | $629.07 |
| 165 | Special 346. luminaire arms single member 6-FT. WP mount (SPV.0060) | EACH | 25 | $636.09 | $636.09 | $636.09 | $636.09 |
| 166 | Special 353. equipment grounding electrode (SPV.0060) | EACH | 46 | $145.58 | $145.58 | $145.58 | $145.58 |
| 167 | Special 357. luminaire arms mounting clamps poles type -3 single bracket (SPV.0060) | EACH | 2 | $444.77 | $444.77 | $444.77 | $444.77 |
| 168 | Special 360. water tight splices and connections (SPV.0060) | EACH | 214 | $157.27 | $157.27 | $157.27 | $157.27 |
| 169 | Special 376. luminaire utility 3LED2 (SPV.0060) | EACH | 48 | $1,588.97 | $1,588.97 | $1,588.97 | $1,588.97 |
| 170 | Special 390. milwaukee light base type 1 (SPV.0060) | EACH | 1 | $742.42 | $742.42 | $742.42 | $742.42 |
| 171 | Special 400. adjusting cuc manhole cover (SPV.0060) | EACH | 5 | $2,500.00 | $2,332.88 | $2,500.00 | $1,900.00 |
| 172 | Special 425. installing conduit into existing manhole (SPV.0060) | EACH | 2 | $3,221.27 | $3,221.27 | $3,221.27 | $3,221.27 |
| 173 | Special 706. marking speed table white chevron (SPV.0060) | EACH | 1 | $404.25 | $600.00 | $408.33 | $404.25 |
| 174 | Special 804. poles type 15-oct (SPV.0060) | EACH | 1 | $5,123.23 | $5,123.23 | $5,123.23 | $5,123.23 |
| 175 | Special 819. poles type A31-BD (SPV.0060) | EACH | 2 | $7,365.23 | $7,365.23 | $7,365.24 | $7,365.23 |
| 176 | Special 820. concrete base type 5 modified (SPV.0060) | EACH | 23 | $1,308.91 | $1,308.91 | $1,308.91 | $1,308.91 |
| 177 | Special 821. concrete base type 2 modified (SPV.0060) | EACH | 2 | $1,455.56 | $1,455.56 | $1,455.56 | $1,455.56 |
| 178 | Special 865. luminaire historic milwaukee harp LED 1 (SPV.0060) | EACH | 6 | $4,295.77 | $4,295.77 | $4,295.77 | $4,295.77 |
| 179 | Special 867. luminaire historic milwaukee lantern LED 3 (SPV.0060) | EACH | 7 | $4,375.92 | $4,375.92 | $4,375.92 | $4,375.92 |
| 180 | Special 240. electrical cable 3#4/1#8 XLP (SPV.0090) | LF | 415 | $9.74 | $9.74 | $9.74 | $9.74 |
| 181 | Special 300. electrical cable type 1#8 AWG 5KV concentric (SPV.0090) | LF | 345 | $4.96 | $4.96 | $4.96 | $4.96 |
| 182 | Special 301. electrical cable type 1#6 AWG 5KV (SPV.0090) | LF | 575 | $7.55 | $7.55 | $7.55 | $7.55 |
| 183 | Special 302. electrical cable type 3#6 AL (SPV.0090) | LF | 695 | $4.59 | $4.59 | $4.59 | $4.59 |
| 184 | Special 304. electrical cable type 2#2/1#4 AL (SPV.0090) | LF | 5,450 | $5.19 | $5.19 | $5.19 | $5.19 |
| 185 | Special 319. liquidtight flexible nonmetallic conduit 1 ½ - inch (SPV.0090) | LF | 375 | $9.51 | $9.51 | $9.51 | $9.51 |
| 186 | Special 324. electrical cable type 4#2/1#8 XLP (SPV.0090) | LF | 6,700 | $18.36 | $18.36 | $18.36 | $18.36 |
| 187 | Special 325. conduit 3-inch HDPE schedule 40 (SPV.0090) | LF | 5,385 | $19.13 | $19.13 | $19.13 | $19.13 |
| 188 | Special 401. 1-duct conduit cement encased 4-inch rigid nonmetallic conduit DB-60 (SPV.0090) | LF | 70 | $233.31 | $233.31 | $233.31 | $233.31 |
| 189 | Special 705. marking line epoxy block style 12-inch (SPV.0090) | LF | 829 | $16.78 | $11.00 | $16.95 | $16.78 |
| 190 | Special 706. marking stop line epoxy 24-inch (SPV.0090) | LF | 482 | $17.69 | $18.00 | $17.87 | $17.69 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.