Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Integrity Grading and Excavating, Inc. | $3,230,119 | Low |
| 2 | A-1 Excavating LLC | $3,636,363 | +13% |
| 3 | S & N Incorporated | $3,692,909 | +14% |
| 4 | Relyco Plus, LLC | $4,204,194 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Integrity Grading and Excavating, Inc. | 2. A-1 Excavating LLC | 3. S & N Incorporated | 4. Relyco Plus, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 75 | $40.00 | $20.00 | $30.00 | $20.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 590 | $3.83 | $12.00 | $9.50 | $10.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 520 | $1.10 | $6.00 | $8.00 | $10.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 12,450 | $4.65 | $4.00 | $11.52 | $10.50 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 795 | $1.38 | $12.00 | $12.50 | $13.50 |
| 6 | Removing manholes (204.0210) | EACH | 5 | $616.69 | $750.00 | $500.00 | $565.00 |
| 7 | Removing inlets (204.0220) | EACH | 42 | $605.59 | $600.00 | $400.00 | $370.00 |
| 8 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 739 | $24.93 | $15.00 | $8.00 | $13.00 |
| 9 | Removing storm sewer (size) 02. 10-inch (204.0245) | LF | 245 | $23.57 | $15.00 | $8.00 | $12.00 |
| 10 | Removing storm sewer (size) 03. 12-inch (204.0245) | LF | 173 | $25.95 | $15.00 | $10.00 | $16.00 |
| 11 | Removing storm sewer (size) 04. 15-inch (204.0245) | LF | 294 | $28.24 | $17.00 | $10.00 | $16.00 |
| 12 | Removing storm sewer (size) 05. 24-inch (204.0245) | LF | 337 | $25.61 | $20.00 | $12.00 | $18.00 |
| 13 | Removing storm sewer (size) 06. 42-inch (204.0245) | LF | 325 | $31.57 | $30.00 | $15.00 | $19.00 |
| 14 | Sealing pipes (204.0280) | EACH | 2 | $1,178.56 | $1,000.00 | $500.00 | $1,015.00 |
| 15 | Excavation common (205.0100) | CY | 3,963 | $19.12 | $25.00 | $22.87 | $23.09 |
| 16 | Finishing roadway (project) 01. 9835-06-70 (213.0100) | EACH | 1 | $500.00 | $1,500.00 | $500.00 | $5,000.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 200 | $49.00 | $27.00 | $25.00 | $34.96 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,510 | $30.10 | $22.00 | $19.85 | $21.17 |
| 19 | Pulverize and relay (325.0100) | SY | 24,620 | $1.17 | $3.00 | $1.65 | $0.45 |
| 20 | Subbase (350.0104) | TON | 3,140 | $12.43 | $14.00 | $12.35 | $11.96 |
| 21 | Tack coat (455.0605) | GAL | 3,910 | $2.00 | $2.20 | $2.60 | $2.00 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 4,633 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 3,900 | $67.90 | $69.00 | $74.80 | $67.90 |
| 24 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 2,750 | $78.50 | $80.00 | $94.30 | $78.50 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 165 | $121.00 | $141.00 | $120.00 | $121.00 |
| 26 | Concrete collars for pipe (520.8000) | EACH | 12 | $1,528.54 | $2,000.00 | $800.00 | $995.00 |
| 27 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 1 | $5,657.84 | $3,910.00 | $3,522.00 | $3,645.00 |
| 28 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 200 | $36.00 | $37.00 | $36.00 | $36.00 |
| 29 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 12,515 | $19.51 | $25.50 | $18.45 | $18.45 |
| 30 | Concrete curb pedestrian (601.0600) | LF | 65 | $75.00 | $78.00 | $75.00 | $75.00 |
| 31 | Concrete sidewalk 4-inch (602.0405) | SF | 35 | $9.00 | $11.00 | $9.00 | $9.50 |
| 32 | Concrete sidewalk 6-inch (602.0415) | SF | 7,700 | $7.50 | $8.50 | $7.50 | $8.00 |
| 33 | Curb ramp detectable warning field yellow (602.0505) | SF | 392 | $30.00 | $32.00 | $30.00 | $30.00 |
| 34 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 31 | $55.00 | $58.00 | $55.00 | $55.00 |
| 35 | Concrete driveway 6-inch (602.0810) | SY | 735 | $67.50 | $74.00 | $67.50 | $68.00 |
| 36 | Concrete driveway 8-inch (602.0820) | SY | 120 | $74.25 | $80.25 | $74.25 | $74.25 |
| 37 | Riprap heavy (606.0300) | CY | 18 | $212.53 | $120.00 | $110.00 | $250.00 |
| 38 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 130 | $117.21 | $275.00 | $179.24 | $260.00 |
| 39 | Storm sewer pipe reinforced concrete class III 60-inch (608.0360) | LF | 305 | $430.16 | $679.00 | $685.00 | $797.00 |
| 40 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 895 | $77.82 | $111.00 | $95.67 | $96.70 |
| 41 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 710 | $71.86 | $113.00 | $101.62 | $113.90 |
| 42 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 64 | $88.14 | $144.00 | $106.60 | $119.00 |
| 43 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 16 | $246.39 | $282.00 | $261.36 | $322.20 |
| 44 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 220 | $221.49 | $396.00 | $341.11 | $348.30 |
| 45 | Reconstructing manholes (611.0420) | EACH | 15 | $1,728.52 | $2,500.00 | $2,822.00 | $1,758.00 |
| 46 | Reconstructing inlets (611.0430) | EACH | 1 | $1,728.52 | $1,200.00 | $2,822.00 | $792.00 |
| 47 | Manhole covers type J (611.0530) | EACH | 1 | $699.78 | $1,020.00 | $942.02 | $542.00 |
| 48 | Manhole covers type J-special (611.0535) | EACH | 8 | $696.74 | $1,020.00 | $960.04 | $560.00 |
| 49 | Inlet covers type H (611.0624) | EACH | 16 | $938.74 | $1,275.00 | $1,178.40 | $778.00 |
| 50 | Inlet covers type H-S (611.0639) | EACH | 35 | $938.73 | $1,275.00 | $1,178.40 | $778.00 |
| 51 | Inlet covers type MS-A (611.0645) | EACH | 2 | $743.32 | $850.00 | $973.82 | $574.00 |
| 52 | Catch basins 4-FT diameter (611.1004) | EACH | 7 | $3,525.10 | $3,420.00 | $2,694.06 | $4,760.00 |
| 53 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $4,089.50 | $5,210.00 | $3,825.42 | $6,225.00 |
| 54 | Catch basins 2X3-FT (611.1230) | EACH | 33 | $3,284.58 | $2,890.00 | $2,078.66 | $3,178.00 |
| 55 | Manholes 4-FT diameter (611.2004) | EACH | 4 | $3,332.58 | $3,710.00 | $3,068.80 | $4,968.00 |
| 56 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $3,704.45 | $5,150.00 | $4,714.42 | $6,405.00 |
| 57 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $6,971.55 | $8,180.00 | $7,648.14 | $7,818.00 |
| 58 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $21,335 | $30,600 | $22,341 | $33,383 |
| 59 | Manholes 9-FT diameter (611.2009) | EACH | 1 | $24,930 | $45,850 | $32,563 | $47,055 |
| 60 | Inlets 4-FT diameter (611.3004) | EACH | 2 | $3,303.56 | $3,350.00 | $2,518.77 | $4,868.00 |
| 61 | Inlets 2X3-FT (611.3230) | EACH | 3 | $3,153.76 | $2,960.00 | $2,138.86 | $3,230.00 |
| 62 | Inlets median 1 grate (611.3901) | EACH | 2 | $3,534.60 | $3,800.00 | $3,399.52 | $3,722.00 |
| 63 | Adjusting manhole covers (611.8110) | EACH | 3 | $726.54 | $700.00 | $770.00 | $550.00 |
| 64 | Adjusting inlet covers (611.8115) | EACH | 5 | $726.54 | $700.00 | $450.00 | $500.00 |
| 65 | Pipe grates (size) 01. 42-inch (611.9850.S) | EACH | 1 | $2,271.90 | $4,550.00 | $4,101.86 | $4,476.00 |
| 66 | Mobilization (619.1000) | EACH | 1 | $394,612 | $279,214 | $410,077 | $559,000 |
| 67 | Water (624.0100) | MGAL | 265 | $47.19 | $35.00 | $48.00 | $0.01 |
| 68 | Topsoil (625.0100) | SY | 7,710 | $3.97 | $8.00 | $7.50 | $13.53 |
| 69 | Silt fence (628.1504) | LF | 100 | $5.00 | $3.20 | $5.00 | $5.00 |
| 70 | Silt fence maintenance (628.1520) | LF | 300 | $0.01 | $0.01 | $0.01 | $0.01 |
| 71 | Mobilizations erosion control (628.1905) | EACH | 6 | $250.00 | $650.00 | $250.00 | $250.00 |
| 72 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $200.00 | $250.00 | $200.00 | $200.00 |
| 73 | Inlet protection type A (628.7005) | EACH | 53 | $25.00 | $116.00 | $25.00 | $25.00 |
| 74 | Inlet protection type B (628.7010) | EACH | 3 | $64.00 | $83.00 | $64.00 | $64.00 |
| 75 | Inlet protection type C (628.7015) | EACH | 97 | $66.00 | $100.00 | $66.00 | $66.00 |
| 76 | Inlet protection type D (628.7020) | EACH | 7 | $135.00 | $150.00 | $135.00 | $135.00 |
| 77 | Tracking pads (628.7560) | EACH | 2 | $1,000.00 | $1.00 | $500.00 | $0.01 |
| 78 | Seed water (630.0500) | MGAL | 175 | $5.00 | $54.00 | $5.00 | $5.00 |
| 79 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $78.00 | $135.00 | $78.00 | $78.00 |
| 80 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 22 | $82.00 | $95.00 | $82.00 | $82.00 |
| 81 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $86.00 | $140.00 | $86.00 | $86.00 |
| 82 | Signs type II reflective H (637.2210) | SF | 11 | $22.15 | $32.00 | $22.15 | $22.15 |
| 83 | Signs type II reflective F (637.2230) | SF | 42 | $24.50 | $34.00 | $24.50 | $24.50 |
| 84 | Moving signs type II (638.2102) | EACH | 26 | $75.00 | $185.00 | $75.00 | $75.00 |
| 85 | Removing small sign supports (638.3000) | EACH | 22 | $50.00 | $30.00 | $50.00 | $50.00 |
| 86 | Field office type C (642.5201) | EACH | 1 | $17,500 | $11,998 | $10,000 | $12,500 |
| 87 | Traffic control barricades type III (643.0420) | DAY | 5,791 | $0.45 | $1.00 | $0.65 | $0.65 |
| 88 | Traffic control warning lights type A (643.0705) | DAY | 11,572 | $0.10 | $0.25 | $0.10 | $0.10 |
| 89 | Traffic control signs (643.0900) | DAY | 7,914 | $0.32 | $1.00 | $0.80 | $0.80 |
| 90 | Traffic control (643.5000) | EACH | 1 | $9,000.00 | $12,491 | $2,500.00 | $2,491.00 |
| 91 | Temporary pedestrian surface matting (644.1440) | SF | 1,035 | $2.75 | $5.00 | $4.00 | $4.00 |
| 92 | Temporary pedestrian curb ramp (644.1601) | DAY | 14 | $27.00 | $14.00 | $4.00 | $4.00 |
| 93 | Temporary pedestrian detectable warning field (644.1605) | SF | 40 | $3.50 | $14.00 | $4.00 | $4.00 |
| 94 | Temporary pedestrian barricade (644.1810) | LF | 115 | $7.50 | $9.00 | $4.00 | $4.00 |
| 95 | Geotextile type HR (645.0120) | SY | 36 | $11.18 | $6.00 | $3.25 | $10.00 |
| 96 | Marking line epoxy 4-inch (646.1020) | LF | 11,835 | $0.57 | $1.10 | $1.05 | $0.80 |
| 97 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 315 | $25.00 | $11.00 | $8.25 | $19.00 |
| 98 | Construction staking storm sewer (650.4000) | EACH | 74 | $45.14 | $56.00 | $152.00 | $45.14 |
| 99 | Construction staking subgrade (650.4500) | LF | 598 | $0.01 | $1.00 | $0.77 | $0.01 |
| 100 | Construction staking base (650.5000) | LF | 598 | $1.32 | $2.00 | $0.77 | $1.32 |
| 101 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 12,715 | $0.75 | $0.80 | $0.59 | $0.75 |
| 102 | Construction staking resurfacing reference (650.8000) | LF | 6,252 | $0.27 | $0.50 | $0.13 | $0.27 |
| 103 | Construction staking curb ramps (650.9000) | EACH | 34 | $150.00 | $160.00 | $155.00 | $150.00 |
| 104 | Construction staking sidewalk (project) 01. 9835-06-70 (650.9500) | EACH | 1 | $1,160.25 | $1,661.00 | $800.00 | $1,160.25 |
| 105 | Construction staking supplemental control (project) 01. 9835-06-70 (650.9911) | EACH | 1 | $460.39 | $961.00 | $800.00 | $460.39 |
| 106 | Construction staking slope stakes (650.9920) | LF | 6,850 | $1.00 | $1.10 | $0.77 | $1.00 |
| 107 | Sawing asphalt (690.0150) | LF | 3,140 | $1.49 | $3.00 | $2.00 | $1.50 |
| 108 | Sawing concrete (690.0250) | LF | 505 | $2.74 | $6.00 | $2.75 | $2.25 |
| 109 | Incentive iri ride (740.0440) | DOL | 4,360 | $1.00 | $1.00 | $1.00 | $1.00 |
| 110 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 111 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 | $5.00 | $5.00 |
| 112 | Special 01. adjusting sanitary manhole covers (SPV.0060) | EACH | 18 | $726.54 | $1,000.00 | $1,167.50 | $1,060.00 |
| 113 | Special 02. inlet covers type H-D (SPV.0060) | EACH | 1 | $1,000.50 | $1,340.00 | $1,183.70 | $784.00 |
| 114 | Special 03. adjusting water valve boxes (SPV.0060) | EACH | 28 | $778.13 | $300.00 | $105.00 | $320.00 |
| 115 | Special 04. inlets 5-FT diameter (SPV.0060) | EACH | 1 | $5,537.58 | $5,210.00 | $4,164.42 | $6,404.00 |
| 116 | Special 05. inlets 2X3-FT special (SPV.0060) | EACH | 5 | $3,330.64 | $3,080.00 | $2,459.28 | $3,435.00 |
| 117 | Special 06. solar powered RRFB system station 18+03 (SPV.0060) | EACH | 1 | $19,260 | $21,260 | $20,260 | $19,260 |
| 118 | Special 07. sanitary wye, 12-inch X 6-inch (SPV.0060) | EACH | 1 | $443.97 | $640.00 | $970.64 | $852.00 |
| 119 | Special 08. sanitary wye, 15-inch X 6-inch (SPV.0060) | EACH | 1 | $717.95 | $990.00 | $1,261.08 | $1,338.00 |
| 120 | Special 09. sanitary sewer tracer wire access box (SPV.0060) | EACH | 2 | $116.99 | $230.00 | $199.02 | $314.00 |
| 121 | Special 10. sanitary manhole casting (SPV.0060) | EACH | 6 | $1,142.24 | $1,800.00 | $2,007.02 | $983.00 |
| 122 | Special 11. water valve and box, 6- inch (SPV.0060) | EACH | 1 | $2,087.87 | $2,600.00 | $2,413.28 | $2,595.00 |
| 123 | Special 12. water valve and box, 8- inch (SPV.0060) | EACH | 4 | $2,926.82 | $3,570.00 | $3,302.62 | $3,534.00 |
| 124 | Special 13. reducer, 8-inch X 6-inch (SPV.0060) | EACH | 4 | $376.97 | $670.00 | $499.62 | $832.00 |
| 125 | Special 14. anchoring tee, 8-inch X 6-inch (SPV.0060) | EACH | 1 | $712.95 | $1,130.00 | $955.78 | $1,330.00 |
| 126 | Special 15. tee, 8-inch X 6-inch (SPV.0060) | EACH | 1 | $694.95 | $1,130.00 | $886.70 | $1,317.00 |
| 127 | Special 16. tee, 8-inch (SPV.0060) | EACH | 2 | $792.96 | $1,245.00 | $990.58 | $1,416.00 |
| 128 | Special 17. cross, 8-inch (SPV.0060) | EACH | 1 | $1,093.94 | $1,605.00 | $1,349.04 | $2,886.00 |
| 129 | Special 18. 11.25 degree bend, 8- inch (SPV.0060) | EACH | 4 | $415.97 | $710.00 | $540.96 | $729.00 |
| 130 | Special 19. 22.5 degree bend, 8- inch (SPV.0060) | EACH | 1 | $443.97 | $740.00 | $570.64 | $1,622.00 |
| 131 | Special 20. 45 degree bend, 8-inch (SPV.0060) | EACH | 6 | $444.97 | $740.00 | $571.70 | $664.00 |
| 132 | Special 21. sleeve, 8-inch (SPV.0060) | EACH | 6 | $439.97 | $740.00 | $566.40 | $1,042.00 |
| 133 | Special 22. water service corp stop, 1-inch (SPV.0060) | EACH | 2 | $87.99 | $400.00 | $343.28 | $1,821.00 |
| 134 | Special 23. curb stop and box, 1- inch (SPV.0060) | EACH | 2 | $345.98 | $780.00 | $451.76 | $1,660.00 |
| 135 | Special 24. reconnect to existing water service (SPV.0060) | EACH | 2 | $2,391.12 | $500.00 | $86.04 | $628.00 |
| 136 | Special 25. reconnect to existing sanitary lateral (SPV.0060) | EACH | 2 | $2,371.12 | $500.00 | $64.84 | $412.00 |
| 137 | Special 26. connect to existing sanitary sewer (SPV.0060) | EACH | 5 | $4,766.21 | $3,500.00 | $3,055.12 | $3,434.00 |
| 138 | Special 27. connect to existing water main (SPV.0060) | EACH | 6 | $5,088.86 | $2,500.00 | $3,397.15 | $6,004.00 |
| 139 | Special 28. connect to existing sanitary manhole (SPV.0060) | EACH | 1 | $5,026.20 | $3,500.00 | $3,246.00 | $40,051 |
| 140 | Special 29. construction staking water main - project 9835-06-70 (SPV.0060) | EACH | 1 | $961.24 | $1,462.00 | $900.00 | $961.24 |
| 141 | Special 30. construction staking sanitary sewer - project 9835-06-70 (SPV.0060) | EACH | 1 | $1,417.78 | $1,918.00 | $900.00 | $1,417.78 |
| 142 | Special 31. 6-inch cap with flush pipe (SPV.0060) | EACH | 4 | $77.99 | $1,600.00 | $587.53 | $659.00 |
| 143 | Special 32. 8-inch cap with flush pipe (SPV.0060) | EACH | 2 | $98.99 | $1,600.00 | $842.72 | $1,256.00 |
| 144 | Special 33. remove, salvage, and reinstall existing hydrant and water valve (SPV.0060) | EACH | 1 | $4,288.62 | $3,830.00 | $8,298.18 | $4,998.00 |
| 145 | Special 34. remove, salvage, and reinstall existing hydrant (SPV.0060) | EACH | 1 | $3,613.65 | $2,600.00 | $7,582.68 | $4,299.00 |
| 146 | Special 35. remove, salvage, and reinstall existing 8-inch water valve (SPV.0060) | EACH | 1 | $2,507.11 | $1,700.00 | $2,548.18 | $3,240.00 |
| 147 | Special 36. 18-inch hydrant barrel extension (SPV.0060) | EACH | 1 | $1,815.07 | $2,000.00 | $1,922.52 | $2,059.00 |
| 148 | Special 37. solar powered RRFB system station 67+13 (SPV.0060) | EACH | 1 | $19,260 | $21,260 | $20,260 | $19,260 |
| 149 | Special 38. deconstruct sanitary manhole drop entrance (SPV.0060) | EACH | 1 | $3,685.65 | $1,500.00 | $9,800.00 | $34,607 |
| 150 | Special 39. temporary water (SPV.0060) | EACH | 1 | $10,607 | $3,000.00 | $6,500.00 | $13,090 |
| 151 | Special 40. temporary sanitary bypass (SPV.0060) | EACH | 1 | $15,293 | $20,000 | $56,900 | $59,550 |
| 152 | Special 41. reconstructing storm manhole #14 (SPV.0060) | EACH | 1 | $4,085.63 | $7,000.00 | $9,800.00 | $24,282 |
| 153 | Special 01. storm sewer laterals 6- inch (SPV.0090) | LF | 25 | $58.56 | $92.00 | $104.09 | $96.30 |
| 154 | Special 02. storm sewer PVC 10- inch (SPV.0090) | LF | 32 | $49.69 | $94.00 | $105.63 | $112.25 |
| 155 | Special 03. sanitary sewer pipe PVC 8-inch (SPV.0090) | LF | 100 | $93.01 | $121.00 | $125.06 | $197.60 |
| 156 | Special 04. sanitary sewer pipe PVC 12-inch (SPV.0090) | LF | 100 | $115.08 | $137.00 | $140.75 | $374.80 |
| 157 | Special 05. sanitary sewer pipe PVC 15-inch (SPV.0090) | LF | 310 | $147.75 | $282.00 | $450.00 | $346.10 |
| 158 | Special 06. sanitary sewer pipe PVC 21-inch (SPV.0090) | LF | 15 | $173.82 | $298.00 | $296.25 | $971.40 |
| 159 | Special 07. sanitary sewer pipe PVC 24-inch (SPV.0090) | LF | 90 | $172.49 | $314.00 | $381.27 | $816.80 |
| 160 | Special 08. sanitary lateral pipe PVC, 6-inch (SPV.0090) | LF | 55 | $110.64 | $88.00 | $92.65 | $159.80 |
| 161 | Special 09. abandon-in-place existing sanitary sewer, 12-inch (SPV.0090) | LF | 345 | $33.67 | $30.00 | $8.70 | $37.95 |
| 162 | Special 10. water main pipe ductile iron class 52, 6-inch (SPV.0090) | LF | 45 | $131.04 | $105.00 | $229.70 | $147.40 |
| 163 | Special 11. water main pipe ductile iron class 52, 8-inch (SPV.0090) | LF | 600 | $94.60 | $118.00 | $178.37 | $142.60 |
| 164 | Special 12. water service pipe, 1- inch (SPV.0090) | LF | 90 | $94.23 | $94.00 | $101.60 | $84.90 |
| 165 | Special 01. preparing topsoil for lawn type turf (SPV.0180) | SY | 7,710 | $0.40 | $1.30 | $0.40 | $0.40 |
| 166 | Special 02. removing excess pulverized material (SPV.0180) | SY | 24,620 | $0.58 | $2.00 | $2.05 | $3.60 |
| 167 | Special 03. hydroseeding (SPV.0180) | SY | 7,710 | $1.80 | $2.40 | $1.80 | $1.80 |
| 168 | Special 02. excavation, hauling and disposal of contaminated soil and MGT of groundwater (SPV.0195) | TON | 685 | $104.60 | $70.00 | $90.00 | $98.00 |
| 169 | Special 01. sanitary manhole 4-FT diameter (SPV.0200) | VF | 73.40 | $1,044.22 | $715.00 | $656.57 | $1,340.50 |
| 170 | Special 02. sanitary reduction manhole (SPV.0200) | VF | 20.80 | $1,038.83 | $775.00 | $773.17 | $1,895.75 |
| 171 | Special 03. sanitary manhole outside drop (SPV.0200) | VF | 42.60 | $294.64 | $600.00 | $612.96 | $1,309.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.