WisDOT contract 20260310018 bid tabulation

C Racine, S Memorial Dr; Durand Ave to 17th St (LOC STR, Racine County C Racine, S Memorial Dr). Let by Wisconsin DOT on March 10, 2026, Racine. 4 bids received; low bid $2,806,994 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
157
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$2,806,994Low
2Zignego Company, Inc.$2,812,2160.0%
3A.W. Oakes & Son, Inc.$3,069,719+9.0%
4Payne and Dolan, Inc$3,467,134+24%
WisDOT contract 20260310018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Zignego Company, Inc.3. A.W. Oakes & Son, Inc.4. Payne and Dolan, Inc
1Removing concrete pavement (204.0100)SY990$0.01$10.00$8.00$8.00
2Removing concrete pavement butt joints (204.0105)SY1,860$3.00$3.00$3.00$3.00
3Removing asphaltic surface butt joints (204.0115)SY239$2.00$2.00$2.00$2.00
4Removing asphaltic surface milling (204.0120)SY1,975$2.00$2.00$2.00$2.00
5Removing curb & gutter (204.0150)LF3,553$10.63$4.00$10.00$10.00
6Removing concrete sidewalk (204.0155)SY490$11.20$10.00$15.00$15.00
7Removing concrete bases (204.0195)EACH10$435.00$500.00$500.00$1,000.00
8Removing inlets (204.0220)EACH29$250.00$250.00$500.00$500.00
9Removing storm sewer (size) 01. 8- inch (204.0245)LF32$30.00$30.00$16.00$16.00
10Removing storm sewer (size) 02. 10-inch (204.0245)LF832$25.00$25.00$16.00$16.00
11Removing storm sewer (size) 03. 12-inch (204.0245)LF32$30.00$30.00$16.00$16.00
12Removing storm sewer (size) 04. 18-inch (204.0245)LF20$30.00$30.00$16.00$16.00
13Removing (item description) 02. loop detector wire and lead-in cable (204.9060.S)EACH1$4,488.00$4,488.00$4,800.00$4,488.00
14Excavation common (205.0100)CY4,200$0.01$30.00$0.01$0.01
15Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON853$68.20$60.00$30.00$30.00
16Backfill granular grade 1 (209.1500)TON7,140$0.01$15.34$11.20$11.20
17Prepare foundation for asphaltic paving (project) 01. 2703-08-71 (211.0101)EACH1$2,000.00$2,000.00$2,000.00$2,000.00
18Finishing roadway (project) 01. 2703-08-71 (213.0100)EACH1$3,280.00$1,000.00$2,500.00$2,500.00
19Base aggregate dense 3/4-inch (305.0110)TON130$136.98$50.00$30.00$30.00
20Removing pavement for base patching (390.0100)CY1,404$52.93$40.00$105.00$107.00
21Base patching concrete hes (390.0305)CY1,200$251.45$331.00$409.00$419.00
22Base patching concrete shes (390.0405)CY214$416.20$551.00$433.00$443.00
23Drilled tie bars (416.0610)EACH2,482$14.78$15.00$10.00$10.00
24Drilled dowel bars (416.0620)EACH5,960$21.06$18.00$23.00$23.00
25Concrete pavement replacement (416.1720)SY990$106.70$111.00$107.00$107.00
26Tack coat (455.0605)GAL3,894$2.75$2.75$2.75$2.75
27Incentive density HMA pavement (460.2000)DOL2,735$1.00$1.00$1.00$1.00
28HMA pavement 4 MT 58-28 S (460.6224)TON2,738$75.00$75.00$75.00$75.00
29HMA pavement 5 MT 58-28 H (460.6425)TON1,955$83.00$83.00$83.00$83.00
30Asphaltic surface driveways and field entrances (465.0120)TON31$102.00$102.00$102.00$102.00
31Asphaltic surface temporary (465.0125)TON68$129.00$129.00$129.00$129.00
32Concrete collars for pipe (520.8000)EACH4$1,000.00$900.00$1,000.00$1,000.00
33Concrete curb & gutter 30-inch type A (601.0409)LF3,516$46.96$50.00$35.00$35.00
34Concrete curb pedestrian (601.0600)LF330$65.32$50.00$55.00$55.00
35Concrete sidewalk 5-inch (602.0410)SF4,680$12.29$9.00$8.80$8.80
36Curb ramp detectable warning field yellow (602.0505)SF180$44.40$60.00$55.00$55.00
37Curb ramp detectable warning field radial yellow (602.0605)SF110$61.69$100.00$75.00$75.00
38Concrete driveway hes 8-inch (602.0870)SY52$101.90$100.00$82.00$82.00
39Concrete safety islands (602.2400)SF350$24.84$40.00$25.00$25.00
40Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF923$72.00$72.00$124.00$124.00
41Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF20$110.00$110.00$200.00$200.00
42Reconstructing manholes (611.0420)EACH15$600.00$600.00$2,500.00$2,500.00
43Manhole covers type J (611.0530)EACH1$580.00$580.00$700.00$700.00
44Inlet covers type H-S (611.0639)EACH30$895.00$895.00$1,000.00$1,000.00
45Catch basins 2X3-FT (611.1230)EACH30$1,400.00$1,400.00$3,900.00$3,900.00
46Manholes 4-FT diameter (611.2004)EACH1$4,500.00$4,500.00$5,500.00$5,500.00
47Adjusting manhole covers (611.8110)EACH23$700.00$700.00$1,000.00$1,000.00
48Adjusting inlet covers (611.8115)EACH3$600.00$600.00$1,100.00$1,100.00
49Cover plates temporary (611.8120.S)EACH50$250.00$250.00$250.00$250.00
50Mobilization (619.1000)EACH1$361,985$99,000$235,000$615,000
51Water (624.0100)MGAL150$0.01$1.00$45.00$45.00
52Topsoil (625.0100)SY1,237$4.80$4.95$6.00$8.30
53Mulching (627.0200)SY1,237$0.01$0.55$0.01$1.14
54Silt fence (628.1504)LF200$2.10$2.25$2.00$2.41
55Silt fence maintenance (628.1520)LF200$0.01$0.01$0.01$1.21
56Mobilizations erosion control (628.1905)EACH8$100.00$200.00$100.00$246.26
57Mobilizations emergency erosion control (628.1910)EACH4$80.00$200.00$80.00$313.20
58Inlet protection type B (628.7010)EACH15$67.00$55.00$70.00$75.51
59Inlet protection type C (628.7015)EACH2$70.00$55.00$75.00$75.51
60Inlet protection type D (628.7020)EACH43$110.00$90.00$120.00$110.35
61Fertilizer type B (629.0210)CWT0.80$100.00$85.00$100.00$185.03
62Seeding temporary (630.0200)LB36$0.01$5.00$0.01$3.52
63Sod water (631.0300)MGAL59$30.00$50.00$35.00$70.01
64Sod lawn (631.1000)SY1,237$7.10$7.95$8.00$12.45
65Posts tubular steel 2X2-inch X 11- FT (634.0811)EACH9$100.00$200.00$110.00$234.75
66Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH2$100.00$215.00$110.00$299.24
67Signs type II reflective F (637.2230)SF99$23.00$25.00$25.00$38.71
68Signs type II reflective F folding (637.2235)SF25$23.00$28.00$25.00$43.47
69Moving signs type II (638.2102)EACH4$80.00$110.00$80.00$200.09
70Removing signs type II (638.2602)EACH6$10.00$25.00$10.00$51.50
71Field office type B (642.5001)EACH1$23,058$20,000$25,000$36,820
72Traffic control barricades type III (643.0420)DAY420$0.75$0.75$0.80$0.75
73Traffic control warning lights type A (643.0705)DAY1,140$0.10$0.10$0.15$0.10
74Traffic control signs (643.0900)DAY17,197$0.25$0.25$0.30$0.25
75Traffic control signs PCMS (643.1050)DAY90$30.00$30.00$35.00$30.00
76Traffic control cones 42-inch (643.1070)DAY16,247$0.09$0.09$0.15$0.09
77Temporary marking line paint 4- inch (643.3105)LF25,625$0.31$0.31$0.35$0.31
78Temporary marking line removable tape 4-inch (643.3150)LF20,500$0.91$0.91$1.00$0.91
79Temporary marking crosswalk paint 6-inch (643.3305)LF50$2.00$2.00$2.00$2.00
80Traffic control (643.5000)EACH1$25,500$25,500$28,000$25,500
81Temporary pedestrian surface asphalt (644.1410)SF27$35.18$55.00$25.00$112.23
82Temporary pedestrian surface plate (644.1430)SF27$10.00$50.00$50.00$15.00
83Temporary pedestrian curb ramp (644.1601)DAY124$10.00$10.00$15.00$10.00
84Temporary pedestrian detectable warning field (644.1605)SF20$16.00$16.00$20.00$16.00
85Temporary pedestrian barricade (644.1810)LF54$6.00$6.00$7.00$6.00
86Temporary audible message devices (644.1900.S)DAY444$10.00$5.00$10.00$8.00
87Marking line epoxy 4-inch (646.1020)LF23,851$0.48$0.48$0.55$0.48
88Marking line epoxy 6-inch (646.2020)LF12,181$0.62$0.62$0.70$0.62
89Marking line epoxy 8-inch (646.3020)LF1,577$0.95$0.95$1.00$0.95
90Marking arrow epoxy (646.5020)EACH52$200.00$200.00$220.00$200.00
91Marking word epoxy (646.5120)EACH2$325.00$325.00$350.00$325.00
92Marking symbol epoxy (646.5220)EACH37$175.00$175.00$200.00$175.00
93Marking stop line epoxy 18-inch (646.6120)LF133$15.00$15.00$17.00$15.00
94Marking diagonal epoxy 12-inch (646.7120)LF705$11.25$11.25$12.00$11.25
95Marking crosswalk epoxy transverse line 6-inch (646.7420)LF680$13.75$13.75$15.00$13.75
96Marking island nose epoxy (646.8220)EACH4$315.00$315.00$350.00$315.00
97Marking removal line 4-inch (646.9000)LF240$2.00$2.00$2.00$2.00
98Construction staking storm sewer (650.4000)EACH31$97.00$97.00$100.00$100.00
99Construction staking curb gutter and curb & gutter (650.5500)LF3,516$1.20$1.20$2.00$2.00
100Construction staking concrete pavement (650.7000)LF500$5.90$5.90$2.00$2.00
101Construction staking resurfacing reference (650.8000)LF423$2.40$2.40$2.00$2.00
102Construction staking electrical installations (project) 01. 2703-08- 71 (650.8501)EACH1$2,000.00$2,000.00$1,000.00$1,000.00
103Construction staking curb ramps (650.9000)EACH30$164.00$164.00$125.00$125.00
104Construction staking sidewalk (project) 01. 2703-08-71 (650.9500)EACH1$1,700.00$1,700.00$1,500.00$1,500.00
105Construction staking supplemental control (project) 01. 2703-08-71 (650.9911)EACH1$2,900.00$2,900.00$2,500.00$2,500.00
106Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF171$11.52$11.52$12.00$11.52
107Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF442$13.78$13.78$15.00$13.78
108Conduit special 2-inch (652.0605)LF1,763$15.29$15.29$16.00$15.29
109Conduit special 3-inch (652.0615)LF222$38.18$38.18$40.00$38.18
110Pull boxes steel 24X36-inch (653.0135)EACH2$1,285.00$1,285.00$1,300.00$1,285.00
111Pull boxes steel 24X42-inch (653.0140)EACH5$1,340.00$1,340.00$1,500.00$1,340.00
112Removing pull boxes (653.0905)EACH9$178.00$178.00$200.00$178.00
113Concrete bases type 1 (654.0101)EACH5$1,162.00$1,162.00$1,200.00$1,162.00
114Concrete bases type 2 (654.0102)EACH2$1,394.00$1,394.00$1,500.00$1,394.00
115Concrete bases type 10-special (654.0120)EACH2$8,558.00$8,558.00$9,000.00$8,558.00
116Concrete control cabinet bases type 9 special (654.0217)EACH1$3,921.00$3,921.00$4,200.00$3,921.00
117Cable traffic signal 3-14 AWG (655.0210)LF395$1.40$1.40$1.50$1.40
118Cable traffic signal 5-14 AWG (655.0230)LF492$1.90$1.90$2.00$1.90
119Cable traffic signal 7-14 AWG (655.0240)LF174$2.27$2.27$2.50$2.27
120Cable traffic signal 12-14 AWG (655.0260)LF685$3.53$3.53$4.00$3.53
121Cable traffic signal 15-14 AWG (655.0270)LF725$3.89$3.89$4.20$3.89
122Electrical wire traffic signals 10 AWG (655.0515)LF1,024$1.35$1.35$1.50$1.35
123Electrical wire lighting 12 AWG (655.0610)LF2,866$1.04$1.04$1.20$1.04
124Pedestal bases (657.0100)EACH5$281.00$281.00$300.00$281.00
125Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH2$690.00$690.00$800.00$690.00
126Poles type 2 (657.0305)EACH2$2,688.00$2,688.00$2,900.00$2,688.00
127Poles type 10-special (657.0352)EACH2$13,303$13,303$14,000$13,303
128Traffic signal standards aluminum 3.5-FT (657.0405)EACH2$251.00$251.00$300.00$251.00
129Traffic signal standards aluminum 13-FT (657.0420)EACH1$557.00$557.00$600.00$557.00
130Traffic signal standards aluminum 15-FT (657.0425)EACH2$625.00$625.00$650.00$625.00
131Monotube arms 35-FT-special (657.0536)EACH1$5,621.00$5,621.00$6,000.00$5,621.00
132Monotube arms 40-FT-special (657.0541)EACH1$6,035.00$6,035.00$6,300.00$6,035.00
133Trombone arms 15-FT (657.0585)EACH2$1,633.00$1,633.00$1,800.00$1,633.00
134Luminaire arms steel type 10 special pole clamp 15-FT (657.0830)EACH2$1,084.00$1,084.00$1,100.00$1,084.00
135Traffic signal face 3S 12-inch (658.0173)EACH12$863.40$863.40$1,000.00$863.40
136Traffic signal face 4S 12-inch (658.0174)EACH4$1,165.20$1,165.20$1,200.00$1,165.20
137Pedestrian signal face 16-inch (658.0416)EACH8$467.00$467.00$500.00$467.00
138Signal mounting hardware (location) 01. memorial at dekoven (658.5070)EACH1$4,734.00$4,734.00$5,000.00$4,734.00
139Luminaires utility LED C (659.1125)EACH2$294.00$294.00$350.00$294.00
140Fiber optic splice enclosure (678.0200)EACH4$1,004.00$1,004.00$1,100.00$1,004.00
141Fiber optic splice (678.0300)EACH2$300.00$300.00$350.00$300.00
142Sawing asphalt (690.0150)LF526$1.75$1.39$2.00$2.00
143Sawing concrete (690.0250)LF19,970$2.35$2.25$3.00$3.00
144Incentive iri ride (740.0440)DOL2,427$1.00$1.00$1.00$1.00
145On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS800$5.00$5.00$5.00$5.00
146On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,800$5.00$5.00$5.00$5.00
147Special 01. adjust sanitary manhole (SPV.0060)EACH7$1,300.00$1,300.00$1,100.00$1,100.00
148Special 02. sanitary manhole seal (SPV.0060)EACH7$650.00$650.00$700.00$700.00
149Special 03. traffic signal cabinet and controller (SPV.0060)EACH1$27,624$27,624$30,000$27,624
150Special 04. accessible pedestrian push button system (SPV.0060)EACH1$9,101.00$9,101.00$10,000$9,101.00
151Special 05. video vehicle detection system (SPV.0060)EACH1$38,864$38,864$40,000$38,864
152Special 06. emergency vehicle preemption system (SPV.0060)EACH1$8,839.00$8,839.00$10,000$8,839.00
153Special 07. remove and salvage traffic signal (SPV.0060)EACH1$5,610.00$5,610.00$6,000.00$5,610.00
154Special 01. street sweeping (SPV.0075)HRS50$145.50$300.00$250.00$232.69
155Special 01. furnish and install 12 SM fiber optic communications (SPV.0090)LF2,188$3.28$3.28$3.50$3.28
156Special 01. management of solid waste (SPV.0195)TON1,449$84.67$60.00$27.00$27.00
157Special 02. management of hazardous solid waste (SPV.0195)TON13$141.33$200.00$55.00$55.00
WisDOT contract 20260310018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy