WisDOT contract 20260310018 bid tabulation
C Racine, S Memorial Dr; Durand Ave to 17th St (LOC STR, Racine County C Racine, S Memorial Dr). Let by Wisconsin DOT on March 10, 2026, Racine. 4 bids received; low bid $2,806,994 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 157
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $2,806,994 | Low |
| 2 | Zignego Company, Inc. | $2,812,216 | 0.0% |
| 3 | A.W. Oakes & Son, Inc. | $3,069,719 | +9.0% |
| 4 | Payne and Dolan, Inc | $3,467,134 | +24% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zignego Company, Inc. | 3. A.W. Oakes & Son, Inc. | 4. Payne and Dolan, Inc |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 990 | $0.01 | $10.00 | $8.00 | $8.00 |
| 2 | Removing concrete pavement butt joints (204.0105) | SY | 1,860 | $3.00 | $3.00 | $3.00 | $3.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 239 | $2.00 | $2.00 | $2.00 | $2.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 1,975 | $2.00 | $2.00 | $2.00 | $2.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 3,553 | $10.63 | $4.00 | $10.00 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 490 | $11.20 | $10.00 | $15.00 | $15.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 10 | $435.00 | $500.00 | $500.00 | $1,000.00 |
| 8 | Removing inlets (204.0220) | EACH | 29 | $250.00 | $250.00 | $500.00 | $500.00 |
| 9 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 32 | $30.00 | $30.00 | $16.00 | $16.00 |
| 10 | Removing storm sewer (size) 02. 10-inch (204.0245) | LF | 832 | $25.00 | $25.00 | $16.00 | $16.00 |
| 11 | Removing storm sewer (size) 03. 12-inch (204.0245) | LF | 32 | $30.00 | $30.00 | $16.00 | $16.00 |
| 12 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 20 | $30.00 | $30.00 | $16.00 | $16.00 |
| 13 | Removing (item description) 02. loop detector wire and lead-in cable (204.9060.S) | EACH | 1 | $4,488.00 | $4,488.00 | $4,800.00 | $4,488.00 |
| 14 | Excavation common (205.0100) | CY | 4,200 | $0.01 | $30.00 | $0.01 | $0.01 |
| 15 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 853 | $68.20 | $60.00 | $30.00 | $30.00 |
| 16 | Backfill granular grade 1 (209.1500) | TON | 7,140 | $0.01 | $15.34 | $11.20 | $11.20 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 2703-08-71 (211.0101) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 18 | Finishing roadway (project) 01. 2703-08-71 (213.0100) | EACH | 1 | $3,280.00 | $1,000.00 | $2,500.00 | $2,500.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 130 | $136.98 | $50.00 | $30.00 | $30.00 |
| 20 | Removing pavement for base patching (390.0100) | CY | 1,404 | $52.93 | $40.00 | $105.00 | $107.00 |
| 21 | Base patching concrete hes (390.0305) | CY | 1,200 | $251.45 | $331.00 | $409.00 | $419.00 |
| 22 | Base patching concrete shes (390.0405) | CY | 214 | $416.20 | $551.00 | $433.00 | $443.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 2,482 | $14.78 | $15.00 | $10.00 | $10.00 |
| 24 | Drilled dowel bars (416.0620) | EACH | 5,960 | $21.06 | $18.00 | $23.00 | $23.00 |
| 25 | Concrete pavement replacement (416.1720) | SY | 990 | $106.70 | $111.00 | $107.00 | $107.00 |
| 26 | Tack coat (455.0605) | GAL | 3,894 | $2.75 | $2.75 | $2.75 | $2.75 |
| 27 | Incentive density HMA pavement (460.2000) | DOL | 2,735 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 2,738 | $75.00 | $75.00 | $75.00 | $75.00 |
| 29 | HMA pavement 5 MT 58-28 H (460.6425) | TON | 1,955 | $83.00 | $83.00 | $83.00 | $83.00 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 31 | $102.00 | $102.00 | $102.00 | $102.00 |
| 31 | Asphaltic surface temporary (465.0125) | TON | 68 | $129.00 | $129.00 | $129.00 | $129.00 |
| 32 | Concrete collars for pipe (520.8000) | EACH | 4 | $1,000.00 | $900.00 | $1,000.00 | $1,000.00 |
| 33 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 3,516 | $46.96 | $50.00 | $35.00 | $35.00 |
| 34 | Concrete curb pedestrian (601.0600) | LF | 330 | $65.32 | $50.00 | $55.00 | $55.00 |
| 35 | Concrete sidewalk 5-inch (602.0410) | SF | 4,680 | $12.29 | $9.00 | $8.80 | $8.80 |
| 36 | Curb ramp detectable warning field yellow (602.0505) | SF | 180 | $44.40 | $60.00 | $55.00 | $55.00 |
| 37 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 110 | $61.69 | $100.00 | $75.00 | $75.00 |
| 38 | Concrete driveway hes 8-inch (602.0870) | SY | 52 | $101.90 | $100.00 | $82.00 | $82.00 |
| 39 | Concrete safety islands (602.2400) | SF | 350 | $24.84 | $40.00 | $25.00 | $25.00 |
| 40 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 923 | $72.00 | $72.00 | $124.00 | $124.00 |
| 41 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 20 | $110.00 | $110.00 | $200.00 | $200.00 |
| 42 | Reconstructing manholes (611.0420) | EACH | 15 | $600.00 | $600.00 | $2,500.00 | $2,500.00 |
| 43 | Manhole covers type J (611.0530) | EACH | 1 | $580.00 | $580.00 | $700.00 | $700.00 |
| 44 | Inlet covers type H-S (611.0639) | EACH | 30 | $895.00 | $895.00 | $1,000.00 | $1,000.00 |
| 45 | Catch basins 2X3-FT (611.1230) | EACH | 30 | $1,400.00 | $1,400.00 | $3,900.00 | $3,900.00 |
| 46 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,500.00 | $4,500.00 | $5,500.00 | $5,500.00 |
| 47 | Adjusting manhole covers (611.8110) | EACH | 23 | $700.00 | $700.00 | $1,000.00 | $1,000.00 |
| 48 | Adjusting inlet covers (611.8115) | EACH | 3 | $600.00 | $600.00 | $1,100.00 | $1,100.00 |
| 49 | Cover plates temporary (611.8120.S) | EACH | 50 | $250.00 | $250.00 | $250.00 | $250.00 |
| 50 | Mobilization (619.1000) | EACH | 1 | $361,985 | $99,000 | $235,000 | $615,000 |
| 51 | Water (624.0100) | MGAL | 150 | $0.01 | $1.00 | $45.00 | $45.00 |
| 52 | Topsoil (625.0100) | SY | 1,237 | $4.80 | $4.95 | $6.00 | $8.30 |
| 53 | Mulching (627.0200) | SY | 1,237 | $0.01 | $0.55 | $0.01 | $1.14 |
| 54 | Silt fence (628.1504) | LF | 200 | $2.10 | $2.25 | $2.00 | $2.41 |
| 55 | Silt fence maintenance (628.1520) | LF | 200 | $0.01 | $0.01 | $0.01 | $1.21 |
| 56 | Mobilizations erosion control (628.1905) | EACH | 8 | $100.00 | $200.00 | $100.00 | $246.26 |
| 57 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $80.00 | $200.00 | $80.00 | $313.20 |
| 58 | Inlet protection type B (628.7010) | EACH | 15 | $67.00 | $55.00 | $70.00 | $75.51 |
| 59 | Inlet protection type C (628.7015) | EACH | 2 | $70.00 | $55.00 | $75.00 | $75.51 |
| 60 | Inlet protection type D (628.7020) | EACH | 43 | $110.00 | $90.00 | $120.00 | $110.35 |
| 61 | Fertilizer type B (629.0210) | CWT | 0.80 | $100.00 | $85.00 | $100.00 | $185.03 |
| 62 | Seeding temporary (630.0200) | LB | 36 | $0.01 | $5.00 | $0.01 | $3.52 |
| 63 | Sod water (631.0300) | MGAL | 59 | $30.00 | $50.00 | $35.00 | $70.01 |
| 64 | Sod lawn (631.1000) | SY | 1,237 | $7.10 | $7.95 | $8.00 | $12.45 |
| 65 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 9 | $100.00 | $200.00 | $110.00 | $234.75 |
| 66 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 2 | $100.00 | $215.00 | $110.00 | $299.24 |
| 67 | Signs type II reflective F (637.2230) | SF | 99 | $23.00 | $25.00 | $25.00 | $38.71 |
| 68 | Signs type II reflective F folding (637.2235) | SF | 25 | $23.00 | $28.00 | $25.00 | $43.47 |
| 69 | Moving signs type II (638.2102) | EACH | 4 | $80.00 | $110.00 | $80.00 | $200.09 |
| 70 | Removing signs type II (638.2602) | EACH | 6 | $10.00 | $25.00 | $10.00 | $51.50 |
| 71 | Field office type B (642.5001) | EACH | 1 | $23,058 | $20,000 | $25,000 | $36,820 |
| 72 | Traffic control barricades type III (643.0420) | DAY | 420 | $0.75 | $0.75 | $0.80 | $0.75 |
| 73 | Traffic control warning lights type A (643.0705) | DAY | 1,140 | $0.10 | $0.10 | $0.15 | $0.10 |
| 74 | Traffic control signs (643.0900) | DAY | 17,197 | $0.25 | $0.25 | $0.30 | $0.25 |
| 75 | Traffic control signs PCMS (643.1050) | DAY | 90 | $30.00 | $30.00 | $35.00 | $30.00 |
| 76 | Traffic control cones 42-inch (643.1070) | DAY | 16,247 | $0.09 | $0.09 | $0.15 | $0.09 |
| 77 | Temporary marking line paint 4- inch (643.3105) | LF | 25,625 | $0.31 | $0.31 | $0.35 | $0.31 |
| 78 | Temporary marking line removable tape 4-inch (643.3150) | LF | 20,500 | $0.91 | $0.91 | $1.00 | $0.91 |
| 79 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 50 | $2.00 | $2.00 | $2.00 | $2.00 |
| 80 | Traffic control (643.5000) | EACH | 1 | $25,500 | $25,500 | $28,000 | $25,500 |
| 81 | Temporary pedestrian surface asphalt (644.1410) | SF | 27 | $35.18 | $55.00 | $25.00 | $112.23 |
| 82 | Temporary pedestrian surface plate (644.1430) | SF | 27 | $10.00 | $50.00 | $50.00 | $15.00 |
| 83 | Temporary pedestrian curb ramp (644.1601) | DAY | 124 | $10.00 | $10.00 | $15.00 | $10.00 |
| 84 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $16.00 | $16.00 | $20.00 | $16.00 |
| 85 | Temporary pedestrian barricade (644.1810) | LF | 54 | $6.00 | $6.00 | $7.00 | $6.00 |
| 86 | Temporary audible message devices (644.1900.S) | DAY | 444 | $10.00 | $5.00 | $10.00 | $8.00 |
| 87 | Marking line epoxy 4-inch (646.1020) | LF | 23,851 | $0.48 | $0.48 | $0.55 | $0.48 |
| 88 | Marking line epoxy 6-inch (646.2020) | LF | 12,181 | $0.62 | $0.62 | $0.70 | $0.62 |
| 89 | Marking line epoxy 8-inch (646.3020) | LF | 1,577 | $0.95 | $0.95 | $1.00 | $0.95 |
| 90 | Marking arrow epoxy (646.5020) | EACH | 52 | $200.00 | $200.00 | $220.00 | $200.00 |
| 91 | Marking word epoxy (646.5120) | EACH | 2 | $325.00 | $325.00 | $350.00 | $325.00 |
| 92 | Marking symbol epoxy (646.5220) | EACH | 37 | $175.00 | $175.00 | $200.00 | $175.00 |
| 93 | Marking stop line epoxy 18-inch (646.6120) | LF | 133 | $15.00 | $15.00 | $17.00 | $15.00 |
| 94 | Marking diagonal epoxy 12-inch (646.7120) | LF | 705 | $11.25 | $11.25 | $12.00 | $11.25 |
| 95 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 680 | $13.75 | $13.75 | $15.00 | $13.75 |
| 96 | Marking island nose epoxy (646.8220) | EACH | 4 | $315.00 | $315.00 | $350.00 | $315.00 |
| 97 | Marking removal line 4-inch (646.9000) | LF | 240 | $2.00 | $2.00 | $2.00 | $2.00 |
| 98 | Construction staking storm sewer (650.4000) | EACH | 31 | $97.00 | $97.00 | $100.00 | $100.00 |
| 99 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,516 | $1.20 | $1.20 | $2.00 | $2.00 |
| 100 | Construction staking concrete pavement (650.7000) | LF | 500 | $5.90 | $5.90 | $2.00 | $2.00 |
| 101 | Construction staking resurfacing reference (650.8000) | LF | 423 | $2.40 | $2.40 | $2.00 | $2.00 |
| 102 | Construction staking electrical installations (project) 01. 2703-08- 71 (650.8501) | EACH | 1 | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 |
| 103 | Construction staking curb ramps (650.9000) | EACH | 30 | $164.00 | $164.00 | $125.00 | $125.00 |
| 104 | Construction staking sidewalk (project) 01. 2703-08-71 (650.9500) | EACH | 1 | $1,700.00 | $1,700.00 | $1,500.00 | $1,500.00 |
| 105 | Construction staking supplemental control (project) 01. 2703-08-71 (650.9911) | EACH | 1 | $2,900.00 | $2,900.00 | $2,500.00 | $2,500.00 |
| 106 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 171 | $11.52 | $11.52 | $12.00 | $11.52 |
| 107 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 442 | $13.78 | $13.78 | $15.00 | $13.78 |
| 108 | Conduit special 2-inch (652.0605) | LF | 1,763 | $15.29 | $15.29 | $16.00 | $15.29 |
| 109 | Conduit special 3-inch (652.0615) | LF | 222 | $38.18 | $38.18 | $40.00 | $38.18 |
| 110 | Pull boxes steel 24X36-inch (653.0135) | EACH | 2 | $1,285.00 | $1,285.00 | $1,300.00 | $1,285.00 |
| 111 | Pull boxes steel 24X42-inch (653.0140) | EACH | 5 | $1,340.00 | $1,340.00 | $1,500.00 | $1,340.00 |
| 112 | Removing pull boxes (653.0905) | EACH | 9 | $178.00 | $178.00 | $200.00 | $178.00 |
| 113 | Concrete bases type 1 (654.0101) | EACH | 5 | $1,162.00 | $1,162.00 | $1,200.00 | $1,162.00 |
| 114 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,394.00 | $1,394.00 | $1,500.00 | $1,394.00 |
| 115 | Concrete bases type 10-special (654.0120) | EACH | 2 | $8,558.00 | $8,558.00 | $9,000.00 | $8,558.00 |
| 116 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $3,921.00 | $3,921.00 | $4,200.00 | $3,921.00 |
| 117 | Cable traffic signal 3-14 AWG (655.0210) | LF | 395 | $1.40 | $1.40 | $1.50 | $1.40 |
| 118 | Cable traffic signal 5-14 AWG (655.0230) | LF | 492 | $1.90 | $1.90 | $2.00 | $1.90 |
| 119 | Cable traffic signal 7-14 AWG (655.0240) | LF | 174 | $2.27 | $2.27 | $2.50 | $2.27 |
| 120 | Cable traffic signal 12-14 AWG (655.0260) | LF | 685 | $3.53 | $3.53 | $4.00 | $3.53 |
| 121 | Cable traffic signal 15-14 AWG (655.0270) | LF | 725 | $3.89 | $3.89 | $4.20 | $3.89 |
| 122 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,024 | $1.35 | $1.35 | $1.50 | $1.35 |
| 123 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,866 | $1.04 | $1.04 | $1.20 | $1.04 |
| 124 | Pedestal bases (657.0100) | EACH | 5 | $281.00 | $281.00 | $300.00 | $281.00 |
| 125 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 2 | $690.00 | $690.00 | $800.00 | $690.00 |
| 126 | Poles type 2 (657.0305) | EACH | 2 | $2,688.00 | $2,688.00 | $2,900.00 | $2,688.00 |
| 127 | Poles type 10-special (657.0352) | EACH | 2 | $13,303 | $13,303 | $14,000 | $13,303 |
| 128 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $251.00 | $251.00 | $300.00 | $251.00 |
| 129 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 1 | $557.00 | $557.00 | $600.00 | $557.00 |
| 130 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $625.00 | $625.00 | $650.00 | $625.00 |
| 131 | Monotube arms 35-FT-special (657.0536) | EACH | 1 | $5,621.00 | $5,621.00 | $6,000.00 | $5,621.00 |
| 132 | Monotube arms 40-FT-special (657.0541) | EACH | 1 | $6,035.00 | $6,035.00 | $6,300.00 | $6,035.00 |
| 133 | Trombone arms 15-FT (657.0585) | EACH | 2 | $1,633.00 | $1,633.00 | $1,800.00 | $1,633.00 |
| 134 | Luminaire arms steel type 10 special pole clamp 15-FT (657.0830) | EACH | 2 | $1,084.00 | $1,084.00 | $1,100.00 | $1,084.00 |
| 135 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $863.40 | $863.40 | $1,000.00 | $863.40 |
| 136 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $1,165.20 | $1,165.20 | $1,200.00 | $1,165.20 |
| 137 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $467.00 | $467.00 | $500.00 | $467.00 |
| 138 | Signal mounting hardware (location) 01. memorial at dekoven (658.5070) | EACH | 1 | $4,734.00 | $4,734.00 | $5,000.00 | $4,734.00 |
| 139 | Luminaires utility LED C (659.1125) | EACH | 2 | $294.00 | $294.00 | $350.00 | $294.00 |
| 140 | Fiber optic splice enclosure (678.0200) | EACH | 4 | $1,004.00 | $1,004.00 | $1,100.00 | $1,004.00 |
| 141 | Fiber optic splice (678.0300) | EACH | 2 | $300.00 | $300.00 | $350.00 | $300.00 |
| 142 | Sawing asphalt (690.0150) | LF | 526 | $1.75 | $1.39 | $2.00 | $2.00 |
| 143 | Sawing concrete (690.0250) | LF | 19,970 | $2.35 | $2.25 | $3.00 | $3.00 |
| 144 | Incentive iri ride (740.0440) | DOL | 2,427 | $1.00 | $1.00 | $1.00 | $1.00 |
| 145 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 146 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,800 | $5.00 | $5.00 | $5.00 | $5.00 |
| 147 | Special 01. adjust sanitary manhole (SPV.0060) | EACH | 7 | $1,300.00 | $1,300.00 | $1,100.00 | $1,100.00 |
| 148 | Special 02. sanitary manhole seal (SPV.0060) | EACH | 7 | $650.00 | $650.00 | $700.00 | $700.00 |
| 149 | Special 03. traffic signal cabinet and controller (SPV.0060) | EACH | 1 | $27,624 | $27,624 | $30,000 | $27,624 |
| 150 | Special 04. accessible pedestrian push button system (SPV.0060) | EACH | 1 | $9,101.00 | $9,101.00 | $10,000 | $9,101.00 |
| 151 | Special 05. video vehicle detection system (SPV.0060) | EACH | 1 | $38,864 | $38,864 | $40,000 | $38,864 |
| 152 | Special 06. emergency vehicle preemption system (SPV.0060) | EACH | 1 | $8,839.00 | $8,839.00 | $10,000 | $8,839.00 |
| 153 | Special 07. remove and salvage traffic signal (SPV.0060) | EACH | 1 | $5,610.00 | $5,610.00 | $6,000.00 | $5,610.00 |
| 154 | Special 01. street sweeping (SPV.0075) | HRS | 50 | $145.50 | $300.00 | $250.00 | $232.69 |
| 155 | Special 01. furnish and install 12 SM fiber optic communications (SPV.0090) | LF | 2,188 | $3.28 | $3.28 | $3.50 | $3.28 |
| 156 | Special 01. management of solid waste (SPV.0195) | TON | 1,449 | $84.67 | $60.00 | $27.00 | $27.00 |
| 157 | Special 02. management of hazardous solid waste (SPV.0195) | TON | 13 | $141.33 | $200.00 | $55.00 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.